Silicon solar cells with a total power capacity of 30 kilowatts
The bulk of the contract effort was carried out in the following two phases: Phase 1 -- module design, Pre-production module fabrication, inspection and test. Phase 2 -- Production, test and delivery. Effort during the first two months of the contract concentrated on design of a solar module to meet specification. Basic module design resulting from this effort is as follows: (1) frame design; (2) cell pan design; (3) cell interconnection; (4) encapsulation; (5) electrical performance.