Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “flexible generation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

What Role Do Aggregators Play in Power System Security and Resilience? Preprint

Barriers to the participation of distributed energy resources (DERs) in wholesale electricity markets have limited the use of DERs for power system security and resilience. In September 2020, the Federal Energy Regulatory Commission (FERC) approved an order to reduce these barriers. FERC Order No. 2222 enables the participation of DER aggregators in wholesale electricity markets. DERs include renewable generation and technologies that support the integration of renewable generation by increasing grid flexibility and resilience. Requiring wholesale energy markets to allow DER aggregator participation provides a path for DERs to become competitive in these markets. As the contribution from aggregated DERs continues to increase, the aggregator's role in supporting grid security and resilience will become more critical. This paper reviews work that demonstrates how DER aggregators can provide resilience support through technical capabilities, operational strategies, and secure communication architectures. Socioeconomic influences and impacts of aggregators, including implications for social resilience, are presented. There is no one-size-fits-all approach to enhancing resilience in a power grid that includes a growing cohort of DER aggregators, but there are many options for aggregators to contribute to a more resilient and secure power grid.

aggregator↗

Energy Arbitrage with Hydrogen: HTSE + Combustion Turbine

The Light Water Reactor Sustainability (LWRS) program seeks to keep Nuclear Power Plants (NPPs) competitive in the changing energy market. The Flexible Plant Operation and Generation (FPOG) pathway investigates Energy Storage Systems (ESS) to give operators an alternative to curtailment or paying to put power on the grid. This work investigates the concept of diverting heat and electricity to High Temperature Steam Electrolysis (HTSE) to produce hydrogen when grid demand is low, storing that hydrogen, then burning it in a combustion turbine to produce zero-emission electricity when grid demand is high. A process model of the combustion turbine was developed in Aspen HYSYS, which was used to complete a parametric analysis and techno-economic analysis.

08 HYDROGEN↗

Synergistic Heat Pumped Thermal Storage and Flexibly Carbon Capture System

As the U.S. grid evolves toward a lower-carbon system, fossil generation assets need to operate in energy markets with high variable renewable energy (VRE) penetration while also decreasing carbon emissions. Current carbon capture and storage (CCS) technologies suffer from high capital cost and an inability to operate flexibly during periods of oscillating demand. The ARPA-E FLECCS Program Phase 1 was created to fund designing and optimizing innovative CCS processes that enable flexibility on a high-VRE grid. To address this need, the Colorado State University (CSU) Team won funding to design a synergized system of thermal energy storage, power generation, and flexible carbon capture to enable breakthrough system performance that achieves an LCOE <$75/MWh with >99% capture rate. This approach will target new or existing natural gas combined cycle power plants. The proposed design utilizes novel hot and cold thermal energy storage (TES) technologies that store low-cost, off-peak electricity as thermal energy to power CCS solvent regeneration and boost plant output during periods of peak demand. The design provides an overall optimized net present value (NPV) by maximizing low carbon power to grid while prices are highest using Storworks Power’s concrete TES technology. The team also capitalizes on decades of ION Clean Energy’s (ION) development in low cost and flexible pioneering solvent technology, which has proven reductions in energy consumption and overall cost of 28% and 38%, respectively, compared with state-of-the-art CCS.

20 FOSSIL-FUELED POWER PLANTS↗

Development of a hardware-in-the-loop testbed for laboratory performance verification of flexible building equipment in typical commercial buildings

The goals of reducing energy costs, shifting electricity peaks, increasing the use of renewable energy, and enhancing the stability of the electric grid can be met in part by fully exploiting the energy flexibility potential of buildings and building equipment. The development of strategies that exploit these flexibilities could be facilitated by publicly available high-resolution datasets illustrating how control of HVAC systems in commercial buildings can be used in different climate zones to shape the energy use profile of a building for grid needs. This article presents the development and integration of a Hardware-In-the-Loop Flexible load Testbed (HILFT) that integrates physical HVAC systems with a simulated building model and simulated occupants with the goal of generating datasets to verify load flexibility of typical commercial buildings. Compared to simulation-only experiments, the hardware-in-the-loop approach captures the dynamics of the physical systems while also allowing efficient testing of various boundary conditions. The HILFT integration in this article is achieved through the co-simulation among various software environments including LabVIEW, MATLAB, and EnergyPlus. Although theoretically viable, such integration has encountered many real-world challenges, such as: 1) how to design the overall data infrastructure to ensure effective, robust, and efficient integration; 2) how to avoid closed-loop hunting between simulated and emulated variables; 3) how to quantify system response times and minimize system delays; and 4) how to assess the overall integration quality. Lessons-learned using the examples of an AHU-VAV system, an air-source heat pump system, and a water-source heat pump system are presented.

