Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “femp”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Building Energy Audit Report for Camp Smith, HI

A detailed energy assessment was performed by a team of engineers from Pacific Northwest National Laboratory (PNNL) under contract to the Department of Energy/Federal Energy Management program (FEMP). The effort used the Facility Energy Decision System (FEDS) model to determine how energy is consumed at Camp Smith, identify the most cost-effective energy retrofit measures, and calculate the potential energy and cost savings. This report documents the results of that assessment.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Building Energy Audit Report, for Hickam AFB, HI

A building energy assessment was performed by a team of engineers from Pacific Northwest National Laboratory (PNNL) under contract to the Department of Energy/Federal Energy Management program (FEMP). The effort used the Facility Energy Decision System (FEDS) model to determine how energy is consumed at Hickam AFB, identify the most cost-effective energy retrofit measures, and calculate the potential energy and cost savings. This documents reports the results of that assessment.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Operations & Maintenance Best Practices - A Guide to Achieving Operational Efficiency (Release 3)

This guide highlights operations and maintenance programs targeting energy and water efficiency that are estimated to save 5% to 20% on energy bills without a significant capital investment. The purpose of this guide is to provide you, the Operations and Maintenance (O&M)/Energy manager and practitioner, with useful information about O&M management, technologies, energy and water efficiency, and cost-reduction approaches. To make this guide useful and to reflect your needs and concerns, the authors met with O&M and Energy managers via Federal Energy Management Program (FEMP) workshops. In addition, the authors conducted extensive literature searches and contacted numerous vendors and industry experts. The information and case studies that appear in this guide resulted from these activities. It needs to be stated at the outset that this guide is designed to provide information on effective O&M as it applies to systems and equipment typically found at Federal facilities. This guide is not designed to provide the reader with step-by-step procedures for performing O&M on any specific piece of equipment. Rather, this guide first directs the user to the manufacturer's specifications and recommendations. In no way should the recommendations in this guide be used in place of manufacturer's recommendations. The recommendations in this guide are designed to supplement those of the manufacturer, or, as is all too often the case, provide guidance for systems and equipment for which all technical documentation has been lost. As a rule, this guide will first defer to the manufacturer's recommendations on equipment operation and maintenance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Impact of E4 Training and Field Auditing of GSA Heartland Region Facilities

To assess the impact of energy efficiency expert evaluation (E4) training and field audits performed since 2007, the Federal Energy Management Program (FEMP) undertook a follow-up study on the implementation of E4 recommendations and an analysis of energy savings. The building property manager and O and M contractor of each facility were interviewed to obtain feedback and implementation status of the E4 recommendations. Overall, there were more than 160 recommendations documented in the E4 reports; about 50% of these recommendations were fully implemented and the remaining 50% either partially implemented or not implemented. In four buildings, the E4 recommendations were aligned with American Recovery and Reinvestment Act of 2009 (ARRA) projects replacing HVAC equipment or upgrading the building control system. The E4 recommendations were not followed-up in two buildings because of uncertainty of the long-term use of the facility or personnel changes. Results of this followon study are reported in this document.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Characteristics of the Department of Energy's Building Inventory 2005-2010

The Pacific Northwest National Laboratory (PNNL) as part of their on-going support to the Department of Energy's Federal Energy Management Program (FEMP) was asked to analyze special building data for an agency to gain a better understanding of the portfolio characteristics to help better shape implementation of their alternative financing activities. This report provides information for one agency, Department of Energy (DOE), and how those characteristics have changed over time.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reverse Osmosis Optimization

This technology evaluation was prepared by Pacific Northwest National Laboratory on behalf of the U.S. Department of Energy’s Federal Energy Management Program (FEMP). The technology evaluation assesses techniques for optimizing reverse osmosis (RO) systems to increase RO system performance and water efficiency. This evaluation provides a general description of RO systems, the influence of RO systems on water use, and key areas where RO systems can be optimized to reduce water and energy consumption. The evaluation is intended to help facility managers at Federal sites understand the basic concepts of the RO process and system optimization options, enabling them to make informed decisions during the system design process for either new projects or recommissioning of existing equipment. This evaluation is focused on commercial-sized RO systems generally treating more than 80 gallons per hour.

