Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “orbit maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Integrated orbital servicing study for low-cost payload programs. Volume 1: Executive summary

Various operating methodologies to achieve low-cost space operations were investigated as part of the Space Transportation System (STS) planning. The emphasis was to show that the development investment, initial fleet costs, and supporting facilities for the STS could be effectively offset by exploiting the capabilities of the STS to satisfy mission requirements and reduce the cost of payload programs. The following major conclusions were reached: (1) the development of an on-orbit servicer maintenance system is compatible with many spacecraft programs and is recommended as the most cost-effective system, (2) spacecraft can be designed to be serviceable with acceptable design, weight, volume, and cost effects, (3) use of on-orbit servicing over a 12 year period results in savings ranging between four and nine billion dollars, (4) the pivoting arm on-orbit servicer was selected and a preliminary design was prepared, (5) orbital maintenance has no significant impact on the STS.

Derocher, W. L., Jr.↗

Spacecraft Onboard Software Maintenance: An Effective Approach which Reduces Costs and Increases Science Return

Flight software (FSW) is a mission critical element of spacecraft functionality and performance. When ground operations personnel interface to a spacecraft, they are dealing almost entirely with onboard software. This software, even more than ground/flight communications systems, is expected to perform perfectly at all times during all phases of on-orbit mission life. Due to the fact that FSW can be reconfigured and reprogrammed to accommodate new spacecraft conditions, the on-orbit FSW maintenance team is usually significantly responsible for the long-term success of a science mission. Failure of FSW can result in very expensive operations work-around costs and lost science opportunities. There are three basic approaches to staffing on-orbit software maintenance, namely: (1) using the original developers, (2) using mission operations personnel, or (3) assembling a Center of Excellence for multi-spacecraft on-orbit FSW support. This paper explains a National Aeronautics and Space Administration, Goddard Space Flight Center (NASA/GSFC) experience related to the roles of on-orbit FSW maintenance personnel. It identifies the advantages and disadvantages of each of the three approaches to staffing the FSW roles, and demonstrates how a cost efficient on-orbit FSW Maintenance Center of Excellence can be established and maintained with significant return on the investment.

Shell, Elaine M.↗

Gateway: An earth orbiting transportation node

University of Texas Mission Design (UTMD) has outlined the components that a space based transportation facility must include in order to support the first decade of Lunar base buildup. After studying anticipated traffic flow to and from the hub, and taking into account crew manhour considerations, propellant storage, orbital transfer vehicle maintenance requirements, and orbital mechanics, UTMD arrived at a design for the facility. The amount of activity directly related to supporting Lunar base traffic is too high to allow the transportation hub to be part of the NASA Space Station. Instead, a separate structure should be constructed and dedicated to handling all transportation-related duties. UTMD found that the structure (named Gateway) would need a permanent crew of four to perform maintenance tasks on the orbital transfer and orbital maneuvering vehicles and to transfer payload from launch vehicles to the orbital transfer vehicles. In addition, quarters for 4 more persons should be allocated for temporary accommodation of Lunar base crew passing through Gateway. UTMD was careful to recommend an expendable structure that can adapt to meet the growing needs of the American space program.

Source record↗

Attitude Ground System (AGS) for the Magnetospheric Multi-Scale (MMS) Mission

MMS Overview Recall from Conrads presentation earlier today MMS launch: March 13, 2015 on an Atlas V from Space Launch Complex 40, Cape Canaveral, Florida MMS Observatory Separation: five minute intervals spinning at 3 rpm approximately 1.5 hours after launch MMS Science Goals: study magnetospheric plasma physics and understand the processes that cause power grids, communication disruptions and Aurora formation Mission: 4 identical spacecraft in tetrahedral formation with variable size1.2 x 12 RE in Phase 1, with apogee on dayside to observe bow shock1.2 x 25 RE in Phase 2, with apogee on night side to observe magneto tail Challenges Tight attitude control box, orbit and formation maintenance requirements Maneuvers on thrusters every two weeks Delta-H Spin axis direction and spin rate maintenance Delta-V Orbit and Formation maintenance Mission phase transitions AGS support Smart targeting prediction of Spin-Axis attitude in the presence of environmental torques to stay within the science attitude Determination of the spacecraft attitude and spin rate (sensitive to knowledge of inertia tensor)Calibrations to improve attitude determination results and improve orbit maneuvers Mass properties (Center of Mass, and inertia tensor for nutation and coning) Accelerometer bias (sensitive to the accuracy of the rate estimates) Sensor alignments.