Chen, zhelun↗

Stochastic Continuous-time Flexibility Scheduling and Pricing in Wholesale Electricity Markets

Large-scale integration of intermittent renewable energy sources (RES) is calling for additional flexibility resources as well as more advanced modeling and optimization techniques to account for the increasing uncertainty and variability in power systems operation. As the RES integration gains momentum, the magnitude and frequency of their variations increase, which may trigger ramping scarcity events in real-time power systems operation. This necessitates revisiting the present definition of power systems flexibility and reserve services to reflect their robustness and adequacy towards sub-interval variations of the load and RES, as well as adjusting the operation models to accommodate the new reserve services. This project took a fundamental approach and aimed at developing continuous-time scheduling and pricing model that accurately models the continuous-time variations of load and RES and efficiently deploys the ramping capability of flexible resources to compensate the sources of variability and uncertainty in the market. In this regard, this project pursued the following goals: Developing stochastic multi-fidelity continuous-time optimization models for scheduling of energy storage (ES) systems and flexible loads in wholesale energy markets; Developing the theory and practices of continuous-time locational marginal pricing for valuating energy storage systems and flexible loads in wholesale energy markets; Developing function space solution approach to convert the proposed stochastic multi-fidelity continuous-time optimization models into tractable mixed-integer linear optimization models; and Defining flexibility reserve as a new type of reserve in markets that would enable ultimate participation of energy storage devices in provision of services to compensate the variability and uncertainty of RES in electricity markets. This project successfully completed all five major tasks defined in the SOPO, and produced 8 high-impact journal papers, 6 conference papers, 3 published U.S. patents, and one web-based software for continuous-time operation optimization of power systems. The application of the proposed flexibility reserve and the stochastic multi-fidelity continuous-time operation scheduling models would modify the forward commitment and schedule of generating units, ES devices and flexible loads, and would line up the resources in such a way that the composition of available resources is better prepared to respond to the sub-hourly variations of the load and renewable resources in real-time operation. Therefore, this project paves the way to sustainable, reliable, and economic integration of renewable energy resources in power system, supporting the progress towards reaching the national targets on energy independence. Even if the proposed models offers a radically different point of view as compared to existing models, it does not alter fundamentally the architecture of power systems operations, nor the complexity of the scheduling problem, so the integration of this project in power systems is extremely practical.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Long-Term Planning for the Tamil Nadu Power System

Increased deployment of wind and solar raises new questions for power system planners regarding the future mix of generation technologies, optimal siting of generation capacity, trade-offs between generation and transmission investments, and system flexibility needs. The National Renewable Energy Laboratory (NREL) is working with Tamil Nadu Generation and Distribution Company (TANGEDCO) to answer the following questions: How much—and what type—of generation and transmission investments are needed to serve future demand at least cost? How can variable resources such as wind and solar be considered in the planning process? What are the key drivers (e.g., policies, technology costs, fuel constraints) for investments?

Children's Investment Fund Foundation↗

The value of in-reservoir energy storage for flexible dispatch of geothermal power

