Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “load scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

NASA Advanced Concepts Office, Earth-To-Orbit Team Design Process and Tools

The Earth to Orbit (ETO) Team of the Advanced Concepts Office (ACO) at NASA Marshal Space Flight Center (MSFC) is considered the preeminent group to go to for prephase A and phase A concept definition. The ACO team has been at the forefront of a multitude of launch vehicle studies determining the future direction of the Agency as a whole due, in part, to their rapid turnaround time in analyzing concepts and their ability to cover broad trade spaces of vehicles in that limited timeframe. Each completed vehicle concept includes a full mass breakdown of each vehicle to tertiary subsystem components, along with a vehicle trajectory analysis to determine optimized payload delivery to specified orbital parameters, flight environments, and delta v capability. Additionally, a structural analysis of the vehicle based on material properties and geometries is performed as well as an analysis to determine the flight loads based on the trajectory outputs. As mentioned, the ACO Earth to Orbit Team prides themselves on their rapid turnaround time and often need to fulfill customer requests within limited schedule or little advanced notice. Due to working in this fast paced environment, the ETO team has developed some finely honed skills and methods to maximize the delivery capability to meet their customer needs. This paper will describe the interfaces between the 3 primary disciplines used in the design process; weights and sizing, trajectory, and structural analysis, as well as the approach each discipline employs to streamline their particular piece of the design process.

Waters, Eric D.↗

Exploring Sustained Food Production in the Veggie Vegetable Production System

Since 2014, the Veggie vegetable production system on the International Space Station has intermittently supplied astronaut crews with fresh produce. To assess the potential for continuous crop production in Veggie and develop a baseline for future space crop production systems, a 120-day study was conducted to determine methodology for inputs, optimal yield, food safety standards, and crew involvement. ‘Amara’ mustard and ‘Red Russian’ kale were grown as initial crops, followed by ‘Extra Dwarf’ pakchoi and shungiku as final crops. Previous grow-outs in Veggie have included harvests at 28-35 days after initiation. In this study, a 56-day grow-out with multiple harvests from the same plants was compared to the conventional, single harvest Veggie schedule. Unlike previous Veggie studies which grew all plants simultaneously, this test staggered initiation and harvest, aiming for consistent and increased production. Plant pillows were initiated in pairs weekly and positioned to reduce shading. Completed pillows were immediately replaced with fresh ones. The multi-harvest scheme used fewer pillows, totaling 46% less pillow mass than the single harvest method. Yield varied by crop and harvest scheme, when compared as fresh edible biomass production across 56-day time increments. ‘Red Russian’ kale yielded similarly across harvest schemes. In the multiple-harvest schedule, ‘Amara’ mustard and shungiku yielded 23% to 25% higher, respectively, while ‘Extra Dwarf’ pakchoi had 43% lower yield. Microbial analysis of the plants indicated no culturable human pathogens. Microbial load of a given plant appeared to depend more on system age than plant age; across harvest methods, aerobic plate counts from final crops were higher than those of initial crops. This project also considered the complexity of crew involvement in a continuous production scenario. New crew procedures that periodically remove plant material from the Veggie root mat would be needed under continuous production to prevent potential pathogens and unpleasant odors. This study supports future space crop production scenarios and was funded by NASA’s Human Research Program.

