Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power system event”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Large Load Management and Grid Planning

This presentation will cover these topics, followed by a discussion and Q&A: Grid impacts of load growth of the current bulk power system, a review of recent trends and events related to large load integration, what might these new large loads look like, what are options for reducing costs and timelines of integration, and working toward a framework for identifying hot spots for efficiently interconnecting large loads.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Unmanned Aircraft Systems (UAS) and Light Detection and Ranging (LiDAR)/Camera Technologies to Detect Avian Events and Other Environmental Measures at Utility- Scale Power Plants (Final Report)

The goal of this project was to develop and validate two complementary, cost-effective remote sensing technologies to monitor avian fatalities at utility-scale solar facilities: fixed platform (Animal Activity Monitoring-AAM) and aerial-based (Uncrewed Aircraft Systems-UAS). This project used these features with machine learning to automate the detection of avian carcasses and nests at solar facilities.

14 SOLAR ENERGY↗

Systems and methods for monitoring a power-generation module assembly after a power-generation module shutdown event

Embodiments are directed to providing a user interface (UI) that streamlines and simplifies the process of monitoring critical power-generation module (PGM) parameters after a PGM assembly is shutdown. The UI displays, in real-time, indicators corresponding to one or more post-shutdown PGM parameters. The UI provides indications of whether the post-shutdown PGM parameters meet post-shutdown criteria of the PGM assembly. When a post-shutdown PGM parameter does not meet the post-shutdown criteria, a user alert is provided to the user. A protocol may additionally be provided to the user. In some embodiments, the protocol may enable the user to return the PGM assembly to a condition that satisfies the post-shutdown criteria. The protocol may be a safety protocol and/or an asset protection protocol.

Buenaventura, Don↗

Systems and methods for monitoring a power-generation module assembly after a power-generation module shutdown event

Embodiments are directed to providing a user interface (UI) that streamlines and simplifies the process of monitoring critical power-generation module (PGM) parameters after a PGM assembly is shutdown. The UI displays, in real-time, indicators corresponding to one or more post-shutdown PGM parameters. The UI provides indications of whether the post-shutdown PGM parameters meet post-shutdown criteria of the PGM assembly. When a post-shutdown PGM parameter does not meet the post-shutdown criteria, a user alert is provided to the user. A protocol may additionally be provided to the user. In some embodiments, the protocol may enable the user to return the PGM assembly to a condition that satisfies the post-shutdown criteria. The protocol may be a safety protocol and/or an asset protection protocol.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Launch Complex 34, SWMU Cc054 2021 DNAPL Source Zone Operations, Maintenance, and Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ) and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 12 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. Site-wide biennial LTM sampling was not conducted during this reporting period and is scheduled to be conducted in December 2022. The timeframe for activities documented in this PMR extends from April 1, 2021 to March 31, 2022. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the DSZ and deep dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to re-characterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS to more adequately capture residual contaminant mass. The operational period for Year 12 of the HCS was from April 1, 2021 to March 31, 2022. Operational runtime for the system was 94 percent during Year 12, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2022, a total of 285,712,801 gallons of groundwater containing 84,933 pounds of VOCs have been removed by the HCS. Influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 12,000 µg/L (March 2022). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2021 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events in 2017, 2018, 2019, and 2020. Full vertical profile sampling was completed at each DPT from 8 to 98 ft bls, at 5 foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations at depths ranging from 8 to 98 ft bls. An overall increasing trend of TCE concentrations was observed in DPT samples during this reporting period, which may be due to several recovery wells that were turned off during the AS Pilot Study in the DSZ that operated from July 2021 to February 2022 (documented separately from this report). The maximum TCE concentration in 2021 was 15,400,000 µg/L in the 58 ft bls depth interval at DPT597 (previous maximum result in 2020 was 1,690,000 at 48 ft bls at DPT596). During the 2021 DPT event, the overall majority of TCE contamination was identified in the 58 ft bls interval (below Layer 4), where in the previous year the majority of mass was observed in Layer 4. This trend appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, monitoring well samples were collected from deep wells in the DSZ area (Layers 7 and 8) to verify vertical delineation. All monitoring well results were non-detect or below cleanup levels, with exception of one well (IW0162, screened 105 to 115 ft bls, which is below the existing recovery well capture zone) where TCE was identified above cleanup target levels. The HS 6 AS system remained operational during the reporting period covered under this report. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual prior to this operational period. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2021 show concentrations of contaminants of concern (cis-1,2-dichloroethene, trans-1,2- dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. Overall, the tasks associated with Year 12 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with the recommendations of the 2020 LC34 (Year 11) Operations, Maintenance, and Monitoring Report for DNAPL Source Zone, Site Wide LongTerm Monitoring, and Hot Spot 6 Air Sparging System PMR (NASA, 2021c). Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

