Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “leasing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Evaluating the Impact of Residential Solar Contract Cancellations in the United States

The residential solar photovoltaic (PV) market in the United States is growing, despite frequent customer cancellations. Contract cancellations result in lost time and costs that must be borne by installers, often in the form of higher "soft costs" (i.e., non-equipment costs). These costs are often passed on to customers who successfully install PV systems. To date, few studies have attempted to estimate national cancellation rates or model the impacts on installed system costs. In this report, we utilize an installer-provided dataset of 199,665 residential PV-only projects representing about 10% of U.S. installs each year from 2017-2019. With this data, we evaluate cancellation rates and trends from contract signing to install. Next, by leveraging NREL's soft cost model for residential solar, we estimate installer spending through each phase of the pre-install process. Applying our findings on cancellation timelines and rates, we then estimate the potential cost impacts to successful installs from contract cancellations. Our work suggests that the rates and impacts of contract cancellations have been previously underestimated. Namely, we find that cancellations/unsuccessful project are; more common than previous estimates suggest; occur earlier in project timelines, though a significant number happen even after permit/ATB approvals; and contribute significantly to customer acquisition and other soft costs. We also find that cancellation do not appear to be driven by review delays in permitting and interconnection applications.

14 SOLAR ENERGY↗

Ames National Laboratory Annual Site Environmental Report for CY2021

The primary purpose of this report is to summarize the performance of Ames National Laboratory’s environmental programs, present highlights of significant environmental activities, and confirm compliance with environmental regulations and requirements for calendar year 2021. This report is a working requirement of Department of Energy Order 231.1B, Environment, Safety and Health Reporting. It includes descriptions of the Laboratory’s site, mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring activities. Ames National Laboratory is located on the campus of Iowa State University (ISU) and occupies 13 buildings owned by the Department of Energy (DOE). See the Laboratory’s Web page for location and Laboratory overview. The Laboratory also leases space in ISU owned buildings. In 2021, the Laboratory accumulated and disposed of hazardous waste under a U.S. Environmental Protection Agency (EPA) issued generator number. All waste was handled according to applicable EPA, State, and local regulations and DOE Orders. The Laboratory operates as a Small Quantity Generator (SQG) of hazardous waste. There were no radiological air emissions or exposures to the general public due to Laboratory activities in 2021 (See U.S. Department of Energy Air Emissions Annual Report in Appendix A.) The Laboratory has an established Environmental Radiological Protection Program (Plan 10200.041) per DOE Order 458.1 requirements. Plans, policies, and procedures are in place to protect the public and the environment against undue risk from radiation associated with DOE radiological activities. As indicated in prior Site Environmental Reports, formal pollution prevention awareness, waste minimization and recycling programs have been in practice since 1990, with improvements implemented most recently in 2017 with Iowa State University’s shift toward single-stream recycling. Included in recycling efforts are items such as batteries, monitors, corrugated cardboard, lamps, miscellaneous electronic office equipment, mixed paper, newsprint, food/beverage containers, and laboratory glassware. Ames National Laboratory also recycles/reuses salvageable metal, used oil, and foamed polystyrene peanuts, and encourages chemical redistribution and sharing among research groups. Ames National Laboratory reported its contractual performance to DOE-Ames Site Office (AMSO) through the Laboratory’s Performance Evaluation Measurement Plan (PEMP), and a performance level of “B+” was achieved in 2021 for Sustain Excellence and Enhance Effectiveness of Integrated Safety, Health, and Environmental Protection As reported in Site Environmental Reports for prior years, the Laboratory’s Environmental Management System (EMS) has been integrated into the Laboratory’s Integrated Safety Management System (ISMS) since 2005. The integration of EMS into Laboratory business practices allows the Laboratory to systematically review, address and respond to environmental impacts. In addition to DOE-identified objectives and targets, the EMS Steering Committee recommends annual environmental goals for the Laboratory. Due to the COVID-19 pandemic and limited onsite work staff, goals of reducing water usage and travel/commuting to promote the reduction of scope 3 greenhouse gases were achieved. All contract deliverables and environmental compliance activities were still met during this time.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Survey and Assessment of the Ocean Renewable Energy Resources in the US Gulf of Mexico

