TRUPACT-III Operations Manual (Rev. 3)
This procedure provides instructions for assembling the following contact-handled (CH) packaging payload: Standard Large Box 2 (SLB2).
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
This procedure provides instructions for assembling the following contact-handled (CH) packaging payload: Standard Large Box 2 (SLB2).
This procedure provides instructions for assembling the following contact-handled (CH) packaging payload: Standard Large Box 2 (SLB2).
Work accomplished in the analysis of systems, space basing concepts, and space shuttle studies and alternative concepts is reported with emphasis on the preparation of cost estimates. It is concluded that space basing, as an operational mode, permits the assembly and maintenance of large space vehicles and payloads in low earth orbit, and may become the basing mode for space exploration.
A Miniaturized Pointing Mount (MPM) for Spacelab missions is defined and simulation results are described. This mount is proposed to complement the Spacelab Instrument Pointing System (IPS). It uses the same mount isolator concept as the Spacelab IPS but is much more efficient and economical for the accommodation of small shuttle payloads. The MPM is built from star tracker assemblies left over from the Apollo Telescope Mount program thereby assuring low cost and development risk. Simulation results indicate a high level of instrument stability can be expected. The short development time of the MPM would permit it to serve as a precursor to the Spacelab IPS for verifying critical new concepts such as the mount isolation and hold down mechanisms.
The paper discusses a potential application of electric propulsion to perform orbit transfer of a large spacecraft structure to geosynchronous orbit (GEO) from LEO, utilizing a nuclear reactor space power source in the spacecraft on a shared basis. The discussions include spacecraft, thrust system, and nuclear reactor space power system concepts. Emphasis is placed on orbiter payload arrangements, spacecraft launch constraints, and spacecraft LEO assembly and deployment sequences.
The Space Shuttle program has relied heavily on simulation throughout all phases of development and operation. Real-time, man-in-the-loop simulation has served the NASA manned space flight program by providing the means to evaluate systems design and integrated systems performance in a simulated flight environment as well as provide a means to train flight crews. New challenges are presented by the development and operation of a permanently manned space station. The assembly of the space station, the transferral of payloads and the use of the space station manipulator to berth the Orbiter are operations critical to the success of the space station. All these operations are examples of constrained motion among the bodies associated with the Orbiter and space station system. The state of the art of formulating the governing dynamical equations of motion for constrained systems are described. The uses of the two basic problems in multibody dynamics are discussed. The most efficient formulations of the equations of motion are addressed from the point of view of completeness. The issues surrounding incorporating the constraints into the equation of motion are presented.
Accommodation of the new Human Exploration Initiative being developed by NASA requires Space Station Freedom to serve three major roles: first, as a facility for precursory technology development and life sciences research for both transportation systems and lunar/Mars outpost systems; second, as a transportation node capable of processing both lunar- and Mars-class transportation vehicles and their accompanying payloads. This processing includes all required initial vehicle assembly, mating, servicing, refurbishment, and repair. In addition, some amount of mission propellant may be stored and transferred on Freedom. Third, Freedom provides an ideal test bed for developing operational techniques that are applicable to the Human Exploration Initiative missions. The work performed under this task and presented in this briefing serves to define and prepare Space Station Freedom evolution in keeping with the mission needs stated above by: defining Freedom transportation node evolution configurations consistent with user requirements and program constraints; defining and incorporating baseline design accommodations (hardware 'scars' and software 'hooks') to satisfy evolution requirements; and identifying advanced technology that will enhance Freedom's capabilities and enables its evolution.
Live footage shows preparation for the Astro-1 mission. Scenes include Payload Bay door closing, Rollover to the Vehicle Assembly Building (VAB) from OPF, the STS-35/Astro rollout to Pad-A, Broad Band X-Ray Telescope (BBXRT) Servicing, and crew arrival for the Terminal Countdown Demonstration Tests (TCDT). The crewmembers of STS-35, Commander Vance D. Brand, Pilot Guy S. Gardner, and Mission Specialists Jeffrey A. Hoffman, John M. Lounge, Robert A. Parker, Samuel T. Durrance, and Ronald A. Parise, are shown participating in various training activities. Activities include driving the M113 vehicle, participating in emergency training, and addressing the press upon arrival at Kennedy Space Center.
Footage shows the in-flight and landing activities of the STS-49 Endeavour crew, Commander Daniel C. Brandenstein, Pilot Kevin P. Chilton, and Mission Specialists Pierre J. Thuot, Kathryn C. Thornton, Richard J. Hieb, Thomas D. Akers, and Bruce E. Melnick. Thornton and Akers are seen during their spacewalks as they begin assembly on the Space Station Freedom in the payload bay of Endeavour. The crew is shown during de-orbit preparations (such as suiting up and closing the payload bay doors) and Endeavour is seen landing. Shots of Earth from the Orbiter show the southern Atlantic Ocean, southern African continent, and Indian Ocean. The moon is seen above Earth's atmosphere and a storm is seen on the night side as lighting illuminates the clouds.
