Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “load scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Safety Basis Compliant Flexible Operations [Capstone Project]

Compliant nuclear operations must be weighed against the radiological risk to the worker, public, and the environment. This project set out to look at one facility at Los Alamos National Laboratory (LANL or the Laboratory) and compare the risk with the operational restrictions associated with the Technical Safety Requirements (TSRs). The hope was to identify controls that could be reduced or simplified while maintaining compliance with 10 CFR 830, Nuclear Safety Management. This would result in increasing facility operational flexibility and efficiency. Controls were identified to be simplified or eliminated based on risk. This identification was initially envisioned from the perspective of reanalysis of the accident and hazard analysis consequences. Additionally, it was envisioned that fire testing could show that the consequences of a fire are not as dramatic as analyzed. Specific facility controls were identified that cause operational inefficiencies. Based on data collection, two controls were identified for further evaluation. The first control was combustible loading within the waste storage buildings, and the second control is related to the seismic power cutoff switch. In evaluating the combustible loading control, the thought is that the fire suppression system (FSS) provides adequate protection and the combustible loading controls do not need elevation to a TSR control. The FSS, along with the Fire Protection Program, would provide protection to prevent a fire from impacting large amounts of stored waste material. The seismic switch was more of a challenge. When reviewing the facility operation, it was determined that the facility does not operate anywhere near the established material-at-risk (MAR – radioactive material) limits. By adjusting these limits, a reduced consequence could be achieved and hence, a significant risk reduction achieved. A new operating mode would be used to achieve this reduction. A reduced MAR limit was successfully used as a test case for snow removal during this project. This project expands on that trial case as related to combustible loading and the seismic power cutoff switch TSRs. This will increase the efficiency of operations with reduced TSR controls while reducing overall facility risk. This is a win-win situation for Triad National Security, LLC (Triad) and the U.S. Department of Energy (DOE). Due to schedule and budgetary constraints, not all envisioned work scope was accomplished. However, it is maintained in this report for future efforts.

61 RADIATION PROTECTION AND DOSIMETRY↗

Integrating Electric Vehicle Charging Infrastructure into Commercial Buildings and Mixed-Use Communities: Design, Modeling, and Control Optimization Opportunities: Preprint

This paper discusses modeling and field studies of controlled EV charging that have been performed with the goal of minimizing requirements for infrastructure upgrades, minimizing building peak demand charges, and maximizing the use of on-site generation. We present a large-scale workplace charging pilot of a demand-controlled scheduled EV charging system with over 250 active daily commuters, successfully demonstrating management of aggregate charging power to avoid new infrastructure investments, mitigate peak demand charges, and provide cost-effective workplace charging to users. In addition to understanding opportunities for demand management, integrating these controllable loads into the energy modeling process for new buildings will also be necessary. This paper then presents an example energy modeling process that evaluates the potential effects of EV charging on building load profiles and infrastructure requirements for a mixed-use community. Finally, we discuss an illustration of how EV charging can be controlled to be synergistic with other building loads and distributed generation.

buildings↗

Post-extreme-event restoration using linear topological constraints and DER scheduling to enhance distribution system resilience

In this paper, a post-extreme-event restoration (PEER) algorithm is proposed to improve distribution system resilience. Linear topological constraints are proposed to ensure radial topology after N-k contingencies, possibly in multiple islands. The approach is made comprehensive by considering dispatchable distributed energy resources (DERs), non-dispatchable DERs, and demand responses, as well as on-load tap changers (OLTCs) and shunt capacitors. The goal is to minimize the accumulative expense caused by load reduction payment or penalty, as well as DER operation cost. As a result, the overall system will survive longer with higher resilience during an extreme event. To verify the effectiveness of the PEER algorithm, we proposed a resilience evaluation algorithm using Monte Carlo simulation (MCS) with reduced scenarios. This is based on a probabilistic model for generating random scenarios which consider the uncertainty of line faults and solar irradiance. Combined with the proposed PEER algorithm, this reduced-scenario MCS can evaluate the expected energy not served (EENS) which is an essential index for distribution system resilience. Case studies of the IEEE 33-bus and 123-bus test systems validate the proposed algorithm in reducing EENS.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Impacts of Distinct Flexibility Enhancements on the Value and Dynamics of Natural Gas Power Plant Operations