This study was conducted by the National Renewable Energy Laboratory (NREL) and funded by the Bureau of Ocean Energy Management (BOEM). It provides a comprehensive feasibility assessment of multiple offshore renewable energy technologies in the Gulf of Mexico (GoM) to inform BOEM's strategic plans related to possible Outer Continental Shelf alternative energy leasing activities in the GoM. In coordination with Gulf Coast states, the study includes some information on offshore renewable energy potential in state waters for future energy planning. The goal of the study is to survey potential offshore renewable energy sources in the GoM and quantify their feasibility relating to resource adequacy, technology maturity, and the potential for competitive cost. The study provides a review of available technologies and concepts for generating offshore renewable energy, including a high-level assessment of the current state of each technology and its potential for future advances. It provides a breakdown of resource capacity for each renewable energy technology and a recommendation that offshore wind be pursued for future study as the most promising technology. The renewable technologies that were considered include offshore wind, wave energy, tidal energy, ocean current energy, offshore solar energy, ocean thermal energy conversion (OTEC), cold water source cooling, and hydrogen (as a storage medium to utilize existing pipeline infrastructure). The resource capacity for each of these renewable energy sources was quantified for both the gross resource capacity potential (gross resource) and the technical resource capacity potential (technical resource) using the methodology described in an earlier NREL report. Many of these sources are very immature from a commercial perspective, which makes some of the comparisons difficult. In many cases, new methods were developed to estimate nominal power density for each technology type, which were necessary to convert the resource areas into deployable gross and technical resource capacity potentials.

17 WIND ENERGY↗

Lidar Buoy Data Dictionary: For the 2020 – 2021 California Deployments

Pacific Northwest National Laboratory (PNNL) manages two AXYS WindSentinel™ buoys (Buoys #120 and #130) on behalf of the U.S. Department of Energy (DOE) that collect a comprehensive set of meteorological and oceanographic (metocean) data to support resource characterization for wind energy offshore. The buoys have been deployed off the California coast in partnership with the Bureau of Ocean Energy Management (BOEM) from September 2020 through October 2021. One buoy was deployed within the Morro Bay Call Area offshore central California; the other buoy was deployed within the Humboldt Call Area off the coast of northern California. The measurements from the buoys are used to characterize the metocean conditions near potential locations for offshore wind lease areas and are uploaded to DOE’s Data Archive and Portal (DAP). Plots are updated on the DAP webpage to visualize the recent metocean measurements. This document serves as a data dictionary – or reference guide – for understanding and interpreting the data available from the buoys. This document includes: (1) specifications for the buoy instrumentation (Section 2.0) (2) description of each plot and definition of measured parameters (Section 3.0) (3) description of data files and naming convention (Appendix A) (4) reference guide of measurements and variables (Appendix B).

17 WIND ENERGY↗

Offshore Wind Market Report: 2023 Edition

The Offshore Wind Market Report: 2023 Edition provides detailed information on the U.S. and global offshore wind energy industries to inform policymakers, researchers, and analysts about technology, economic, and market trends. The scope of the report covers the status of over 293 global operating offshore wind energy projects as well as the broader global pipeline of projects in various stages of development through December 31, 2022. To provide up-to-date information and discussion on this emerging industry in the United States, this report tracks the significant U.S. domestic industry progress and events from January 1, 2022, through May 31, 2023. The U.S. offshore wind energy project development pipeline has reached a potential generating capacity of over 52 gigawatts, and the industry has seen strong support from state and federal governments (such as from the Inflation Reduction Act of 2022 and the announced Floating Offshore Wind Shot to reduce the cost of floating wind by 70%). There are contracts for over 17 gigawatts of the electricity from these offshore wind projects and state policies are in place to procure over 42 gigawatts by 2040. Although some projects are facing economic headwinds due to rising costs and higher interest rates (corresponding to project cost increases of 11% - 30% in 2022), there has still been significant investment in a domestic supply chain (including manufacturing facilities, new vessels, and upgraded or planned ports). Technologies continue to evolve as offshore wind turbines in the 15-megawatt class advance towards commercial production. Key offshore wind energy market indicators, such as commercial leasing, state energy planning targets, procurement policies, offtake agreements, and federal support for U.S. jobs and supply chain development, point toward sustained market growth when viewed together, but the macroeconomic hurdles facing the first generation of commercial projects could significantly stunt that growth.