trichloroethene↗

SiC Multi-Chip Power Modules as Power-System Building Blocks

The term "SiC MCPMs" (wherein "MCPM" signifies "multi-chip power module") denotes electronic power-supply modules containing multiple silicon carbide power devices and silicon-on-insulator (SOI) control integrated-circuit chips. SiC MCPMs are being developed as building blocks of advanced expandable, reconfigurable, fault-tolerant power-supply systems. Exploiting the ability of SiC semiconductor devices to operate at temperatures, breakdown voltages, and current densities significantly greater than those of conventional Si devices, the designs of SiC MCPMs and of systems comprising multiple SiC MCPMs are expected to afford a greater degree of miniaturization through stacking of modules with reduced requirements for heat sinking. Moreover, the higher-temperature capabilities of SiC MCPMs could enable operation in environments hotter than Si-based power systems can withstand. The stacked SiC MCPMs in a given system can be electrically connected in series, parallel, or a series/parallel combination to increase the overall power-handling capability of the system. In addition to power connections, the modules have communication connections. The SOI controllers in the modules communicate with each other as nodes of a decentralized control network, in which no single controller exerts overall command of the system. Control functions effected via the network include synchronization of switching of power devices and rapid reconfiguration of power connections to enable the power system to continue to supply power to a load in the event of failure of one of the modules. In addition to serving as building blocks of reliable power-supply systems, SiC MCPMs could be augmented with external control circuitry to make them perform additional power-handling functions as needed for specific applications: typical functions could include regulating voltages, storing energy, and driving motors. Because identical SiC MCPM building blocks could be utilized in a variety of ways, the cost and difficulty of designing new, highly reliable power systems would be reduced considerably. Several prototype DC-to-DC power-converter modules containing SiC power-switching devices were designed and built to demonstrate the feasibility of the SiC MCPM concept. In anticipation of a future need for operation at high temperature, the circuitry in the modules includes high-temperature inductors and capacitors. These modules were designed to be stacked to construct a system of four modules electrically connected in series and/or parallel. The packaging of the modules is designed to satisfy requirements for series and parallel interconnection among modules, high power density, high thermal efficiency, small size, and light weight. Each module includes four output power connectors two for serial and two for parallel output power connections among the modules. Each module also includes two signal connectors, electrically isolated from the power connectors, that afford four zones for signal interconnections among the SOI controllers. Finally, each module includes two input power connectors, through which it receives power from an in-line power bus. This design feature is included in anticipation of a custom-designed power bus incorporating sockets compatible with snap-on type connectors to enable rapid replacement of failed modules.

Lostetter, Alexander↗

Resilient Operations of Networked Microgrids (RONM)

Objective: Improve the resiliency of power systems with optimization-based methods that leverage advanced microgrid technologies to reduce system recovery times after extreme event induced outages. Outcome: First-of-kind, high-fidelity physics-based optimization method for modeling networked microgrids which includes key engineering constraints associated with system recovery after extreme events.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Launch Complex 34, SWMU CCO542022 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.

Complex 34↗

Resilient cooling strategies – A critical review and qualitative assessment

The global effects of climate change will increase the frequency and intensity of extreme events such as heatwaves and power outages, which have consequences for buildings and their cooling systems. Buildings and their cooling systems should be designed and operated to be resilient under such events to protect occupants from potentially dangerous indoor thermal conditions. This study performed a critical review on the state-of-the-art of cooling strategies, with special attention to their performance under heatwaves and power outages. We proposed a definition of resilient cooling and described four criteria for resilience—absorptive capacity, adaptive capacity, restorative capacity, and recovery speed —and used them to qualitatively evaluate the resilience of each strategy. The literature review and qualitative analyses show that to attain resilient cooling, the four resilience criteria should be considered in the design phase of a building or during the planning of retrofits. The building and relevant cooling system characteristics should be considered simultaneously to withstand extreme events. A combination of strategies with different resilience capacities, such as a passive envelope strategy coupled with a low-energy space-cooling solution, may be needed to obtain resilient cooling. Finally, a further direction for a quantitative assessment approach has been pointed out.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗

Automated System-wide Event Detection and Classification Using Machine Learning on Synchrophasor Data

