Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “met”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Advanced Reactor Supply Chain Assessment (GAIN Report)

Several net-zero scenario evaluations predict a rapid ramp up of nuclear energy in the coming decades. If this materializes, it will most likely strain the supply chains associated with the potential advanced reactor concepts awaiting deployment. To help assess the current and potential capacities of the various advanced reactor supply chains, the Gateway for Accelerated Innovation in Nuclear (GAIN) conducted a survey of companies able to produce components for advanced reactors in the near future (namely for sodium, gas-cooled, and molten salt reactors). Using an aggressive nuclear deployment scenario, the objective was to assess the ability of the various supply chains to meet the considerable demand projections for certain key components (vessels, heat exchangers, pumps, graphite, and sensors) and identify potential challenges. While individual companies were unable to meet the most optimistic nuclear deployment rate projections, it was found that on aggregate, a United States-based supply chain projected that expansion could be ramped up to meet a larger future demand of these components. However, meeting projected demand for several more complex items (namely gas or salt heat exchangers) was found to be more challenging. Deploying new reactors at scale necessitates the production of more and more supply chain components, requiring a ramp up in production. Supply chain companies were surveyed, and respondents appeared less able to meet short term demand (next year) versus longer-term demand projections (5 and 10 years). This reflects the need to obtain orders with adequate lead times (can range from 3 to 30 months). Future demand will need to be met by expanding existing capacity. These expansions will require suppliers to raise capital or secure other types of support (federal loans or grants) to invest in facilities, equipment, and workforce. Individual suppliers indicated financial investments could be in the range of $\$ $100 million to $\$ $1 billion for their own facilities (depending on the type of facility). The biggest risk, according to respondents, related to general uncertainties surrounding the future nuclear industry and whether the potential demand projections will materialize into real demand that is actionable from a business perspective. Businesses do not seem willing to take investments risks without clear orders. If businesses are not able to invest to expand the supply, it will either delay the deployment of advanced nuclear technology, or the supply chain will be met by suppliers outside of the United States. This report only focuses on the domestic supply chain’s ability to meet the various projections stipulated here for the specific assessed components (vessels, heat exchangers, pumps, graphite, and sensors). The report does not cover all reactor designs or all components that may ultimately be needed for any one reactor design. It also does not address whether any specific aspect of the supply chain will be cost competitive in the global market, nor how potential state-backed entities could affect the expansion of a United States-based supply chain. The largest challenges in ramping up capacity among respondents appear to be workforce related. This includes workforce availability, experience, training, and turnover. In addition to facility investment, suppliers will also need to invest heavily in long-term workforce training to meet production goals. This issue is not nuclear-specific, and the expansion of any supply chain will likely face similar challenges. While suppliers evaluated expected normal business demand from other markets outside of nuclear, it is possible that other market segments could expand more than predicted and compete for the same suppliers. One potential market that may compete for the same supplier resources is the United States military, as many of these suppliers support both the commercial nuclear sector as well as the Navy with reactors and components. In summary, suppliers in the United States believe that there is a way to increase production in order to begin meeting the demand which will exist for advanced reactors—as long as appropriate investments can be made in the supply chain in an appropriate timeframe. Based on the capacity projections and lead times, investment will be needed to meet the 5-year and 10-year production targets. Therefore, if significant nuclear deployment is to occur in the 2030s, investment and ramp up of the advanced nuclear supply chain will need to begin in the near future for the United States to successfully deploy these advanced reactors with domestic supply chains.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

