Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power forecasting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Rapid ISS Power Availability Simulator

The ISS (International Space Station) Power Resource Officers (PROs) needed a tool to automate the calculation of thousands of ISS power availability simulations used to generate power constraint matrices. Each matrix contains 864 cells, and each cell represents a single power simulation that must be run. The tools available to the flight controllers were very operator intensive and not conducive to rapidly running the thousands of simulations necessary to generate the power constraint data. SOLAR is a Java-based tool that leverages commercial-off-the-shelf software (Satellite Toolkit) and an existing in-house ISS EPS model (SPEED) to rapidly perform thousands of power availability simulations. SOLAR has a very modular architecture and consists of a series of plug-ins that are loosely coupled. The modular architecture of the software allows for the easy replacement of the ISS power system model simulator, re-use of the Satellite Toolkit integration code, and separation of the user interface from the core logic. Satellite Toolkit (STK) is used to generate ISS eclipse and insulation times, solar beta angle, position of the solar arrays over time, and the amount of shadowing on the solar arrays, which is then provided to SPEED to calculate power generation forecasts. The power planning turn-around time is reduced from three months to two weeks (83-percent decrease) using SOLAR, and the amount of PRO power planning support effort is reduced by an estimated 30 percent.

Downing, Nicholas↗

Mesoscale to Microscale Coupling for a Wind Ramp Case over Complex Terrain

Within the wind energy community, it has become increasingly important to simulate realistic weather events at high fidelity in order to improve wind turbine design, wind farm efficiency, and power forecasting. One of the major difficulties in simulating atmospheric events with numerical models at high fidelity is in accurately transitioning from the mesoscale to the microscale. The mesoscale flow, when input into the large-eddy simulation (LES) domain, will be free of resolved turbulence; needing sufficient time and space (known as fetch) for resolved-scale turbulence to develop. In order to reduce this fetch, several methods exist in which the temperature field, wind field, or both, are stochastically perturbed in order to accelerate the generation of turbulence. However, for cases involving complex terrain, it remains unclear if these perturbation processes are necessary, and if the interaction of the flow over the terrain, alone, is sufficient to generate adequate turbulence. In this study, a wind ramp event observed at the National Wind Technology Center (NWTC) outside of Boulder, CO is simulated first with a mesoscale model and then, using the simulated mesoscale solution as initial and boundary conditions, within a microscale LES solver. The mesoscale solution generated by the Weather Research and Forecasting (WRF) model accurately captures the wind ramp event with only a slight temporal shift and a small temperature bias when compared to the meteorological towers in the NWTC site. This information is then taken as the initial and boundary conditions within the Simulator for Wind Farm Applications (SOWFA) microscale LES model with varying terrain inputs. These inputs include the high-resolution (roughly 30 m grid spacing) terrain data from the Shuttle Radar Topography Mission (SRTM) (Figure 1a), as well as, three intermediate terrain resolution data sets produced by applying a uniform convolution window to the SRTM data with varying window sizes (Figure 1b-d). These are compared to the WRF terrain data interpolated to the high-resolution microscale grid (Figure 1e) in order to determine the impact of low-resolution (about 1 km grid spacing) terrain data on turbulence generation. The wind field is compared at several heights and distances along the dominant wind flow axis between each of the terrain cases. It is found that the development of turbulence across the domain is accelerated as terrain information increases in fidelity. Further, because this ramp event at the location of interest is largely influenced by the interaction of the short-wave trough with the terrain, as the topographic information decreases in fidelity the accuracy of the ramp event is decreased. To make generalizations and describe the benefits and shortcomings of this approach, several of the existing perturbation techniques are employed and compared to that of turbulence generation through topographic features.

