Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “fleet optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

204 records · Page 12

Human Factors and Technologies Design to Improve User Acceptance of Pooled Rideshare for Increasing Transportation System Energy Efficiency

This multi-year project delivered a comprehensive, human-factors-driven framework to understand, model, and improve pooled rideshare (PR) adoption in the United States. Through three large-scale national survey studies involving more than 16,000 participants across multiple cities and demographic groups, the research established one of the most extensive datasets to date on user perceptions, behavioral barriers, and service expectations related to pooled rideshare. These data revealed key human factors barriers of user acceptance of PR and suggested potential actionable experience optimizations that could lead to increased PR usage. This foundational knowledge guided the development of novel human-factors models and behavioral choice models that quantify how psychological, demographic, and trip-level factors influence willingness to pool. Building on these empirical insights, the project developed advanced behavioral modeling tools, including mixed logit and integrated choice and latent variable models, to capture both observable and latent influences on PR adoption. These models significantly improved the ability to predict riders’ acceptance of pooled trips, explaining choice heterogeneity through latent constructs such as safety, service experience, privacy concerns, time sensitivity, and environmental attitudes. Together, these models provide a robust analytical foundation for designing PR systems that more effectively meet user needs. The project translated human-factors insights and behavioral models into actionable technology innovations by extending POLARIS—an agent-based, activity-based travel simulation platform—into a fully functional pooled rideshare simulation environment. New PR modules, acceptance models, and regional scenarios were implemented for Greenville, SC and Austin, TX, enabling high-fidelity validation of algorithmic strategies under realistic demand and traffic conditions. The simulation platform supported the development and evaluation of adaptive discount-based assignment algorithms, enhanced willingness-to-pay formulations, demographic-aware incentive mechanisms, and a proactive joint assignment and repositioning strategy. Simulation results demonstrated substantial gains in pooling uptake, average vehicle occupancy, energy efficiency, and fleet profitability. In Greenville, pooling adoption more than doubled, while reductions in vehicle-miles traveled and energy consumption were significant. In Austin, pooling improvements were achieved with minimal service-quality trade-offs, and profitability increased across all fleet sizes. Through this research, we developed a comprehensive understanding of the human factors barriers that limit user acceptance of pooled rideshare services. These insights enabled the design of human-factors-aware pooled rideshare technologies that more effectively address user concerns and improve adoption rates. By integrating these models into an advanced agent-based simulation framework, we demonstrated that higher adoption of pooled rideshare can lead to measurable improvements in energy efficiency and system performance. Together, these contributions establish a validated pathway from human-centered analysis to technology development and energy-saving outcomes, supporting national goals for more sustainable and efficient mobility systems.

Jia, Yunyi↗

Digitalization mapping and assessment process supporting ION strategic transformation activities

The existing fleet of commercial nuclear power plants (NPPs) are an important asset in the nation’s portfolio of electrical generating resources. Their continued safe and reliable operation are critical to providing a large source of carbon-free electricity to power the nation’s economy. The United States Department of Energy’s (DOE) Light Water Reactor Sustainability (LWRS) Program develops the scientific bases, methods, and tools, for the continued safe and economical operation of the nation's commercial NPPs. The Plant Modernization Pathway within LWRS Program focuses on providing guidance to industry on the full-scale implementation of modernization solutions for NPPs that significantly reduce the technical and financial risks associated with modernization. This research is focused on helping the nuclear industry understand how to digitize and digitalize their NPPs so that they can design their modernization solutions to be scalable, sustainable, and integrated both laterally and horizontally within their organization. That is, this research creates a digital transformation in NPPs by reshaping cultural mindsets and by identifying business efficiencies. In partnership with industry, and using four previously established guiding principles for digitalization, this research supported NPP modernization through assessing readiness for digitalization as a means to achieve integrated operations for nuclear. Specifically, this research created an assessment to review an entire organization’s work processes to gather information about the digitalization health of the plant. The assessment tools were administered to plant employees, and the results were used to develop a digitalization plan. The survey assessment identified the optimal candidate processes that would most benefit from a digitalization initiative which were revealed through analytical frameworks. One analysis calculated mean digitalization health indicator scores for all endorsed activities which allowed the researchers to rank and color code the results for easy identification. Individual health indicator scores are also provided, should our industry partner wish to understand these findings according to their own organizational priorities, business considerations and desired end-state. The results were also analyzed from the perspective that organizations are comprised of different types of innovators (e.g., generators, optimizers, conceptualizers, and implementers), which differentially affects the organization’s ability to comprehend and adapt to change (i.e., opportunities to innovate). Understanding the relative composition of innovator types at an NPP allows them to gather insights into the strengths and weaknesses they have in innovating how work is performed. For the utility that partnered with this research team, the results showed that implementers make up the largest portion of respondents and conceptualizers the smallest portion. Knowing the proportion of innovator types gave this organization insights on how they can effectively implement their innovation solutions. Additionally, the results were analyzed from a technical, economic, and risk perspective to identify and quantify work reduction opportunities (WROs). Recognizing that not all cost-saving opportunities are the same, a Technical, Economic and Risk Assessment (TERA) was performed to evaluate WROs to identify areas of greatest potential and lowest risk. The key results from TERA included a digitalization opportunity score for each activity, and a calculation of potential cost savings. These two outputs formed the bases for calculating a priority index and rank for the activities/processes assessed. From the prioritization calculations, TERA can then help the utility 1) decide what digitalization priorities to invest money in implementing and then 2) calculates how much should be invested in the digitalization initiatives selected to achieve cost savings and/or an acceptable return on investment. Last, onsite interviews revealed several inefficiencies in the standard work processes that occur cross-departmentally that are due to the absence of digitized and digitalized processes. Examples of these include time spent scanning paper documents and then uploading the documents electronically, obtaining signatures, and searching for desired information. This represents a digital but not digitalized process. Over 15 opportunities to improve work processes were identified through this multi-method digitalization assessment. The various analytical assessments used (e.g., TERA, digitalization health indicator scores), as well as discussions with the utility partner, corroborated that all the opportunities identified had a strong potential to make work processes more efficient and to improve overall performance of the NPP.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Extreme-scale EV charging infrastructure planning for last-mile delivery using high-performance parallel computing