High Performance PEFC Electrode Structures

Raytheon Technologies Research Center (RTRC) in collaboration with Ion Power Inc. and the University of Arkansas at Little Rock and the FC-PAD consortium executed a project that: (1) developed comprehensive models of oxygen and proton transport in cathode catalyst layers that provided new insights about losses associated with reducing platinum loading to 0.1 mg/cm 2 , (2) designed, fabricated, characterized, and tested cells featuring carbon-supported catalyst layers with low platinum loadings that met efficiency and power density targets set forth by the Hydrogen and Fuel Cells Technology Office, and (3) designed, fabricated, characterized, and tested novel catalyst structures. The modeling efforts produced eight scientific publications that shared new descriptions of oxygen and proton transport in catalyst layers with the broader technical community. The key physical insights from the models are expressed in straightforward algebraic expressions, facilitating easy adoption by other researchers. The models developed during the project explain why resistance to oxygen transport is inversely proportional to interfacial area of platinum – an observation that eluded quantitative explanation for a decade. The models quantitatively predict polarization when measured morphological parameters and transport properties are input. Membrane-electrode assemblies made during the project met stated goals for current at high voltage and power density at rated voltage for transportation fuel cells at the end of budget period 2. High performance was achieved by developing a diffusion layer with low resistance to oxygen transport and a PtCo/C cathode catalyst layer capable of supporting rapid proton and oxygen transport. The project was subsequently directed to curtail experimental work and focus on modeling during budget period 3. Ion Power Inc. developed new expertise in fabricating catalyst layers containing platinum-cobalt catalysts, and processing very thin membranes. The University of Arkansas at Little Rock developed novel nanocolumnar self-supported thin film electrocatalysts that can be grown on carbon supports using a simple high pressure sputter deposition method. The nanocolumnar microstructure provides adequate surface-to-volume ratio for efficient platinum utilization, and the conformal platinum shell with larger crystal grain sizes covering the carbon support surface may eliminate durability issues associated with catalyst dissolution, agglomeration, and carbon corrosion.

08 HYDROGEN↗

Laser Diode Analysis and Verification (Professional Report)

The goal of this project at Lawrence Livermore National Laboratory (LLNL) was focused on analyzing and verifying laser diodes to ensure that the diodes meet requirements for LLNL mission applications. The different stages of this testing were documented in a process flow map which included location color coding so that each step was clearly defined in scope and location of appropriate testing facility. Data were collected and analyzed and compared to minimum acceptable values to see if requirements were met. The process map documents the initial receipt, inspection, and testing of the laser diodes. Initial inspections started with Keyence Microscope imaging and then moved on to High Potential, Ramp, and Burst Testing. Data from the diode testing were processed through MATLAB and Python codes to verify various metrics such as slope efficiency, threshold current, back irradiance, and beam divergence met requirements. These metrics were then recorded in Excel summary reports. Approximately 95% of the laser diodes passed all tests. Presentations were given to Lawrence Livermore’s internal leadership team, an external partner, and to a Lab-wide audience. The data released for this report was constrained by information protection considerations of LLNL’s national security missions.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

White Paper On Nuclear Structure Reactions and Astrophysics

In preparation for the 2023 NSAC Long Range Plan (LRP), the DNP Town Meeting on Nuclear Structure, Reactions, and Astrophysics was held at Argonne National Laboratory (ANL) on Nov 14-16, 2022. The town meeting brought together 578 members of the low-energy nuclear science community, including 216 in-person attendees and 362 remote participants coming from US national laboratories, a wide range of US universities and other research institutions and universities abroad. Participants met in five topic-oriented and seven cross-cutting and intersecting working groups to discuss progress since the 2015 LRP and identify compelling science opportunities and the resources needed to realize them. These considerations were used during the Town Meeting to determine a set of resolutions outlining the highest priorities for our subfield. The full text of the resolutions endorsed by unanimous consent by the low-energy nuclear science community at the Town Meeting is presented at the end of this executive summary. The reports from all working groups that met during the Town Meeting are included as Secs. 1 to 11 of this Whitepaper. The intellectual challenges for nuclear structure, reactions and astrophysics can be captured in the following questions: What is the nature of the nuclear force that binds protons and neutrons into stable nuclei and rare isotopes, and how do the rich phenomena of nuclear structure and reactions emerge? How do single-nucleon, cluster, and collective degrees of freedom coexist and evolve with increasing proton-neutron imbalance and excitation energies? What are the limits of nuclear existence, and what features arise near and beyond these limits? What are the astrophysical origins of the elements and how did the associated chemical evolution proceed? How do stars evolve, and what nuclear signatures do they leave behind? What is the nature of neutron stars and dense matter? How can the knowledge and technological progress provided by nuclear science best be used to benefit society?