Geothermal systems making use of advanced drilling and well stimulation techniques have the potential to provide tens to hundreds of gigawatts of clean electricity generation in the United States by 2050. With near-zero variable costs, geothermal plants have traditionally been envisioned as providing “baseload” power, generating at their maximum rated output at all times. However, as variable renewable energy sources (VREs) see greater deployment in energy markets, baseload power is becoming increasingly less competitive relative to flexible, dispatchable generation and energy storage. Herein we conduct an analysis of the potential for future geothermal plants to provide both of these services, taking advantage of the natural properties of confined, engineered geothermal reservoirs to store energy in the form of accumulated, pressurized geofluid and provide flexible load-following generation. We develop a linear optimization model based on multi-physics reservoir simulations that captures the transient pressure and flow behaviors within a confined, engineered geothermal reservoir. We then optimize the investment decisions and hourly operations of a power plant exploiting such a reservoir against a set of historical and modeled future electricity price series. Further, we find that operational flexibility and in-reservoir energy storage can significantly enhance the value of geothermal plants in markets with high VRE penetration, with energy value improvements of up to 60% relative to conventional baseload plants operating under identical conditions. Across a range of realistic subsurface and operational conditions, our modeling demonstrates that confined, engineered geothermal reservoirs can provide large and effectively free energy storage capacity, with round-trip storage efficiencies comparable to those of leading grid-scale energy storage technologies. Optimized operational strategies indicate that flexible geothermal plants can provide both short- and long-duration energy storage, prioritizing output during periods of high electricity prices. Sensitivity analysis assesses the variation in outcomes across a range of subsurface conditions and cost scenarios.

15 GEOTHERMAL ENERGY↗

The Impacts of Distinct Flexibility Enhancements on the Value and Dynamics of Natural Gas Power Plant Operations

The rapid increase of renewable generation and its anticipated continued growth requires greater operational flexibility in modern power systems. Previous studies explored the addition of more flexible resources to improve system flexibility, but this may also be achieved at lower cost by enhancing existing power plants via flexibility retrofits. Potential flexibility upgrades to existing thermal plants include modifications that enable faster ramp rates, increase maximum load levels, decrease minimum load levels, and provide faster and lower cost startup operations. In this paper, we focus on improvements to existing natural gas combined cycle generators, and apply a unit commitment model to analyze the impact that each specific upgrade has on their operational dynamics and profitability from both the system perspective and from the asset owner perspective. We show that the value of each type of flexibility improvement varies depending on the capacity factor and usage pattern of the generator before the upgrade, and that the relative benefit of each type of flexibility varies. We demonstrate diminishing returns to increased flexibility when upgrading multiple generators simultaneously. Sensitivity tests for several shares of renewable generation, different generation mixes and different net load realizations confirm the generality of the results shown.

03 NATURAL GAS↗

Optimal Economic Dispatch and Load-Following Strategies for Nuclear Integrated Energy Systems

The need for distributed and adaptable energy resources that can handle the growing unpredictability in both supply and demand is rising as the power system continues to modernize. In order to satisfy those needs and maintain grid resilience, nuclear power plants can dynamically control their output, despite typically being used as baseload generators. By incorporating energy storage and renewable energy sources, nuclear integrated energy systems are designed to satisfy the electrical and thermal demands of different end-user applications while ensuring flexible power operation. These systems generate revenue by participating in both wholesale and ancillary services electricity markets, as well as commodity markets for various byproducts generated from coupled industrial processes. This study addresses the economic dispatch efficiency of a tightly coupled nuclear integrated energy system comprising a gigawatt-scale light water reactor, commercialized in the U.S., a high-temperature steam electrolysis unit, a district heating network, and specified electrical loads. To demonstrate the nuclear power plant’s flexibility within the day-ahead unit commitment and economic dispatch framework, while maintaining equilibrium even during periods of refueling outages, this paper develops a mixed-integer linear programming framework that models the subsystems and components of its nuclear steam supply system. A systematic comparative analysis of flexible versus baseload nuclear power plant operation under varying levels of renewable energy integration indicates that flexible operation enhances system profitability by more than 18% while also increasing energy storage utilization, improving reactor responsiveness to load fluctuations, and allowing for greater participation across numerous electricity markets.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Ultrathin and Ultrasensitive Direct X‐ray Detector Based on Heterojunction Phototransistors

