Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “interconnection policies”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Catalina Repower Feasibility Study: NREL Phases I & II Summary Report

Engineers at the National Renewable Energy Laboratory (NREL) supported Southern California Edison (SCE) and the United States Environmental Protection Agency (EPA) by conducting technical and economic analyses for energy systems at Santa Catalina (Catalina) Island, which is located 22 miles off the coast of Long Beach, California. This effort was part of a broader Repower Catalina Feasibility Study that was also supported by NV5, an engineering consulting firm and project partner to NREL for this analysis. This document describes NREL’s techno-economic modeling and optimization analysis for the first two phases of this project which focus on supply-side generation and energy storage options for Catalina. SCE’s goal for this analysis is to determine a strategy for electricity generation on Catalina Island that results in lower energy costs, improved energy resiliency, and reduced air emissions. EPA goals for this effort are to reduce emissions of air pollution and encourage renewable energy development on contaminated and formerly contaminated lands when such development is aligned with the community’s vision for the site. Currently, an on-island SCE power plant serves the Catalina Island electrical load with 6 reciprocating diesel generators totaling 9.4 MW; 23 propane-fueled microturbines totaling 1.5 MW; and a 1-MW, 7.2-MWh sodium sulfur battery energy storage system (BESS). In 2017, the electricity consumption on the island was 29.1 GWh, with an average load of 3.3 MW and peak load of approximately 5.5 MW. Considering new environmental standards on diesel generator emissions from California’s South Coast Air Quality Management District, a 60% renewable energy target for 2030 laid out in California’s Senate Bill 100, SCE’s Clean Power Electrification Pathway, and the characteristics of the island’s existing diesel generators, SCE is seeking to evaluate the technical and economic implications of different energy technology options to determine a path forward. Phases I and II of the Repower Catalina Feasibility Study, summarized in this document, evaluated the following: Interconnection with the mainland via an undersea cable; On-island fossil fuel generation, including diesel, propane, and/or liquified natural gas (LNG); On-island renewable energy (RE) technologies, including solar photovoltaics (PV), wind turbines, and wave energy devices; BESS to support the above generation technologies; Initial analysis of the potential impacts of implementing energy efficiency measures. Results indicate strong techno-economic potential for a mix of on-island diesel and/or propane generators, solar PV, BESS, and energy efficiency measures to help SCE and Catalina achieve their goals compliant with California’s emissions and clean energy standards while minimizing electricity life cycle costs (LCC) over the 30-year analysis period. This document summarizes the considerations and findings of Phases I and II, focusing on high-level takeaways from Phase I and more detailed results from Phase II, and discusses a potential path forward for Phase III.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Advancing Urban Water Resilience: Coproducing Knowledge through Civic–Academic Global Partnerships on Water and Climate

As extreme weather events become more pronounced, the vulnerabilities associated with the urban water supply and wastewater systems in megacities are intensified in multiple interconnected dimensions. These multifaceted water challenges can benefit from enhanced cross-sectoral collaboration and sharing of critical knowledge, which are essential for sustainable and adaptive water governance frameworks. In this context, the Megacity Alliance for Water and Climate (MAWAC)–Europe and North America Region (ENAR) Working Group convened a workshop in March 2023, followed by a subsequent workshop in London, United Kingdom, from 11 to 13 September 2024. These workshops aimed to investigate and devise solutions for the cascading hazards with water systems. The solutions examined various aspects focused on climate adaptation and mitigation, stormwater management, and the governance of water and wastewater systems. Additionally, discussions highlighted the importance of community engagement, economic considerations, equity, and effective communication in addressing these pressing challenges. Over the course of 3 days, experts from academia, government agencies, and industry engaged in meaningful discussions on digital modeling for integrated water management, climate-informed urban planning, and public–private–academic partnerships (Fig. 1). Case studies from cities such as New York, Los Angeles, London, Paris, and Chicago highlighted innovative governance strategies for managing water and wastewater systems, promoting water reuse, planning infrastructure, and fostering stakeholder-driven and stakeholder-informed adaptation. The workshop participants emphasized the need for data-driven decision-making, scalable governance models, and knowledge-sharing networks to enhance urban water governance for sustainability and resilience. This workshop report presents the key takeaways from the 3-day convening, providing a roadmap for integrating scientific research, policy frameworks, and emerging technologies to address water challenges faced by megacities.

