Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “performance monitoring”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

An evaluation of a real-time fault diagnosis expert system for aircraft applications

A fault monitoring and diagnosis expert system called Faultfinder was conceived and developed to detect and diagnose in-flight failures in an aircraft. Faultfinder is an automated intelligent aid whose purpose is to assist the flight crew in fault monitoring, fault diagnosis, and recovery planning. The present implementation of this concept performs monitoring and diagnosis for a generic aircraft's propulsion and hydraulic subsystems. This implementation is capable of detecting and diagnosing failures of known and unknown (i.e., unforseeable) type in a real-time environment. Faultfinder uses both rule-based and model-based reasoning strategies which operate on causal, temporal, and qualitative information. A preliminary evaluation is made of the diagnostic concepts implemented in Faultfinder. The evaluation used actual aircraft accident and incident cases which were simulated to assess the effectiveness of Faultfinder in detecting and diagnosing failures. Results of this evaluation, together with the description of the current Faultfinder implementation, are presented.

Schutte, Paul C.↗

Constructing Space-Time Views from Fixed Size Statistical Data: Getting the Best of Both Worlds

Many performance monitoring tools are currently available to the super-computing community. The performance data gathered and analyzed by these tools fall under two categories: statistics and event traces. Statistical data is much more compact but lacks the probative power event traces offer. Event traces, on the other hand, can easily fill up the entire file system during execution such that the instrumented execution may have to be terminated half way through. In this paper, we propose an innovative methodology for performance data gathering and representation that offers a middle ground. The user can trade-off tracing overhead, trace data size vs. data quality incrementally. In other words, the user will be able to limit the amount of trace collected and, at the same time, carry out some of the analysis event traces offer using spacetime views for the entire execution. Two basic ideas are employed: the use of averages to replace recording data for each instance and "formulae" to represent sequences associated with communication and control flow. With the help of a few simple examples, we illustrate the use of these techniques in performance tuning and compare the quality of the traces we collected vs. event traces. We found that the trace files thus obtained are, in deed, small, bounded and predictable before program execution and that the quality of the space time views generated from these statistical data are excellent. Furthermore, experimental results showed that the formulae proposed were able to capture 100% of all the sequences associated with 11 of the 15 applications tested. The performance of the formulae can be incrementally improved by allocating more memory at run-time to learn longer sequences.

Schmidt, Melisa↗

Constructing Space-Time Views from Fixed Size Statistical Data: Getting the Best of both Worlds

Many performance monitoring tools are currently available to the super-computing community. The performance data gathered and analyzed by these tools fall under two categories: statistics and event traces. Statistical data is much more compact but lacks the probative power event traces offer. Event traces, on the other hand, can easily fill up the entire file system during execution such that the instrumented execution may have to be terminated half way through. In this paper, we propose an innovative methodology for performance data gathering and representation that offers a middle ground. The user can trade-off tracing overhead, trace data size vs. data quality incrementally. In other words, the user will be able to limit the amount of trace collected and, at the same time, carry out some of the analysis event traces offer using space-time views for the entire execution. Two basic ideas arc employed: the use of averages to replace recording data for each instance and formulae to represent sequences associated with communication and control flow. With the help of a few simple examples, we illustrate the use of these techniques in performance tuning and compare the quality of the traces we collected vs. event traces. We found that the trace files thus obtained are, in deed, small, bounded and predictable before program execution and that the quality of the space time views generated from these statistical data are excellent. Furthermore, experimental results showed that the formulae proposed were able to capture 100% of all the sequences associated with 11 of the 15 applications tested. The performance of the formulae can be incrementally improved by allocating more memory at run-time to learn longer sequences.

Schmidt, Melisa↗

Brainwave Monitoring Software Improves Distracted Minds

Neurofeedback technology developed at Langley Research Center to monitor pilot awareness inspired Peter Freer to develop software for improving student performance. His company, Fletcher, North Carolina-based Unique Logic and Technology Inc., has gone on to develop technology for improving workplace and sports performance, monitoring drowsiness, and encouraging relaxation.

Source record↗

Real-time in-flight engine performance and health monitoring techniques for flight research application

Various engine related performance and health monitoring techniques developed in support of flight research are described. Techniques used during flight to enhance safety and to increase flight test productivity are summarized. A description of the NASA range facility is given along with a discussion of the flight data processing. Examples of data processed and the flight data displays are shown. A discussion of current trends and future capabilities is also included.