17 WIND ENERGY↗

Multi-Factor-Coupled, Ahead-of-Time Aggregation of Power Flexibility Under Forecast Uncertainty

The increasing penetration of distributed energy resources (DERs) is significantly reshaping the role of distribution systems under active energy management. To aggregate the active-reactive power flexibility of DERs dispersed at the feeder and provide capacity support to the transmission system, it is essential to efficiently identify feasible substation power injection trajectories. This paper introduces a novel ahead-of-time flexibility characterization method to address it. First, a polyhedral non-feeder-level power flexibility region (PFR) is constructed, accounting for various time-dependent, power-coupled, and forecast error uncertainties. Then, a polyhedral feeder-level PFR is analytically derived through a coordinate transformation, which can reveal the uncertainty propagation path, i.e., how uncertainty applies to the feeder-level PFR. To facilitate the high-level application, a tractable chance-constrained Chebyshev centering optimization model is further developed to find a ball-shaped inner approximation of the feeder-level PFR. Finally, the proposed method is validated on a modified IEEE 123-bus test system. Here, both theoretical and experimental results show that, with appropriate robustness parameter settings, the proposed method can make the approximated PFR less conservative with abundant robustness against forecast error uncertainty.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impact of Improved Solar Forecasts on Bulk Power System Operations in ISO-NE (Presentation)

The diurnal nature of solar power is made uncertain by variable cloud cover and the influence of atmospheric conditions on irradiance scattering processes. Its forecasting has become increasingly important to the unit commitment and dispatch process for efficient scheduling of generators in power system operations. This presentation is an overview of a study that examines the value of improved solar forecasts on Bulk Power System Operations.

14 SOLAR ENERGY↗

Novel stochastic methods to predict short-term solar radiation and photovoltaic power

Solar forecasting has evolved towards becoming a key component of economical realization of high penetration levels of photovoltaic (PV) systems. This paper presents two novel stochastic forecasting models for solar PV by utilizing historical measurement data to outline a short-term high-resolution probabilistic behavior of solar. First, an uncertain basis functions method is used to forecast both solar radiation and PV power. Three possible distributions are considered for the uncertain basis functions - Gaussian, Laplace, and Uniform distributions. Second, stochastic state-space models are applied to characterize the behaviors of solar radiation and PV power output. A filter-based expectation-maximization and Kalman filtering mechanism is employed to recursively estimate the system parameters and state variables. This enables the system to accurately forecast small as well as large fluctuations of the solar signals. The introduced forecasting models are suitable for real-time tertiary dispatch controllers and optimal power controllers. The PV forecasting models are tested using solar radiation and PV power measurement data collected from a 13.5 kW PV panel installed on the rooftop of our laboratory. Furthermore, the results are compared with standard time series forecasting mechanisms and show a substantial improvement in the forecasting accuracy of the total energy produced.

14 SOLAR ENERGY↗

Power system load flexibility forecasting

The example embodiments are directed to a system and method for forecasting load flexibility of a power grid. In one example, the method includes receiving temperature values associated with temperature set points of a plurality of loads that are included on a power grid, forecasting a flexibility of the plurality of loads using a polynomial-time mixed-integer non-linear programming (MINLP) optimization based on the received temperature values for the plurality of loads, and outputting information about the forecasted flexibility for display to a display device. The MINLP optimization performs the forecasting of the load flexibility on a fine-grained basis in comparison to conventional methods and is still fast enough that it can be computed in real-time.

Genc, Sahika↗

The Wind Forecast Improvement Project (WFIP). A Public/Private Partnership for Improving Short Term Wind Energy Forecasts and Quantifying the Benefits of Utility Operations -- the Northern Study Area