The rapid increase of renewable generation and its anticipated continued growth requires greater operational flexibility in modern power systems. Previous studies explored the addition of more flexible resources to improve system flexibility, but this may also be achieved at lower cost by enhancing existing power plants via flexibility retrofits. Potential flexibility upgrades to existing thermal plants include modifications that enable faster ramp rates, increase maximum load levels, decrease minimum load levels, and provide faster and lower cost startup operations. In this paper, we focus on improvements to existing natural gas combined cycle generators, and apply a unit commitment model to analyze the impact that each specific upgrade has on their operational dynamics and profitability from both the system perspective and from the asset owner perspective. We show that the value of each type of flexibility improvement varies depending on the capacity factor and usage pattern of the generator before the upgrade, and that the relative benefit of each type of flexibility varies. We demonstrate diminishing returns to increased flexibility when upgrading multiple generators simultaneously. Sensitivity tests for several shares of renewable generation, different generation mixes and different net load realizations confirm the generality of the results shown.

03 NATURAL GAS↗

Front-End Engineering Design for Piperazine with the Advanced Stripper

This Department of Energy (DOE) funded project was executed with the goal of preparing a Front-End Engineering Design (FEED) for the capture and compression of 90% of the CO2 that would normally be emitted from an existing natural gas combined cycle (NGCC) plant. The FEED focused on the application of the piperazine advanced stripper (PZAS) process at Mustang Station of the Golden Spread Electric Cooperative (GSEC), which consists of two gas turbines with common heat recovery steam generator (HRSG). The University of Texas at Austin (UT) served as the prime contractor, and subcontracted AECOM Technical Services and Trimeric Corporation to support FEED development. This project team has worked together to advance PZAS for more than a decade. ExxonMobil, Chevron, and Total provided project co-funding. The objectives of this work included: 1. To advance engineering design such that a comprehensive estimate for the total installed cost of a full-scale PZAS CO2 Capture Plant with CO2 compression can be developed on an existing NGCC power plant. a. These detailed costs can also be used to qualify PZAS and other related second generation (2G) amine scrubbing processes for use on cogeneration facilities in refineries and chemical plants that use gas turbines with HRSGs to produce steam. b. These detailed costs will help qualify 2G amine scrubbing for use on NGCC power plants and establish a more accurate baseline cost to be used as a target by other capture technologies. 2. To provide cost details to be used in the economic optimization of the process features of PZAS and other 2G amine scrubbing processes. 3. To provide DOE with a more detailed understanding of carbon capture costs in a commercial application, enabling DOE to better design its R&D program to improve the economics for carbon capture. 4. To provide the host site and cost share partners with the information necessary to determine whether a commercial project to capture and use CO2 for enhanced oil recovery (EOR) or for sequestration can be justified (when accounting for the 45Q tax credit). A key component of the FEED is the estimated total installed cost, which provides a basis for the likely capital investment necessary to implement the PZAS carbon capture process at this location and scale. In combination with the included economic analysis, which accounts for potential revenue from the produced CO2, potential avenues to profitability are explored. The major findings of the FEED are as follows: The Mustang Station PZAS CO2 Capture Plant estimated total project cost of $698 MM of which $384 MM was direct costs. The annual operating costs were $32.6 MM. The total investment for a PZAS facility at Mustang Station is $725 MM. This estimate includes owner’s cost of $25 million and a contingency of $110 MM. • The study estimated the CO2 capture plant at Mustang Station would generate CO2 at $110/tonne for EOR, assuming a 12% IRR (internal rate of return) and an 85% capacity factor. For CO2 storage, the same case would achieve a 12% IRR at about $114/tonne. At a capacity factor of 52%, the storage and EOR cases would break even when carbon is priced ~$150/tonne. The economic analysis determined that the capacity factor and utility pricing, among other variable factors, had a significant effect on the economics and will need additional studied. • The energy penalty of the PZAS plant would be about 46 MW in connected power and 35 MW in operating load. The natural gas requirement (for the Gas Boiler package) would be about 354 MMBTU/hr. • The FEED revealed no major risks in process maturity. However, some areas were outlined for further engineering during detailed design, which included the Gas Boiler system, general arrangement and site layout, air coolers, schedule development, and optimization of the process for higher CO2 removal. • If PZAS were to be implemented at another host site, additional opportunities for cost reduction for would include cost reduction through use of cooling water and steam extraction.