Ray, Ronald J.↗

Technical Specification Surveillance Interval Extension Using Self-Diagnostics

As part of the Light Water Reactor Sustainability program, an ongoing research effort is being conducted on technical specifications surveillance interval extension of digital equipment in nuclear power plants. The research team is led by Idaho National Laboratory and includes Pacific Northwest National Laboratory, Technology Resources, and Oak Ridge National Laboratory. This research focuses on developing methods for applying the U.S. Nuclear Regulatory Commission (NRC)–approved guidance to implement a licensee-controlled, risk-informed surveillance frequency change program in digital instrumentation and control (I&C) systems that include self-diagnostics and online monitoring (OLM) capabilities. Although approved methods exist for extending technical specifications (TS) surveillance test intervals (STIs) for general equipment, including analog I&C equipment, gaps remain in technology and guidance on crediting newer digital equipment’s internal self-diagnostics and OLM characteristics. Previous research described a general methodology for crediting internal self-diagnostics for extending surveillance test intervals. The methodology used self-diagnostics to detect—and credited recovery from—failure. Self-diagnostics were also applied for performance monitoring during the extended surveillance interval. This report discusses the status of recent activities to evaluate the previously developed methodology using a pilot study. Although both a utility partner for a pilot study and a specific digital asset were identified in FY2020, delays in obtaining proprietary information resulted in a limited ability to fully evaluate the methodology, and further interactions were complicated by the COVID pandemic. Therefore, at that time, the use of public-domain information—along with current processes for surveillance interval extension through a surveillance frequency control program—identified the need to fully assess diagnostic coverage as part of the pilot study. Furthermore, self-diagnostics were also identified as a potential option to replace the drift analyses conducted as part of current STI extension procedures. In FY2022, the project was reconstituted with the industry partner, and information and data were made available by the industry partner to the research team for review. The shared information included failure event descriptions and data for a digital I&C system since its implementation, as well as recent STI extension interval reports developed by the utility partner on that digital I&C system. This report presents an evaluation of this information and data and describes an application of the proposed methodology cited above. The methodology seeks to take advantage of the self-diagnostics and OLM capabilities to reduce risk or reduce the level of qualitative monitoring assessment needed to perform a risk-informed STI extension using existing NRC approved guidance or both. Addressing these issues of STI extension by crediting self-diagnostics is likely to result in benefits for current and future nuclear power plant (NPP) operations, including lowering the barriers to adoption of digital I&C systems and increasing cost savings by deferring or eliminating unneeded preventive maintenance (tasks or checks or activities). Specifically, self-diagnostic and OLM capabilities of newer digital equipment being installed in non-safety and safety applications are designed to detect failures, provide early warning of potential failures, and notify plant operators to take appropriate action to reduce out of service (OOS) time thus protecting safety margins. Moreover, the equipment is expected to provide information that time-related operational degradation is identified early to ensure timely and planned corrective actions instead of a reactive and unplanned approach ahead of an extended-surveillance interval.

42 ENGINEERING↗

Selection of Well Locations for Saturated Zone Monitoring at the E-Area Low Level Waste Facility

Savannah River Site (SRS) has adopted a revised approach to performance monitoring of the E- Area Low Level Waste Facility (ELLWF) that adds a saturated zone component to the existing vadose zone monitoring program (Kubilius, 2019). The revised monitoring approach specifies that eight additional water table wells be installed near Slit Trench 1 (ST1) and Engineered Trench 2 (ET2). Six wells will be installed at locations characterized in 2017 and 2018. These include four wells near ET2 (ELF001D, ELF002D, ELF003D, and ELF004D) at locations identified by Kubilius (2019) and two wells north of ST1 (ELF005D and ELF006D) at locations finalized in this report. Additionally, two wells (ELF007D and ELF008D) are to be installed at locations south of ST1 based on characterization work completed in 2020 and documented in this report. This area is near well cluster BGX-2 between the Mixed Waste Management Facility (MWMF) and the ELLWF. The area is upgradient of ELLWF and, contamination in the water table aquifer is sourced from MWMF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improved Photosensor for Light Valves

Processing changes improve performance of liquid-crystal light valve for displaying projection TV images. New approach monitors performance of finished light valves for given changes in CdS process and experimentally to optimize process for good sensitivity and low negative memory.