This report contains the results from research aimed at improving short-range (0-6 hour) hub-height wind forecasts in the NOAA weather forecast models through additional data assimilation and model physics improvements for use in wind energy forecasting. Additional meteorological observing platforms including wind profilers, sodars, and surface stations were deployed for this study by NOAA and DOE, and additional meteorological data at or near wind turbine hub height were provided by South Dakota State University and WindLogics/NextEra Energy Resources over a large geographical area in the U.S. Northern Plains for assimilation into NOAA research weather forecast models. The resulting improvements in wind energy forecasts based on the research weather forecast models (with the additional data assimilation and model physics improvements) were examined in many different ways and compared with wind energy forecasts based on the current operational weather forecast models to quantify the forecast improvements important to power grid system operators and wind plant owners/operators participating in energy markets. Two operational weather forecast models (OP_RUC, OP_RAP) and two research weather forecast models (ESRL_RAP, HRRR) were used as the base wind forecasts for generating several different wind power forecasts for the NextEra Energy wind plants in the study area. Power forecasts were generated from the wind forecasts in a variety of ways, from very simple to quite sophisticated, as they might be used by a wide range of both general users and commercial wind energy forecast vendors. The error characteristics of each of these types of forecasts were examined and quantified using bulk error statistics for both the local wind plant and the system aggregate forecasts. The wind power forecast accuracy was also evaluated separately for high-impact wind energy ramp events. The overall bulk error statistics calculated over the first six hours of the forecasts at both the individual wind plant and at the system-wide aggregate level over the one year study period showed that the research weather model-based power forecasts (all types) had lower overall error rates than the current operational weather model-based power forecasts, both at the individual wind plant level and at the system aggregate level. The bulk error statistics of the various model-based power forecasts were also calculated by season and model runtime/forecast hour as power system operations are more sensitive to wind energy forecast errors during certain times of year and certain times of day. The results showed that there were significant differences in seasonal forecast errors between the various model-based power forecasts. The results from the analysis of the various wind power forecast errors by model runtime and forecast hour showed that the forecast errors were largest during the times of day that have increased significance to power system operators (the overnight hours and the morning/evening boundary layer transition periods), but the research weather model-based power forecasts showed improvement over the operational weather model-based power forecasts at these times.

17 WIND ENERGY↗

Incorporating Wind Generation Forecast Uncertainty into Power System Operation, Dispatch, and Unit Commitment Procedures

In this paper, an approach to evaluate the uncertainties of the balancing capacity, ramping capability, and ramp duration requirements is proposed. The approach includes three steps: forecast data acquisition, statistical analysis of retrospective information, and prediction of grid balancing requirements for a specified time horizon and a given confidence level. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on histogram analysis, incorporating sources of uncertainty of both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures) nature. A new method called the "flying-brick" technique is developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation process is used to validate the accuracy of the confidence intervals. To demonstrate the validity of the developed uncertainty assessment methods and its impact on grid operation, a framework for integrating the proposed methods with an EMS system is developed. Demonstration through integration with an EMS system illustrates the applicability of the proposed methodology and the developed tool for actual grid operation and paves the road for integration with EMS systems from other vendors.

17 WIND ENERGY↗

Integration of Wind Generation and Load Forecast Uncertainties into Power Grid Operations

In this paper, a new approach to evaluate the uncertainty ranges for the required generation performance envelope, including the balancing capacity, ramping capability and ramp duration is presented. The approach includes three stages: statistical and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence intervals. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis incorporating all sources of uncertainty and parameters of a continuous (wind forecast and load forecast errors) and discrete (forced generator outages and failures to start up) nature. Preliminary simulations using California Independent System Operator (CAISO) real life data have shown the effectiveness and efficiency of the proposed approach.

17 WIND ENERGY↗

Constraints on primordial non-Gaussianity from WMAP7 and luminous red galaxies power spectrum and forecast for future surveys

We place new constraints on the primordial local non-Gaussianity parameter f{sub NL} using recent cosmic microwave background anisotropy and galaxy clustering data. We model the galaxy power spectrum according to the halo model, accounting for a scale-dependent bias correction proportional to f{sub NL}/k{sup 2}. We first constrain f{sub NL} in a full 13 parameters analysis that includes 5 parameters of the halo model and 7 cosmological parameters. Using the WMAP7 CMB data and the SDSS DR4 galaxy power spectrum, we find f{sub NL}=171{sub -139}{sup +140} at 68% C.L. and -69<f{sub NL}<+492 at 95% C.L. We discuss the degeneracies between f{sub NL} and other cosmological parameters. Including SN-Ia data and priors on H{sub 0} from Hubble Space Telescope observations we find a stronger bound: -35<f{sub NL}<+479 at 95%. We also fit the more recent SDSS DR7 halo power spectrum data finding, for a {Lambda}CDM+f{sub NL} model, f{sub NL}=-93{+-}128 at 68% C.L. and -327<f{sub NL}<+177 at 95% C.L. We finally forecast the constraints on f{sub NL} from future surveys as EUCLID and from CMB missions as Planck showing that their combined analysis could detect f{sub NL{approx}}5.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Net Interchange Schedule Forecasting of Electric Power Exchange for RTO/ISOs

