Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operating reserves”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Accurate Prediction of Algal Biomass Lipid, Protein, and Carbohydrate Composition with Machine Learning Regression Modelling of Near-IR Spectra

During large scale algal biomass cultivation, it is difficult to reliably control relative composition to target levels. Rapid determination of chemical composition is feasible by using near infrared (NIR) spectral data. We sought to build and improve on reliable high-throughput screening prediction method based on partial least squares regression (PLSR) by the application of artificial neural networks (ANN) and associated optimization strategies. The algal biomass sample set was designed and created in an iterative process of culturing in physiologically diverse conditions at the GAI field site, followed by compositional analyses at NREL. The workflow allowed us to identify gaps in compositional space for informing the subsequent cultivation and sampling efforts and generated a high quality set of 210 unique samples with chemical analysis results, spectral scanning data, and cultivation metadata. We observed a significant improvement in the performance of carbohydrate content predictions using an optimized ANN model compared to PLSR, with > 16% reduction in mean absolute percent error (MAPE) when tested on the same set of reserved data. The optimized ANN models for FAME and protein prediction performed exceptionally well with 5.99% and 5.09% MAPE, respectively. Application of these methods to detection and quantification of minor biomass constituents that are relevant to certain product streams has shown positive preliminary results, opening the possibility for extensions to the outputs of this powerful data type. All models are accompanied by prediction uncertainties and unsupervised spectral outlier detection to alert an operator to unreliable spectral data. These tools can be deployed for rapid determination of algal culture status, and cultivation and biomass quality improvement.

algal biofuels↗

Distributed optimization and control for autonomous distributed energy resource power dispatch and frequency regulation considering communication failures

Distributed energy resources (DERs) can significantly enhance grid flexibility by supplying power and secondary frequency regulation (SFR) services. Yet, their large number and dispersed nature limit the effectiveness of traditional centralized power dispatch and frequency control schemes, and expose the system to single-point communication failures. This paper presents a unified distributed optimization and control framework for DER power dispatch and SFR provision. A transmission-loss-aware distributed direct current optimal power flow is first formulated to optimize DER power dispatch and reserve scheduling. On top of this, a fully distributed control scheme for DER autonomous SFR provision is developed to allocate automatic generation control signals cost-effectively while ensuring robustness to communication link disruptions. The framework is validated on IEEE 14-bus and 39-bus transmission systems with large-scale distribution feeders using transmission-distribution dynamic co-simulation, demonstrating reliable and autonomous DER power dispatch and SFR provision under diverse operating conditions and communication contingencies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cavern Leaching Monitoring CY18 And CY19

The U.S. Strategic Petroleum Reserve (SPR) is a crude oil storage system run by the U.S. Department of Energy (DOE). The reserve consists of 60 active storage caverns spread across four sites in Louisiana and Texas, near the Gulf of Mexico. Beginning in 2016, the SPR began executing U.S. congressionally mandated oil sales. The configuration of the reserve, with a total capacity of greater than 700 MMB, requires raw water to be used instead of saturated brine for oil withdrawals such as for sales. All sales will produce leaching within the caverns used for oil delivery. Thirty-six caverns had a combined total of over 29 MMB of water injected from CY18-CY19 for mandatory sales. Leaching effects were monitored in these caverns to understand how the sales operations may impact the long-term integrity of the caverns. While frequent sonars are the best way to monitor changes in cavern shape, they can be resource intensive for the number of caverns involved in sales and exchanges. An intermediate option is to model the leaching effects and see if any concerning features develop. The leaching effects were modeled here using the Sandia Solution Mining Code (SANSMIC). The results indicate that leaching induced features are not of concern in the majority of the caverns, 32 of 36. Four caverns, BH-107, BH-108, BH-114 and WH-114 have features that may grow with additional leaching and should be monitored as leaching continues in those caverns. Six caverns had post sale sonars which were compared with SANSMIC results. SANSMIC was able to capture the leaching well. A deviation in the SANSMIC and sonar cavern shapes was observed near the cavern floor in caverns with significant floor rise, a process not captured by SANSMIC. These results suggest SANSMIC is a useful tool for monitoring changes in cavern shape due to leaching effects related to sales and exchanges.