Hydrologic models↗

Electric Access System Enhancement (EASE): Assessment of a Distributed Energy Resource Management System for Enabling Dynamic Hosting Capacity

The Electric Access System Enhancement (EASE) project demonstrated a scalable, interoperable, and cost-effective means of integrating high penetration of distributed energy resources (DERs). The control architecture developed leveraged a Distributed Energy Resource Management System, Distribution System Operator for transacting energy, and 3rd Party DER Aggregator platform. The project identified ways to enhance the customer interconnection process to the grid and improve access to information from DERs and optimize the usage of DERs to provide energy services in a simulated day-ahead shadow market while maintain grid reliability. By integrating these capabilities into a scalable system of systems, the DSO can effectively balance DER generation and customer demand on the distribution network. This capability allows the grid to host more DER than traditionally possible on wires alone. Hosting more DER has the added benefit of supplying increased demand growth, sometimes beyond the capacity limits of the distribution network itself. This is known as a dynamic hosting capacity, which could help utilities manage the forecasted growth in electricity demand as California switch to electric vehicles and appliances. This could help to establish energy storage and PV generation as a “pseudo firm” generation resource mix if managed appropriately and provide sufficient resource adequacy for distribution capacity upgrade deferrals.

14 SOLAR ENERGY↗

Solar Resource and Infrastructure Assessment for the Town of Blandford

This report is a solar resource and infrastructure assessment for the town of Blandford, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Blandford. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, most distribution lines providing electricity to Blandford are over-saturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. We can expect significant upgrades to these circuits, if any of the in-process projects are to proceed, which might then free up additional capacity for new projects. There is one circuit which serves a section of North Blandford Road that is not over-saturated; for the immediate future, this is the most cost-effective location for new large-scale projects to be sited. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in preferred locations. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗

Lessons Learned for Transmission Cost Allocation in U.S. Regional Markets

Expanding electric transmission can facilitate generator interconnection and improve grid reliability. Assigning costs for new transmission infrastructure is highly contentious because these costs can have a direct impact on energy prices and ratepayer bills. In this report, we evaluate what factors influence successful transmission cost allocation agreements. Through a review of legal disputes, existing cost allocation practices, and regional case studies, we identify potential strategies to minimize cost allocation disputes for future projects. The report also highlights the processes by which regions can update their cost allocation methods. While we do not consider cost allocation methods currently under development for compliance with FERC Order 1920, the trends and lessons learned identified in this report can inform discussions on effective cost allocation methods to reduce barriers for transmission development.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Improving Solar and Solar+Storage Screening Techniques to Reduce Utility Interconnection Time and Costs (Final Technical Report)

Residential PV installations have increased rapidly over the last decade, and the increased application volume has caused permitting delays and lower overall adoption rates. In this project, we developed and evaluated whether data-driven secondary modeling and screening techniques can help utilities assess customer applications more accurately than traditional screening shortcuts. Secondary topologies are predicted using decision trees and commonly available information, such as service transformer, customer, and street locations. Conductors were predicted using a logistic regression method based on real world object (RWO) types, service transformer ratings, conductor length, and distance to transformer. After developing the combined primary and secondary distribution network model, hosting capacity results were used to train a random forest model to predict the pass/fail likelihood of a customer application. Powerflow based models with predicted secondaries and data-driven methods both increased the screening success rate, relative to common utility heuristics, by as much as 55 percentage points. Data-driven screening techniques were described by one utility as a "right-sized" approach for residential customers given the low-risk of small errors and the high-cost of accurate modeling.