03 NATURAL GAS↗

EVI-Rental: A Scalable Model to Quantify the Impact of Rental Car Electrification

This fact sheet describes the Electric Vehicle Infrastructure - Rental Car (EVI-Rental) tool, a flexible and comprehensive simulation tool that addresses key questions about the charging demand, infrastructure needs, and business impacts of adding growing numbers of electric vehicles (EVs) to rental fleets. To validate the EVI-Rental model, the Athena research team conducted a case study at Dallas-Fort Worth International Airport (DFW) to understand the impact of state-of-charge requirements, different charger types and charging schedules, solar power generation, and behind-the-meter storage on a fully electrified rental car fleet.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Microgrid Assisted Design for Remote Areas

In this work, we present a three-stage multiobjective mixed-integer linear programming (MILP) for the optimal expansion planning and operation of isolated multienergy microgrids in remote areas. By selecting the optimal distributed generators (DGs) and energy storage systems (ESSs) mix selection, siting, sizing, and scheduling in the remote microgrid, the proposed model is targeted to minimize the annualized total cost of microgrids while enhancing the performance of the system, i.e., minimizing the voltage deviations and line power loss. To represent the electricity and heat flow between generation resources and various electrical, heating, and cooling loads in the isolated microgrid, linearized power flow, and heat flow constraints are employed in the proposed optimization model. The available capacity of DGs and ESSs are modeled as discrete constants instead of continuous variables for practical purpose. Numerical simulation results on a remote microgrid consisting of DGs, ESSs, and various loads validate the proposed method.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Deep Reinforcement Learning for Residential HVAC Control with Consideration of Human Occupancy

The Artificial Intelligence (AI) development described herein uses model-free Deep Reinforcement Learning (DRL) to minimize energy cost during residential heating, ventilation, and air conditioning (HVAC) operation. Building cooling loads and HVAC operation are difficult to accurately model due to complexity, lack of measurements and data, and model specific performance, so online machine learning is used to allow for real-time readjustment in performance. Energy costs for the multi-zone cooling unit shown in this work are minimized by scheduling on/off commands around dynamic prices. By taking advantage of precooling events that take place when the price is low, the agent is able to reduce operational cost without violating user comfort. The DRL controller was tested in simulation where the learner achieved a 43.89% cost reduction when compared to traditional, fixed-setpoint operation. The system is now ready for the next phase of testing in a live, real-time home environment.

Mckee, Evan↗

Method and system for providing flexible reserve power for power grid

An optimization-based method and system is disclosed to enable heterogeneous loads and distributed energy resources (DERs) to participate in grid ancillary services, such as spinning and non-spinning reserves, and ramping reserves. The method includes receiving inputs for decision parameters for optimizing an objective for obtaining flexible reserve power, solving the objective for obtaining flexible reserve power, determining a reserve power schedule for a prediction horizon for providing flexible reserve power based on the objective, generating a service bid based on the reserve power schedule for the power grid; and when the service bid is accepted, providing flexible reserve power to the power grid based on the service bid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Fast Dynamic Internal Predictive Power Scheduling Approach for Power Management in Microgrids: Preprint