17 WIND ENERGY↗

ORNL FY22 NCSP Time-of-Flight Measurement [Slides]

This presentation covers the ORNL FY22 NCSP Time-of-Flight measurements. Key take-aways from this presentation include that the process was initiated in FY22. The Lease starts Mar. FY23 (delayed). Finally, that there has been a 30% increase in cost to sample fabrication.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Assessing Impacts of Waves on Hub-Height Winds off the U.S. West Coast Using Lidar Buoys and Coupled Modeling Approaches

Given the importance of offshore wind energy development to the U.S. clean energy targets, it is vital to be able to characterize the wind resource in that environment accurately. Toward that end, two Bureau of Ocean Energy Management buoys equipped with Doppler lidar are being maintained by Pacific Northwest National Laboratory on behalf of the Department of Energy and deployed to regions of potential offshore wind development. In addition to standard meteorological and oceanographic measurements, the buoys document the wind profile between about 40 m and 250 m above the sea surface through Doppler lidar retrievals. After a multiyear deployment of two buoys along the U.S. East Coast, the buoys were redeployed to the U.S. West coast from 2020 – 2022 to locations near the Humboldt and Morro Bay lease areas. The buoys provide nearly continuous, multiyear datasets that can be used to evaluate predictions of hub-height (~100 m) wind speed for standard atmospheric models in the region. In the absence of measurements at the study site, offshore wind developers rely on model-based data to assess site conditions. Potential sources of model error in this environment include under-resolution or misrepresentation of coastal topographically forced flows, marine boundary layer dynamics and the evolution of their associated cloud and turbulence fields, the role of upwelling and other currents on surface heat fluxes into the boundary layer, and the impact of wave fields on surface momentum fluxes and thus the wind speed profile. In particular, most predictive models of wind speed do not predict wave fields at all, relying on parameterizations to represent their effects. In thus study, we focus on evaluating the role of wind / wave interactions on modeled hub-height wind speed and error by using the Coupled Ocean–Atmosphere–Wave–Sediment–Transport Modeling System to capture two-way interactions between an atmospheric model (Weather Research and Forecasting (WRF)) and a wave model (WAVEWATCHIII (WW3)) and compare to both stand-alone WRF and one-way coupled WRF / WW3 configurations. Our approach is similar to that used in Gaudet et al. (2022) to evaluate wind / wave coupling over the U.S. East Coast, but applied to the very different environment of the U.S. West Coast. We show examples for two cases, a cold-season frontal case and a warm-season low-level jet case. We find that wind / wave coupling makes little impact on model error for these cases at the location of the lidar buoys, for which other misrepresentations of model physics seems to be responsible for model-observation discrepancies. However, domain-wide evaluations, which also make use of the National Buoy Data Center network, show that a two-way coupling approach is less prone to systematic errors in the hub-height wind field than the one-way coupled approach. WRF resolution of kilometer-scale or less is needed to properly capture the sharp wind speed gradients that can be found along the coastline, and WW3 simulations driven by the downscaled WRF produce better bulk and spectral wave fields when compared to observations. Implications of the results for wind resource characterization are then discussed.

17 WIND ENERGY↗

OSW Consortium 2 - Validated National Offshore Wind Resource Dataset with Uncertainty Quantification (CRADA Report)

This research has led to the development of the 2023 National Offshore Wind data set (NOW-23), which offers the latest wind resource information for offshore regions in the United States. NOW-23 supersedes, for its offshore component, the Wind Integration National Dataset (WIND) Toolkit, which was published a decade ago and is currently a primary resource for wind resource assessments and grid integration studies in the contiguous United States. By incorporating advancements in the Weather Research and Forecasting (WRF) model, NOW-23 delivers an updated and cutting-edge product to stakeholders. As part of this project, we also developed a summary of the uncertainty quantification in NOW-23, along with NOW-WAKES, a 1-year post-construction data set that quantifies expected offshore wake effects in the US Mid-Atlantic lease areas. Stakeholders can access the NOW-23 data set at https://doi.org/10.25984/1821404.