McMordie Stoughton, Kate L.↗

Guidelines for Datacenter Energy Information System

The purpose of this document is to provide structured guidance to data center owners, operators, and designers, to empower them with information on how to specify and procure data center energy information systems (EIS) for managing the energy utilization of their data centers. Data centers are typically energy-intensive facilities that can consume up to 100 times more energy per unit area than a standard office building (FEMP 2013). This guidance facilitates “data-driven decision making,” which will be enabled by following the approach outlined in the guide. This will bring speed, clarity, and objectivity to any energy or asset management decisions because of the ability to monitor and track an energy management project’s performance.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Metering Best Practices: A Guide to Achieving Utility Resource Efficiency, Release 3.0

DOE FEMP guide for metering best practices aligned with the DOE Metering Guidance revision required by the 12/2013 Presidential Memo. The purpose of this guide is to provide information on effective energy and water metering strategies, relevant metering technologies and communications, how to collect and use metered data, and how to develop a metering plan. This guide is designed to serve as a resource for facility, energy, and water management and technical staff. It does not try to represent the universe of metering-related material. Rather, it attempts to: Provide background information on why metering is important, Provide guidance on the structure of an effective metering program, Provide information on metering and communications technologies, and Highlight common uses of metered data.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

From Policy to Compliance: Federal Energy Efficient Product Procurement

Federal buyers are required to purchase energy-efficient products in an effort to minimize energy use in the federal sector, save the federal government money, and spur market development of efficient products. The Federal Energy Management Program (FEMP)’s Energy Efficient Product Procurement (EEPP) Program helps federal agencies comply with the requirement to purchase energy-efficient products by providing technical assistance and guidance and setting efficiency requirements for certain product categories. Past studies have estimated the savings potential of purchasing energy-efficient products at over $500 million per year in energy costs across federal agencies.1 Despite the strong policy support for EEPP and resources available, energy-efficient product purchasing operates within complex decision-making processes and operational structures; implementation challenges exist that may hinder agencies’ ability to comply with purchasing requirements. The shift to purchasing green products, including energy-efficient products, relies on “buy in” from a variety of potential actors throughout different purchasing pathways. Challenges may be especially high for EEPP relative to other sustainable acquisition programs given that efficient products frequently have a higher first cost than non-efficient ones, which may be perceived as a conflict with fiscal responsibility, or more simply problematic for agency personnel trying to stretch limited budgets. Federal buyers may also face challenges in determining whether a given product is subject to EEPP requirements. Previous analysis on agency compliance with EEPP, conducted by the Alliance to Save Energy (ASE), shows that federal agencies are getting better at purchasing energy-efficient products. ASE conducted two reviews of relevant solicitations for product and service contracts listed on Federal Business Opportunities (FBO), the centralized website where federal agencies are required to post procurements greater than $25,000. In 2010, ASE estimated a compliance rate of 46% in 2010, up from an estimate of 12% in 2008. Our work updates and expands on ASE’s 2010 analysis to gauge agency compliance with EEPP requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Updated Estimates of the Remaining Market Potential of the U.S. ESCO Industry