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Bench-Scale Testing of a High Efficiency, Ultra-Compact Process for Pre-Combustion CO 2 Capture (Final Report)

The overarching objective of this bench-scale study is to field-validate the technical feasibility of a membrane- and adsorption-enhanced water gas shift (WGS) reaction process that employs a carbon molecular sieve (CMS) membrane reactor (MR) followed by an adsorption reactor (AR) for pre-combustion CO 2 capture while demonstrating progress towards achievement of the overall performance goals of CO 2 capture with 95% CO 2 purity at a cost of electricity (COE) of 30% less than the baseline capture approaches. The main goal of this bench-scale project is to advance the proposed MR-AR transformative CO 2 capture technology to a sufficient maturity level so that our present industrial partners (M&PT and Worley) can potentially adapt the technology for further small pilot-scale testing. The project began at TRL 4, as the system prototype had already been validated in the laboratory on simulated syngas (as part of project DE-FE0026423). The project ended at TRL 5, via scaling-up of the prototype system and testing it on actual syngas at a host site (CAER at the University of Kentucky (UKy)). The project was carried-out in two different phases: In Phase I (during BP1 of the project), the team designed, constructed, and assembled the bench-scale experimental MR-AR system, prepared the membranes, adsorbents, and catalysts, tested the bench-scale unit with simulated syngas to validate functionality, and prepared a preliminary TEA of the technology. In Phase II (during BP2 of the project), the team installed the unit at the test site at the UKy site and completed all utility connections and hookups, field-tested the novel MR-AR process in the bench-scale system using real syngas, collected and analyzed experimental data, and completed a detailed TEA of the technology. A key aim of the project was to identify and address the technical and process risks and to generate information to advance the technology to the next stage of development. All project milestones and success criteria were met. Specifically, the team: (i) designed, constructed and assembled a bench scale system that handled 1 – 5 scfm syngas and tested its functionality with simulated syngas; (ii) prepared high performance CMS membrane tubes (ID: 3.5 mm, OD: 5.7 mm, 30” long) that meet the target H 2 permeance ( > 1 m 3 /(m 2 .hr.bar) or (> 370.3 GPU)) and a target H 2 /CO selectivity >80 at the relevant temperature (up to 300oC) and pressure conditions (up to 25 bar) with a <10% decline in performance over each 250 hr. testing period (iii) procured commercial sour-shift catalyst in sufficient quantity and prepared up to 10 kg of pelletized adsorbent for use at relevant conditions (250oC 2.5wt.% and target sorbent attrition rate < 0.2; (iv) installed the bench-scale unit at the test site (UKy) and tested the MR-AR technology using real syngas for over 250 hr. for both static and flow experiments; (v) updated the TEA analysis based on bench-scale data and met CO 2 capture goals of 95% CO 2 purity at a cost of electricity 30% less than baseline capture approaches. The CMS membranes, HTC adsorbents and catalysts employed all exhibited very robust and stable performance during the long-term run (over a >250 hr live syngas run). Furthermore, the proposed MR-AR IGCC system achieved a LCOE with a N 2 sale price of $\$$ 30/ton, with N 2 compression (no N 2 compression) of 101.2 $\$$/MWh (95.3 $\$$/MWh), which represents a 29.8% (33.9%) LCOE reduction in the baseline IGCC with carbon capture of 144.2 $\$$/MWh. The proposed MR-AR IGCC delivers a CO 2 capture cost of 44.8 $\$$/tonne (39.9 $\$$/tonne) vs 98.1 $\$$/tonne of the baseline capture case and a net power production of 586 MWe (623 MWe) vs 556 MWe of the baseline capture case.

01 COAL, LIGNITE, AND PEAT↗

Meteorological Services Annual Data Report for 2023

This document presents the meteorological data collected at Brookhaven National Laboratory (BNL) by Meteorological Services (Met Services) for the calendar year 2023. The purpose is to publicize the data sets available to emergency personnel, researchers and facility operations. Met services has been collecting data at BNL since 1949. Data from 1994 to the present is available in digital format. Data is presented in monthly plots of one-minute data. This allows the reader the ability to peruse the data for trends or anomalies that may be of interest to them. Full data sets are available to BNL personnel and to a limited degree outside researchers. The full data sets allow plotting the data on expanded time scales to obtain greater details (e.g., daily solar variability, inversions, etc.).