17 WIND ENERGY↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗

PNNL Review of Federal and State Agency Regulatory Streamlining Practices

All major federal actions that have the potential to significantly affect the environment (e.g., land purchases and/or issuing grants, permits, leases, or licenses) are subject to multiple statutes including the following: • an environmental analysis under the National Environmental Policy Act (NEPA) • potential consultations with the U.S. Fish and Wildlife Service (USFWS) and/or National Marine Fisheries Service (NMFS) under the Endangered Species Act of 1973, as amended (ESA) • potential consultations with State Historical Preservation Officers (SHPOs) and/or tribal nations [often Tribal Historic Preservation Officers (THPOs)] under the National Historic Preservation Act of 1966 (NHPA). Given the size of the federal government and the corresponding variability and complexity in its missions, different branches within the federal government have a fairly wide range of approaches to fulfill their NEPA and consultation requitements. Many of these approaches are founded on the desire to streamline their NEPA and consultation processes while meeting the spirit and letter of the regulations. Some federal and state environmental/engineering agencies have developed web-based dashboards that provide a single web location for permit application submittals. They also use general permits in their various permitting processes. General permits can streamline the permitting process by establishing identical requirements for all eligible applicants. This reduces the time these agencies need to spend reviewing individual permits and setting specific requirements. In addition, general permits do not require a case-specific permit application. This paper presents a sampling of effective agency examples of streamlining the NEPA process and associated agency consultations. It also includes several examples of federal and state agency web portals, online application systems, and general permits that make application processes more efficient and accessible.

54 ENVIRONMENTAL SCIENCES↗

Pilot-Scale Algal Oil Production

The main objective of the project is complete: development of a preliminary planning and design for a pilot-scale algal oil cultivation and processing facility, FEL-3 design with -5% / +15% cost estimate accuracy, and conversion of the algal oil to biofuel in an off-site existing bio-oil refinery. The design basis includes 10 tons per day of dried algae cultivated with CO 2 supplied by direct air capture, electricity supplied solar power, well water supply, zero liquid discharge, off-site extraction, and off-site conversion of oil to biofuel. The design and permitting package is an important milestone in the path to commercialization of algal biofuels and bioproducts as it provides the preliminary design, permitting path, long-term land lease, planning documents, and team needed for success in future engineering, construction, start-up and operations of a pilot-scale farm at a site in Paso Robles, CA. Outcomes of the business assessment include (i) identification of a product spectrum for economical algal biofuels using co-products with markets that are commensurate with production of 6-7 billion gallons per year of sustainable aviation fuel (SAF), renewable diesel, and renewable gasoline, (ii) a path toward near-term contribution of algae oil to SAF, and (iii) an approach for long-term operation of a pilot-scale farm.

09 BIOMASS FUELS↗

Review of Feasibility and Cost Drivers for Floating Offshore Wind Energy in Washington State

The state of Washington must double its clean electricity supply by 2050 to meet its clean energy goals and comply with the Clean Energy Transformation Act. With more than 6.6 GW of technical resource potential in federal waters where Bureau of Ocean Energy Management has leasing authority, offshore wind energy could play an important role in diversifying Washington State's clean energy mix, reducing dependence on out-of-state energy sources, and helping meet state decarbonization goals. Decision makers need technology-specific information to assist with long-term energy system planning, so the Bureau of Ocean Energy Management requested that the National Renewable Energy Laboratory provide an overview of several drivers of offshore wind energy feasibility and cost in Washington. This study summarizes some of the existing engagement efforts and perspectives on offshore wind energy in the region and quantifies the offshore wind resources in Washington as well as technology costs and performance of potential projects. Furthermore, this report reviews existing grid and port infrastructure and discusses infrastructure needs along with information gaps. This study also explores opportunities and barriers to Washington entities supporting the broader floating offshore wind energy supply chain along the U.S. West Coast. Note that this study is not part of a formal project planning process or official engagement effort, nor does it assess environmental or economic impacts from potential offshore wind energy development.

17 WIND ENERGY↗

Optimizing cost-effective and benchmarked industry standards to quantify nutrient bioextraction by seaweed

Interest in the utility of seaweed farms to mitigate coastal eutrophication, or nutrient loading, has grown commensurate with the recent rise of the farmed seaweed industry in the U.S. But economic valuation of this ecosystem service remains elusive in part because of challenges in quantifying this spatiotemporally variable biological process with reproducible and comparable metrics. Regulatory bodies that permit wastewater discharge or lease area for aquaculture farms require water quality testing and reporting of dissolved total nitrogen (N) in nearshore marine environments. These metrics must meet EPA standards for testing and reporting (e.g., Total Kjeldahl Nitrogen - TKN). However, these metrics are inherently highly variable over space and time in dynamic nearshore systems, and expensive to evaluate with sufficient breadth to constrain this variance, creating a critical bottleneck to direct quantification of farmed seaweed net uptake rates in situ.

