Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “long pulse operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

200 records · Page 12

Charge per Micro-Pulse Calculation for Ideal Lujan and WNR beams

A complete redesign of the LANSCE front-end is currently under development for the Los Alamos Modernization Project (LAMP). This includes the replacement of the traditional Cockroft-Walton injection system to the newer radiofrequency quadrupole (RFQ) standard. LANSCE accelerates both H- and H+ beams and therefore requires an unconventional application for RFQ systems. A new facility could consider using an independent RFQ for each beam species. However, with the tight space of the LANSCE injector facility, it would prove difficult to instrument. Our initial studies have shown that a single RFQ could be used. The negatively- and positively-charged direct current (DC) beams are shaped, bunched, and accelerated out of phase to each other, with very little interaction. This would work for all possible H+ beam gates and most H- Beam gates. However, a challenge arises with the Weapons Neutron Research (WNR) beam structure that requires the acceleration of bunched beams at higher charge density per pulse. The Long Bunch Enable Gate (LBEG) used for the Lujan center is the best example of a standard injector beam gate. The beam gate, or Macro-Pulse (MP), is 625-us long, separated by at least 8.3 ms. A chopper is used to dice the MP into 1750 mini-Pulses (mP), which are 290-ns wide. After chopping, the MP contains 100,000 micro-Pulses (uP), which are generated by the linac acceleration structure modulated at 201.25 MHz; that is, the micro-Pulses are separated 5 ns apart from each other. The H+ beam structure will be very similar once a chopper is added to its transport. However, the Multi-Pulse Enable Gate (MPEG) used for WNR is significantly different in structure. In this case, the mP is chopped to be only 35-ns wide. This width is then rotated into a single 201.25 MHz RF bucket using the Low Frequency Buncher (LFB). This is proving difficult for the RFQ design in the LAMP upgrade. We began investigating the amount of current sent to WNR for two reasons. Firstly, we wanted to find a solution to avoid using the Low Frequency Buncher to simplify the LAMP RFQ design. It is simple to inject and accelerate a 35 mA DC beam in the LAMP RFQ (this is done in numerous accelerator facilities). However, injecting a short bunch with a larger current (once compressed to 5 ns to meet the RFQ frequency) may be difficult. Second, we have a technique called PSR2WNR in which we do not employ the Low Frequency Buncher, but rather accumulate 5 LBEG uP (5 ns) in the PSR and deliver the accumulated beam to WNR every 1.8 us. As a result, we could provide to WNR with five accumulated LBEG uPs every shot. The goal here is to create a rapid kicker with a frequency response of 555 kHz. DARHT-II and other accelerator facilities have constructed kickers of this type for other uses, and our engineers consider this technology as feasible.

43 PARTICLE ACCELERATORS↗

Experimental Study of the 3 He and Neutron Spin Structure at Low Q 2 and The Upgrade of the JLab Polarized 3 He Target

In the scattering process off a nuclear or nucleon target, the Gerasimov-Drell-Hearn (GDH) sum rule for real photons (Q 2 =0 where Q 2 &equiv; -q 2 with q the photon's 4-momentum) relates static properties of the target particle's ground state to dynamic properties of all its excited states. On the other side of the Q 2 spectrum, the Bjorken sum rule holds in the Bjorken limit Q 2 &rarr; &infin;. Bjorken sum rule relates the final structure functions of the proton and neutron to the nucleon axial coupling constant in weak decay. These two sum rules belong to domains where calculations are achievable but use different degrees of freedom: hadronic degrees of freedom at low Q 2 versus partonic degrees of freedom at intermediate Q 2 . Meanwhile, different methods have been used to connect the two sum rules at finite Q 2 values: Chiral Perturbation Theory is used to expand the GDH sum rule while Operator Product Expansion is used to expand the Bjorken sum rule. In recent decades, improvements in polarized beam and polarized target techniques have made it possible to test theoretical predictions in the intermediate Q 2 region. During the Jefferson Lab (JLab) Hall A E97110 experiment, a precise measurement of polarized cross sections was performed at 0.02 < Q 2 < 0.3 GeV 2 using a polarized 3 He target as an effective polarized neutron target. The measured data allowed us to test predictions of Chiral Perturbation Theory at very low Q 2 . Furthermore, an extrapolation to the real photon point Q 2 =0 tests the GDH sum rule on the neutron. In order to reach the small angles necessary for the low Q 2 range, a new septum magnet was installed in Hall A for this experiment. Unfortunately, the magnet was mis-wired during initial running. There were therefore two periods for this experiment: the first period had the defective magnet due to mis-wiring; while in the second period, the magnet had been fixed and was working properly. The cross sections and the asymmetries for the first period must be extracted using a difficult and unusual method employing focal plane variables in the spectrometer. In the work described in this thesis, the target-plane and focal-plane method will be established first and confirmed by elastic scattering cross section measurements from carbon foil and 3 He targets. Cross sections and asymmetries of inelastic scattering were then extracted using the same method, which constitute the main physics results of this thesis. Preliminary results on ITT , the integral of the polarized cross section, were also extracted and are presented in this thesis. In addition to the data analysis of E97110, this thesis includes instrumentation work performed on the polarized 3 He target at JLab. For the 12 GeV program of JLab, the polarized 3 He target is being upgraded to satisfy new experimental requirements. The new target is a convection-based cell with two transfer tubes rather than a single transfer tube as in the former 6 GeV design. The first stage of the target upgrade aims to produce a 40 cm long, 10 amg target that can withstand 30 &mu;A of electron beam current with an in-beam polarization of 55%, doubling the figure-of-merit from the 6 GeV time. Several studies were conducted at the Test Lab of JLab on the new convection cell. Work and improvement done on the Pulse Nuclear Magnetic Resonance (NMR) polarimetry and its test results will be presented. As this thesis is written, the target is being installed in Hall C of JLab in preparation for a 6-month long running from November 2019 to May 2020.

Ton, Nguyen↗