This paper presents a Dynamic Internal Predictive Power Scheduling (DIPPS) approach for optimizing power management in microgrids, particularly focusing on external power exchanges among diverse prosumers. DIPPS utilizes a dynamic objective function with a time-varying binary parameter to control the timing of power transfers to the external grid, facilitated by efficient usage of energy storage for surplus renewable power. The microgrid power scheduling problem is modeled as a mixed-integer nonlinear programming (MINLP-PS) and subsequently transformed into a mixed-integer linear programming (MILPPS) optimization through McCormick's relaxation to reduce computational complexity. A predictive window window with 6 data points is solved at an average of 0.92s, a 97.6% improvement over the 38.27s required for the MINLP-PS formulation, implying the numerical feasibility of the DIPPS approach for real-time implementation. Finally, the approach is validated against a static objective using real-world load data across three case studies with different time-varying parameters, demonstrating the ability of DIPPS to optimize power exchanges and efficiently utilize distributed resources while shifting the external power transfers to specified time durations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Plutonium-238 Loadout Calorimeter Return To Service

The calorimeter in the transfer area in Building 7920 at the US Department of Energy’s Oak Ridge National Laboratory is used to measure the amount of 238 Pu in the Plutonium Heat Source Oxide. The calorimetry measurement is taken after the oxide is packaged in an ORISC (Oak Ridge Inner Shipping Capsule)/FSO (Fuel Storage Outer) assembly before loading into the Containment Vessel and shipping container. The equipment is used in three specific configurations: zero measurement (nothing in the sample cup), FSO measurement (actual measurement of 238 Pu), and reference calibration measurement (using the reference FSO as a known heat source). System checks were performed in July 2023 in preparation for scheduled material loadout. During these checks, personnel discovered that the reference FSO had experienced an electrical short in the heater cable and was no longer functional. The calorimeter was in the reference calibration measurement configuration at this time. Facility management was notified when the damage was discovered. The data from the Yokogawa recorder were pulled and analyzed for a span of time between September 2022 and July 2023. An unusual spike was found in the sample cup temperature data that started on October 19, 2022, and ended on October 20, 2022. The sample cup reached a temperature of 191.1°C. The maximum allowable temperature for the calorimeter thermopile to reach is 220°C based on the manufacturer statement provided in Appendix B of this report [1]. The calorimeter thermopile and the sample cup thermocouple are physically close to each other; therefore, the data suggest that the calorimeter itself never saw a temperature in excess of 191.1°C. Physical damage present on the cable, tape, and insulation suggests that the temperature reached a higher value in some locations within the sample cup than the data shows. Because of this discrepancy, testing of the calorimeter was required to confirm that the calorimeter is functioning the same as it was before the electrical short. The intent of this report is to assess the functionality of the calorimeter and determine if it is acceptable to use for 238 Pu loadout material measurement. Testing showed that the calorimeter is functionally equivalent to the initial calibration that was performed in the summer of 2021, and thus, the calorimeter was cleared to be used for its intended purposes.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