54 ENVIRONMENTAL SCIENCES↗

Performance Audit Report: Automated Meteorological Monitoring Stations, Lawrence Livermore National Laboratory

The Waste and Air Quality Offices Group at the Lawrence Livermore National Laboratory operates two main meteorological monitoring sites near Livermore, California. The primary met tower (Site 200) is located in the northwest corner of the lab and consists of a fifty-two (52) meter tower with vertical wind speed sensors, horizontal wind speed and direction sensors and air temperature sensors at fifty-two (52) meters, twenty-three (23) meters and ten (10) meters. In addition, there is a temperature and humidity probe at ten (10) meters. At two (2) meters there are upward and downward facing solar and infrared radiation sensors, an air temperature sensor, barometric pressure sensor and a temperature and relative humidity probe. At ground level there is a tipping bucket rain gauge located to the southwest of the tower. The datalogger, communication peripherals and the barometric pressure sensor are housed in a small building near the tower. The Site 300 met site is located approximately 10 miles east of Livermore within the boundary of the LLNL blast test site. This site also consists of a 52-meter tower which is configured the same as the 52-meter tower at Site 200. There is also a building at this site that houses the datalogger, communication peripherals and the barometric pressure sensor. At both Site 200 and Site 300, data are collected by Ethernet with telephone modem collection as a backup. The data collection interval for both sites is fifteen (15) minutes via workstations running Loggernet software located at the main lab facility. The audits of the Lawrence Livermore National Laboratory’s two automated meteorological stations located near Livermore, California were performed on October 24 & 25, 2023. These audits were performed under the guidelines of the Quality Assurance Handbook for Air Pollution Measurement Systems, Volume IV, Version 2 and the On-Site Meteorological Program Guidance for Regulatory Modeling Applications, U.S. EPA.

54 ENVIRONMENTAL SCIENCES↗

January 2023 Semiannual Saltstone Toxicity Characteristic Leaching Procedure (TCLP) Results

The aqueous waste from Tank 50 (salt solution) is sampled semiannually for transfers to the Saltstone Production Facility (SPF). Salt solution is treated at SPF and disposed of in the Saltstone Disposal Facility (SDF). Per request of customer, X-TTR-Z-00027, Revision 0, two SDF waste form (saltstone) samples were prepared in the Savannah River National Laboratory (SRNL) from the Tank 50 Waste Acceptance Criteria (WAC) sample and Z-area premix material for January 2023 semiannual Toxicity Characteristic Leaching Procedure (TCLP) samples. One sample contained a Full Premix which included 10:45:45 (by weight) of cement, slag, and fly ash. The second sample contained 60:40 (by weight) of slag and fly ash only referred to as the “Cement-Free grout sample.” Results from the technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request (TTR) prepared by Savannah River Mission Completion (SRMC). After at least 28 days cured, a sample of each of the SDF waste forms was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure (TCLP). The January 2023 semiannual saltstone (Full Premix) and the Cement-Free grout samples met the South Carolina (SC) Code of Regulations for Hazardous Waste Management Regulations (HWMR) 61-79.261.24 and 61-79.268.48 requirements for a non-hazardous waste form with respect to the Resource Conservation and Recovery Act (RCRA) metals and Underlying Hazardous Constituents (UHCs), and also met the SPF WAC that was in effect at the time of the tank sampling.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mono-Ether and Alcohol Bioblendstocks to Reduce the Fuel Penalty of Mixing Controlled Compression Ignition (MCCI) Engine Aftertreatment