Jess M Bunchek↗

Sustained Veggie: A Continuous Food Production Comparison

The International Space Station’s Veggie system intermittently supplies the crew with fresh produce. To assess the potential for continuous crop production in Veggie and develop a baseline for future space crop production systems, a 120-day study was conducted to determine methodology for inputs, optimal yield, and crew involvement. ‘Amara’ mustard and ‘Red Russian’ kale were grown as initial crops, followed by ‘Extra Dwarf’ pak choi and shungiku as final crops. Previous grow-outs in Veggie have included harvests at 28-35days after initiation. In this study, a 56-day grow-out with multiple harvests from the same plants was compared to the conventional, single harvest Veggie schedule. Unlike previous Veggie studies which grew all plants simultaneously, this test staggered initiation and harvest, aiming for consistent and increased production. Plant pillows were initiated in pairs weekly and positioned to reduce shading. Completed pillows were immediately replaced with fresh ones. The multi-harvest scheme used fewer pillows, totaling 46% less pillow mass than the single harvest method. Scaled to 56-day increments, yield varied by crop and harvest scheme. ‘Red Russian’ kale yielded similarly across harvest schemes. In the multiple-harvest schedule, ‘Amara’ mustard and shungiku yielded 23% to 25% higher, respectively, while ‘Extra Dwarf’ pak choi had43% lower yield. Microbial analysis of the plants indicated no culturable human pathogens. Microbial load of a given plant appears to depend more on system age than plant age. Across harvest methods, aerobic plate counts from final crops were higher than those of initial crops. This project also considered the complexity of crew involvement in a continuous production scenario. New crew procedures that periodically remove plant material from the Veggie root mat are needed under continuous production to prevent potential pathogens and unpleasant odors. This study supports future space crop production scenarios and was funded by NASA’s Human Research Program.

Jess M Bunchek↗

Runtime support and compilation methods for user-specified data distributions

This paper describes two new ideas by which an HPF compiler can deal with irregular computations effectively. The first mechanism invokes a user specified mapping procedure via a set of compiler directives. The directives allow use of program arrays to describe graph connectivity, spatial location of array elements, and computational load. The second mechanism is a simple conservative method that in many cases enables a compiler to recognize that it is possible to reuse previously computed information from inspectors (e.g. communication schedules, loop iteration partitions, information that associates off-processor data copies with on-processor buffer locations). We present performance results for these mechanisms from a Fortran 90D compiler implementation.

Ponnusamy, Ravi↗

Operations automation

This is truly the era of 'faster-better-cheaper' at the National Aeronautics and Space Administration/Jet Propulsion Laboratory (NASA/JPL). To continue JPL's primary mission of building and operating interplanetary spacecraft, all possible avenues are being explored in the search for better value for each dollar spent. A significant cost factor in any mission is the amount of manpower required to receive, decode, decommutate, and distribute spacecraft engineering and experiment data. The replacement of the many mission-unique data systems with the single Advanced Multimission Operations System (AMMOS) has already allowed for some manpower reduction. Now, we find that further economies are made possible by drastically reducing the number of human interventions required to perform the setup, data saving, station handover, processed data loading, and tear down activities that are associated with each spacecraft tracking pass. We have recently adapted three public domain tools to the AMMOS system which allow common elements to be scheduled and initialized without the normal human intervention. This is accomplished with a stored weekly event schedule. The manual entries and specialized scripts which had to be provided just prior to and during a pass are now triggered by the schedule to perform the functions unique to the upcoming pass. This combination of public domain software and the AMMOS system has been run in parallel with the flight operation in an online testing phase for six months. With this methodology, a savings of 11 man-years per year is projected with no increase in data loss or project risk. There are even greater savings to be gained as we learn other uses for this configuration.

Boreham, Charles Thomas↗

Atmospheric particulate measurements in Norfolk, Virginia

Characterization of atmospheric particulates was conducted at a site near the center of Norfolk, Virginia. Air quality was measured in terms of atmospheric mass loading, particle size distribution, and particulate elemental composition for a period of 2 weeks. The objectives of this study were (1) to establish a mean level of air quality and deviations about this mean, (2) to ascertain diurnal changes or special events in air quality, and (3) to evaluate instrumentation and sampling schedules. Simultaneous measurements were made with the following instruments: a quartz crystal microbalance particulate monitor, a light-scattering multirange particle counter, a high-volume air sampler, and polycarbonate membrane filters. To assess the impact of meteorological conditions on air quality variations, continuous data on temperature, relative humidity, wind speed, and wind direction were recorded. Particulate elemental composition was obtained from neutron activation and scanning electron microscopy analyses of polycarbonate membrane filter samples. The measured average mass loading agrees reasonably well with the mass loadings determined by the Virginia State Air Pollution Control Board. There are consistent diurnal increases in atmospheric mass loading in the early morning and a sample time resolution of 1/2 hour seems necessary to detect most of the significant events.

