Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “implementation decisions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Modeling and Simulation Resource Repository (MSRR)(System Engineering/Integrated M&S Management Approach

NASA s Exploration Systems Mission Directorate (ESMD) is implementing a management approach for modeling and simulation (M&S) that will provide decision-makers information on the model s fidelity, credibility, and quality, including the verification, validation and accreditation information. The NASA MSRR will be implemented leveraging M&S industry best practices. This presentation will discuss the requirements that will enable NASA to capture and make available the "meta data" or "simulation biography" data associated with a model. The presentation will also describe the requirements that drive how NASA will collect and document relevant information for models or suites of models in order to facilitate use and reuse of relevant models and provide visibility across NASA organizations and the larger M&S community.

Milroy, Audrey↗

TPSAS-NF1676L-17243-DND

This presentation captures ERA Project's effort in using integrated cost-schedule-risk analysis tool, identifying and capturing explicit relationships between program funds, schedule, and discrete risks. The project team merged a myriad of cost and schedule data for timely, objective, uncertainty analysis of the ITD's budget and schedule. The project team conducted detailed schedule uncertainty analysis showing schedule activities and how their interrelationships were impacted, representing an impressive advance beyond routine Gantt charts. Furthermore, the ERA Project collected discrete risk events including their impacts to costs and/or schedule and interwove these risks into cost and schedule logic networks, providing the foundation to conduct cost and schedule analyses. The team integrated this data into the analysis model, providing probabilistic results that were then used by the ERA Project's senior management for decision-making purposes. The ERA Project management team, through technical and pathfinder expertise in integrating cost, schedule, risk, and technical content, consistently provided risk-informed recommendations to Implementing Centers and ISRP senior management which ultimately ensured the successful ARMD Key Decision Point (KDP) review of the ERA Phase 2 ITD Portfolio and increased the likelihood of achieving technical objectives within cost and schedule constraints.

Gaudy M Bezos-O'Connor↗

Clustering Days with Similar Airport Weather Conditions

On any given day, traffic flow managers must often rely on past experience and intuition when developing traffic flow management initiatives that mitigate imbalances between the aircraft demand and the weather impacted airport capacity. The goal of this study was to build on recent efforts to apply data mining classification and clustering algorithms to vast archives of historical weather and air traffic data to identify patterns and past decisions that can ultimately inform day-of-operations decision-making. More specifically, this study identified similar weather impacted days at select U.S. airports, and analyzed the traffic management initiatives implemented on these representative days. The identification of the similar days was accomplished by applying a decision tree algorithm to the hourly Localized Aviation Model Output Statistics Program observations and the arrival delays for Newark Liberty International Airport. The branches from the trained decision tree were subsequently pruned to identify four weather conditions that resulted in medium to high delays for the arrivals scheduled to Newark in 2012. Using these weather conditions, four, daily airport-level Weather Impacted Traffic Index values were calculated using the Localized Aviation Model Output Statistics Program observations and the 2012 scheduled arrival counts from the FAAs Aviation System Performance Metric system. The four, daily Weather Impacted Traffic Index values for 2012 were subsequently clustered using an Expectation Maximization clustering algorithm, and nine unique types of weather days at Newark were identified. By far the most prominent type of day at Newark was a day associated with relatively good weather conditions, where there was little convective activity, winds were low, ceilings and visibility were high and there was little precipitation. Moderate levels of convective activity characterized the next most prominent type of day. Days with persistently high winds or low ceiling and visibility levels were relatively rare in 2012. Lastly, the frequency at which Ground Delay Programs, Ground Stops and Miles-in-Trail restrictions were implemented on each of the typical types of days at Newark were analyzed. Based on the results, it does appear as if the usage of Miles-in-Trail, Ground Delay Program and Ground Stop restrictions correlates well with the severity of the weather associated with each unique type of weather impacted day at Newark. Furthermore, the results demonstrate that it is feasible to use historical weather and air traffic archives to provide guidance on the types of traffic management restrictions to implement in response to the weather conditions impacting an airport.