59 BASIC BIOLOGICAL SCIENCES↗

Elastic Stochastic Full Waveform Inversion (eSFWI)

This collaboration between Lawrence Livermore National Security, LLC (LLNS) as manager and operator of Lawrence Livermore National Laboratory (LLNL) and Chevron USA Inc., acting through its Chevron Technical Center division, aimed at developing next-generation computational methods for the Elastic Stochastic Full Waveform Inversion (eSFWI). Seismic imaging is heavily used in the oil and gas industry for identifying and operating subsurface reservoirs. Improved seismic imaging methods can improve productivity, lower costs, and improve operational and environmental safety. This CRADA demonstrated that new high-performance computing (HPC) architectures being rolled out over the next five years can enable unprecedented seismic imaging resolution when using eSFWI techniques to process active seismic data. An open-source computational mini-application was developed, capable of demonstrating near-peak performance for eSFWI algorithms on CPU and GPU enabled HPC platforms. Performance was demonstrated on LLNL HPC systems such as Lassen, as well as on Chevron systems. This project benefited Chevron USA Inc. by demonstrating the potential computational efficiency of their full waveform inversion capabilities used to characterize oil/gas reservoirs, which in turn benefits the public through potential increases in capabilities to perform analysis of leasing sites.

04 OIL SHALES AND TAR SANDS↗

Floating Offshore Wind US Manufacturing and Commercialization (CRADA Final Report)

Create a detailed manufacturing, assembly, load-out, transportation, upending, turbine integration, and offshore transportation plan for a hypothetical project in one of the California lease areas off the central coast. Develop a detailed schedule and cost estimation for each step of the process and compare with conventional floating platform designs.

17 WIND ENERGY↗

Southeast Regional CO 2 Utilization and Storage Acceleration Partnership (SECARB-USA): Needs Assessment Framework for Storage Complexes

A team of SECARB storage experts examined 63 formations at 39 sites that were selected to represent the range of diversity of newly assessed, as well as well-advanced, storage prospects in the SECARB region. We inventoried the data needs triggered by the requirements to obtain a Class VI UIC storage permit, the data needs that results from the requirement to create geocellular fluid flow models to support that permit, and by pragmatic and best practice inputs such as public acceptance, regulatory readiness, and pore space leasing. We anchored both the needs inventory and the processes for and cost of meeting the needs with data from 9 sites in in the SECARB area that have advanced far in characterization.

42 ENGINEERING↗

CalTestBed - Parthian Energy: Electromagnetic Sensing of Pre-mature Cell Failure (CRADA Final Report)

We had lengthy discussions with Parthian on the interpretation of the original SOW as laid out in the original proposal and on whether or not these tasks were allowable under the rules set by Cal Test Bed. There were also discussions on program limitations on purchasing equipment. We were engaged with vendors identified by Parthian as companies from which we could lease equipment, and in most cases, came to find, that these products were only available for purchase. As a result, we configured translational stages into an x-y plotter arrangement and established computer control over the setup as a step toward building our own system for acquiring data to meet Parthian's requirements. The project reached its scheduled end prior to the start of testing and was allowed to elapse uncompleted.

25 ENERGY STORAGE↗

Potential of Offshore Wind Energy Off the Coast of California

Two buoys equipped with lidars owned by US Department of Energy were deployed off the coast of California in fall of 2020 by Pacific Northwest National Laboratory. The buoys are scheduled to collect data for an entire annual cycle at two offshore locations proposed for offshore wind development by Bureau of Ocean Energy Management. One of the buoys was deployed approximately 50 km off the coast near Morro Bay in central California in 1100 m of water. The second buoy was deployed approximately 40 km off Humboldt County in northern California in 625 m of water. The buoys provided the first-ever measurements of hub-height winds off the coast of California. The atmospheric and oceanographic characteristics of the area and estimates of annual energy production at both Morro Bay and Humboldt lease areas show that both locations have a high wind energy yield and are prime locations for future floating offshore wind turbines.

Krishnamurthy, Raghavendra↗