02 PETROLEUM↗

Novel Electrowinning Reactor for the Energy-Efficient, Low- Cost Production of Rare Earth Metals

This project developed a novel neodymium (Nd) electrowinning reactor for energy-efficient electrowinning of Nd metal. Throughout this project we have developed an alternative chloride based molten salt electrolysis process. Our process lowers the specific electrical energy consumption compared to the state of the art, while producing reusable chlorine gas and eliminating direct CO2 and PFC emissions. Facilities required for implementing the project were setup and designs were finalized, and a standard operating procedure for safe operation of high temperature electrolysis cells was written. The electrowinning reactor was designed and constructed. Electrolysis experiments confirmed the ability to reproducibly electrowin Nd metal on a Mo cathode. The current efficiency for Nd electrowinning was measured as a function of applied current density in the presence of the separator. Successful electrowinning of Nd sponge at high current densities (200 mA/cm2 and above) at a current efficiency >80% was demonstrated using multiple techniques. Stable Nd electrowinning up to 10h at 250 mA/cm2 was demonstrated. All of these design advancements were used to develop a techno-economic and life cycle assessment model that demonstrated that our process could be operated at cost of less than $0.20/kg-Nd (~30% lower compared to state of the art when comparing electrolysis energy cost) with a >20% total reduction in global warming potential compared to the state of the art while generating no direct CO2 or perfluorocarbon emissions.

42 ENGINEERING↗

Jet Fuel Production at the Pittsburgh Airport: GTL via Fischer-Tropsch Synthesis

The Pittsburgh International Airport (PIT)—with the Allegheny County Airport Authority (which manages PIT)—has established itself as a leader in resiliency by becoming the first major United States (U.S.) airport to have a self-sustaining microgrid, providing electricity, heating, and cooling for airport operations. The microgrid is powered by natural gas and solar power produced on the airport property and was completed in Summer 2021. This study examines the feasibility of producing jet fuel at the airport to provide a secure supply of aviation fuel, furthering PIT’s ability to weather supply disruptions and operate self-sufficiently. Gas-to-liquids (GTL) is a commercially available technology that converts natural gas to liquid hydrocarbons, including synthetic jet fuel. A GTL facility at PIT could convert natural gas from onsite wells to jet fuel, effectively doubling the onsite fuel stores in the event of a supply disruption. Moreover, GTL provides a pathway to renewable jet fuel production and reduced greenhouse gas (GHG) emissions from the aviation sector, particularly if renewable natural gas (RNG) is used as a feedstock or other renewable energy sources are used for energy inputs. This study has found that it would be technically feasible to construct and operate a GTL facility on PIT’s property. The approximately 6,000-barrel per day (BPD) facility evaluated would produce nearly 70 million (MM) gallons (gal) of synthetic jet fuel per year, which could supplant nearly all (85 percent) current jet fuel consumption at PIT. Given the current blend limitation of 50 percent Fischer-Tropsch fuels by volume, the plant would have excess production capacity available for the United States Air Force (USAF) Pittsburgh Air Reserve Station and the USAF 171st Air Refueling Wing co-located at the airport.

03 NATURAL GAS↗

Resilient Operation of Power Distribution Systems Using MPC-Based Critical Service Restoration

Power distribution systems are more prone to disruptions and cause most power system outages. We propose a service restoration technique to recover the system service (electricity delivery) following an extreme event-triggered substation outage. The proposed technique considers the problem of controlling distributed energy resources (DERs) of a distribution system with the objective of achieving maximum load pick up while satisfying network flow and voltage constraints. The problem is formulated as a model predictive control (MPC), where a linearized optimal power flow (OPF) model is employed to describe the network. The formulation is augmented with a ramping (up) reserve product for the DERs to ensure an upward monotonic load restoration as time evolves. We perform simulations considering the IEEE 13-bus test feeder integrated with wind, solar, microturbine, and energy storage devices. We demonstrate the efficacy of the devised technique in restoring the system loads monotonically, without shedding previously restored loads. We also show the benefit of co-optimization of power and reserve products for DERs on service restoration. In addition, the capability of the technique in regulating nodal voltages and reducing renewable power curtailment is demonstrated.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Resilient Operation of Power Distribution Systems Using MPC-Based Critical Service Restoration