traffic flow management↗

Clustering Days with Similar Airport Weather Conditions

On any given day, traffic flow managers must often rely on past experience and intuition when developing traffic flow management initiatives that mitigate imbalances between the aircraft demand and the weather impacted airport capacity. The goal of this study was to build on recent efforts to apply data mining classification and clustering algorithms to vast archives of historical weather and air traffic data to identify patterns and past decisions that can ultimately inform day-of-operations decision-making. More specifically, this study identified similar weather impacted days at select U.S. airports, and analyzed the traffic management initiatives implemented on these representative days. The identification of the similar days was accomplished by applying a decision tree algorithm to the hourly Localized Aviation Model Output Statistics Program observations and the arrival delays for Newark Liberty International Airport. The branches from the trained decision tree were subsequently pruned to identify four weather conditions that resulted in medium to high delays for the arrivals scheduled to Newark in 2012. Using these weather conditions, four, daily airport-level Weather Impacted Traffic Index values were calculated using the Localized Aviation Model Output Statistics Program observations and the 2012 scheduled arrival counts from the FAAs Aviation System Performance Metric system. The four, daily Weather Impacted Traffic Index values for 2012 were subsequently clustered using an Expectation Maximization clustering algorithm, and nine unique types of weather days at Newark were identified. By far the most prominent type of day at Newark was a day associated with relatively good weather conditions, where there was little convective activity, winds were low, ceilings and visibility were high and there was little precipitation. Moderate levels of convective activity characterized the next most prominent type of day. Days with persistently high winds or low ceiling and visibility levels were relatively rare in 2012. Lastly, the frequency at which Ground Delay Programs, Ground Stops and Miles-in-Trail restrictions were implemented on each of the typical types of days at Newark were analyzed. Based on the results, it does appear as if the usage of Miles-in-Trail, Ground Delay Program and Ground Stop restrictions correlates well with the severity of the weather associated with each unique type of weather impacted day at Newark. Furthermore, the results demonstrate that it is feasible to use historical weather and air traffic archives to provide guidance on the types of traffic management restrictions to implement in response to the weather conditions impacting an airport.

weather↗

Climate Extremes and Risks: Links Between Climate Science and Decision-Making

The World Climate Research Programme (WCRP) envisions a future where actionable climate information is universally accessible, supporting decision makers in preparing for and responding to climate change. In this perspective, we advocate for enhancing links between climate science and decision-making through a better and more decision-relevant understanding of climate impacts. The proposed framework comprises three pillars: climate science, impact science, and decision-making, focusing on generating seamless climate information from sub-seasonal, seasonal, decadal to century timescales informed by observed climate events and their impacts. The link between climate science and decision-making has strengthened in recent years, partly owing to undeniable impacts arising from disastrous weather extremes. Enhancing decision-relevant understanding involves utilizing lessons from past extreme events and implementing impact-based early warning systems to improve resilience. Integrated risk assessment and management require a comprehensive approach that encompasses good knowledge about possible impacts, hazard identification, monitoring, and communication of risks while acknowledging uncertainties inherent in climate predictions and projections, but not letting the uncertainty lead to decision paralysis. The importance of data accessibility, especially in the Global South, underscores the need for better coordination and resource allocation. Strategic frameworks should aim to enhance impact-related and open-access climate services around the world. Continuous improvements in predictive modeling and observational data are critical, as is ensuring that climate science remains relevant to decision makers locally and globally. Ultimately, fostering stronger collaborations and dedicated investments to process and tailor climate data will enhance societal preparedness, enabling communities to navigate the complexities of a changing climate effectively.

climate extremes↗

Cockpit resource management training

Cockpit resource management which is a multifaceted concept is outlined. The system involves the effective coordination of many resources: aircraft systems, company, air traffic control, equipment, navigational aids, documents, and manuals. The main concept, however, is group interaction. Problems which arise from lack of coordination, decision making, and lack of communication are pointed out. Implementation by the regional airline industry of cockpit resource management, designed to deal with human interactions problems in the most cost effective manner, is discussed.

Yocum, M.↗

A knowledge-based approach to identification and adaptation in dynamical systems control

Artificial intelligence techniques are applied to the problems of model form and parameter identification of large-scale dynamic systems. The object-oriented knowledge representation is discussed in the context of causal modeling and qualitative reasoning. Structured sets of rules are used for implementing qualitative component simulations, for catching qualitative discrepancies and quantitative bound violations, and for making reconfiguration and control decisions that affect the physical system. These decisions are executed by backward-chaining through a knowledge base of control action tasks. This approach was implemented for two examples: a triple quadrupole mass spectrometer and a two-phase thermal testbed. Results of tests with both of these systems demonstrate that the software replicates some or most of the functionality of a human operator, thereby reducing the need for a human-in-the-loop in the lower levels of control of these complex systems.