As the number of phasor measurement units (PMUs) deployed in a power system increases, and their data volume streamed to the control canter intensifies, operators are facing challenges related to the analysis of such data, which need to be observed and responded to as the measurements are displayed in the Control Room. Humans are generally unable to process such large amount of data efficiently and rapidly. There is an apparent need for automated ways to analyze the data, extract actionable information about occurrence of specific events, and characterize the events quickly and cost effectively. This paper discusses the use of machine learning (ML) to facilitate such tasks by providing automated, highly computationally efficient, and cost-effective ways of extracting actionable information from synchrophasor big data in real-time. We developed Big Data Smart (BDSmart) ML-based prototype tool for the Control Room use that automatically analyses data properties from synchrophasor system measurements taken across the three grid Interconnections in the USA (Western, Eastern and ERCOT). The data collected from several hundreds of PMUs located across the Interconnections over a period of two years have been made available for our extensive study. As a result, we were able to identify a number of big data properties that influence how ML methodology is applied to select, develop, train and test the data models that can eventually be used for the tool implementation. The resulting set of candidate algorithms spans unsupervised, supervised, semi-supervised and transfer-learning approaches. Many ML techniques, such as decision trees, multinomial logistic regression, feed-forward neural networks, K-nearest neighbor, multiclass support vector machine, and single and multi-channel convolutional neural networks, are implemented, and their performance is examined. We offer the results from testing the data models. The novelty of our study is in the approaches for bad data detection and mitigation, selection of a simplified feature for event detection, and data label improvements. As a result, we came up with a list of recommendations for the utilities on how to improve the PMU recording practices to cater to the future ML applications aimed at automating the analysis of synchrophasor data.

Synchrophasors, Machine Learning, System-wide Even↗

A Scalable Transmission and Distribution Co-simulation Platform for IBR-heavy Power Systems

The integration of Inverter-Based Resources (IBRs) into power systems, including both transmission and distribution networks, poses challenges for studying grid dynamic behaviours under various operating conditions and system events. This paper addresses the urgent need to investigate the influence of IBRs on grid dynamics, and their potential to enhance power system reliability and resilience. We propose a flexible, scalable transmission and distribution co-simulation platform, using opensource tools only for assessing the impact of grid-following (GFL) and grid-forming (GFM) IBRs on dynamic stability at various renewable penetration levels (up to 100%). This platform enables researchers to explore different contingencies at transmission, distribution, or both, providing a comprehensive evaluation of grid status. A series of case studies, including both small and large T&D systems with varying GFL/GFM configurations and contingencies, have been conducted. The results not only robustly validate our co-simulation framework, but also provide invaluable insights for effective IBR management in the power grid.

grid management↗

Update on Development of SiC Multi-Chip Power Modules

Progress has been made in a continuing effort to develop multi-chip power modules (SiC MCPMs). This effort at an earlier stage was reported in 'SiC Multi-Chip Power Modules as Power-System Building Blocks' (LEW-18008-1), NASA Tech Briefs, Vol. 31, No. 2 (February 2007), page 28. The following recapitulation of information from the cited prior article is prerequisite to a meaningful summary of the progress made since then: 1) SiC MCPMs are, more specifically, electronic power-supply modules containing multiple silicon carbide power integrated-circuit chips and silicon-on-insulator (SOI) control integrated-circuit chips. SiC MCPMs are being developed as building blocks of advanced expandable, reconfigurable, fault-tolerant power-supply systems. Exploiting the ability of SiC semiconductor devices to operate at temperatures, breakdown voltages, and current densities significantly greater than those of conventional Si devices, the designs of SiC MCPMs and of systems comprising multiple SiC MCPMs are expected to afford a greater degree of miniaturization through stacking of modules with reduced requirements for heat sinking; 2) The stacked SiC MCPMs in a given system can be electrically connected in series, parallel, or a series/parallel combination to increase the overall power-handling capability of the system. In addition to power connections, the modules have communication connections. The SOI controllers in the modules communicate with each other as nodes of a decentralized control network, in which no single controller exerts overall command of the system. Control functions effected via the network include synchronization of switching of power devices and rapid reconfiguration of power connections to enable the power system to continue to supply power to a load in the event of failure of one of the modules; and, 3) In addition to serving as building blocks of reliable power-supply systems, SiC MCPMs could be augmented with external control circuitry to make them perform additional power-handling functions as needed for specific applications. Because identical SiC MCPM building blocks could be utilized in such a variety of ways, the cost and difficulty of designing new, highly reliable power systems would be reduced considerably. This concludes the information from the cited prior article. The main activity since the previously reported stage of development was the design, fabrication, and testing a 120- VDC-to-28-VDC modular power-converter system composed of eight SiC MCPMs in a 4 (parallel)-by-2 (series) matrix configuration, with normally-off controllable power switches. The SiC MCPM power modules include closed-loop control subsystems and are capable of operating at high power density or high temperature. The system was tested under various configurations, load conditions, load-transient conditions, and failure-recovery conditions. Planned future work includes refinement of the demonstrated modular system concept and development of a new converter hardware topology that would enable sharing of currents without the need for communication among modules. Toward these ends, it is also planned to develop a new converter control algorithm that would provide for improved sharing of current and power under all conditions, and to implement advanced packaging concepts that would enable operation at higher power density.