Power distribution systems are more prone to disruptions and cause most power system outages. We propose a service restoration technique to recover the system service (electricity delivery) following an extreme event-triggered substation outage. The proposed technique considers the problem of controlling distributed energy resources (DERs) of a distribution system with the objective of achieving maximum load pick up while satisfying network flow and voltage constraints. The problem is formulated as a model predictive control (MPC), where a linearized optimal power flow (OPF) model is employed to describe the network. The formulation is augmented with a ramping (up) reserve product for the DERs to ensure an upward monotonic load restoration as time evolves. We perform simulations considering the IEEE 13-bus test feeder integrated with wind, solar, microturbine, and energy storage devices. We demonstrate the efficacy of the devised technique in restoring the system loads monotonically, without shedding previously restored loads. We also show the benefit of co-optimization of power and reserve products for DERs on service restoration. In addition, the capability of the technique in regulating nodal voltages and reducing renewable power curtailment is demonstrated.

61 RADIATION PROTECTION AND DOSIMETRY↗

Hierarchical Control of Grid-Connected Hydrogen Electrolyzer Providing Grid Services

This paper presents the operational modes and control architecture of the grid-connected hydrogen electrolyzer systems for the provision of frequency and voltage supports. The analysis is focused on the primary and secondary loops in the hierarchical control scheme. At the power converter inner control loop, the voltage- and current-control modes are analyzed. At the primary level, the droop and opposite droop control strategies to provide voltage and frequency support are described. Coordination between primary control and secondary, tertiary reserves is briefly discussed. The case studies and real-time hardware-in-the-loop simulation results are provided using Typhoon HIL to back the theoretical investigation.

ancillary services↗

Resilient Operation of Power Distribution Systems Using MPC-Based Critical Service Restoration: Preprint

Power distribution systems are more prone to disruptions and cause most power system outages. We propose a service restoration technique to recover the system service (electricity delivery) following an extreme event-triggered substation outage. The proposed technique considers the problem of controlling distributed energy resources (DERs) of a distribution system with the objective of achieving maximum load pick up while satisfying network flow and voltage constraints. The problem is formulated as a model predictive control (MPC), where a linearized optimal power flow (OPF) model is employed to describe the network. The formulation is augmented with a ramping (up) reserve product for the DERs to ensure an upward monotonic load restoration as time evolves. We perform simulations considering the IEEE 13-bus test feeder integrated with wind, solar, microturbine, and energy storage devices. We demonstrate the efficacy of the devised technique in restoring the system loads monotonically, without shedding previously restored loads. We also show the benefit of co-optimization of power and reserve products for DERs on service restoration. In addition, the capability of the technique in regulating nodal voltages and reducing renewable power curtailment is demonstrated.

61 RADIATION PROTECTION AND DOSIMETRY↗

Superiority of compensatory reserve measurement compared with the Shock index for early and accurate detection of reduced central blood volume status

Shock index (SI) equals the ratio of heart rate (HR) to systolic blood pressure (SBP) with clinical evidence that it is more sensitive for trauma patient status assessment and prediction of outcome compared with either HR or SBP alone. We used lower body negative pressure (LBNP) as a human model of central hypovolemia and compensatory reserve measurement (CRM) validated for accurate tracking of reduced central blood volume to test the hypotheses that SI: (1) presents a late signal of central blood volume status; (2) displays poor sensitivity and specificity for predicting the onset of hemodynamic decompensation; and (3) cannot identify individuals at greatest risk for the onset of circulatory shock. We measured HR, SBP, and CRM in 172 human subjects (19–55 years) during progressive LBNP designed to determine tolerance to central hypovolemia as a model of hemorrhage. Subjects were subsequently divided into those with high tolerance (HT) (n = 118) and low tolerance (LT) (n = 54) based on completion of 60 mm Hg LBNP. The time course relationship between SI and CRM was determined and receiver operating characteristic (ROC) area under the curve (AUC) was calculated for sensitivity and specificity of CRM and SI to predict hemodynamic decompensation using clinically defined thresholds of 40% for CRM and 0.9 for SI. The time and level of LBNP required to reach a SI = 0.9 (~60 mm Hg LBNP) was significantly greater (p < 0.001) compared with CRM that reached 40% at ~40 mm Hg LBNP. Shock index did not differ between HT and LT subjects at 45 mm Hg LBNP levels. ROC AUC for CRM was 0.95 (95% CI = 0.94–0.97) compared with 0.91 (0.89–0.94) for SI (p = 0.0002). Despite high sensitivity and specificity, SI delays time to detect reductions in central blood volume with failure to distinguish individuals with varying tolerances to central hypovolemia.