14 SOLAR ENERGY↗

Noise-Resilient Quantum Machine Learning for Stability Assessment of Power Systems

Transient stability assessment (TSA) is a cornerstone for resilient operations of todays interconnected power grids. This paper is a confluence of quantum computing, data science and machine learning to potentially address the power system TSA issue. Here, we devise a quantum TSA (QTSA) method to enable scalable and efficient data-driven transient stability prediction for bulk power systems, which is the first attempt to tackle the TSA issue with quantum computing. Our contributions are three-fold: 1) A high expressibility, low-depth (HELD) quantum circuit is designed for accurate and noise-resilient TSA; 2) A quantum natural gradient descent algorithm is developed for efficient HELD circuit training; 3) A systematical analysis on QTSAs performance under various quantum factors is per-formed. QTSA underpins a foundation of quantum-enabled and data-driven power grid stability analytics. It renders the intractable TSA straightforward and effortless in the Hilbert space, and therefore provides stability information for power system operations. Extensive experiments on quantum simulators and real quantum computers verify the accuracy, noise-resilience, scalability and universality of QTSA.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Bridging the Gap for Powering Data Centers

The rapid expansion of data centers, primarily driven by artificial intelligence, is outpacing the adaptability of the U.S. electric grid. This report, developed by Idaho National Laboratory (INL) , presents a gap analysis of some of the infrastructure challenges associated with large-scale data center deployment. Drawing from a national workshop hosted by INL in October of 2025, the report synthesizes stakeholder insights, survey data, and technical discussions to identify critical barriers and research needs. Key findings highlight the growing preference for behind-the-meter generation, the perceived inadequacy of legacy interconnection processes, and the urgent need for improved coordination between utilities, regulators, and data center developers. Environmental concerns such as water use and noise pollution, as well as economic constraints like equipment lead times and cost allocation, are also explored. The report outlines national lab capabilities in modeling, simulation, and technical assistance, and proposes targeted R&D priorities to support resilient, scalable, and efficient integration of data centers into the grid.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Tierra del Fuego Case Study Capacity Expansion Analysis

This case study, developed by Net Zero World Initiative and the Government of Argentina, examines least-cost decarbonization pathways for Tierra del Fuego, Argentina, utilizing renewable energy, energy storage, hydrogen, and other decarbonization technologies. Being the second largest natural gas producing province in Argentina, Tierra del Fuego has historically relied on natural gas for their energy sector needs. As they look at possible decarbonization pathways, they face challenges due to extreme weather conditions, isolation from the mainland, and low population density. The study utilizes the Engage web application for capacity expansion modeling, addressing both business-as-usual (BAU) and accelerated decarbonization scenarios, with varying degrees of electrification and carbon emission constraints. Key findings reveal that an interconnection with the mainland, high contribution of wind energy development on Tierra del Fuego, energy storage, and hydrogen, coupled with energy-efficient electrification technologies (such as heat pumps and electric vehicles), emerge as the most cost-effective solutions to decarbonize, significantly reducing carbon emissions and total system energy costs. The study explores self-generation and interconnection alternatives, demonstrating the economic advantage of an interconnection of Tierra del Fuego with the mainland, as an alternative to 100% local generation. Sensitivity analyses on wind data sources and temporal resolutions, as well as projected natural gas prices, highlight the influence of external factors on the feasibility of decarbonization pathways. Challenges identified include the practicality of phasing out natural gas, economic uncertainty, cost implications of long-term storage technologies as wind energy increases, and geographical limitations for wind generation. The case study concludes that while substantial emissions reductions can be achieved by 2050, and be competitive with conventional pathways, achieving a full 100% decarbonization by 2050 would entail higher costs, particularly due to the significant reliance on storage solutions with higher contribution of wind energy. The analysis offers valuable insights for policymakers and stakeholders in Argentina's energy sector, emphasizing the importance of strategic planning, investment in renewable energy and storage technologies, and careful consideration of local conditions in the transition towards Net Zero targets.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Review of Resilience and Long-Term Planning in Power and Water Systems in the United States

There is recognition among power and water utilities that the frequency and magnitude of high consequence and low probability events could increase as a result of climate change. The interconnected nature of energy-water systems raises the possibility of cascading failures, increasing complexity and risks. Resilience and long-term planning are important ways of weathering the effects of climate change. First, to understand more about resilience, we reviewed existing literature on resilience definitions, metrics, and modeling, focusing on integrated water-power systems. Second, to understand how resilience and planning are being applied in practice, we interviewed utilities and organized, curated, and synthesized the interview data to arrive at several key findings, which are presented here. We found that there is not a consistent definition for resilience, yet it is something that utilities regularly plan for, often with different names and varying methods/measures. However, there is a tangible shift in the industry towards defining and determining measurable resilience metrics. While the exact metrics are a work in progress, utilities are taking steps forward by (1) putting people and culture at the center of resilience, (2) recognizing their own interdependencies, and (3) pursuing better cross-sector collaboration.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A method for assessing economic, environmental, and reliability tradeoffs of interregional transmission connecting ERCOT (the Texas grid) to the eastern and western grids