Estimation and Calibration Support↗

Space Telescope maintenance and refurbishment

The Space Telescope (ST) represents a new concept regarding spaceborne astronomical observatories. Maintenance crews will be brought to the orbital worksite to make repairs and replace scientific instruments. For major overhauls the telescope can be temporarily returned to earth with the aid of the Shuttle. It will, thus, be possible to conduct astronomical studies with the ST for two decades or more. The five first-generation scientific instruments used with the ST include a wide field/planetary camera, a faint object camera, a faint object spectrograph, a high resolution spectrograph, and a high speed photometer. Attention is given to the optical telescope assembly, the support systems module, aspects of mission and science operations, unscheduled maintenance, contingency orbital maintenance, planned on-orbit maintenance, ground maintenance, ground refurbishment, and ground logistics.

Trucks, H. F.↗

Hubble Space Telescope - First Servicing Mission: Down to Earth Logistics - From GSFC to KSC and Back

The Hubble Space Telescope First Servicing Mission is a major accomplishment for NASA and has drawn world-wide attention and interest. The extravehicular servicing and repair activities performed by the STS-61 crew were the most ambitious ever undertaken. Their unprecedented success in performing on-orbit repair and maintenance, particularly in correcting the aberration in the primary mirror, has enabled the HST to provide sensational images and the anticipation of exciting scientific discoveries. Although the whole world watched the televised logistics activities (on-orbit maintenance) that took place in space, few are aware of the time and effort that went into planning and executing the space logistics that takes place with our feet on the ground. This paper addresses a major part of that effort - the packaging, handling, and transportation (PH&T) activities required to ship the GSFC HST space flight hardware and ground support equipment to KSC for launch and the post launch return to GSFC. It addresses the logistics and transportation planning for the containers for the Solar Array Carrier, the Orbital Replacement Unit Carrier, and the Flight Support System and their transporters, and the over land and water portions of the shipments.

Kubicko, Richard M.↗

Active thermal control for an advanced power platform

Effective use of the Shuttle Orbiter during the operational phase will require the provision of electrical power from free-flying power platforms which will interface with the Orbiter. Such platforms present unique requirements for active thermal control based upon the long life and high heat load requirements which will be necessary to provide 25 kW or more of electricity to the Orbiter and payloads. This paper will present key issues in the design of these active thermal control systems (ATCS) and will discuss potential solutions intended to ensure maximum effectiveness of advanced power platforms. Such issues include proper selection of coolant fluid for the power platform and payload loops; selection and development of thermal control surfaces for five-year life; the use of off-the-shelf hardware vs development of unique hardware, central vs decentralized control of the ATCS; system life and reliability as a factor in determining redundancy and the possibility of on-orbit EVA maintenance; and the interfaces between the power platform and the Orbiter and payloads.

Owen, J. W.↗

First In-Orbit Experience of TerraSAR-X Flight Dynamics Operations

TerraSAR-X is an advanced synthetic aperture radar satellite system for scientific and commercial applications that is realized in a public-private partnership between the German Aerospace Center (DLR) and the Astrium GmbH. TerraSAR-X was launched at June 15, 2007 on top of a Russian DNEPR-1 rocket into a 514 km sun-synchronous dusk-dawn orbit with an 11-day repeat cycle and will be operated for a period of at least 5 years during which it will provide high resolution SAR-data in the X-band. Due to the objectives of the interferometric campaigns the satellite has to comply to tight orbit control requirements, which are formulated in the form of a 250 m toroidal tube around a pre-flight determined reference trajectory (see [1] for details). The acquisition of the reference orbit was one of the main and key activities during the Launch and Early Orbit Phase (LEOP) and had to compensate for both injection errors and spacecraft safe mode attitude control thruster activities. The paper summarizes the activities of GSOC flight dynamics team during both LEOP and early Commissioning Phase, where the main tasks have been 1) the first-acquisition support via angle-tracking and GPS-based orbit determination, 2) maneuver planning for target orbit acquisition and maintenance, and 3) precise orbit and attitude determination for SAR processing support. Furthermore, a presentation on the achieved results and encountered problems will be addressed.