Storey, R. W., Jr.↗

A Fast-Time Study of Aircraft Reordering in Arrival Sequencing and Scheduling

In order to ensure that the safe capacity of the terminal area is not exceeded, Air Traffic Management ATM often places restrictions on arriving flights transitioning from en route airspace to terminal airspace. This restriction of arrival traffic is commonly referred to as arrival flow management, and includes techniques such as metering, vectoring, fix-load balancing, and the imposition of miles-in-trail separations. These restrictions are enacted without regard for the relative priority which airlines may be placing on individual flights based on factors such as crew criticality, passenger connectivity, critical turn times, gate availability, on-time performance, fuel status, or runway preference. The development of new arrival flow management techniques which take into consideration priorities expressed by air carriers will likely reduce the economic impact of ATM restrictions on the airlines and lead to increased airline economic efficiency by allowing airlines to have greater control over their individual arrival banks of aircraft. NASA and the Federal Aviation Administration (FAA) have designed and developed a suite of software decision support tools (DSTs) collectively known as the Center TRACON Automation System (CTAS). One of these tools, the Traffic Management Advisor (TMA) is currently being used at the Fort Worth Air Route Traffic Control Center to perform arrival flow management of traffic into the Dallas/Fort Worth airport (DFW). The TMA is a time-based strategic planning tool that assists Traffic Management Coordinators (TMCs) and En Route Air Traffic Controllers in efficiently balancing arrival demand with airport capacity. The primary algorithm in the TMA is a real-time scheduler which generates efficient landing sequences and landing times for arrivals within about 200 no a. from touchdown. This scheduler will sequence aircraft so that they arrive in a first- come - first-served (FCFS) order. While FCFS sequencing establishes a fair order based on estimated times of arrival, it does not take into account individual airline priorities among incoming flights. NASA is exploring the possibility of allowing airlines to express relative arrival priorities to air traffic management through the development of new CTAS scheduling algorithms which take into consideration airline arrival preferences. The accommodation of airline priorities in arrival sequencing and scheduling would under most circumstances result in a deviation from a "natural" or FCFS arrival order. As a First step toward developing airline influenced sequencing algorithms, an investigation was conducted to determine the feasibility of reordering arrival traffic from a strict FCFS sequence. A fast-time simulation has been developed which allows statistical evaluation of sequencing and scheduling algorithms for arrival traffic at the Dallas/Fort Worth Airport. In contrast to real-time simulation or field tests, which would require on the order of ninety minutes to examine a single traffic rush period, the fast-time simulation allows examination of multiple rush periods in a matter of seconds.

Carr, Greg↗

V/STOL tilt rotor aircraft study. Volume 7: Tilt rotor flight control program feedback studies

An exploratory study has been made of the use of feedback control in tilt rotor aircraft. This has included the use of swashplate cyclic and collective controls and direct lift control. Various sensor and feedback systems are evaluated in relation to blade loads alleviation, improvement in flying qualities, and modal suppression. Recommendations are made regarding additional analytical and wind tunnel investigations and development of feedback systems in the full scale flight vehicle. Estimated costs and schedules are given.

Alexander, H. R.↗

Developing integrated parametric planning models for budgeting and managing complex projects

The applicability of integrated parametric models for the budgeting and management of complex projects is investigated. Methods for building a very flexible, interactive prototype for a project planning system, and software resources available for this purpose, are discussed and evaluated. The prototype is required to be sensitive to changing objectives, changing target dates, changing costs relationships, and changing budget constraints. To achieve the integration of costs and project and task durations, parametric cost functions are defined by a process of trapezoidal segmentation, where the total cost for the project is the sum of the various project cost segments, and each project cost segment is the integral of a linearly segmented cost loading function over a specific interval. The cost can thus be expressed algebraically. The prototype was designed using Lotus-123 as the primary software tool. This prototype implements a methodology for interactive project scheduling that provides a model of a system that meets most of the goals for the first phase of the study and some of the goals for the second phase.