Koda, N. J.↗

NASA Goddard Space Flight Center

The NASA SLR Operational Center is responsible for: 1) NASA SLR network control, sustaining engineering, and logistics; 2) ILRS mission operations; and 3) ILRS and NASA SLR data operations. NASA SLR network control and sustaining engineering tasks include technical support, daily system performance monitoring, system scheduling, operator training, station status reporting, system relocation, logistics and support of the ILRS Networks and Engineering Working Group. These activities ensure the NASA SLR systems are meeting ILRS and NASA mission support requirements. ILRS mission operations tasks include mission planning, mission analysis, mission coordination, development of mission support plans, and support of the ILRS Missions Working Group. These activities ensure than new mission and campaign requirements are coordinated with the ILRS. Global Normal Points (NP) data, NASA SLR FullRate (FR) data, and satellite predictions are managed as part of data operations. Part of this operation includes supporting the ILRS Data Formats and Procedures Working Group. Global NP data operations consist of receipt, format and data integrity verification, archiving and merging. This activity culminates in the daily electronic transmission of NP files to the CDDIS. Currently of all these functions are automated. However, to ensure the timely and accurate flow of data, regular monitoring and maintenance of the operational software systems, computer systems and computer networking are performed. Tracking statistics between the stations and the data centers are compared periodically to eliminate lost data. Future activities in this area include sub-daily (i.e., hourly) NP data management, more stringent data integrity tests, and automatic station notification of format and data integrity issues.

Carter, David↗

The Efficiency and the Scalability of an Explicit Operator on an IBM POWER4 System

We present an evaluation of the efficiency and the scalability of an explicit CFD operator on an IBM POWER4 system. The POWER4 architecture exhibits a common trend in HPC architectures: boosting CPU processing power by increasing the number of functional units, while hiding the latency of memory access by increasing the depth of the memory hierarchy. The overall machine performance depends on the ability of the caches-buses-fabric-memory to feed the functional units with the data to be processed. In this study we evaluate the efficiency and scalability of one explicit CFD operator on an IBM POWER4. This operator performs computations at the points of a Cartesian grid and involves a few dozen floating point numbers and on the order of 100 floating point operations per grid point. The computations in all grid points are independent. Specifically, we estimate the efficiency of the RHS operator (SP of NPB) on a single processor as the observed/peak performance ratio. Then we estimate the scalability of the operator on a single chip (2 CPUs), a single MCM (8 CPUs), 16 CPUs, and the whole machine (32 CPUs). Then we perform the same measurements for a chache-optimized version of the RHS operator. For our measurements we use the HPM (Hardware Performance Monitor) counters available on the POWER4. These counters allow us to analyze the obtained performance results.

Frumkin, Michael↗

Situation Awareness Implications of Adaptive Automation of Air Traffic Controller Information Processing Functions

The goal of this research was to define a measure of situation awareness (SA) in an air traffic control (ATC) task and to assess the influence of adaptive automation (AA) of various information processing functions on controller perception, comprehension and projection. The measure was also to serve as a basis for defining and developing an approach to triggering dynamic control allocations, as part of AA, based on controller SA. To achieve these objectives, an enhanced version of an ATC simulation (Multitask (copyright)) was developed for use in two human factors experiments. The simulation captured the basic functions of Terminal Radar Approach Control (TRACON) and was capable of presenting to operators four different modes of control, including information acquisition, information analysis, decision making and action implementation automation, as well as a completely manual control mode. The SA measure that was developed as part of the research was based on the Situation Awareness Global Assessment Technique (SAGAT), previous goal-directed task analyses of enroute control and TRACON, and a separate cognitive task analysis on the ATC simulation. The results of the analysis on Multitask were used as a basis for formulating SA queries as part of the SAGAT-based approach to measuring controller SA, which was used in the experiments. A total of 16 subjects were recruited for both experiments. Half the subjects were used in Experiment #1, which focused on assessing the sensitivity and reliability of the SA measurement approach in the ATC simulation. Comparisons were made of manual versus automated control. The remaining subjects were used in the second experiment, which was intended to more completely describe the SA implications of AA applied to specific controller information processing functions, and to describe how the measure could ultimately serve as a trigger of dynamic function allocations in the application of AA to ATC. Comparisons were made of the sensitivity of the SA measure to automation manipulations impacting both higher-order information processing functions, such as information analysis and decision making, versus lower-order functions, including information acquisition and action implementation. All subjects were exposed to all forms of AA of the ATC task and the manual control condition. The approach to AA used in both experiments was to match operator workload, assessed using a secondary task, to dynamic control allocations in the primary task. In total, the subjects in each experiment participated in 10 trials with each lasting between 45 minutes and 1 hour. In both experiments, ATC performance was measured in terms of aircraft cleared, conflicting, and collided. Secondary task (gauge monitoring) performance was assessed in terms of a hit-to-signal ratio. As part of the SA measure, three simulation freezes were conducted during each trial to administer queries on Level 1, 2, and 3 SA.