Here, this paper addresses stochastic charger location and allocation problems under queue congestion for last-mile delivery using electric vehicles (EVs). The objective is to decide where to open charging stations and how many chargers of each type to install, subject to budgetary and waiting-time constraints. We formulate the problem as a mixed-integer non-linear program, where each station-charger pair is modeled as a multiserver queue with stochastic arrivals and service times to capture the notion of waiting in fleet operations. The model is extremely large, with billions of variables and constraints for a typical metropolitan area; even loading the model in solver memory is difficult, let alone solving it. To address this challenge, we develop a Lagrangian-based dual decomposition framework that decomposes the problem by station and leverages parallelization on high-performance computing systems, where the subproblems are solved by using a cutting plane method and their solutions are collected at the master level. We also develop a three-step rounding heuristic to transform the fractional subproblem solutions into feasible integral solutions. Computational experiments on data from the Chicago metropolitan area with hundreds of thousands of households and thousands of candidate stations show that our approach produces high-quality solutions in cases where existing exact methods cannot even load the model in memory. We also analyze various policy scenarios, demonstrating that combining existing depots with newly built stations under multiagency collaboration substantially reduces costs and congestion. These findings offer a scalable and efficient framework for developing sustainable large-scale EV charging networks.

Capacity allocation↗

Test and Validate Distributed Coaxial Cable Sensors for in situ Condition Monitoring of Coal-Fired Boiler Tubes

This project aims to test, validate, and advance the technology readiness level (from TRL5 to TRL7) of a novel low-cost distributed stainless-steel/ceramic coaxial cable sensing (SSC-CCS) technology for in situ monitoring of the boiler tube temperature in existing coal-fired power plants. The novel SSC-CCS sensing technology and associated condition-based monitoring (CBM) software to be demonstrated in this project will lead to an improved understanding of the boiler tube failure mechanisms and a prognostic system to improve the overall performance, reliability, and flexibility of the nation’s coal-fired power plant fleet. A boiler tube monitoring system with distributed coaxial cable temperature sensors and a sensor acquisition system was constructed. The high-temperature coaxial cable sensor with a length of 1.3m was made by using a quartz tube (1mm inner diameter (ID) and 6mm outer diameter (OD)) to concentrically separate a 304 stainless-steel (SS) rod (1mm OD) and SS tube (7.94mm OD and 6.16mm ID). The sensor acquisition system includes a vector network analyzer (VNA), a radio frequency (RF) power amplifier, multiple switches and a USB hub. The distributed stainless-steel quartz coaxial cable sensor (SSQ-CCS) had a linear response to temperature with a resolution uncertainty of σ = 0.77℃. To withstand the harsh conditions of 3,300 steam pressures and 800℃ high temperatures, the sensor was shielded by a protective tube made of the same material as the boiler tube. The protection tube had an OD of 1.5 inches and a thickness of 0.25 inches. In the laboratory tests, the sensor showed good sensitivity and fast response. The drift was bounded between +0.33% and -0.67% during a test at 600℃ for 350 hours, indicating good stability of the sensor. A field test was conducted where four sensors were welded on four superheat tubes (SH-Ts) at a coal-fired power station over 400 days. Conventional thermocouples were welded to the superheater tubes alongside the coaxial cable sensors for the purpose of comparison. Two sensors were capable of distributed sensing, with three multiplexed sensing sections. The other two sensors were single section. During the 400-day test period, the power plant experienced startups and shutdowns. At the steady state operations, the temperature of the boiler tube is about 600℃ (1112°F). The sensors recorded the entire coal-firing processes (start-up, steady state, and shut-down) and the glitch event. A GSM modem and a Watchdog were added to the system to ensure reliable data recording. The GSM modem sent daily messages to plant managers and Clemson team to inform the status of the sensor system. If the system was not normally working, the Watchdog would reboot the system automatically. The new coaxial cable based distributed sensing technology has been proven to be successful in both laboratory and field tests. A comprehensive four-stage multi-physics computational framework has been developed to assist the design, optimization, installation, and operation of SSQ-CCS. With the consideration of various operation conditions, we predict the distributions of flue gas temperatures within coal-fired boilers, the temperature correlation between the boiler tube and SSQ-CCS, and the safety of SSQ-CCS. A conditional-based monitoring system is implemented as well. The computational framework developed in this work can guide the future operation of coal-fired plants and other power plants for the safety prediction of boiler operations.