Etnyre, Vance A.↗

Milestone 4: Test plan for Reusable Hydrogen Composite Tank System (RHCTS). Task 3: Composite tank materials

This document is the detailed test plan for the series of tests enumerated in the preceding section. The purpose of this plan is to present the test objectives, test parameters and procedures, expected performance and data analysis plans, criteria for success, test schedules, and related safety provisions and to describe the test articles, test instrumentation, and test facility requirements. Initial testing will be performed to screen four composite materials for suitability for SSTO LH2 tank loads and environmental conditions. The laminates for this testing will be fabricated by fiber placement, which is the manufacturing approach identified as baseline for the tank wall. Even though hand layup will be involved in fabricating many of the internal structural members of the tank, no hand-layup laminates will be evaluated in the screening or subsequent characterization testing. This decision is based on the understanding that mechanical properties measured for hand-layup material should be at least equivalent to properties measured for fiber-placed material, so that the latter should provide no less than a conservative approximation of the former. A single material will be downselected from these screening tests. This material will be subsequently characterized for impact-damage tolerance and durability under conditions of mechanical and thermal cycling, and to establish a preliminary design database to support ongoing analysis. Next, testing will be performed on critical structural elements fabricated from the selected material. Finally, the 8-foot diameter tank article, containing the critical structural features of the full-scale tank, will be fabricated by fiber placement and tested to verify its structural integrity and LH2 containment.

Greenberg, H. S.↗

Hierarchical Control of Distributed Battery Energy Storage Systems in a DC Microgrid

Contents - NASA Future Power Systems - DC Microgrid with Distributed Battery Energy Storage - A simplified gateway power system - Droop Control (Primary Control) - Distributed battery units, droop control, and load sharing characteristics - Simulation results - Three-Level Hierarchical Control of Distributed Battery Units During Eclipse - Secondary Control - Objective and definition of unit control error - Implementation of secondary control - Simulation results - Tertiary Control - Schedule BU current sharing with the objective of equal SoC - Simulation results•Conclusions

Jing Zhang↗

Space fabrication demonstration system, technical volume

The automatic beam builder ABB was developed, fabricated, and demonstrated within the established contract cost and schedule constraints. The ABB demonstrated the feasibility of: producing lightweight beams automatically within the required rate of 1 to 5 ft of completed beam per minute and producing structurally sound beams with axial design load of 5538 N based on the Grumman photovoltaic satellite solar power system design reference structure.

Source record↗

Optimal pre-scheduling of problem remappings

A large class of scientific computational problems can be characterized as a sequence of steps where a significant amount of computation occurs each step, but the work performed at each step is not necessarily identical. Two good examples of this type of computation are: (1) regridding methods which change the problem discretization during the course of the computation, and (2) methods for solving sparse triangular systems of linear equations. Recent work has investigated a means of mapping such computations onto parallel processors; the method defines a family of static mappings with differing degrees of importance placed on the conflicting goals of good load balance and low communication/synchronization overhead. The performance tradeoffs are controllable by adjusting the parameters of the mapping method. To achieve good performance it may be necessary to dynamically change these parameters at run-time, but such changes can impose additional costs. If the computation's behavior can be determined prior to its execution, it can be possible to construct an optimal parameter schedule using a low-order-polynomial-time dynamic programming algorithm. Since the latter can be expensive, the performance is studied of the effect of a linear-time scheduling heuristic on one of the model problems, and it is shown to be effective and nearly optimal.

Nicol, David M.↗

Investigating Low-Altitude Constellations of Ad-Hoc Lunar PNT System for Distributed Spacecraft Autonomy