NLR HPC Kestrel Jobs Data

Overview: Anonymized job-level records from the Kestrel HPC system at the National Laboratory of the Rockies (NLR). Each record represents a Slurm batch job with scheduling metadata, resource requests, utilization, energy estimates, and efficiency metrics. Sensitive fields (user, account, job name, submit line, working directory, submit script, and job type) are replaced with 7-character cryptographic hashes. System & Timeframe: Kestrel is located at the NLR campus. Standard compute nodes have 104 cores and 256 GB RAM; bigmem nodes have 2,000 GB. GPU nodes (gpu-h100 partition) use NVIDIA H100 GPUs. Data covers jobs submitted August 2023 through December 2025. Funding provided by the U.S. Department of Energy, EERE. Files: esif.hpc.kestrel.job-anon.zip — Anonymized job records (Hive-partitioned Parquet) datacard.md — Full dataset documentation ~11 million rows, 50 variables. Readable with PyArrow, pandas, DuckDB, Apache Spark, or any Parquet-compatible tool. Data Collection: Jobs collected via sacct with timezone-aware export (SLURM_TIME_FORMAT="%Y-%m-%dT%H:%M:%S%z"), loaded into PostgreSQL. Calculated columns updated via database triggers and batch functions. All timestamps use timestamptz and correctly handle DST transitions. Preprocessing: Anonymization of name, user, account, submit_line, work_dir, submit_script, and job_type via 7-char hex hashes Derived columns: queue_wait, cpu_eff, max/min/avg_mem_eff, energy estimates Simplified job state mapping (e.g., "CANCELLED by 132357" → "CANCELLED") Boolean flags: python_job, reframe_job Temporal decomposition: year, month, day, day_of_week, hour, minute from submit_time Shared node tracking: shared_job_count, nodes_shared, jobs_shared Key Variables: Scheduling: job_id, partition, state_simple, submit_time, start_time, end_time, queue_wait Resources: nodes_req/used, processors_req/used, memory_req, wallclock_req/used, gpus_requested Efficiency: cpu_eff, max/min/avg_mem_eff Energy: cpu_energy_tdp_estimated_max/used_watt_hours, consumed_energy_raw_joules, consumed_energy_raw_watt_hours Sharing: shared_job_count, nodes_shared, jobs_shared Partitions: short, standard, debug, gpu-h100 Job States: CANCELLED, COMPLETED, FAILED, PENDING, RUNNING QoS Levels: normal, high Important Notes: Timestamps include timezone offsets; DST transitions are handled correctly, though adding intervals across DST boundaries requires offset adjustment shared_job_count reflects physical node co-residency, not use of the shared partition Job step records and raw Slurm JSONB fields are excluded Do not attempt to re-identify individuals from hashed fields

97 MATHEMATICS AND COMPUTING↗

Ibis Networks/WattIQ (IN2 Final Report)

Ibis Networks is a full-stack cleantech company that provides plug-level energy monitoring and control to solve energy and asset management problems for the enterprise. During DATES – DATES, an NREL research team worked with the Ibis team to validate their product, the InteliSocket. The Ibis InteliSocket is a pass-through plug-load energy monitor and controller that is designed to reduce energy wasted by common 120 V plug-in devices in commercial office buildings, such as computer peripherals, conference room AV equipment, and break-room appliances. The system can shut off supply power to these end uses via remote control, manual switches, pre-set schedules, or automated control algorithms. The scope of this IN2 project was the development and refinement of “smart” learning behavior algorithms (LBAs), which could help installation processes and dramatically expand the sockets’ capabilities and energy-saving potential by suggesting suitable control schedules that are based on monitored use patterns. While Ibis has the analytical and software expertise for algorithm development, the lack of test data, both in a controlled laboratory setting and in real-life deployment scenarios, represented a key barrier toward commercialization of the product. Assistance through the IN2 program provided an opportunity to conduct the needed “trial and error” algorithm development. The project included baseline field-data collection, laboratory testing, and field validation components, all of which were conducted at the NREL campus between April 2017 and July 2019.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

STOCHASTIC OPTIMAL POWER FLOW FOR REAL-TIME MANAGEMENT OF DISTRIBUTED RENEWABLE GENERATION AND DEMAND RESPONSE (Final Report)