Abstract Most contemporary X‐ray detectors adopt device structures with non/low‐gain energy conversion, such that a fairly thick X‐ray photoconductor or scintillator is required to generate sufficient X‐ray‐induced charges, and thus numerous merits for thin devices, such as mechanical flexibility and high spatial resolution, have to be compromised. This dilemma is overcome by adopting a new high‐gain device concept of a heterojunction X‐ray phototransistor. In contrast to conventional detectors, X‐ray phototransistors allow both electrical gating and photodoping for effective carrier‐density modulation, leading to high photoconductive gain and low noise. As a result, ultrahigh sensitivities of over 10 5 μC Gy air −1 cm −2 with low detection limit are achieved by just using an ≈50 nm thin photoconductor. The employment of ultrathin photoconductors also endows the detectors with superior flexibility and high imaging resolution. This concept offers great promise in realizing well‐balanced detection performance, mechanical flexibility, integration, and cost for next‐generation X‐ray detectors.

Gao, Yuanhong↗

Design and optimization of a modular hydrogen-based integrated energy system to maximize revenue via nuclear-renewable sources

Here, this paper demonstrates a novel modular distributed framework that uses optimal energy-dispatching strategies to enable greater flexibility and profitability in nuclear-renewable integrated energy systems (NR-IES). Hydrogen is used as a commodity in this framework since its production can improve grid stability and system operational flexibility, decarbonize heavy industry, and create an additional revenue stream for electricity generators, particularly nuclear power plants with high operational expenses. The proposed solution addresses the challenges associated with merging multiple software and services from various domains by using functional mock-up units (FMU) to co-simulate diverse subsystems designed in various platforms. The tightly coupled integrated energy system (IES) is optimized to maximize revenue by utilizing the deep reinforcement learning (DRL) technique to make smart dispatching decisions based on variable electricity prices and the availability of renewable energy. Proximal policy optimization (PPO) algorithm is used in training and testing the DRL agent. Over a period of 120 days, the proposed hydrogen-based IES framework showed about 10% revenue boost compared to a non-hydrogen generating baseline IES while also providing an easily-adoptable framework which can help to improve the flexibility of future generation nuclear power plants.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

LeptonInjector and LeptonWeighter: A neutrino event generator and weighter for neutrino observatories

In this work, we present a high-energy neutrino event generator, called LeptonInjector, alongside an event weighter, called LeptonWeighter. Both are designed for large-volume Cherenkov neutrino telescopes such as IceCube. The neutrino event generator allows for quick and flexible simulation of neutrino events within and around the detector volume, and implements the leading Standard Model neutrino interaction processes relevant for neutrino observatories: neutrino-nucleon deep-inelastic scattering and neutrino-electron annihilation. In this paper, we discuss the event generation algorithm, the weighting algorithm, and the main functions of the publicly available code, with examples. Program summary: Program Titles: LeptonInjector and LeptonWeighter CPC Library link to program files: https://doi.org/10.17632/662gkpjfd9.1 Developer's repository links: https://github.com/icecube/LeptonInjector and https://github.com/icecube/LeptonWeighter Licensing provisions: GNU Lesser General Public License, version 3. Programming Language: C++11 External Routines: • Boost • HDF5 • nuflux (https://github.com/icecube/nuflux) • nuSQuIDS (https://github.com/arguelles/nuSQuIDS) • Photospline (https://github.com/icecube/photospline) • SuiteSparse (https://github.com/DrTimothyAldenDavis/SuiteSparse) Nature of problem: LeptonInjector: Generate neutrino interaction events of all possible topologies and energies throughout and around a detector volume. LeptonWeighter: Reweight Monte Carlo events, generated by a set of LeptonInjector Generators, to any desired physical neutrino flux or cross section. Solution method: LeptonInjector: Projected ranges of generated leptons and the extent of the detector, in terms of column depth, are used to inject events in and around the detector volume. Event kinematics follow distributions provided in cross section files. LeptonWeighter: Event generation probabilities are calculated for each Generator, which are then combined into a generation weight and used to calculate an overall event weight.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Ku-band electron linac for battery-powered hand-portable 2-MeV X-ray generator

X-ray generators, producing radiation in MeV range, are a critical tool for radiography, non-destructive testing and security applications. Field operation of such source requires them to be hand-portable, autonomous and allow parameter adjustability. RF linear accelerators can serve as a flexible, reliable, and robust radiation generator alternative to dangerous radioisotopes and bulky betatrons that are currently used for field radiography if their size, weight, cost, and imaging performance are matched to these sources. Here, in this paper, we present the design and test results of a 2 MeV Ku-band electron linac for a hand-portable X-ray generator system for field radiography being developed by RadiaBeam. The dramatic scale of miniaturization and cost-reduction is achieved thanks to the implementation of innovative technologies such as air-cooled Ku-band air-traffic control magnetrons, a split accelerating structure fabrication technique, and solid-state Marx modulators. This paper presents the design of the first prototype of the accelerator, its operation from Li-Ion batteries, as well as high-power and beam measurements.