This paper is focused on applying Monte Carlo simulation to probabilistic launch vehicle design and requirements verification. The approaches developed in this paper can be applied to other complex design efforts as well. Typically the verification must show that requirement "x" is met for at least "y" % of cases, with, say, 10% consumer risk or 90% confidence. Two particular aspects of making these runs for requirements verification will be explored in this paper. First, there are several types of uncertainties that should be handled in different ways, depending on when they become known (or not). The paper describes how to handle different types of uncertainties and how to develop vehicle models that can be used to examine their characteristics. This includes items that are not known exactly during the design phase but that will be known for each assembled vehicle (can be used to determine the payload capability and overall behavior of that vehicle), other items that become known before or on flight day (can be used for flight day trajectory design and go/no go decision), and items that remain unknown on flight day. Second, this paper explains a method (order statistics) for determining whether certain probabilistic requirements are met or not and enables the user to determine how many Monte Carlo samples are required. Order statistics is not new, but may not be known in general to the GN&C community. The methods also apply to determining the design values of parameters of interest in driving the vehicle design. The paper briefly discusses when it is desirable to fit a distribution to the experimental Monte Carlo results rather than using order statistics.
The Skylab Program consists of three low-earth-orbit missions of the Orbital Assembly (OA) (figure 1.0-1), extending over.an a-month period. The OA consists of the CSM docked to the Saturn Workshop.(SWS). This handbook describes the systems for three of the four major components of the SWS (OWS, AM, and MDA), and also discusses significant interfaces with the Instrument Unit (IU), ATM, and CSM. The other major component of the SWS, the ATM, is treated separately in its own handbook. The OWS, AM, MDA, ATM Deployment Assembly (ATM-DA), Fixed Airlock Shroud (FAS), Payload Shroud (PS), and IU are addressed throughout this document as individual modules from a structural standpoint only. Although normally considered a part of the launch vehicle, the IU is treated in this document as part of the SWS because of its function in preparing the SWS for orbital operation. Section 1.0 describes vehicle and mission configurations of the Skylab program and provides general descriptions of the various systems. Section 2.0 provides detailed systems data covering system interfaces, functional description, subsystems and major components description, component operation, failure modes, performance and design data, operational limitations and restrictions, and instrumentation, and briefly outlines the experiments. Section 3.0 contains illustrations of all panels and identifies the controls and displays, panels, reference designators, nomenclature, functions, circuit breakers, and power sources. The Table of Contents lists in order of appearance all sections, subsections, major paragraphs, illustrations, and tables and provides their respective page locations. Appendix A defines the abbreviations and acronyms employed throughout this handbook, and Appendix B explains the symbols used. Appendix C is a locator index that references component controls contained in Section 3.0. Appendix D is an alphabetical index of paragraph headings, illustrations, and tables, according to the key word, with applicable page numbers. Additional items of significance to the user have been included in the index. The technical level to which this document is written assumes the reader to have general knowledge of engineering terms and principles.
The Ocean Color Instrument (OCI), the primary payload of the Plankton, Aerosol, Cloud, ocean Ecosystem (PACE)observatory, will collect data to monitor the health of Earth’s oceans and atmosphere. The Short-Wave Infrared(SWIR) Detection Assembly (SDA) was built and characterized by the Utah State University Space DynamicsLaboratory (SDL) and is a subsystem of OCI. The SDA measures seven bands centered at 940, 1038, 1250, 1378,1615, 2130, and 2260 nm, with standard- and high-gain varieties for the 1250 and 1615 nm bands, resulting in nine total detection configurations in the SWIR. The delivery of high-quality science data is critically dependent upon accurately characterizing the linearity of the SDA. Two metrology techniques were employed to measure the linearity and characterize the frequency-dependent linearity uncertainty of the system. The first technique used superposition linearity measurements to determine the DC linearity, and the second technique involved an oscillating small-signal response at seven frequencies to determine the frequency-dependent linearity. Discrepancies between the DC and frequency-dependent linearities constrain the uncertainty between the two. Examining the difference between these two methods for all SDA channels, we find most channels experience an uncertainty below0.2% with a worst-case measurement uncertainty of 0.31%. Averaging SDA channels with similar detectors, optical filters, and electronics to simulate the flight-like data products yields a worst-case frequency-dependence linearity uncertainty of 0.12%, demonstrating minimal frequency dependence, implying an excellent linearity knowledge.Detailed performance knowledge, including linearity performance, verifies data quality and builds confidence in the success of the PACE mission.