Reliable development of the power grid is an evolving concern for humanity due to extreme weather that frequently threatens power sector infrastructure. The state of Texas is a uniquely structured testbed for grid planners to study when looking for solutions to development, innovation, and overcoming such challenges. Because of its size and islanded structure, Texas is small enough to model, but big enough to matter. Texas is a global leader in energy production, energy consumption, and maintains an unusually diverse fuel mix. In addition, the state has experienced winter freezes, heat waves, wind storms, droughts and floods that have threatened power sector infrastructure or caused recent blackouts and calls for demand side conservation. One of the most devastating of these events was the North American winter storm, dubbed “Winter Storm Uri” by the Weather Channel, that froze the region in February 2021 and led to an extended power outage event that put the majority of Texan residents in darkness for days. While preparing to avoid such outage events in the future, various tools have been proposed to improve grid reliability, including energy efficiency, demand response, and distributed energy resources. An additional option would be to develop interregional transmission that connects the Texas grid to other national grids. To assess the merits of this idea, we developed a novel, universally-applicable and internationally-relevant framework to study how the Texas grid would evolve alongside access to various interregional ties. This method allows us to stress the synthetic grid structure and analyze how it would respond to the shock of a simulated winter storm event. Our method leverages open-source modeling tools, such as PowerGenome, pyGRETA, and GenX to synthesize unique zonal grid data, construct a consolidated network of model regions, and simulate different developmental pathways of capacity expansion and operational dispatch. We demonstrate our method with an analysis connecting the Electric Reliability Council of Texas (ERCOT), the grid that serves most of Texas, the Western Electricity Coordinating Council (WECC), the grid that serves the western half of the contiguous U.S., and the Eastern Interconnect, the grid that serves the eastern half of the contiguous U.S. Our results indicate that the cost-optimal capacity of interregional transmission connecting the ERCOT grid to other grids lies between 9–13 GW assuming baseline conditions. Building this amount of connecting capacity in one or multiple directions lowers the costs and emissions of development and operation by up to $16 billion and 257 million metric tonnes (MMT) respectively. Additionally, our results show that the interregional connections between ERCOT and other national grids reduce the amount of total load shed required through mild winter storm events. However, our results also show that there is a threshold of very extreme winter storm conditions, spanning multiple service areas, above which the connections exacerbate resource adequacy problems. Therefore, the results indicate that the connections need to be carefully planned alongside the rest of the grid infrastructure to avoid over-reliance on specific resources or technology options.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transmission Value in 2023: Market Data Shows the Value of Transmission Remained High in Certain Locations Despite Overall Low Wholesale Electricity Prices

In 2023 additional electricity transmission would have provided the most value for links that crossed between grid interconnection regions in the United States (the Western Interconnection, the Eastern Interconnection, the Texas Interconnection) or crossed between system operator regions within the same interconnection. Many multi-interconnection or multi-region links had values of greater than $\$20$/MWh, or up to $\$175$ million/yr per 1 GW expanded transmission (subject to limits to the depth of the market at each side of the link). In contrast, many links within regions, or between regions in the northeast, had relatively low values in 2023, following the overall decline in wholesale electricity prices in 2023 compared with 2021-2022. The most valuable link in 2023, at $\$61$ /MWh, was between Texas and the Southwest. Multiple events in 2023 (high natural gas prices in the western U.S., and high summer temperatures in Texas and the Southwest) were observed to have driven this high value. Of particular note, high prices in Texas occurred at a largely distinct set of hours from high prices in the Southwest, helping to drive up the value of transmission in total and demonstrating significant value to both regions. This example demonstrates the unique value of transmission (compared to other solutions, such as building local generation resources) in delivering benefits to multiple regions given its ability to connect areas of the country that inevitably face differing circumstances.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Preparing Distribution Utilities for the Future - Evolving Customer Consumption in Renewable Rich Grids: A Novel Analytical Framework