In this study, we examine a low-altitude Lunar Position, Navigation, and Timing (LPNT) constellations and the localization performance of Centralized Extended Kalman Filter (CEKF) and Decentralized Extended Kalman Filter (DEKF) algorithms. The primary investigation involves a 100-node swarm operating at a 100 km altitude, in contrast to previous studies that examined a 21-node asset in a frozen-orbit at 5,500 km. The autonomous operation of large-scale swarm is based on two-way Inter-Satellite Link (ISL) measurements, which involve pseudoranges and relative velocities among swarm nodes. We perform a numerical assessment of the two filtering approaches, utilizing ‘fully sampled’ measurements from all available assets as well as ‘two ISL’ measurements where each spacecraft is restricted to only two antennas. This research includes an analysis of CEKF under 2-ISL constraints and evaluates the performance of DEKF in a 100-node swarm, which has not been explored in previous studies. In addition, we examine the impact of increasing the sampling frequency for DEKF, showing that the update cycle can be shortened from a 10-minute interval. A novel approach for ‘2-ISL limited’ DEKF will also be introduced, using a matching formulation that exhaustively enumerates all potential matches. This study provides valuable insights into large-scale distributed swarm operations, considering various filter configurations, sampling frequencies, matching strategies, and scalability of CEKF and DEKF for low-altitude LPNT applications. The Lunar PNT technology plays a key role in providing reliable and robust navigation services on the Moon's surface and the South pole, where the primary Lunar missions are planned. To support upcoming Lunar missions, including small satellites from NASA's Commercial Lunar Payload Services program, the Lunar PNT system must be adaptable to smaller platforms like CubeSats. Driven by the growing involvement of public and private exploration partnerships, the traditional low Earth orbit missions are shifting to beyond geosynchronous orbit [1]. These upcoming missions aim to foster a sustainable and innovative exploration program, in collaboration with commercial and international partners, to facilitate human expansion throughout the solar system and return new knowledge and opportunities to Earth [2]. As part of this trend, there are increasing efforts to utilize science missions in Lunar orbit to develop a non-dedicated and ad-hoc PNT network system. Two traditional approaches, the Deep Space Network (DSN) and the weak signal Global Positioning System (GPS), are established deep-space navigation technologies for missions beyond the geosynchronous orbit. Beginning in 1958, the DSN was developed to communicate with the Explorer 1 spacecraft based on the use of radiometric tracking in spacecraft navigation [3]. The DSN is capable of providing nearly unfettered coverage to spacecraft beyond low-Earth orbit (LEO), however, increased space mission volume has created concerns about future expectations of DSN usage for spacecraft navigation [4]. For cislunar mission applications, the position accuracy using DSN achieves 100 m (3σ) with at least three geometrically diverse ground stations when using radiometric tracking alone [5]. The DSN's dependence on Earth-based ground stations restricts its operational capabilities to periods of Earth visibility. This limitation, coupled with its poor localization performance, renders the DSN unsuitable for future lunar missions that demand continuous tracking and precise positioning. To satisfy the increasing requirements of DSN in Lunar applications, spacecrafts are also required to improve their onboard antenna power and efficiency of the transmission. However, there is an important aggregate cost trade between adding capabilities to every spacecraft and adding to a capacity on the ground that serves multiple spacecraft [6]. A weak GPS system can provide PNT service while the user spacecraft is bound to the Moon, leveraging a single, steerable high gain antenna with the relatively narrow beam which includes all the sources in its field of view [7]. However, the higher the altitude the receiver is above the GPS constellations, the poorer and the weaker are the relative geometry and the received signal powers, respectively, leading to a significant navigation accuracy reduction [8]. The transmitted power becomes weaker with increasing distance from the Earth as well as signals tracked from one of the side lobes of the GPS antenna pattern. As a results, the number of visible satellites and relative geometric condition of the GPS satellites at very high altitude drops dramatically and reduces the navigation solution accuracy. Therefore, the weak GPS system is also not an ideal way to provide PNT service to upcoming Lunar missions when considering its limited geometric condition and the recued navigation accuracy. Another navigation approach on the Moon is being developed, similar to the Global Navigation Satellite System (GNSS) on Earth, aiming to offer navigation service with continuous 24/7 coverage across the entire Lunar surface. For example, lunar communications relay and navigation systems (LCRNS) by NASA and Lunar navigation satellite systems (LNSS) by JAXA are designed to serve as dedicated Position, Navigation, and Timing (PNT) systems for the Moon. However, designing a dedicated LNSS and PNT service involves additional challenges, which are unique to the lunar environment, including limited payload capacity for the CubeSat platform, i.e., the size, weight, and power (SWaP) of the onboard clock, limited lunar ground monitoring stations, and limited financial investment as compared to the legacy Earth-GPS [9]. NASA’s focus on utilizing CubeSat platforms on the Moon leads to an alternative Lunar navigation platform that leverages the existing Lunar science and exploration assets. The small satellites used in Lunar missions can be used to create a low-cost, autonomous, ad-hoc, and on-demand mission-centric Lunar PNT swarm capable of providing PNT services to these low-cost lunar missions [10]. As upcoming Lunar missions will often operate at low-altitude about 30 km to 100 km for scientific observations and mapping purposes, the low-altitude orbital constellations