Lostetter, Alexander↗

A Cybersecurity Event Simulation Tool and Platform

Digital Instrumentation and Control Systems (ICSs) have replaced analog control systems in nuclear power plants raising cybersecurity concerns. To study and understand the cybersecurity risks of nuclear power plants both high fidelity models of the plant physics and controllers must be created, and a framework to test and evaluate cyber security events must be established. A testing and evaluation framework of cybersecurity events consists of a method of interfering with control systems, a simulation of the plant network, and a network packet capture and recording tool. Sandia National Labs (SNL) in collaboration with the University of New Mexico’s Institute for Space and Nuclear Power Studies (UNM-ISNPS) is developing such a cybersecurity testing framework.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Power System Resilience Evaluation Framework and Metric Review: Preprint

Power system resilience is an emerging hot topic in recent years to study the increasing threats of extreme events such as natural disasters, severe weather, and cyberattacks. Although many research works have been done to define, model, and quantify resilience from different aspects, the lack of universally accepted resilience metrics and evaluation methods makes it difficult to assess and compare resilience across different power systems like what is typically done in power system reliability studies. In this paper, we first review the definitions of resilience and summarized two core concepts shared by most literature. On top of that, we conduct a thorough review of resilience metrics and develop a new framework to assess power system resilience from two perspectives, i.e., pre-event estimation and post-event evaluation, to capture system resilience performance in both general and specific fashions. Existing resilience metrics are summarized and categorized using the proposed framework, where recommendations are also proposed to capture core concepts of resilience.

power system resilience↗

Impact analysis of DERs on bulk power system stability through the parameterization of aggregated DER_a model for real feeders

With an ever increasing percentage of distributed energy resources (DERs) connected behind the meter in the distribution system, it is becoming increasingly important to equip transmission planners with the visibility of DER dynamic performance in distribution system. Not having visibility of the disconnection of DERs with the occurrence of transmission events, could result in an erroneous view of the stability of bulk power system. Here, in this paper, a parameterized aggregated model (DER_a) serves as a representation of the distribution-level dynamics of real residential feeders, which is used for analysis of bulk power system stability. The parameters are obtained by executing dynamic Monte Carlo simulations. Faults are then induced at the substation level causing the DERs to trip which subsequently enables the parameterization of the low and high voltage breakpoints (v l0 , v l1 , v h0 , and v h1 ) of the DER_a model’s partial voltage trip block. These parameters are then utilized to study the effectiveness of the DER_a model to represent the behavior of the aggregated DERs’ response and their impact on the bulk power system. The case study shows the ability of the positive-sequence DER_a model to provide an accurate estimation of DERs that are susceptible to trip due to 3-$\phi$ and 1-$\phi$ faults of transmission.

14 SOLAR ENERGY↗

Voltage and Current Response Characteristics of PMU Device by PCI Simulation

Phasor Measurement Units (PMUs) are critical for the Wide Area Measurement System (WAMS), especially for real-time grid monitoring, disturbance location, and situation awareness. Once they are damaged, the stable operation of power system will be affected directly and greatly. As new electronic devices in power system, their immunity to electromagnetic pulse (EMP) events needs to be studied. In this paper, an effective impedance measurement scheme is proposed for port impedance measurement of PMU. A non-uniform transmission line model is established to eliminate the impact of fixture in the de-embedding process. Then circuit of pulse current generator is established to generate damping sinusoid and double exponential wave applied to the port. Finally, by using measured impedance as load of the generator, the voltage and current responses of different ports are calculated in the pulsed current injection (PCI) simulation. Results shows the characteristics of port impedance, voltage and current waveforms. The relation between port impedance and the waveforms is discussed.

Zhang, Liang↗

Bayesian High-Rank Hankel Matrix Completion for Nonlinear Synchrophasor Data Recovery

Phasor measurement units (PMUs) provide high temporal-resolution synchrophasor measurements for power system monitoring and control. The frequent data quality issues, such as missing and bad data, prevent the incorporation of synchrophasor data in real-time operations. Most existing data-driven data recovery methods assume the power system dynamics can be approximated by a linear dynamical system, and the recovery performance degrades significantly when the power system is experiencing nonlinear dynamics during significant events. Here, this paper proposes a data-driven Bayesian nonlinear synchrophasor data recovery method (Ba-NSDR) that can recover a consecutive time period of simultaneous data losses or errors across all channels, even when the underlying system is highly nonlinear. The idea is to lift the Hankel matrix of the spatial-temporal synchrophasor data to a higher dimension such that the lifted Hankel matrix is low-rank in that space and can be processed with the kernel trick. Our proposed Bayesian method then infers the probabilistic distributions of synchrophasor from the partial observations. Some distinctive features of Ba-NSDR include an uncertainty index to measure the accuracy of the recovery result and the robustness to parameter selections. Our method is verified on both synthetic and recorded event datasets.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