The integration process of activities conducted at the NASA Lyndon B. Johnson Space Center (JSC) for the Experimental Assembly of Structures in Extravehicular activity (EASE)/Assembly Concept for Construction of Erectable Space Structures (ACCESS) payload is provided as a subset to the standard payload integration process used by the NASA Space Transportation System (STS) to fly payloads on the Space Shuttle. The EASE/ACCESS payload integration activities are chronologically reviewed beginning with the initiation of the flight manifesting and integration process. The development and documentation of the EASE/ACCESS integration requirements are also discussed along with the implementation of the mission integration activities and the engineering assessments supporting the flight integration process. In addition, the STS management support organizations, the payload safety process leading to the STS 61-B flight certification, and the overall EASE/ACCESS integration schedule are presented.
The paper discusses the relationships that will develop among experimenters, mission managers, and operators when satellites, using equipment transported by the Space Shuttle, are constructed in space. Since these satellites do not have to be lifted and guided from the earth's surface, and since they are more accessible for maintenance, future hardware will be built to less demanding standards, which will permit a greater variety of research and more of it in terms of costs. Present and future interrelationships among management authority, interface documentation, accommodations allocation, experiment autonomy, and assembly and checkout are analyzed, so that less costly payload-integration procedures can be developed.
The Core Stage of the new NASA Space Launch System (SLS) is a 212-foot-tall rocket assembly—consisting primarily of two cryogenic propellant tanks, an engine section, and four RS-25 rocket engines—that will send crew and large payloads to the moon and beyond for NASA’s Artemis program. Prior to SLS assembly, the Core Stage completed a series of structural and functional tests in the B-2 Test Stand at Stennis Space Center, designated Green Run. The goal of Green Run was to verify analytical models, confirm proper subsystem operation, and test-fire all four RS-25 engines of the Core Stage. In January 2020, Green Run testing began with an experimental modal analysis test, performed by the Marshal Space Flight Center modal test team. A free-boundary test condition of the Core Stage was simulated as close as possible by suspending the massive launch vehicle from the B-2 Test Stand crane. Modal excitation was provided by a pair of 250-lb electro-dynamic shakers for multi-shaker random vibration testing, as well as a 12-pound instrumented hammer for impact testing. Modal response was measured with 550 accelerometer channels distributed on both the Core Stage and the B-2 Test Stand derrick crane. Following one very long day of testing, frequency response functions were calculated from the measured time histories in the target mode frequency range of 5 Hz to 15 Hz, and mode shapes, frequencies, and damping values were successfully estimated. The case-study presented in this paper will discuss Green Run, the SLS Core Stage, the modal test setup and execution, as well as a brief overview of the test results. Challenges associated with testing such a large, suspended structure in an outdoor environment will be discussed as well.
Statistical decision models are shown to provide a viable method of evaluating the cost effectiveness of alternate vibroacoustic test plans and the associated test levels. The methodology developed provides a major step toward the development of a realistic tool to quantitatively tailor test programs to specific payloads. Testing is considered at the no test, component, subassembly, or system level of assembly. Component redundancy and partial loss of flight data are considered. Most and probabilistic costs are considered, and incipient failures resulting from ground tests are treated. Optimums defining both component and assembly test levels are indicated for the modified test plans considered. modeling simplifications must be considered in interpreting the results relative to a particular payload. New parameters introduced were a no test option, flight by flight failure probabilities, and a cost to design components for higher vibration requirements. Parameters varied were the shuttle payload bay internal acoustic environment, the STS launch cost, the component retest/repair cost, and the amount of redundancy in the housekeeping section of the payload reliability model.
Now in Phase-B, the architecture of the Wide-Field Infra-Red Survey Telescope (WFIRST) payload has matured since 2013 to accommodate various opto-mechanical constraints. Based on a 2.4-meter aperture Forward Optical Assembly (FOA), the Imaging Optics Assembly (IOA) provides corrected optical fields to each on-board instrument. Using a Three Mirror Anastigmat (TMA) optical design, the Wide-Field Channel (WFC) provides ~1/3-square degree of instantaneous field coverage at 0.11 arcsecond pixel scale. The WFC as-built predictive analysis anticipates near diffraction-limited imaging over a focal plane of 300.8 million pixels, operating in seven panchromatic bands between 0.48 - 2.0μm, or a 1-octive multi-spectral imaging mode from ~0.95-1.93μm. The IOA provides the Coronagraph Instrument (CGI) a collimated beam with very specific wavefront constraints. We present configuration changes since 2013 that improved interfaces, improved testability, and reduced technical risk. We provide an overview of our Integrated Modeling results, performed at an unprecedented level for a phase-A study, to illustrate performance margins with respect to static wavefront error, jitter, and thermal drift.
The teleoperator maneuvering system (TMS), consisting of the vehicle, the shuttle orbiter bay cradle with airborne support equipment, and the aft flight deck control station, is described. The vehicle is a reusable remotely controlled free flying vehicle capable of a variety of missions including payload placement, retrieval, servicing, viewing, and large space systems assembly support. The TMS flies preprogrammed trajectories as well as being controlled or reprogrammed from the aft flight deck or the ground. A building block design philosophy is described which permits the evolution of capability as it is needed and delays cost as much as possible. Various mission operations are discussed.