Neighboring independent system operators (ISOs) exchange electric power to enable efficient and reliable operation of the grid. Net interchange (NI) schedule is the sum of the transactions (in MW) between an ISO and its neighbors. Effective forecasting of the amount of actual NI can improve grid operation efficiency. This paper presents results of a preliminary investigation into various methods of prediction that may result in improved prediction accuracy. The methods studied are linear regression, forward regression, stepwise regression, and support vector machine (SVM) regression. The work to date is not yet conclusive. The hope is to explore the effectiveness of other prediction methods and apply all methods to at least one new data set. This should enable more confidence in the conclusions.

Electrical Power Exchange↗

Descriptive Analytics-Based Anomaly Detection for Cybersecure Load Forecasting

As power delivery systems evolve and become increasingly reliant on accurate forecasts, they will be more and more vulnerable to cybersecurity issues. A coordinated data attack by sophisticated adversaries can render existing data corrupt or outlier detection methods ineffective. This would have a very negative impact on operational decisions. The focus of this paper is to develop descriptive analytics-based methods for anomaly detection to protect the load forecasting process against cyberattacks to essential data. We propose an integrated solution (IS) and a hybrid implementation of IS (HIIS) that can detect and mitigate cyberattack induced long sequence anomalies. HIIS is also capable of improving true positive rates and reducing false positive rates significantly comparing with IS. The proposed HIIS can serve as an online cybersecure load forecasting scheme.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Effects of input gradient regularization on neural networks time-series forecasting of thermal power systems

This study proposes using neural networks, specifically gated recurrent unit (GRU), long-short-term memory (LSTM), and transformer networks, to improve control strategies in a 450 MW coal-fired power plant. However, neural networks face issues of becoming overly dependent on just a few variables to make predictions, which negatively impacts control decisions that rely on the model to determine the value of all manipulated variables. The paper introduces regularization techniques, including noise injection and input gradient regularization, during the training phase. Here, the work presents novel contributions in adapting neural networks to control industrial systems and applying regularization techniques from computer vision to industrial process control. Results demonstrate the effectiveness of input gradient regularization in reducing model dependence on subsets of variables, emphasizing the balance between fidelity and controllability. Further exploration is recommended, including the development of recurrent transformers, closed-loop control testing, and a sensitivity analysis on computer models to provide further insight.

20 FOSSIL-FUELED POWER PLANTS↗

Forecasting Solar Photovoltaic Power Production: A Comprehensive Review and Innovative Data-Driven Modeling Framework

The intermittent and stochastic nature of Renewable Energy Sources (RESs) necessitates accurate power production prediction for effective scheduling and grid management. This paper presents a comprehensive review conducted with reference to a pioneering, comprehensive, and data-driven framework proposed for solar Photovoltaic (PV) power generation prediction. The systematic and integrating framework comprises three main phases carried out by seven main comprehensive modules for addressing numerous practical difficulties of the prediction task: phase I handles the aspects related to data acquisition (module 1) and manipulation (module 2) in preparation for the development of the prediction scheme; phase II tackles the aspects associated with the development of the prediction model (module 3) and the assessment of its accuracy (module 4), including the quantification of the uncertainty (module 5); and phase III evolves towards enhancing the prediction accuracy by incorporating aspects of context change detection (module 6) and incremental learning when new data become available (module 7). This framework adeptly addresses all facets of solar PV power production prediction, bridging existing gaps and offering a comprehensive solution to inherent challenges. By seamlessly integrating these elements, our approach stands as a robust and versatile tool for enhancing the precision of solar PV power prediction in real-world applications.

14 SOLAR ENERGY↗