The energy service company (ESCO) industry has a well-established track record of delivering energy and economic savings in the public and institutional buildings sector, primarily through the use of performance-based contracts. The ESCO industry often provides (or helps arrange) private sector financing to complete public infrastructure projects with little or no up-front cost to taxpayers. In 2014, total U.S. ESCO industry revenue was estimated at $5.3 billion. ESCOs expect total industry revenue to grow to $7.6 billion in 2017—a 13% annual growth rate from 2015-2017. Researchers at Lawrence Berkeley National Laboratory (LBNL) were asked by the U.S. Department of Energy Federal Energy Management Program (FEMP) to update and expand our estimates of the remaining market potential of the U.S. ESCO industry. We define remaining market potential as the aggregate amount of project investment by ESCOs that is technically possible based on the types of projects that ESCOS have historically implemented in the institutional, commercial, and industrial sectors using ESCO estimates of current market penetration in those sectors. In this analysis, we report U.S. ESCO industry remaining market potential under two scenarios: (1) a base case and (2) a case “unfettered” by market, bureaucratic, and regulatory barriers. We find that there is significant remaining market potential for the U.S. ESCO industry under both the base and unfettered cases. For the base case, we estimate a remaining market potential of $92-$201 billion ($2016). We estimate a remaining market potential of $190-$333 billion for the unfettered case. It is important to note, however, that there is considerable uncertainty surrounding the estimates for both the base and unfettered cases.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Risk Management Framework Process Map

The purpose of this document is to provide an overview of the Risk Management Framework (RMF) codified in National Institute of Standards & Technology (NIST) Special Publication (SP) 800-37r1 for the Federal Energy Management Program (FEMP). This document, while accurate, is not an authoritative source on the management of federal information systems. However, the concepts and process discussed herein are representative of the data points used to compare the RMF with NIST’s Framework for Improving Critical Infrastructure Cybersecurity , otherwise known as the cybersecurity framework .

97 MATHEMATICS AND COMPUTING↗

Rainwater Harvesting State Regulations and Technical Resources

Pacific Northwest National Laboratory (PNNL) conducted in-depth research of state-level rainwater harvesting regulations for the Federal Energy Management Program (FEMP) to help federal agencies strategically identify locations conducive to rainwater harvesting projects. Currently, rainwater harvesting is not regulated by the federal government; instead it is up to individual states to regulate the collection and use of rainwater. There is no centralized information about state-level regulations on rainwater harvesting maintained by a federal agency or outside organization. To fill this information gap, PNNL performed detailed internet searches for each state, which included researching regulations associated with state agencies, universities, Cooperative Extension Offices, city governments, and related organizations. The state-by-state information about rainwater harvesting regulations was compiled and assembled into an interactive map that is color coded by state regulations. The map provides a visual representation of the general types of rainwater harvesting policies across the country as well as general information about the state programs if applicable. The map allows the user to quickly discern where rainwater harvesting is supported and regulated by the state. This map was created in June 2015 and the data were updated in June 2019.

54 ENVIRONMENTAL SCIENCES↗

FAST FY 2018 Data Call: A Preliminary Review [Slides]

This presentation provides an overview of fiscal year 2018 federal motor vehicle fleet data at the individual vehicle level during the fall of 2018, a preliminary summary of the data collected, and how the collecting project has reviewed that information for potential quality issues. This presentation will be given at the March 2019 INTERFUEL group meeting, hosted by DOE's Federal Energy Management Program (DOE FEMP). The information is collected through the Federal Automotive Statistical Tool (FAST) project. FAST is a Web-based information system managed by the US Department of Energy, the US General Services Administration, and the Energy Information Administration. FAST is used to collect information about the fleet of motor vehicles used and managed by the Federal government. FAST is developed and maintained by DOE's Idaho National Laboratory (INL).

99 GENERAL AND MISCELLANEOUS↗

Federal Energy Management Program’s Technical Resilience Navigator: Communications Plan

The Federal Energy Management Program is working to develop a standard, agency-neutral energy and water technical resilience navigator (TRN) to assist federal agencies with their resilience planning efforts, building on agency-expressed needs. The TRN Communications Plan defines how the project team and FEMP will generate awareness of the TRN, recruit validators, encourage its use across federal agencies, increase awareness among various audiences, and solicit user feedback on its usefulness including suggestions for improvement. In support of this purpose, the communications plan characterizes the key audiences, messages, communications channels, and activities needed to help ensure success. The role of communications is to define strategy and ensure leadership and consistency in messaging, writing, outreach, media relations, editing, and design related to the TRN.

99 GENERAL AND MISCELLANEOUS↗