Glass, B. J.↗

Search for supporting methodologies - Or how to support SEI for 35 years

Concepts relevant to the development of an evolvable information management system are examined in terms of support for the Space Exploration Initiative. The issues of interoperability within NASA and industry initiatives are studied including the Open Systems Interconnection standard and the operating system of the Open Software Foundation. The requirements of partitioning functionality into separate areas are determined with attention given to the infrastructure required to ensure system-wide compliance. The need for a decision-making context is a key to the distributed implementation of the program, and this environment is concluded to be next step in developing an evolvable, interoperable, and securable support network.

Handley, Thomas H., Jr.↗

Probabilistic design of advanced composite structure

Advanced composite technology offers potentials for sizable improvements in many areas: weight savings, maintainability, durability, and reliability. However, there are a number of inhibitors to these improvements. One of the biggest inhibitors is the imposition of traditional metallic approaches to design of composite structure. This is especially detrimental in composites because new materials technology demands new design approaches. Of particular importance are the decisions made regarding structural criteria. Significant changes cannot be implemented without careful consideration and exploration. This new approach is to implement changes on a controlled, verifiable basis. Probabilistic design is the methodology and the process to accomplish this. Its foundation is to base design criteria and objectives on reliability targets instead of arbitrary factors carried over from metallic structural history. The background is discussed of probabilistic design and the results are presented of a side-by-side comparison to generic aircraft structure designed the 'old' way and the 'new'. Activities are also defined that need to be undertaken to evolve available approaches to probabilistic design followed by summary and recommendations.

Gray, P. M.↗

An Algorithm for Integrated Subsystem Embodiment and System Synthesis

Consider the statement,'A system has two coupled subsystems, one of which dominates the design process. Each subsystem consists of discrete and continuous variables, and is solved using sequential analysis and solution.' To address this type of statement in the design of complex systems, three steps are required, namely, the embodiment of the statement in terms of entities on a computer, the mathematical formulation of subsystem models, and the resulting solution and system synthesis. In complex system decomposition, the subsystems are not isolated, self-supporting entities. Information such as constraints, goals, and design variables may be shared between entities. But many times in engineering problems, full communication and cooperation does not exist, information is incomplete, or one subsystem may dominate the design. Additionally, these engineering problems give rise to mathematical models involving nonlinear functions of both discrete and continuous design variables. In this dissertation an algorithm is developed to handle these types of scenarios for the domain-independent integration of subsystem embodiment, coordination, and system synthesis using constructs from Decision-Based Design, Game Theory, and Multidisciplinary Design Optimization. Implementation of the concept in this dissertation involves testing of the hypotheses using example problems and a motivating case study involving the design of a subsonic passenger aircraft.

Lewis, Kemper↗

Impact of Probabilistic Weather on Flight Routing Decisions

Flight delays in the United States have been found to increase year after year, along with the increase in air traffic. During the four-month period from May through August of 2005, weather related delays accounted for roughly 70% of all reported delays, The current weather prediction in tactical (within 2 hours) timeframe is at manageable levels, however, the state of forecasting weather for strategic (2-6 hours) timeframe is still not dependable for long-term planning. In the absence of reliable severe weather forecasts, the decision-making for flights longer than two hours is challenging. This paper deals with an approach of using probabilistic weather prediction for Traffic Flow Management use, and a general method using this prediction for estimating expected values of flight length and delays in the National Airspace System (NAS). The current state-of-the-art convective weather forecasting is employed to aid the decision makers in arriving at decisions for traffic flow and flight planing. The six-agency effort working on the Next Generation Air Transportation System (NGATS) have considered weather-assimilated decision-making as one of the principal foci out of a list of eight. The weather Integrated Product Team has considered integrated weather information and improved aviation weather forecasts as two of the main efforts (Ref. 1, 2). Recently, research has focused on the concept of operations for strategic traffic flow management (Ref. 3) and how weather data can be integrated for improved decision-making for efficient traffic management initiatives (Ref. 4, 5). An overview of the weather data needs and benefits of various participants in the air traffic system along with available products can be found in Ref. 6. Previous work related to use of weather data in identifying and categorizing pilot intrusions into severe weather regions (Ref. 7, 8) has demonstrated a need for better forecasting in the strategic planning timeframes and moving towards a probabilistic description of weather (Ref. 9). This paper focuses on. specified probability in a local region for flight intrusion/deviation decision-making. The process uses a probabilistic weather description, implements that in a air traffic assessment system to study trajectories of aircraft crossing a cut-off probability contour. This value would be useful for meteorologists in creating optimum distribution profiles for severe weather, Once available, the expected values of flight path and aggregate delays are calculated for efficient operations. The current research, however, does not deal with the issue of multiple cell encounters, as well as echo tops, and will be a topic of future work.