could be employed to create an ad-hoc Lunar PNT system. However, several issues must be addressed, such as the instability of these orbits, which often require maintenance or are only suitable for short-duration missions, operating for fewer than 90 days. Additionally, at an altitude of 100 km, the satellites have a limited period during which they are above the horizon and capable of providing PNT service to users. The implementation of a non-dedicated, ad-hoc Lunar navigation constellation facilitates on-demand PNT services. A preliminary study of ad-hoc Lunar PNT system was conducted using 21 spacecraft in 5,5000 km altitude frozen orbits to test its feasibility and a basic performance of orbital asset localization among ad-hoc Lunar constellations in small satellites format [10]. These swarm assets are designed for autonomous localization with minimal Earth interaction, reducing dependency on bandwidth and ground resources. The design in [10] demonstrated the feasibility of a decentralized PNT approach, specifically employing a DEKF approach for state estimation, which helps minimize onboard operating costs. The DEKF method distributes computation across individual satellites, which lightens the computational load while maintaining accuracy in orbit ephemeris and clock offsets, similar to centralized systems [11]. In a follow-on study [12], each spacecraft was limited to 2 communications antennae, forcing the selection of measurements and scheduling spacecraft activities to perform the measurements. A matching algorithm is implemented to select the best measurements and schedule position estimation updates. The decentralized localization performance is also investigated with increasing levels of network degradation for swarm assets considering the impact of intermittent and permanent communication failure, to demonstrate the robustness and fidelity of the decentralized Lunar PNT service [13]. This study confirmed that the ad-hoc PNT constellations in frozen orbit are highly robust and resilient to communication failures. However, unlike frozen orbit swarm assets, the low-altitude satellites have a limited ground view at an altitude of 100 km, where the ad-hoc Lunar constellation consists of 98 low-altitude satellites, evenly distributed across seven circular polar orbital planes, alongside two satellites in a frozen orbit at an altitude of 5,500 km (Figure 1). Therefore, the number of satellites visible to ground users is significantly limited in low-altitude orbit constellations. As each visibility of a spacecraft remains intact for only a few ticks before it moves out of the field of view, the ground user encounters challenges in maintaining continuous navigation service, resulting in sparse availability and provision of Lunar PNT system. Consequently, service availability is primarily restricted to the Lunar South Pole region (Figure 2). Given these limitations and concerns, the localization performance of low-altitude swarm assets will be assessed in this study. We focus on the investigation of the localization performance of low-altitude swarm assets and ground users near the Lunar South Pole. The overall flow of the Lunar PNT simulation incorporates the DEKF approach of asset localization and the weighted least-squares approach in user localization (Figure 3). The autonomous Lunar PNT simulation is primarily implemented in MATLAB, where the DEKF based on the matching scheduler is implemented with Google’s OR-tools as a model builder and Gurobi optimization tool as a backend solver. The General Mission Analysis Tool (GMAT) is utilized to generate ephemeris data for swarm assets, and accounts for satellite orbital details, mass, and perturbations like solar radiation pressure and drag coefficients. Each ephemeris dataset is produced in the Moon International Celestial Reference Frame (ICRF) inertial coordinate system. For state estimation, the distributed swarm assets rely on two-way Inter-Satellite Link (ISL) measurements, which involve tracking pseudoranges and relative velocities between visible satellites and anchor nodes during each observation. Numerical evaluations of the decentralized localization process are conducted to demonstrate the feasibility of the low-altitude PNT system in providing reliable navigation services. The main approach involves using DEKF and CEKF to localize 100 satellites in low-altitude constellations, where the CEKF is implemented to serve as a baseline for comparing the performance of distributed algorithms. In both cases, we evaluate ‘fully sampled’ measurements from all available assets, and ‘two ISL’ measurements when spacecraft are constrained to have only two antennas. We test four estimation techniques: CEKF fully sampled, CEKF two ISL, DEKF fully sampled, and DEKF two ISL filters. As the DEKF update cycle is comprised of network setup, communication, and computations, a global broadcast network and 2-way ISL network setup will take from 4 to 6 minutes as maximum [12]. In this simulation, the DEKF update cycle is set to 10 minutes, including a 4-minute latency for obtaining and computing the actual measurement updates. We experiment an increased update cycle to demonstrate the feasibility and evaluate the impact on localization performance using various tuning values for measurement noise covariances (Figures 4 and 5). By comparing centralized and decentralized approaches using a matching algorithm, we analyze the influence of cross-correlation factors in the covariance matrix, assuming 100% reliability of all assets and measurements. The increased frequency and the adjustments of tuning parameters reveal distinct error patterns between the two scenarios. The localization accuracy of the swarm assets and ground users is assessed by taking the median error across 100 assets and one ground user (84.9°S, 137.5°E) over 7-day simulation period (Table 1). Since the user localization accuracy is significantly affected by the performance of the swarm assets, it is crucial to maintain high localization accuracy within the swarm. This study will continue to explore decentralized filtering for autonomous LPNT operations, with further investigation of an 'iterative' matching approach which enumerates every valid matching pair, planned for the following month.