60 APPLIED LIFE SCIENCES↗

Managing Hanford's Direct Feed Low Activity Waste Program - 20002

The Office of River Protection (ORP) is responsible for the management and completion of the River Protection Project (RPP) mission, which comprises both the Hanford Site tank farms operations and the completion and operation of the Waste Treatment and Immobilization Plant Project. The RPP mission is to safely retrieve, treat, and immobilize Hanford's high-level and low-activity tank waste and close the tank farms to protect the Columbia River. The Direct-Feed Low-Activity Waste (DFLAW) Program is a major subset of the overall RPP mission, providing disposition of low-activity waste. The scope is to retrieve, treat, and immobilize the low-activity waste at the Low-Activity Waste Facility. DFLAW will begin operations no later than December 2023. The DFLAW Program overarches a suite of individual projects, activities, and infrastructure upgrades. The major projects and activities include multiple contractors under both ORP and the Richland Operations Office, underscoring the need for effective integration, coordination, and collaboration. The objectives of the DFLAW Program leadership team are to: - Effectively coordinate and integrate the projects that comprise the DFLAW Program - Manage the interfaces between the projects so that the integrated DFLAW Program is completed successfully - Ensure the DFLAW portfolio of projects operate as required without gaps or conflicts at the interfaces. DOE is accomplishing these objectives through a newly established leadership model that integrates the DOE and contractor work streams and promotes a teamwork model to enable collaborative success. Long considered one of the most formidable cleanup challenges at Hanford, the Department of Energy and its contractors are on the verge of achieving a cleanup commitment that has been decades in the making. DOE is preparing to vitrify (turn to glass) Hanford's chemical and radioactive tank waste using the DFLAW process. The Modified Consent Decree milestone for completing hot commissioning of the Hanford Site's Low- Activity Waste Facility is Dec. 31, 2023. While this milestone may seem distant under normal project management circumstances, it is a relatively short period of time for the operational and cultural transformation necessary to successfully begin treating tank waste at Hanford. Direct feed means separating the waste at a tank farm to remove the more radioactive portion (i.e., solids and cesium) so that the resulting low-activity (less radioactive) waste can be fed directly to the Waste Treatment and Immobilization Plant's Low-Activity Waste Facility. Starting DFLAW will require a singular, intensive leadership focus, along with a sustained, collective commitment to excellence and teamwork by the Department and its contractors. Major upgrades to Hanford's infrastructure will occur prior to startup. Supporting DFLAW operations requires significant integration between the DFLAW facilities - the Waste Treatment Plant, Hanford's tank farms, effluent treatment facilities, disposal facilities - and between all of the site contractors to achieve success. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2020 Annual Report of Available Drawdowns for Each Oil Storage Cavern in the Strategic Petroleum Reserve