To meet the grand challenge of a sustainable energy future, there has been a surge of interest in renewable energy. Today, the uncertainty associated with renewable resources is handled by using operating reserves. The high penetration of renewable resources, however, introduces difficult-to-control dynamics and challenges for power system operation. Decision support tools are necessary at the bulk system operational level to recognize and efficiently utilize renewable resources and distributed demand response products in concert with traditional grid resources. It is envisaged that responsive load can potentially have very significant cost advantages over either spinning or non-spinning ramping reserve. Critical decisions are made during hour(s)-ahead and real-time power system operation regarding the commitment and dispatch of generators to ensure power delivery is both reliable and economic. These decisions are typically made by a security constrained optimal flow, which determines future generator commitments, dispatches, and ensures adequate reserves are available in the event of a contingency (unexpected outage) or if future system conditions deviate from forecasts. However, security has been always based on a pre-specified subset of contingency constraints whose enforcement does not guarantee security under all possible future possibilities while also giving little or no weight to the likelihood of each contingent event or the severity of its consequences. Existing tools, which are based exclusively on deterministic optimization models, do not yield optimal operational decisions to address these new challenges, in terms of both reliability and cost-effectiveness. This project has focused on developing a stochastic optimal power flow (SOPF) framework, which integrates renewable resource uncertainty, load uncertainty, distributed storage (DS), demand response (DR) products, in a holistic manner to address the uncertainty associated with ever-increasing renewable resources, along with the inclusion of distributed demand response products in future power systems. A proof-of-concept problem was created using the Pennsylvania-Jersey-Maryland (PJM) power system network. Synthetic wind generation was added to the system to simulate 50% wind penetration. A 1-hour test of SOPF operation indicated more than 6% operational cost savings. The project continued by adding the Midwestern Independent System Operator (MISO) as a partner, with focus shifting from SOPF to Stochastic Look-Ahead Unit Commitment (SLAC). Unlike PJM, MISO is faced with significant renewable energy resources within its footprint and is challenged with substantial uncertainty in its operations. The SLAC distinguishes itself from existing tools that operators use. At best, today’s tools solve two to three cases independently, where one or two system parameters, such as forecasted load level (e.g., a low, base, and high forecast), are varied and the resulting scenarios are analyzed independently. The stochastic-based optimization of SLAC leverages statistical information from an ensemble of potential operational scenarios and their respective likelihood. The SLAC output can be translated into valuable information to the operator such as suggested commitments, optimal scheduling and dispatch of resources, reserve requirements at both locational and zonal resolutions, ramping availability and requirements, availability of demand response including operational guidance concerning the near-term and real-time coordination between distributed energy resources, and utilization of distributed storage resources. The developed SOPF/SLAC tool, a stand-alone tool compatible with existing EMSs, will provide system operators with unprecedented visibility, flexibility and predictability to these resources and operational guidance concerning the real-time coordination between DERs and DR/DS products. The game changing and practical impact of this disruptive technology will be dramatic and will usher in a new era in the electric power industry, wherein green energy concepts are fully embraced, and electric power costs are lowered throughout the nation.

42 ENGINEERING↗

Depot-Based Vehicle Data for National Analysis of Medium- and Heavy-Duty Electric Vehicle Charging

Medium- and heavy-duty vehicles (MHDVs) are a major source of greenhouse gases and local criteria air pollutants. Electrifying MHDVs may reduce these harmful emissions, which disproportionately impact disadvantaged communities. Due to their relatively high per-vehicle energy needs, consistent fleet operations, and frequent colocation of multiple vehicles at depots, MHDVs may have more spatially and temporally concentrated charging demands than light-duty passenger electric vehicles. That charging concentration means their electrification may require careful advance planning and coordination to manage potential impacts to the electrical grid via charge management or infrastructure upgrades. However, MHDV duty cycles and parking schedules are highly variable across vocations of operation, and there is a shortage of nationally representative, vocationally diverse public data describing typical MHDV operations. This report summarizes the methodology - designed with national representativeness in mind - used to create a new set of data describing typical daily driving distances, dwell durations, and normalized electric vehicle depot charging load curves for MHDVs. The dataset reflects the subset of MHDV operating patterns that may originate from a consistent depot each day and rely on the same depot for charging. In addition to trucks with depot-centric vocational patterns, the data describes operations of transit buses and school buses, each with a depot-centric focus. The dataset is available to the public and suitable for national analysis. It can inform research, infrastructure planning, and policymaking regarding the electrification of MHDVs.