Yeji Kim↗

NASA Tech Briefs, February 2001

The topics include: 1) Application Briefs; 2) National Design Engineering Show Preview; 3) Marketing Inventions to Increase Income; 4) A Personal-Computer-Based Physiological Training System; 5) Reconfigurable Arrays of Transistors for Evolvable Hardware; 6) Active Tactile Display Device for Reading by a Blind Person; 7) Program Automates Management of IBM VM Computer Systems; 8) System for Monitoring the Environment of a Spacecraft Launch; 9) Measurement of Stresses and Strains in Muscles and Tendons; 10) Optical Measurement of Temperatures in Muscles and Tendons; 11) Small Low-Temperature Thermometer With Nanokelvin Resolution; 12) Heterodyne Interferometer With Phase-Modulated Carrier; 13) Rechargeable Batteries Based on Intercalation in Graphite; 14) Signal Processor for Doppler Measurements in Icing Research; 15) Model Optimizes Drying of Wet Sheets; 16) High-Performance POSS-Modified Polymeric Composites; 17) Model Simulates Semi-Solid Material Processing; 18) Modular Cryogenic Insulation; 19) Passive Venting for Alleviating Helicopter Tail-Boom Loads; 20) Computer Program Predicts Rocket Noise; 21) Process for Polishing Bare Aluminum to High Optical Quality; 22) External Adhesive Pressure-Wall Patch; 23) Java Implementation of Information-Sharing Protocol; 24) Electronic Bulletin Board Publishes Schedules in Real Time; 25) Apparatus Would Extract Water From the Martian Atmosphere; 26) Review of Research on Supercritical vs Subcritical Fluids; 27) Hybrid Regenerative Water-Recycling System; 28) Study of Fusion-Driven Plasma Thruster With Magnetic Nozzle; 29) Liquid/Vapor-Hydrazine Thruster Would Produce Small Impulses; and 30) Thruster Based on Sublimation of Solid Hydrazine

Source record↗

Automation of Hubble Space Telescope Mission Operations

On June 13, 2011, after more than 21 years, 115 thousand orbits, and nearly 1 million exposures taken, the operation of the Hubble Space Telescope successfully transitioned from 24x7x365 staffing to 815 staffing. This required the automation of routine mission operations including telemetry and forward link acquisition, data dumping and solid-state recorder management, stored command loading, and health and safety monitoring of both the observatory and the HST Ground System. These changes were driven by budget reductions, and required ground system and onboard spacecraft enhancements across the entire operations spectrum, from planning and scheduling systems to payload flight software. Changes in personnel and staffing were required in order to adapt to the new roles and responsibilities required in the new automated operations era. This paper will provide a high level overview of the obstacles to automating nominal HST mission operations, both technical and cultural, and how those obstacles were overcome.