The Department of Energy maintains an up-to-date documentation of the number of available full drawdowns of each of the caverns owned by the Strategic Petroleum Reserve (SPR). This information is important for assessing the SPR's ability to deliver oil to domestic oil companies expeditiously if national or world events dictate a rapid sale and deployment of the oil reserves. Sandia was directed to develop and implement a process to continuously assess and report the evolution of drawdown capacity, the subject of this report. A cavern has an available drawdown if after that drawdown, the long-term stability of the cavern, the cavern field, or the oil quality are not compromised. Thus, determining the number of available drawdowns requires the consideration of several factors regarding cavern and wellbore integrity and stability, including stress states caused by cavern geometry and operations, salt damage caused by dilatant and tensile stresses, the effect of enhanced creep on wellbore integrity, and the sympathetic stress effect of operations on neighboring caverns. A consensus has now been built regarding the assessment of drawdown capabilities and risks for the SPR caverns. The process involves an initial assessment of the pillar-to-diameter (P/D) ratio for each cavern with respect to neighboring caverns. A large pillar thickness between adjacent caverns should be strong enough to withstand the stresses induced by closure of the caverns due to salt creep. The first evaluation of P/D includes a calculation of the evolution of P/D after a number of full cavern drawdowns. The most common storage industry standard is to keep this value greater than 1.0, which should ensure a pillar thick enough to prevent loss of fluids to the surrounding rock mass. However, many of the SPR caverns currently have a P/D less than 1.0 or will likely have a low P/D after one or two full drawdowns. For these caverns, it is important to examine the structural integrity with more detail using geomechanical models. Finite-element geomechanical models have been used to determine the stress states in the pillars following successive drawdowns. By computing the tensile and dilatant stresses in the salt, areas of potential structural instability can be identified that may represent "red flags" for additional drawdowns. These analyses have found that many caverns will maintain structural integrity even when grown via drawdowns to dimensions resulting in a P/D of less than 1.0. The analyses have also confirmed that certain caverns should only be completely drawn down one time. As the SPR caverns are utilized and partial drawdowns are performed to remove oil from the caverns (e.g., for occasional oil sales authorized by the Congress or the President), the changes to the cavern caused by these procedures must be tracked and accounted for so that an ongoing assessment of the cavern's drawdown capacity may be continued. A proposed methodology for assessing and tracking the available drawdowns for each cavern was presented in Sobolik et al. (2018). This report includes an update to the baseline drawdowns for each cavern, and provides an initial assessment of the evolution of drawdown expenditure for several caverns

02 PETROLEUM↗

Available Drawdowns for Each Oil Storage Cavern in the Strategic Petroleum Reserve (2021 Annual Report)

The Department of Energy maintains an up-to-date documentation of the number of available full drawdowns of each of the caverns owned by the Strategic Petroleum Reserve (SPR). This information is important for assessing the SPRs ability to deliver oil to domestic oil companies expeditiously if national or world events dictate a rapid sale and deployment of the oil reserves. Sandia was directed to develop and implement a process to continuously assess and report the evolution of drawdown capacity, the subject of this report. A cavern has an available drawdown if after that drawdown, the long-term stability of the cavern, the cavern field, or the oil quality are not compromised. Thus, determining the number of available drawdowns requires the consideration of several factors regarding cavern and wellbore integrity and stability, including stress states caused by cavern geometry and operations, salt damage caused by dilatant and tensile stresses, the effect of enhanced creep on wellbore integrity, and the sympathetic stress effect of operations on neighboring caverns. A consensus has now been built regarding the assessment of drawdown capabilities and risks for the SPR caverns (Sobolik et al., 2014; Sobolik 2016). The process involves an initial assessment of the pillar - to - diameter (P/D) ratio for each cavern with respect to neighboring caverns. A large pillar thickness between adjacent caverns should be strong enough to withstand the stresses induced by closure of the caverns due to salt creep. The first evaluation of P/D includes a calculation of the evolution of P/D after a number of full cavern drawdowns. The most common storage industry standard is to keep this value greater than 1.0, which should ensure a pillar thick enough to prevent loss of fluids to the surrounding rock mass. However, many of the SPR caverns currently have a P/D less than 1.0 or will likely have a low P/D after one or two full drawdowns. For these caverns, it is important to examine the structural integrity with more detail using geomechanical models. Finite-element geomechanical models have been used to determine the stress states in the pillars following successive drawdowns. By computing the tensile and dilatant stresses in the salt, areas of potential structural instability can be identified that may represent red flags for additional drawdowns. These analyses have found that many caverns will maintain structural integrity even when grown via drawdowns to dimensions resulting in a P/D of less than 1.0. The analyses have also confirmed that certain caverns should only be completely drawn down one time. As the SPR caverns are utilized and partial drawdowns are performed to remove oil from the caverns (e.g., for occasional oil sales , purchases, or exchanges authorized by the Congress or the President), the changes to the cavern caused by these procedures must be tracked and accounted for so that an ongoing assessment of the caverns drawdown capacity may be continued. A proposed methodology for assessing and tracking the available drawdowns for each cavern was presented in Sobolik et al. (2018). This report is the latest in a series of annual reports, and it includes the baseline available drawdowns for each cavern, and the most recent assessment of the evolution of drawdown expenditure for several caverns .