43 PARTICLE ACCELERATORS↗

Insights Into Seismicity Associated With Flexibly Operating Enhanced Geothermal System From Real‐Time Distributed Acoustic Sensing

Enhanced Geothermal Systems (EGS) have the capacity to broaden the accessible resource pool for geothermal power generation. Traditionally viewed as a “baseload” resource, their flexible operation might also enable dispatchable load‐following generation and long‐term energy storage, aligning them with the evolving landscape of decarbonized electricity systems. However, increasing permeability and extracting energy during EGS operations can induce microseismic events; for many prior EGS efforts, some associated seismicity has been observed. While energetically beneficial, the flexibility of EGS operations prompts our inquiry into whether new types of operations will yield previously unseen seismicity patterns. We demonstrate the use of distributed acoustic sensing (DAS) with real‐time edge computing to monitor seismicity during a pilot test of a cyclically operated EGS facility at the Blue Mountain geothermal field. Our focus lies in uncovering seismicity insights from the real‐time microseismic catalog, particularly during load‐following dispatchability tests simulating flexible EGS operation. Here, we find that variations in pore pressure consistently correlate with seismicity, and that controlling pressure cycles during flexible operations appears to constrain microseismic activity during subsequent cycles. The spatio‐temporal evolution of microseismic clouds recorded during cyclic injection cycles fits diffusive models over our available observation period. Additionally, seismicity elevation lags behind pore pressure increases, likely due to pressure diffusion to the fracture system boundary. Through real‐time monitoring, we offer novel insights into seismicity associated with flexibly operating EGS. Our findings suggest that leveraging DAS and edge computing can inform EGS operations and help mitigate induced seismicity.

Chamarczuk, Michal [Rice Univ., Houston, TX (Unite↗

Fitness-for-Service Analysis of Reactor Components under Flexible Load-Following Operating Conditions

Conventional power-generation plants, including nuclear plants, have been traditionally designed to provide a steady baseload energy capacity, optimizing output efficiency while minimizing variable costs. However, the growing adoption of large-scale renewable energy-generation systems, which rely on intermittent sources such as solar and wind, has introduced more variability into the energy supply in interconnected electricity grids. As a result, the next generation of power plants needs to operate in what is known as the load-following mode, requiring flexible adjustments in electricity production to align with the energy demand on the grid. This transition from the steady baseload operation to load-following operating conditions can significantly increase the number of times various plant components are exposed to transient stresses. This increased thermo-mechanical cycling can lead to accelerated material degradation, thereby elevating the risk of premature failure of a component. It becomes imperative to conduct a comprehensive analysis of fatigue, creep-fatigue, and stress corrosion cracking life, to assess the resilience of the various engineering components under these flexible load-following operating conditions. This study aims to develop a comprehensive numerical model of a light-water reactor pressure vessel (RPV) to investigate its degradation under various operating scenarios. This coupled thermo-mechanical finite element analysis evaluated the stress response of the RPV caused by considering fluctuations in thermal and mechanical loads caused by the varying pressure and temperature occurring during the load-following operation. Critical locations on the RPV are subsequently identified based on the stress response. The stress intensity factors for the postulated flaws at those locations are then calculated, followed by an evaluation of the reactor's life in accordance with the ASME Boiler and Pressure Vessel Code Section XI. This comprehensive life assessment covers a number of transients expected during the flexible load-following operation, providing invaluable insights into the RPV's structural integrity. Moreover, the development methodology can be adapted to other reactor components, as well as components of conventional power stations that are affected by varying operating conditions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Distributed Coordination of Demand-side Flexible Resources in Microgrid with All-Time Feasibility