Kahle, R.↗

An analysis of the loads applied to a heavy Space Station rack during translation and rotation tasks

To prepare for Space Station Alpha's on-orbit assembly, maintenance, and resupply, NASA requires information about the crew members' ability to move heavy masses on orbit. Ease of movement in microgravity and orbiter stay time constraints may change the Space Station equipment and outfitting design requirements. Therefore, the time and effort required to perform a particular task and how and where the forces and torque should be applied become critical in evaluating the design effort. Thus, the three main objectives of this investigation were to: (1) quantify variables such as force and torque as they relate to heavy mass handling techniques; (2) predict the time required to perform heavy mass handling tasks; and (3) note any differences between males and females in their ability to manipulate a heavy mass.

Stoycos, Lara E.↗

Updated Heliostorm Warning Mission: Enhancements Based on New Technology

The Heliostorm (also referred to as Geostorm) mission has been regarded as the best choice for the first application of solar sail technology. The objective of Heliostorm is to obtain data from an orbit station slightly displaced from the ecliptic at or nearer to the Sun than 0.98 AU, which places it twice as dose to the sun as Earth's natural L1 point at 0.993 AU. The maintenance of such an orbit location would require prohibitive amounts of propellants using chemical or electric propulsion systems; however, a solar sailcraft is ideally suited for this purpose because it relies solely on the propulsive force from photons for orbit maintenance. Heliostorm has been the subject of several mission studies over the past decade, with the most complete study conducted in 1999 in conjunction with a proposed New Millennium Program (NMP) Space Technology 5 (ST-5) flight opportunity. Recently, over a two and one-half year period dating from 2003 through 2005, NASA's In-Space Propulsion Technology Program (ISTP) matured solar sail technology from laboratory components to full systems, demonstrated in as relevant a space environment as could feasibly be simulated on the ground. Work under this program has yielded promising results for enhanced Heliostorm mission performance. This enhanced performance is achievable principally through reductions in the sail areal density. These reductions are realized through the use of lower linear mass density booms, a thinner sail membrane, and increased sail area. Advancements in sailcraft vehicle system design also offer potential mass reductions and hence improved performance. This paper will present the preliminary results of an updated Heliostorm mission design study including the enhancements incorporated during the design, development, analysis and testing of the system ground demonstrator.

Young, Roy M.↗

Updated Heliostorm Warning Mission: Enhancements Based on New Technology

The Heliostorm (also referred to as Geostorm) mission has been regarded as the best choice for the first application of solar sail technology. The objective of Heliostorm is to obtain data from an orbit station slightly displaced from the ecliptic at or nearer to the Sun than 0.98 AU, which places it twice as close to the sun as Earth's natural L1 point at 0.993 AU. The maintenance of such an orbit location would require prohibitive amounts of propellants using chemical or electric propulsion systems; however, a solar sailcraft is ideally suited for this purpose because it relies solely on the propulsive force from photons for orbit maintenance. Heliostorm has been the subject of several mission studies over the past decade, with the most complete study conducted in 1999 in conjunction with a proposed New Millennium Program (NMP) Space Technology 5 (ST-5) flight opportunity. Recently, over a two and one-half year period dating from 2003 through 2005, NASA's In-Space Propulsion Technology Program (ISTP) matured solar sail technology from laboratory components to full systems, demonstrated in as relevant a space environment as could feasibly be simulated on the ground. Work under this program has yielded promising results for enhanced Heliostorm mission performance. This enhanced performance is achievable principally through reductions in the sail areal density. These reductions are realized through the use of lower linear mass density booms, a thinner sail membrane, and increased sail area. Advancements in sailcraft vehicle system design also offer potential mass reductions and hence improved performance. This paper will present the preliminary results of an updated Heliostorm mission design study including the enhancements incorporated during the design, development, analysis and testing of the system ground demonstrator.