Sheth, Kapil↗

Evolution of the Lunar Network

The National Aeronautics and Space Administration (NASA) is planning to upgrade its network Infrastructure to support missions for the 21st century. The first step is to increase the data rate provided to science missions to at least the 100 megabits per second (Mbps) range. This is under way, using Ka-band 26 Gigahertz (GHz), erecting an 18-meter antenna for the Lunar Reconnaissance Orbiter (LRO), and the planned upgrade of the Deep Space Network (DSN) 34-meter network to support the James Webb Space Telescope (JWST). The next step is the support of manned missions to the Moon and beyond. Establishing an outpost with several activities such as rovers, colonization, and observatories, is better achieved by using a network configuration rather than the current method of point-to-point communication. Another challenge associated with the Moon is communication coverage with the Earth. The Moon's South Pole, targeted for human habitat and exploration, is obscured from Earth view for half of the 28-day lunar cycle and requires the use of lunar relay satellites to provide coverage when there is no direct view of the Earth. The future NASA and Constellation network architecture is described in the Space Communications Architecture Working Group (SCAWG) Report. The Space Communications and Navigation (SCAN) Constellation Integration Project (SCIP) is responsible for coordinating Constellation requirements and has assigned the responsibility for implementing these requirements to the existing NASA communication providers: DSN, Space Network (SN), Ground Network (GN) and the NASA Integrated Services Network (NISN). The SCAWG Report provides a future architecture but does not provide implementation details. The architecture calls for a Netcentric system, using hundreds of 12-meter antennas, a ground antenna array, and a relay network around the Moon. The report did not use cost as a variable in determining the feasibility of this approach. As part of the SCIP Mission Concept Review and the second iteration of the Lunar Architecture Team (LAT), the focus is on cost, as well as communication coverage using operational scenarios. This approach maximizes use of existing assets and adds capability in small increments. This paper addresses architecture decisions such as the Radio Frequency (RF) signal and network (Netcentric) decisions that need to be made and the difficulty of implementing them into the existing Space Network and DSN. It discusses the evolution of the lunar system and describes its components: Tracking and Data Relay Satellite System (TDRSS), Earth-based ground stations, Lunar Relay, and surface systems.

Gal-Edd, Jonathan↗

BGen: A UML Behavior Network Generator Tool

BGen software was designed for autogeneration of code based on a graphical representation of a behavior network used for controlling automatic vehicles. A common format used for describing a behavior network, such as that used in the JPL-developed behavior-based control system, CARACaS ["Control Architecture for Robotic Agent Command and Sensing" (NPO-43635), NASA Tech Briefs, Vol. 32, No. 10 (October 2008), page 40] includes a graph with sensory inputs flowing through the behaviors in order to generate the signals for the actuators that drive and steer the vehicle. A computer program to translate Unified Modeling Language (UML) Freeform Implementation Diagrams into a legacy C implementation of Behavior Network has been developed in order to simplify the development of C-code for behavior-based control systems. UML is a popular standard developed by the Object Management Group (OMG) to model software architectures graphically. The C implementation of a Behavior Network is functioning as a decision tree.

Huntsberger, Terry↗

Integrating Wind Profiling Radars and Radiosonde Observations with Model Point Data to Develop a Decision Support Tool to Assess Upper-Level Winds for Space Launch

On the day-of-launch, the 45th Weather Squadron (45 WS) Launch Weather Officers (LWOs) monitor the upper-level winds for their launch customers to include NASA's Launch Services Program and NASA's Ground Systems Development and Operations Program. They currently do not have the capability to display and overlay profiles of upper-level observations and numerical weather prediction model forecasts. The LWOs requested the Applied Meteorology Unit (AMU) develop a tool in the form of a graphical user interface (GUI) that will allow them to plot upper-level wind speed and direction observations from the Kennedy Space Center (KSC) 50 MHz tropospheric wind profiling radar, KSC Shuttle Landing Facility 915 MHz boundary layer wind profiling radar and Cape Canaveral Air Force Station (CCAFS) Automated Meteorological Processing System (AMPS) radiosondes, and then overlay forecast wind profiles from the model point data including the North American Mesoscale (NAM) model, Rapid Refresh (RAP) model and Global Forecast System (GFS) model to assess the performance of these models. The AMU developed an Excel-based tool that provides an objective method for the LWOs to compare the model-forecast upper-level winds to the KSC wind profiling radars and CCAFS AMPS observations to assess the model potential to accurately forecast changes in the upperlevel profile through the launch count. The AMU wrote Excel Visual Basic for Applications (VBA) scripts to automatically retrieve model point data for CCAFS (XMR) from the Iowa State University Archive Data Server (http://mtarchive.qeol.iastate.edu) and the 50 MHz, 915 MHz and AMPS observations from the NASA/KSC Spaceport Weather Data Archive web site (http://trmm.ksc.nasa.gov). The AMU then developed code in Excel VBA to automatically ingest and format the observations and model point data in Excel to ready the data for generating Excel charts for the LWO's. The resulting charts allow the LWOs to independently initialize the three models 0-hour forecasts against the observations to determine which is the best performing model and then overlay the model forecasts on time-matched observations during the launch countdown to further assess the model performance and forecasts. This paper will demonstrate integration of observed and predicted atmospheric conditions into a decision support tool and demonstrate how the GUI is implemented in operations.