Kaber, David B.↗

Decommissioning, Decontamination, and Disposal of LLW-LL, and ILW-LL at a Former Rare Earths Processing Facility in Malaysia - 19087

Geosyntec Consultants, Inc. (Geosyntec) was the design-build Contractor for a project involving the remediation and disposal of low level (LLW-LL and ILW-LL) NORM and TENORM wastes at a former rare earth processing facility in Malaysia. These sites were associated with a plant that extracted rare earth elements from local tin ores. Because of the naturally occurring radioactivity contained in the raw materials, these productions resulted in by-products and residues containing LLW-LL and ILW-LL thorium hydroxide and uranium hydroxide. The total mass of uranium (∼120 tons) and thorium (∼1,200 tons) managed in a single repository required the project design incorporate requirements related to inventory, security and safeguards around nuclear precursor materials. The requirement to consider a performance over a period of more than 10,000 years led to significant challenges in design and modeling of the disposal facility as this disposal facility was purposely designed and permitted as a final disposal for the LLW-LL and ILW-LL. The first phase of the project was the decommissioning, decontamination, and demolition of the 14- acre former rare earth processing plant and excavation of contaminated soils, construction of an engineered cell at the repository for waste disposal, and transportation and disposal of the waste materials into the cell. Final status surveys were carried out to allow the site to be successfully released by the Malaysian regulatory authorities as a clean site for re-development as common industrial use. Over 11,000 loads of material, including approximately 75,000 cubic meters of excavated soils and plant debris, were transported in specially designed steel transport boxes on public roads for disposal in the engineered cell. The second phase of the project included the design and construction of a second engineered cell, enhanced with protective barrier systems and a final cover system constructed of natural materials. Ancillary facilities such as substations, offices, processing buildings, and wastewater treatment plants were constructed to support retrieval and processing of the materials from more than 87,000 individual drums using a semi-automated process. The drums, waste packages, and other materials in the storage facility were systematically extracted, sorted, inventoried, solidified using Portland cement, transported, and disposed in the cell. All temporary facilities were decontaminated, demolished, and disposed in the cell. Radiological inventory and radiation safety programs were implemented to quantify the waste activity and to control exposure to workers and the public during the project. The total mass of radioactive contaminated waste disposed in the two projects is nearly 200,000 tons. The projects were carried out under a high level of scrutiny from Malaysian and international regulatory bodies. Between 2014 and 2017, performance monitoring and modeling activities were carried out to demonstrate that the disposal facility was performing in accordance with design requirements established by regulatory agencies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A generalized correlation of experimental flat-plate collector performance

A generalized collector performance correlation was derived and shown by experimental verification to be of the proper form to account for the majority of the variable conditions encountered both in outdoor and in indoor collector tests. This correlation permits a determination of collector parameters which are essentially nonvarying under conditions which do vary randomly (outdoors) or conditions which vary in a controlled manner (indoors - simulator). It was shown that correlation of the experimental performance of collectors allows the following: (1) comparisons of different collector designs; (2) collector performance prediction under conditions that differ from the conditions of the test program; and (3) monitoring performance degradation effects.

Simon, F. F.↗

A generalized correlation of experimental flat-plate collector performance

A generalized correlation of flat-plate collector performance obtained by outdoor and indoor test methods is presented. This correlation shows that the indoor (simulator) test approach is a special case of the general situation of variable solar conditions. The important feature of the generalized correlation is that it permits a separation of the solar variables (flux, incident angle, etc.) which affect collector performance from the collector parameters (absorptance, transmittance, heat loss, etc.) which also affect collector performance and which are uniquely part of a given collector design. The correlation permits an evaluation of the relative merits of using instantaneous, hourly and daily collector efficiencies in obtaining a good collector correlation. The question of the transient behavior outdoors of a collector is an important part of determining whether to use instantaneous, hourly or daily efficiency values in a correlation approach. Correlation of the experimental performance of collectors allows the following: (1) comparisons of different collector designs, (2) collector performance prediction under conditions that differ from the conditions of the test program, and (3) monitoring performance degradation effects.