An integrated approach utilizing catalysis experiments, process systems engineering, fuel property modeling, and engine testing was utilized in this project to optimize the production process and composition of a #2 diesel bioblendstock produced from ethanol consisting primarily of long-chain mono-ethers. The primary objective of the project was to determine the composition and to design the production process for a bioblendstock for #2 diesel fuel with > 50% reduction in greenhouse gas emissions relative to conventional diesel fuel. The desired bioblendstock needed to be blendable with #2 diesel fuel at > 5 vol. % while still meeting ASTM D975 diesel fuel specification properties and achieving improvements in fuel properties: increased cetane number, decreased sooting, and reduced pour point and cloud point temperatures. At the same time, it needed to reduce the fuel energy penalty associated with MCCI engine aftertreatment resulting in improved system efficiency. The findings of the current project demonstrate that primary objective of the work has been met, i.e., to determine the composition and to design the production process for a bioblendstock for #2 diesel fuel with > 50% reduction in greenhouse gas emissions relative to conventional diesel fuel. Additionally, the results indicate that the property objectives (increased cetane number, reduced pour and cloud points, and reduced sooting propensity) for the designed bioblendstock composition have also been met. Engine testing performed has also confirmed that the increased reactivity of the bioblendstock can be used to improve catalyst heating operation and to reduce the fuel penalty associated with this operation mode. The fuel property results demonstrate that >5 vol.% blending is easily achieved while meeting the ASTM D975 #2 diesel fuel property specifications tested in this work, as this was achieved for a blend with 43 vol. % of the bioblendstock. The results provide a foundation for future work to scaleup the catalytic production process designed in this work, with many of the challenges and areas for improvement being identified in this work to enable economic production with low GHG lifecycle emissions.

09 BIOMASS FUELS↗

Residential Cold Climate Heat Pump Technology Challenge (Rheem) (CRADA NFE-22-09374 Final Report)

The purpose of this CRADA was to test a nominal 3-ton capacity heat pump system supplied by Rheem Manufacturing to determine if it met the laboratory test requirements of the United States Department of Energy Cold Climate Heat Pump (CCHP) Technology Challenge (hereafter noted as “the Challenge”). Results of the laboratory testing completed at ORNL demonstrated that the system met all requirements of the Challenge. Rheem Manufacturing has successfully completed this aspect of the Challenge. This CRADA report will briefly describe the CCHP Challenge, the test plan created to measure the success of heat pump systems provided by CCHP Challenge participants, and the results of laboratory testing of the Rheem heat pump system.

42 ENGINEERING↗

U.S. DOE Midwest Combined Heat and Power Technical Assistance Partnership (Midwest CHP TAP) (Final Technical Report)

The University of Illinois Chicago (UIC) was awarded the U.S. DOE Midwest Combined Heat and Power Technical Assistance Partnership (Midwest CHP TAP) program to provided technical and policy expertise to support local opportunities to promote CHP, waste heat to power, district energy, and microgrids in the Midwest and Central regions of the U.S. that included the states of Illinois, Indiana, Iowa, Kansas, Michigan, Minnesota, Missouri, Nebraska, Ohio, and Wisconsin. During this contract period, UIC, through the Midwest CHP TAP activities, provided significant regional support to the U.S. strategic goals of: 1) Stimulating America’s Energy Revolution and Promoting Energy Independence; 2) Promoting Jobs and Manufacturing Competitiveness; 3) Supporting a Positive Trade Balance; 4) Enhancing Energy System Resiliency and Energy Security; and 5) Improving the Nation’s Infrastructure. UIC met the annual go/no-go metrics each year and either met and/or exceeded the milestones each year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

LANL Meteorology Program Self-Assesment 2024 Update

The DOE Meteorological Coordinating Council (DMCC) conducted an initial LANL Meteorological (Met) Program Assist Visit in August 2006 (DMCC 2006). A follow-up assist visit in August 2015 assessed progress (DMCC 2015), and in June 2023, the DOE Meteorological Subcommittee (DMSC), successor to the DMCC, conducted a second follow-up assist visit (DMSC 2023), in which the Met Program was evaluated relative to the following 8 high-level questions.

54 ENVIRONMENTAL SCIENCES↗

April 2024 Semiannual Composite Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) Toxicity Characteristic Leaching Procedure (TCLP) Results