The research collaboration between NREL and BYPL focuses on the challenges caused by renewable integration into the power grid at large. Since the challenges and opportunities vary depending on the point of interconnection (distribution or transmission) the research team identified two tracks for research as listed below: 1. Power procurement - This research track focuses on the challenges and opportunities caused by GW scale renewable integration at the transmission level. Specifically, this track focuses on the contribution that utility-scale renewable energy procurement provides to distribution utilities, both from energy and capacity perspectives. In this track of research, utility customers are only considered as traditional (one-directional) consumers of energy. 2. Distributed energy resources - This research track focuses on the challenges and opportunities caused by many small-scale distributed renewable resource integrations at the distribution systems. At the power distribution level, distribution utilities may face not only new solar energy technologies, but also battery energy storage and electric vehicles as well. These three technologies (solar PV, battery energy storage, and electric vehicles) combined, pose unique challenges to distribution utilities. This track focuses on assessing the net-load evolution that distribution utilities observe as these emerging technologies make their way to the grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Managing Solar Photovoltaic Integration in the Western United States: Resource Adequacy Considerations

This study examines the impact of reserve margin-based reliability assessment, as commonly used in capacity expansion models, on planning resource-adequate power systems under high penetrations of solar photovoltaics (PV). As a generation resource, PV is operationally different from the conventional dispatchable resources for which most capacity expansion models were designed. The question this study attempts to answer is whether large amounts of PV on a system (in this case, the Western Interconnection of North America) would bias the results of conventional reserve margin-based capacity expansion modeling towards an over- or under-provisioning of resource adequacy. This analysis used NREL’s Resource Planning Model (RPM) for capacity expansion modeling and NREL’s Probabilistic Resource Adequacy Suite (PRAS) for resource adequacy assessment. RPM uses a reserve margin requirement to enforce resource adequacy. PRAS, a collection of tools for studying the resource adequacy of power systems and the adequacy contributions of individual resources on a probabilistic basis, was used to compute multiple resource adequacy metrics across a number of simulated scenarios and system representations with differing regional detail. In all cases, including high PV penetrations (up to 33% annual generation from PV, interconnection-wide), RPM was able to produce resource-adequate systems as measured by normalized expected unserved energy and loss-of-load expectation results from PRAS. The accuracy of reserve margin approaches depends heavily on the underlying assumptions informing the capacity credit assigned to variable and energy-limited resources, particularly when such resources are abundant in the modeled system. RPM’s standard methodology for estimating variable and flexible resources’ capacity contributions, which is based on the top 100 hours of net load, did not appear to systematically undervalue or overvalue variable generation relative to a more rigorous equivalent firm capacity assessment using PRAS, although both over- and under-valuations were observed in specific scenarios. In the worst cases, the top 100 hour method underestimated the equivalent firm capacity of PV by two percentage points, and overestimated the equivalent firm capacity of PV by five percentage points. Calculating capacity contributions based on the top 10 hours of net load systematically underestimated equivalent firm capacities at more modest PV penetrations, but was often a better approximation of equivalent firm capacity than the existing 100-hour approach in scenarios with higher PV penetrations.

14 SOLAR ENERGY↗

Evolving Competitive Markets in SAPP: Leveraging Competitive Wholesale Electricity Markets to Drive Renewable Generation Capacity in the Southern African Power Pool (SAPP)