01 COAL, LIGNITE, AND PEAT↗

Transition core modeling for extended enrichment, accident tolerant fuel using PARCS/Polaris

Current plans and efforts from reactor operators and vendors to include extended enrichment (EE) and accident-tolerant fuel (ATF) in current reactor fleets motivate the study of these changes in reactor physics analysis. This work uses the US Nuclear Regulatory Commission core simulator PARCS to do the core calculation and SCALE Polaris lattice physics code to generate the required homogenized, few-group constants. The lattice model used is based on the GE-14 10x10 assemblies with UO{sub 2} fuels. Both nominal core and transition core are studied in this work, and both cores use GE-14 10x10 assemblies with UO{sub 2} fuel. The nominal core uses regular UO{sub 2} fuel with a maximum enrichment of 5 wt % and ZIRC-2 cladding. The ATF transition core uses FeCrAl cladding and regular UO{sub 2} fuel, while the EE-ATF transition core uses FeCrAl cladding with UO{sub 2} fuel with 8 max wt % enrichment. The accuracy presented in the colorset models verified the capability of the PARCS/Polaris procedures for the transition core analysis. For the whole core calculation, the ATF and EE-ATF transition core models were made in addition to the nominal core model. The core parameters to study are the core power distribution and power peaking factor, doppler temperature coefficients, and control rod worth at cold zero power and hot full power. Comparing the core parameters of the transition cores with the nominal core in PARCS, the results suggest that there is no unexpected outcome for the implementation of ATF and EE fuels. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Extended Low Load Boiler Operation to Improve Performance and Economics of an Existing Coal Fired Power Plant (Final Report)

The overall goal is to improve the performance and economics of existing coal fired power plants by extending low load boiler operation to lower loads than is currently achievable. The objective of this program is to develop and validate sensor hardware and analytical algorithms to lower plant operating expenses (OPEX) for the currently operating pulverized coal utility boiler fleet. Coal fired utility boilers are increasingly under grid dispatch pressure. In some cases, the coal fired cost of generation is noncompetitive with respect to natural gas generation and subsidized renewable sources. To remain profitable and remain fully compliant with existing environmental regulations, the installed coal fired fleet must find technologies which allow it to move into a more flexible cyclic load dispatch model. Today the installed coal fired utility fleet must be cost of generation competitive, fully emissions compliant, and responsive to the variability inherent in renewable energy generation sources. In the Phase I of the project, GE Steam Power, Inc. (GE) performed modeling of different operating scenarios for low load operation using an existing full plant dynamic model developed for a 660MW steam power plant. Sensors and analytic algorithms to enable a stable and steady coal supply for low load pulverizer operation were identified and tested at the Pulverizer Development Facility (PDF) at GE’s Clean Energy Center in Bloomfield, Connecticut. Sensors and analytic algorithms to enable stable combustion for low load operation were identified and tested at the 15 MWth Industrial Scale Burner facility (ISBF) at GE’s Clean Energy Center. A concept was developed to test the sensors and control algorithms, down selected after testing, at a full-scale coal fired power plant. A budget estimate was then developed, and the concept was implemented at an existing utility power plant. The specific objectives of the experimental work were to: • Identify and select sensors and analytic algorithms for monitoring coal pulverizer operation at lower loads to provide stable operation and appropriate coal fineness at lower coal throughput; Identify and select sensors and analytic algorithms for a Boiler Flame Stability Monitor to better balance air and fuel at each burner. This enables a reduction in a coal boiler’s safe low load power level while maintaining stable flame characteristics; Develop a concept in Phase I for low load operation of a full-scale power plant and develop a budget estimate for testing and execute the test plan at an existing plant in Phase II; Validate the capability of the extended low load boiler system to extend the minimum load operating point in a safe and reliable manner on an existing full-scale utility boiler. At the completion of this experimental study, GE has developed a set of sensors and analytic algorithms, down selected after testing, that have the potential to enable safe low load operation of a utility boiler. GE has also identified a host site for testing these identified sensors and analytic algorithms. GE has generated a full set of deliverables that provide sufficient information to proceed with the next step of testing at a host site. This includes a potential host site and budget estimate for concept testing at host site. In the Phase II of the project, a series of field tests were completed to validate the extended low load boiler operation, which consisted of detailed engineering, installation, commissioning, and testing the additional sensors and analytics for the coal-fired combustion system on an existing full-scale utility boiler. The optimization work has been supported by the host plant and endorsed by their engineering and operation staff.

01 COAL, LIGNITE, AND PEAT↗