Burley, Richard↗

An architecture for object-oriented intelligent control of power systems in space

A control system for autonomous distribution and control of electrical power during space missions is being developed. This system should free the astronauts from localizing faults and reconfiguring loads if problems with the power distribution and generation components occur. The control system uses an object-oriented simulation model of the power system and first principle knowledge to detect, identify, and isolate faults. Each power system component is represented as a separate object with knowledge of its normal behavior. The reasoning process takes place at three different levels of abstraction: the Physical Component Model (PCM) level, the Electrical Equivalent Model (EEM) level, and the Functional System Model (FSM) level, with the PCM the lowest level of abstraction and the FSM the highest. At the EEM level the power system components are reasoned about as their electrical equivalents, e.g, a resistive load is thought of as a resistor. However, at the PCM level detailed knowledge about the component's specific characteristics is taken into account. The FSM level models the system at the subsystem level, a level appropriate for reconfiguration and scheduling. The control system operates in two modes, a reactive and a proactive mode, simultaneously. In the reactive mode the control system receives measurement data from the power system and compares these values with values determined through simulation to detect the existence of a fault. The nature of the fault is then identified through a model-based reasoning process using mainly the EEM. Compound component models are constructed at the EEM level and used in the fault identification process. In the proactive mode the reasoning takes place at the PCM level. Individual components determine their future health status using a physical model and measured historical data. In case changes in the health status seem imminent the component warns the control system about its impending failure. The fault isolation process uses the FSM level for its reasoning base.

Holmquist, Sven G.↗

Lunar Reconnaissance Orbiter (LRO) Rapid Thermal Design Development

The Lunar Reconnaissance Orbiter (LRO) project had a rapid development schedule starting with project conception in spring of 2004, instrument and launch vehicle selection late in 2005 and then launch in early 2009. The lunar thermal environment is one of the harshest in our solar system with the heavy infrared loading of the moon due to low albedo, lack of lunar atmosphere, and low effective regolith conduction. This set of constraints required a thermal design which maximized performance (minimized radiator area and cold control heater power) and minimized thermal hardware build at the orbiter level (blanketing, and heater service). The orbiter design located most of the avionics on an isothermalized heat pipe panel called the IsoThermal Panel (ITP). The ITP was coupled by dual bore heat pipes to an Optical Solar Reflector (OSR) covered heat pipe radiator. By coupling all of the avionics to one system, the hardware was simplified. The seven instruments were mainly heritage instruments which resulted in their desired radiators being located by their heritage design. This minimized instrument redesigns and therefore allowed them to be delivered earlier, though it resulted in a more complex orbiter level blanket and heater service design. Three of the instruments were mounted on a tight pointing M55J optical bench that needed to be covered in heaters to maintain pointing. Two were mounted to spacecraft controlled radiators. One was mounted to the ITP Dual Bores. The last was mounted directly to the bus structure on the moon facing panel. The propulsion system utilized four-20 pound insertion thrusters and eight-5 pound attitude control thrusters (ACS) in addition to 1000 kg of fuel in two large tanks. The propulsion system had a heater cylinder and a heated mounting deck for the insertion thrusters which coupled most of the propulsion design together simplifying the heater design. The High Gain Antenna System (HGAS) and Solar Array System (SAS) used dual axis actuator gimbal systems. HGAS required additional boom heaters to cool the approximately 10 W of RF losses thru the rotary joints and wave guides from the 40 W Ka system. By design this module needed a fair amount of heater, blanketing, and radiator complexity. The SAS system required a separate cable wrap radiator to help cool the Solar Array harness which dissipated 30 W thru the actuators and cable wraps. This module also was complex.

Baker, Charles↗