02 PETROLEUM↗

Available Drawdowns for Each Oil Storage Cavern in the Strategic Petroleum Reserve (2022 Annual Report)

The Department of Energy maintains an up-to-date documentation of the number of available full drawdowns of each of the caverns owned by the Strategic Petroleum Reserve (SPR). This information is important for assessing the SPR's ability to deliver oil to domestic oil companies expeditiously if national or world events dictate a rapid sale and deployment of the oil reserves. Sandia was directed to develop and implement a process to continuously assess and report the evolution of drawdown capacity, the subject of this report. A cavern has an available drawdown if after that drawdown, the long-term stability of the cavern, the cavern field, or the oil quality are not compromised. Thus, determining the number of a vailable drawdowns requires the consideration of several factors regarding cavern and wellbore integrity and stability, including stress states caused by cavern geometry and operations, salt damage caused by dilatant and tensile stresses, the effect of enhanced creep on wellbore integrity, and the sympathetic stress effect of operations on neighboring caverns. A consensus has now been built regarding the assessment of drawdown capabilities and risks for the SPR caverns (Sobolik et al., 2014; Sobolik 2016). The process involves an initial assessment of the pillar-to-diameter (P/D) ratio for each cavern with respect to neighboring caverns. A large pillar thickness between adjacent caverns should be strong enough to withstand the stresses induced by closure of the caverns due to salt creep. The first evaluation of P/D includes a calculation of the evolution of P/D after a number of full cavern drawdowns. The most common storage industry standard is to keep this value greater than 1.0, which should ensure a pillar thick enough to prevent loss of fluids to the surrounding rock mass. However, many of the SPR caverns currently have a P/D less than 1.0 or will likely have a low P/D after one or two full drawdowns. For these caverns, it is important to examine the s tructural integrity with more detail using geomechanical models. Finite - element geomechanical models have been used to determine the stress states in the pillars following successive drawdowns. By computing the tensile and dilatant stresses in the salt, areas of potential structural instability can be identified that may represent "red flags" for additional drawdowns. These analyses have found that many caverns will maintain structural integrity even when grown via drawdowns to dimensions resulting in a P/D of less than 1.0. The analyses have also confirmed that certain caverns should only be completely drawn down one time. As the SPR caverns are utilized and partial drawdowns are performed to remove oil from the caverns (e.g., for occasional oil sales , purchases, or exchanges authorized by the Congress or the President), the changes to the cavern caused by these procedures must be tracked and accounted for so that an ongoing assessment of the cavern's drawdown capacity may be continued. A proposed methodology for assessing and tracking the available drawdowns for each cavern was presented in Sobolik et al. (2018). This report is the latest in a series of annual reports, and it includes the baseline available drawdowns for each cavern, and the most recent assessment of the evolution of drawdown expenditure for several caverns.

02 PETROLEUM↗

A Multi-Stage Stochastic Risk Assessment With Markovian Representation of Renewable Power

Probabilistic forecasts provide a distribution of possible outputs and so can capture the uncertainty and variability of Variable Renewable Energy (VRE). However, taking advantage of uncertainty information has practical challenges that make it difficult to integrate probabilistic forecasting into control room decision-making. This paper proposes a novel use-case for probabilistic forecasts by incorporating them into the hour-ahead operations for situational awareness via a risk-averse multi-stage stochastic program. We employ a Markovian representation of the probabilistic forecasts that enables the formulation of the multi-stage problem and avoids a scenario generation phase. We test the model on a realistically sized system to assess risk and showcase the capability of using probabilistic renewable forecast as input to produce probabilistic output forecasts of future system states. The results show that the model can capture time consistency in the reserves and Area Control Error (ACE) forecast. The solution times are adequate for risk profiling in hour-ahead timescales.