Simon, F. F.↗

Performance deterioration based on simulated aerodynamic loads test, JT9D jet engine diagnostics program

An engine was specially prepared with extensive instrumentation to monitor performance, case temperatures, and clearance changes. A special loading device was used to apply known loads on the engine by the use of cables placed around the flight inlet. These loads simulated the estimated aerodynamic pressure distributions that occur on the inlet in various segments of a typical airplane flight. Test results indicate that the engine lost 1.3 percent in take-off thrust specific fuel consumption (TSFC) during the course of the test effort. Permanent clearance changes due to the loads accounted for 1.1 percent; increase in low pressure compressor airfoil roughness and thermal distortion in the high pressure turbine accounted for 0.2 percent. Pretest predicted performance loss due to clearance changes was 0.9 percent in TSFC. Therefore, the agreement between measurement and prediction is considered to be excellent.

Stromberg, W. J.↗

Advanced crew procedures development techniques

The development of an operational computer program, the Procedures and Performance Program (PPP), is reported which provides a procedures recording and crew/vehicle performance monitoring capability. The PPP provides real time CRT displays and postrun hardcopy of procedures, difference procedures, performance, performance evaluation, and training script/training status data. During post-run, the program is designed to support evaluation through the reconstruction of displays to any point in time. A permanent record of the simulation exercise can be obtained via hardcopy output of the display data, and via magnetic tape transfer to the Generalized Documentation Processor (GDP). Reference procedures data may be transferred from the GDP to the PPP.

Arbet, J. D.↗

The " Swarm of Ants vs. Herd of Elephants" Debated Revisited: Performance Measurements of PVM-Overflow Across a Wide Spectrum of Architectures

The Gorden Bell Prizes given out at Supercomputing every year includes at least two catergories: performance (highest GFLOP count) and price-performance (GFLOP/million $$) for real applications. In the past five years, the winners of the price-performance categories all came from networks of work-stations. This reflects three important facts: 1. supercomputers are still too expensive for the masses; 2. achieving high performance for real applications takes real work; and, most importantly; 3. it is possible to obtain acceptable performance for certain real applications on network of work stations. With the continued advance of network technology as well as increased performance of "desktop" workstation, the "Swarm of Ants vs. Herd of Elephants" debate, which began with vector multiprocessors (VPPs) against SIMD type multiprocessors (e.g. CM2), is now recast as VPPs against Symetric Multiprocessors (SMPs, e.g. SGI PowerChallenge). This paper reports on performance studies we performed solving a large scale (2-million grid pt.s) CFD problem involving a Boeing 747 based on a parallel version of OVERFLOW that utilizes message passing on PVM. A performance monitoring tool developed under NASA HPCC, called AIMS, was used to instrument and analyze the the performance data thus obtained. We plan to compare its performance data obtained across a wide spectrum of architectures including: the Cray C90, IBM/SP2, SGI/Power Challenge Cluster, to a group of workstations connected over a simple network. The metrics of comparison includes speed-up, price-performance, throughput, and turn-around time. We also plan to present a plan of attack for various issues that will make the execution of Grand Challenge Applications across the Global Information Infrastructure a reality.

Yan, Jerry C.↗

Orion GN and C Overview and Architecture

The Crew Exploration Vehicle, named Orion, is a critical element in the Constellation Program to develop the transportation system needed to send humans back to the moon and then beyond. Lockheed Martin is the prime contractor for the Orion spacecraft, which is managed by the Johnson Space Center. The Orion GN&C sub-system is being jointly developed by NASA and Lockheed Martin through a mode team approach. The GN&C is a critical element of the Orion mission to carry astronauts to low earth orbit to service the International Space Station and then on later flights to transfer and return a crew of four to the moon. The Orion GN&C system must perform monitoring and abort functions during ascent, rendezvous and docking in both low earth and lunar orbits, perform uncrewed lunar loiter operations, perform trans earth injection and atmospheric entry and landing. The Orion also must be integrated with the Ares I Crew Launch Vehicle, the Earth Departure Stage of the Ares V and the Lunar Surface Access Module. This paper provides an overview of the Orion GN&C system. The functional capabilities of the Orion GN&C will be provided in the context of Constellation architecture, the key GN&C requirements will be summarized, the GN&C architecture will be presented, the development schedule and plans will summarized and finally conclusions will be presented.

Hu, Howard↗