Young, Roy M.↗

Autonomous NanoTechnology Swarm (ANTS) Prospecting Asteroid Mission (PAM), Asteroid Proximity Operations

The Autonomous NanoTechnology Swarm (ANTS) is a generic mission architecture based on spatially distributed spacecraft, autonomous and redundant components, and hierarchical organization. The ANTS Prospecting Asteroid Mission (PAM) is an ANTS application which will nominally use a swarm of 1000 spacecraft. There would be 10 types of "specialists" with common spacecraft buses. There would be 10 subswarms of approximately 100 spacecraft each or approximately 10 of each specialist in each swarm. The ANTS PAM primary objective is the exploration of the asteroid belt in search of resources and material with astrobiologically relevant origins and signatures. The ANTS PAM spacecraft will nominally be released from a station in an Earth-Moon L1 libration point orbit, and they will use Solar sails for propulsion. The sail structure would be highly flexible, capable of changing morphology to change cross-section for capture of sunlight or to form effective "tip vanes" for attitude control. ANTS PAM sails would be capable of full to partial deployment, to change effective sail area and center of pressure, and thus allow attitude control. Results of analysis of a transfer trajectory from Earth to a sample target asteroid will be presented. ANTS PAM will require continuous coverage of different asteroid locations as close as one to two asteroid "diameters" from the surface of the asteroid for periods of science data collection during asteroid proximity operations. Hovering spacecraft could meet the science data collection objectives. The results of hovering analysis will be presented. There are locations for which hovering is not possible, for example on the illuminated side of the asteroid. For cases where hovering is not possible, the results of utilizing asteroid formations to orbit the asteroid and achieve the desired asteroid viewing will be presented for sample asteroids. The ability of ANTS PAM to reduce the area of the solar sail during asteroid proximity operations is critical to the maintenance of orbiting formations for a period of time. Results of analysis of potential "traffic" problems during asteroid proximity operations will be presented.

Marr, Greg↗

In-Space Propulsion: Where We Stand and What's Next

The focus of this paper will be on the three stages of in-space transportation propulsion systems, now commonly referred to as in-space propulsion (ISP); i.e., the transfer of payloads from low-Earth orbits into higher orbits or into trajectories for planetary encounters, including planetary landers and sample return launchers, if required. Functions required at the operational location where ISP must provide thrust for orbit include maintenance, position control, stationkeeping, and spacecraft altitude control; i.e., proper pointing and dynamic stability in inertial space; and the third function set to enable operations at various planetary locations, such as atmospheric entry and capture, descent to the surface and ascent, back to rendezvous orbit. The discussion will concentrate on where ISP stands today and some observations of what might be next in line for new ISP technologies and systems for near-term and future flight applications. The architectural choices that are applicable for ISP will also be described and discussed in detail.

Sackheim, Robert L.↗

The Final Proceedings of the DOE/NASA Solar Power Satellite Program Review

The solar power satellite (SPS) concept defined as 'placing gigantic satellites in geosynchronous orbit to capture sunlight, changing the energy into an appropriate form for transmission to Earth, and introducing the energy into the electric power grid' is evaluated in terms of costs and benefits. The concept development and evaluation program is reviewed in four general areas: systems definition; environmental; societal; and comparative assessments. Specific factors addressed include: transportation, construction in space, methods of conversion of sunlight into energy, transmission to Earth, maintenance in orbit and decommissioning of satellites; environmental, political, and economic effects; and comparison of SPS to other forms of power generation, both terrestrial and in space.

Source record↗

Implementation of Autonomous GPS Guidance and Control for Spacecraft Formation Flying

This paper presents the general relative orbit dynamics equations and GPS (Global Positioning System) orbit observational equations that have been developed for on-board control of spacecraft flying in formation. The approach to the implementation of the autonomous control for orbit acquisition and maintenance of spacecraft formation using GPS code pseudoranges are presented. As a practical application of the models and method provided in this paper, the orbit control of the Earth-Orbiter 1(EO-1) / Landsat 7 system has been designed, using the discrete-time linear optimal output feedback control. For the actuator of the on/off type reaction jets, the implementation problem of the pulse-amplitude modulation is also studied. Simulation results of autonomous orbit control and maintenance, for 3-dimensional initial orbit error, using optimal output feedback control are shown. These simulation results certified the feasibility of the implementation of the autonomous maintenance control for EO-1/Landsat 7 formation flying by means of the discrete-time linear optimal output feedback control.

Xing, Guang Q.↗