The SADC region has significant natural resource potential to increase renewable energy generation, improve electricity reliability, and support economic development. This research finds an apparent lack of confidence from electricity infrastructure investors in SAPP wholesale electricity markets, which increases risk perception and lowers the likelihood of capital deployment. With respect to free market fundamentals, competitive market obstacles and renewable energy development obstacles are characterized. Stakeholders identified the top obstacles to well-functioning competitive markets as insufficient transmission infrastructure for interconnection and regional movement of electricity, dominance of national single-buyer markets, and lack of or weak nation-state regulatory frameworks. Stakeholders prioritized the top three obstacles for renewable energy development as a lack of viable commercial arrangements for variable renewable energy (VRE) balancing, lack of functional and consistent nation-level regulations, and higher project costs related to reliance on imported equipment. With respect to potential solution options, stakeholders prioritized the development of new cost allocation and finance methods to facilitate new transmission expansion, training to educate new or potential new market entrants on SAPP processes, as well as modeling and analysis of regional SAPP participation benefits disaggregated to the nation-state level. From these perspectives, this research identified strategy options for consideration including transitioning SAPP to a regional transmission operator (RTO) for operation and planning of cross-border transmission facilities and market administration, shifting operations of SAPP member transmission systems to Independent System Operators (ISOs), establishing a regional regulatory authority and enhancing market data transparency. Implementing these reforms is expected to be challenging, but not insurmountable, given the domestic political, legal, and jurisdictional complexities of the SADC region.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Western Interconnection Baseline Study

The purpose of the baseline study is to evaluate the degree to which current industry planning processes meet the national 2035 decarbonization goals for the Western Interconnection. This analysis serves as a comparative baseline for the scenario analysis conducted in the NTP Study using a Western Interconnection dataset that is readily available to industry. This baseline analysis differs from the production cost modeling analysis and power flow analysis in the main NTP Study report (forthcoming). In particular, the analysis presented in this report reflects a business-as-usual future with an optimistic build out of specific planned transmission projects and foreseeable generation. In contrast, the NTP Study models a future generation and transmission expansion based on optimization from a capacity expansion model. The analysis presented herein also reflects a 2030 timeframe, whereas the main NTP Study production cost modeling analysis and power flow analysis reflect a 2035 time frame. This baseline analysis utilizes industry’s most reliable data to account for future transmission projects across various stages of development, with a particular focus on those in the permitting stage. Additionally, it incorporates projections for changes in generation capacity (both additions and retirements). This baseline analysis outlines a probable trajectory, given current process and practice, for the future of the bulk power system with a horizon extending to 2030.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Navigating Integration: Key Challenges for Data Centers, Nuclear Stakeholders, and Utility Operators

The rapid expansion of data centers, driven by the exponential growth in data-processing and storage needs, presents significant challenges and opportunities for various stakeholders, including data center developers, nuclear energy providers, and utility companies. Data centers are projected to consume 6.7–12% of United States (U.S.) electricity by 2028, driven by artificial intelligence (AI) and cloud-computing demands. Nuclear energy offers reliability and dispatchable baseload power, but data centers need power now while nuclear still needs time to address siting, fast power ramping, and regulatory hurdles. Utilities must keep pace with the unprecedented acceleration of large load interconnection requests and urgently adapt to high-density loads while maintaining grid stability, reliability, and accelerating interconnection timelines. This report dives into these challenges and proposes key collaboration strategies to streamline data center integration that aligns with recent federal initiatives like America’s AI Action Plan and related executive orders that emphasize the importance of data center growth, nuclear energy expansion, and maintaining a competitive edge in the global AI race.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Hydropower operation in future power grid with various renewable power integration

Hydropower generation may play an increasingly important role in the power grid under increasing contribution of variable renewable sources such as wind and solar. An improved understanding of the changes to hydropower dispatch under future higher VRE grid conditions reveals research gap that should be informed power grid planning and reservoir water releases policies considering multiple other water uses and varying hydrologic condition. Here this study aims to understand the role of hydropower in a changing power grid by employing a production cost model, PLEXOS, across future power system scenarios, planning horizons, and regions. We explore optimized hydropower dispatch to understand its potential role in minimizing the system cost and renewable curtailment. We also examine the sensitivity of hydropower revenue under various grid scenarios of the Eastern U.S. and hydrology conditions. Results indicate hydropower generation follows net load and compensates for the variability of solar and wind generation. Although energy prices are lower during some periods in the future grid scenarios, there is a potential for higher revenue for hydropower by providing both energy and ancillary services during times of stress. Additionally, hydropower revenue is sensitive to hydrology in the SERC region, which we considered as an example. The feasibility of hydropower dispatching with higher ramps between low and high hourly-capacity factors, as indicated in the optimization model, requires further study to consider other water use and ecology constraints.

13 HYDRO ENERGY↗