The aqueous waste from the Salt Waste Processing Facility (SWPF) is sampled semiannually for transfers to the Saltstone Production Facility (SPF). Salt solution is treated at SPF and disposed of in the Saltstone Disposal Facility (SDF). Per request of customer, X-TTR-Z-00027, Revision 0, one SDF waste form (saltstone) sample was prepared in the Savannah River National Laboratory (SRNL) from the SWPF Decontaminated Salt Solution (DSS) Waste Acceptance Criteria (WAC) sample and Z-area premix material for the April 2024 semiannual Toxicity Characteristic Leaching Procedure (TCLP) sample. The sample contained 60:40 (by weight) of slag and fly ash (referred to as the “Cement-Free grout sample”). Results from the technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request (TTR) prepared by Savannah River Mission Completion (SRMC). After at least 28 days cured, a sample of the SDF waste form was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure (TCLP). The April 2024 semiannual Cement-Free grout sample met the South Carolina (SC) Code of Regulations for Hazardous Waste Management Regulations (HWMR) 61-79.261.24 and 61-79.268.48 requirements for a non-hazardous waste form with respect to the Resource Conservation and Recovery Act (RCRA) metals and Underlying Hazardous Constituents (UHCs), and met the SPF WAC that was in effect at the time of the tank sampling.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Meteorological Services Annual Data Report for 2024

This document presents the meteorological data collected at Brookhaven National Laboratory (BNL) by Meteorological Services (Met Services) for the calendar year 2024. The purpose is to publicize the data sets available to emergency personnel, researchers and facility operations. Met services has been collecting data at BNL since 1949. Data from 1994 to the present is available in digital format. Data is presented in monthly plots of one-minute data. This allows the reader the ability to peruse the data for trends or anomalies that may be of interest to them. Full data sets are available to BNL personnel and to a limited degree outside researchers. The full data sets allow plotting the data on expanded time scales to obtain greater details (e.g., daily solar variability, inversions, etc.).

54 ENVIRONMENTAL SCIENCES↗

Annual Status Report (FY 2024): Performance Assessment for the Integrated Disposal Facility

The purpose of this Annual Summary Report (ASR) for Fiscal Year (FY) 2024 is to evaluate the continued adequacy of the Integrated Disposal Facility (IDF) Performance Assessment (PA) and Disposal Authorization Statement (DAS). This report consolidates relevant monitoring data, modeling analyses, and regulatory reviews to demonstrate a reasonable expectation that the PA objectives and performance measures will be met, as required under DOE O 435.1. The ASR follows the guidance in DOE-STD-5002-2017, which provides a framework for maintaining the validity of the DAS through periodic assessment of facility performance and compliance with waste disposal requirements. The IDF is a near-surface disposal facility designed to receive and permanently dispose of low-level waste (LLW) and mixed low-level waste (MLLW) generated from Hanford Site operations. The facility consists of two double-lined disposal cells equipped with leak detection and leachates recovery systems to ensure environmental protection. Waste planned for disposal includes vitrified low-activity waste (LAW) and solid secondary waste (SSW) from the Hanford Waste Treatment and Immobilization Plant (WTP). At the end of FY 2024, the IDF had not yet received any waste, as it remains in a pre-operational state. Disposal activities will begin with the hot commissioning of the WTP LAW Vitrification Facility using the Direct-Feed Low-Activity Waste (DFLAW) approach in Calendar Year (CY) 2025. This ASR justifies the continued adequacy of the PA and DAS by reviewing key documents and data sources. these sources are listed in Table A-2 in Appendix A.4): The Operating Disposal Authorization Statement (ODAS) for the IDF (DOE-EM, 2021) remains in effect, with no outstanding conditions or key issues affecting its implementation. Based on the comprehensive review of PA analyses, monitoring data, and regulatory compliance activities, this ASR concludes that the IDF remains in compliance with DOE O 435.1, and there is reasonable assurance that the PA performance objectives will be met once disposal operations commence in CY 2025.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant Effluent Management Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Hanford Tank Waste Treatment and Immobilization Plant Effluent Management Facility (EMF) stack monitor location was qualified using a combination of scale model stacks to mitigate the risk of identifying that the sampling location does not meet the qualification criteria on the full-scale stack. The LV-S1 scale model stack was used as a baseline, augmented by the LB-S1 and LV-S2 scale model stacks to address the Direct Feed Low Activity Waste Effluent Management Facility Vessel Vent Process (DVP) injection into the main Active Confinement Ventilation (ACV) system duct. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling locations were geometrically similar to the actual stack, and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. The LV-S1, LB-S1, and LV-S2 scale model stack tests have met the criteria of the ANSI/HPS N13.1-1999 standard to demonstrate the stack sampling locations are well mixed. Verification tests of the EMF stack were performed at normal operating conditions. The minimum 1/6 DV value and the maximum 6 DV value from the scale model testing determine the range of stack flow rates for which the full-scale stack may be operated while remaining in compliance with the stack verification criterion. A practical range for the full-scale stack qualification uses the average DV through 6 DV from the scale model tests to compute the corresponding flow rates. Table S1 lists the operating flow rate along with the average and maximum qualified stack flow rate based on the LV-S1 scale model DV values. The operating flow is below the maximum qualified stack flow, which means that the scale model test results are acceptable for stack qualification. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be ≤20°. Second, the velocity uniformity at the full-scale stack must be ≤20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack test at the EMF. Flow angle results were <5°; all flow angle results were within the ≤20° criterion. The velocity uniformity results for each test condition ranged between 2.2% COV and 4.3% COV, all of which were within the range of the target % COV values from the scale model tests on the LV-S1, LB-S1, and LV S2 scale models. Based on these stack verification test results, the EMF filtered exhaust stack sampling location meets the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all planned fan operating configurations. This includes each combination of ACV fans with DVP exhausters. Further changes to the system configuration or operating conditions that are outside the qualified flow rates described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