forecasting↗

Physically Realistic Estimates of Electric Water Heater Demand Response Resource

Multiple grid integration studies have examined the value of demand response, including from water heaters, to bulk power systems. Common shortcomings of these studies include physically unrealistic assumptions. For example, studies often assume that all electric water heater load can be shed for up to an hour to provide capacity or contingency service, that all electric water heater load is shiftable, and that round-trip efficiencies for shifting service are 100%. Another issue is that simply summing up estimates of individual water heaters' flexibility bounds, an attractive idea for constructing the MW-scale resources necessary for direct inclusion in grid investment and operational models, can result in significant overestimates of actual resource, because, e.g., a water heater with the ability to reduce load may not be able sustain the reduction for as long as the aggregate model suggests is possible. This presentation demonstrates the impact of estimating the flexibility of electric water heaters with physically realistic models suitable for grid service analysis. Electric water heater flexibility representations are constructed based on ResStock simulations of New England. Specifically, we examine contingency resource (related to capacity, shed, and contingency reserve services) and energy shifting resource from electric resistance and heat pump water heaters. Different estimation methods are compared; and the surrogate models' event responses are validated against events directly simulated in EnergyPlus. We also demonstrate the impact of using electric water heaters for contingency reserves and energy shifting in detailed models of possible future ISO New England power systems.

building energy modeling↗

High-resolution in-beam video rate imaging with the ClearXCam for synchrotron beamlines

The ClearXCam detector is a new video rate imaging in-beam monitor based on a diamond sensor. Imaging with 2304 effective pixels is achieved by sequentially biasing one of 48 metal stripes on one side of a diamond sensor, while reading out the current from 48 stripes on the other side of the sensor. This system was characterized for real-time X-ray beam diagnostics at synchrotron beam­line 17-BM at the National Synchrotron Light Source II. Significant results include: detection of in-beam structure via the imaging mode, beam focusing in one minute with real-time imaging feedback during a focusing event, linearity over five orders of magnitude, validation of a fast mode operating at 100 Hz, and sub-micron beam-positioning resolution. The system is now available commercially.

36 MATERIALS SCIENCE↗

Section 3 Reporting: Preserve America

Brookhaven National Laboratory (BNL) is a multidisciplinary laboratory with seven Nobel Prize-winning discoveries, 37 R&D 100 Awards, and countless advances in science and technology. For over 75 years, the Laboratory has played a leading role in the Department of Energy (DOE) Science and Technology mission and continues to contribute to the DOE’s missions in energy resources, environmental quality, and national security. The Laboratory is operated and managed by Brookhaven Science Associates (BSA), which was founded by the Research Foundation for the State University of New York on behalf of Stony Brook University, and Battelle, a non-profit applied science and technology organization. BNL is committed to longstanding partnerships with researchers, academic institutions, industry, students, teachers, and the surrounding community. BNL is located near the center of Suffolk County on Long Island, New York within Brookhaven Township, about 60 miles east of New York City. Most of BNL’s principal facilities are located near the center of the 5,265-acre (8.23 square mile) site (Figure 1). The developed area encompasses approximately 1,820 acres, consisting of: ▪ 500 acres originally developed by the Army (as part of WW II Camp Upton) and still used for offices and other operational buildings. ▪ 200 acres occupied by large, specialized research facilities. ▪ 520 acres occupied by outlying facilities, such as the Sewage Treatment Plant, research agricultural fields, housing facilities, and fire breaks. ▪ 400 acres of roads, parking lots, and connecting areas. ▪ 200 acres developed for the Long Island Solar Farm. The balance of the site, approximately 3,400 acres, is largely wooded and represents a native pine barrens ecosystem. In November 2000, DOE set aside 530 acres of undeveloped land at BNL as the Upton Ecological and Research Reserve. The Upton Reserve preserves this portion of the pine barrens ecosystem and provides an area for ecological research and education activities.

99 GENERAL AND MISCELLANEOUS↗