The prevalence of distributed renewable generators motivates microgrid operators to exploit demand-side flexible resources (DFRs). Due to their dispersed nature, distributed DFR coordination has been a vibrant research area, while there are several issues awaiting to be addressed. On one hand, DFR power is internally coupled through power flow, while DFR usually cannot access grid information. On the other hand, in time-restricted scenarios, solution feasibility cannot be guaranteed by conventional dual-based algorithms. To fill these gaps, we propose a distributed DFR coordination framework with all-time feasibility. The proposed framework accounts for the distinct access of microgrid entities to grid information. A distributed and all-time feasible algorithm is proposed for optimal DFR coordination, which allows DFRs to make local decisions without violating constraints throughout iterations. The effectiveness of the proposed algorithm is demonstrated through case studies. The impact of peer-to-peer communication links on algorithm convergence is also investigated, which emphasizes the balance between communication investment and algorithm performance.

Li, Hongyi [Iowa State Univ., Ames, IA (United Sta↗

Demand response event simulator and risk-aware bidding tool for industrial customers

Incentive Based Demand Response (IBDR) program participation delivers financial benefits to the consumers and resiliency benefits to the electricity grid. Effectively participating in these programs as an industrial consumer requires bidding strategies that balance financial risk with operational constraints. Existing bidding tools tend not to fully incorporate stochastic IBDR event modeling, program specific baseline and payment/penalty calculations, or demand reduction process control schemes that account for the cascading impacts of shutdown in complex facilities. Here, this work presents an IBDR event simulator and risk-aware bidding framework tool integrating three key components: a flexible, parameterized demand response event generator that rigorously accounts for program structures and stochasticity, a demand response operational simulation model that generates explicit control strategies for load reduction, and a Monte Carlo simulator to evaluate financial risk for varied capacity bids. A case study at a wastewater treatment plant participating in PG&E's Capacity Bidding Program demonstrates the framework's utility. In the peak capacity price month of August, optimal bidding by the wastewater treatment plant nets a mean IBDR benefit of $101,000 (67% of the August electricity bill) with 0.4% probability of a financial loss. This framework enables industrial operators to make informed bidding decisions, negotiate better program terms with demand response load aggregators, and analyze energy flexibility investments at their facilities. Ultimately, this work reduces participation barriers in IBDR programs and supports the broader goal of enhancing grid reliability and renewable energy integration.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Assessing thermal comfort and participation in residential demand flexibility programs

Residential space-conditioning-based demand flexibility (DF) has become an increasingly sought-after method for demand-side load management to enhance grid reliability and facilitate integration of renewable energy generation. However, predicting the effectiveness and flexibility of residential DF resources is challenging due to the variability in household energy use behaviors. Current estimates show that only 50 % of projected savings from DF resources are actualized due to regulatory, technological, and social barriers. From a household perspective, concerns over thermal comfort during space conditioning-based DF events significantly impact participation decisions. Currently, there is a very limited understanding of how thermal comfort during space-conditioning-based DF events in real-world settings impacts household energy use behaviors and, consequently, the success of DF programs in achieving targeted savings. This paper proposes a method to comprehensively assess the thermal comfort implications of DF strategies and presents results of their impacts on DF event participation decisions and demand savings. Here, the proposed method was applied to a heat pump DF field study in Cordova, Alaska. The study’s key findings are: 1) DF event setpoint offsets that maintain indoor operative temperatures between 18 to 22 °C (65 to 71°F) may be preferred in Cordova, Alaska; 2) Household-level thermal comfort is more sensitive to the duration of the DF event than to the degree of temperature offset from baseline conditions; 3) The delayed impact of changes in indoor operative temperature in response to setpoint offsets, both during and after a DF event, influences occupants’ thermal comfort perceptions and willingness to persistently participate in events. The findings from application of the proposed method can help inform future larger-scale occupant-centric DF programs as it can capture information not readily available through utility and device-level energy use data. Thus, it can supplement these sources and help program administrators develop occupant-centric DF strategies, enabling more accurate predictions of participation rates and savings estimates for space-conditioning-based DF programs.

Demand side management↗