October 2024 Semiannual Composite Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) Toxicity Characteristic Leaching Procedure (TCLP) Results

The aqueous waste from the Salt Waste Processing Facility (SWPF) is sampled semiannually for transfers to the Saltstone Production Facility (SPF). Salt solution is treated at SPF and disposed of in the Saltstone Disposal Facility (SDF). Per request of customer, X-TTR-Z-00027, Revision 0, one SDF waste form (saltstone) sample was prepared in the Savannah River National Laboratory (SRNL) from the SWPF Decontaminated Salt Solution (DSS) Waste Acceptance Criteria (WAC) sample and Z-area premix material for the October 2024 semiannual Toxicity Characteristic Leaching Procedure (TCLP) sample. The sample contained 60:40 (by weight) of slag and fly ash (referred to as the “Cement-Free grout sample”). Results from the technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request (TTR) prepared by Savannah River Mission Completion (SRMC). At 64 days cured, a sample of the SDF waste form was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure (TCLP). The October 2024 semiannual Cement-Free grout sample met the South Carolina (SC) Code of Regulations for Hazardous Waste Management Regulations (HWMR) 61-79.261.24 and 61-79.268.48 requirements for a non-hazardous waste form with respect to the Resource Conservation and Recovery Act (RCRA) metals and Underlying Hazardous Constituents (UHCs), and met the SPF WAC that was in effect at the time of the sample collection at SWPF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Test Report for the Regulatory Testing of the Welded Isotek-SFC-W-3 Special Form Capsule

Two prototypes the welded ISOTEK-SFC-W-3 special form capsules (SFCs) of the same design were evaluated to determine if the requirements of Title 49, Code of Federal Regulations (CFR), Part 173.469, Tests for Special Form Class 7 (Radioactive) Materials, were met. The results of the special form tests are documented in this test report. This report describes the special form testing activities performed on the two welded ISOTEK-SFC-W-3 capsules. The test units were designated as TU-1 and TU-2. TU-1 was subjected to leak testing, percussion testing, and impact testing. TU-1 was leak tested using the leak rate test specified in 49 CFR 173.469(a)(4)(i). The impact test on TU-1 was conducted according to the requirements in 49 CFR 173.469 (b)(1). The percussion test that was carried out on TU-1 was conducted in accordance with 49 CFR 173.469 (b)(2). TU-2 was subjected to a leak rate test as specified in 173.469(a)(4)(i) and a heat test as specified in 49 CFR 173.469(b)(4). Each test unit was leak tested before and after these respective tests. The leak rate tests performed were helium back-pressure tests and bubble tests, as specified in American National Standards Institute (ANSI) N14.5-2014. The measured leak rates were converted to standard condition leak rates as specified in American Society for Testing and Measurement (ASTM) E 493. The determined standardized leak rates obtained from the test and the calculations for all the test units met the requirements for special form certification. The testing was performed under the direction of the Oak Ridge National Laboratory (ORNL) Package Testing Program (PTP).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