Bauman, William H., III↗

NASA's Space Launch System: Momentum Builds Toward First Launch

NASA's Space Launch System (SLS) is gaining momentum toward the first launch of a new exploration-class heavy lift launch vehicle for international exploration and science initiatives. The SLS comprises an architecture that begins with a vehicle capable of launching 70 metric tons (t) into low Earth orbit. It will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017. Its first crewed flight follows in 2021. SLS can evolve to a130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. The SLS Program formally transitioned from the formulation phase to implementation with the successful completion of the rigorous Key Decision Point C review in 2014. As a result, the Agency authorized the Program to move forward to Critical Design Review, scheduled for 2015. In the NASA project life cycle process, SLS has completed 50 percent of its major milestones toward first flight. Every SLS element manufactured development hardware for testing over the past year. Accomplishments during 2013/2014 included manufacture of core stage test articles, preparations for qualification testing the solid rocket boosters and the RS-25 main engines, and shipment of the first flight hardware in preparation for the Exploration Flight Test-1 (EFT-1) in 2014. SLS was conceived with the goals of safety, affordability, and sustainability, while also providing unprecedented capability for human exploration and scientific discovery beyond Earth orbit. In an environment of economic challenges, the SLS team continues to meet ambitious budget and schedule targets through the studied use of hardware, infrastructure, and workforce investments the United States made in the last half century, while selectively using new technologies for design, manufacturing, and testing, as well as streamlined management approaches that have increased decision velocity and reduced associated costs. This paper will summarize recent SLS Program accomplishments, as well as the challenges and opportunities ahead for the most powerful and capable launch vehicle in history.

May, Todd A.↗

NASA's Space Launch System: Momentum Builds Towards First Launch

NASA's Space Launch System (SLS) is gaining momentum programmatically and technically toward the first launch of a new exploration-class heavy lift launch vehicle for international exploration and science initiatives. The SLS comprises an architecture that begins with a vehicle capable of launching 70 metric tons (t) into low Earth orbit. Its first mission will be the launch of the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back. SLS will also launch the first Orion crewed flight in 2021. SLS can evolve to a 130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Managed by NASA's Marshall Space Flight Center, the SLS Program formally transitioned from the formulation phase to implementation with the successful completion of the rigorous Key Decision Point C review in 2014. At KDP-C, the Agency Planning Management Council determines the readiness of a program to go to the next life-cycle phase and makes technical, cost, and schedule commitments to its external stakeholders. As a result, the Agency authorized the Program to move forward to Critical Design Review, scheduled for 2015, and a launch readiness date of November 2018. Every SLS element is currently in testing or test preparations. The Program shipped its first flight hardware in 2014 in preparation for Orion's Exploration Flight Test-1 (EFT-1) launch on a Delta IV Heavy rocket in December, a significant first step toward human journeys into deep space. Accomplishments during 2014 included manufacture of Core Stage test articles and preparations for qualification testing the Solid Rocket Boosters and the RS-25 Core Stage engines. SLS was conceived with the goals of safety, affordability, and sustainability, while also providing unprecedented capability for human exploration and scientific discovery beyond Earth orbit. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets through the studied use of hardware, infrastructure, and workforce investments the United States has already made in the last half century, while selectively using new technologies for design, manufacturing, and testing, as well as streamlined management approaches that have increased decision velocity and reduced associated costs. This paper will summarize recent SLS Program technical accomplishments, as well as the challenges and opportunities ahead for the most powerful and capable launch vehicle in history.

May, Todd↗