33 ADVANCED PROPULSION SYSTEMS↗

Depot Charging Schedule Optimization for Medium- and Heavy-Duty Battery-Electric Trucks

Charge management, which lowers charging costs for fleets and prevents straining the electrical grid, is critical to the successful deployment of medium- and heavy-duty battery-electric trucks (MHD BETs). This study introduces an energy demand and cost management framework that optimizes depot charging for MHD BETs by combining an energy consumption machine learning model and a linear program optimization model. The framework considers key factors impacting real-world MHD BET operations, including vehicle and charger configurations, duty cycles, use cases, geographic and climate conditions, operation schedules, and utilities’ time-of-use (TOU) rates and demand charges. The framework was applied to a hypothetical fleet of 100 MHD BETs in California under three different utilities for 365 days, with results compared to unmanaged charging. The optimized charging solution avoided more than 90% of on-peak charging, reduced fleet charging peak load by 64–75%, and lowered fleet energy variable costs by 54–64%. This study concluded that the proposed charge management framework significantly reduces energy costs and peak loads for MHD BET fleets while making recommendations for fleet electrification infrastructure planning and the design of utility TOU rates and demand charges.

Song, Shuhan↗

An Integrated Paradigm for the Management of Delivery Risk in Electricity Markets: From Batteries to Insurance and Beyond [Slides]

In wholesale electricity markets today, flexibility from a limited number of distributed energy resources (DERs) is offered daily, and the value of flexibility is not yet recognized for economic hedging of delivery risk. Under a three-year project funded by the ARPA-E PERFORM program, a collaborative team is working towards developing an integrated risk management framework that will leverage flexibility from distributed and bulk resources to cost-effectively and reliably manage delivery risk of intermittent resources. Two concepts are at the core of the proposed integrated risk management framework: (A) flexibility options, which are a novel type of options and enable wholesale electricity market participants to hedge uncertainty by buying flexibility. (B) DER flexibility scores, which provide a way for utilities or aggregators to classify assets in groups with different likelihood of delivering contracted flexibility. This report presentation will focus on the proposed ISO-product "flexibility options," which is complementary to ramp and other products being introduced by ISOs/RTOs to manage net load uncertainties. Participating resources with imbalance risk can buy flexibility options to hedge their production, whereas grid-connected resources that can provide physical flexibility can offer flexibility options. We will present basics of the formulation for a day-ahead ISO market that matches buyers and sellers of this hedge in coordination with existing capabilities to schedule energy and ancillary services, and outline how their settlements mitigate the impact of imbalance risk.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Robust multi‐loop control of a floating wind turbine

Abstract A principal challenge facing the control of floating offshore wind turbines (FOWTs) is the problem of instability, or “negative damping,” when using blade pitch feedback to control generator speed. This closed‐loop instability can be attributed to non‐minimum phase zeros in the transfer function from blade pitch to generator speed. Standard approaches to improving stability and performance include robust tuning of control gains and introducing multiple feedback loops to respond to platform motion. Combining these approaches is nontrivial because multiple control loops complicate the impact of coupling in the system dynamics. The single‐loop approach to analyzing stability robustness neglects inter‐loop coupling, while a simplistic multi‐loop approach is highly sensitive to dimensional scaling and overestimates the robustness of the single‐loop controller. This work proposes a sensitivity representation that separates some of the natural FOWT dynamic coupling into a parallel feedback loop in the sensitivity function loop to address both of these concerns. The modified robustness measure is used with a simplified linear FOWT model to optimize scheduled multi‐loop control parameters in an automated tuning procedure. This controller is implemented for the 10‐MW Ultraflexible Smart FLoating Offshore Wind Turbine (USFLOWT) and compared against conventional single‐ and multi‐loop controllers tuned using frequency‐domain analysis and high‐fidelity OpenFAST simulations. The multi‐loop robust controller shows the highest overall performance in generator speed regulation and tower load reduction, though consideration of power quality, actuator usage, and other structural loading leads to additional trade‐offs.

Stockhouse, David↗