Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “failure reports”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Durability of YSZ Coated Ti2AlC in 1300 °C Mach 0.3 Burner Rig Tests

A thermal barrier coating system survived burner rig testing at 1300 °C for 500 h. A 160 µm thick yttria stabilized zirconia (YSZ) coating was applied to a Ti2AlC MAX phase bar sample by plasma spray physical vapor deposition (PS-PVD) and tested face-on in an atmospheric Mach 0.3 jet fuel burner, using 5-h thermal cycles. No thermal barrier coating (TBC) spallation or recession was observed, only a 2.4 mg/cm2 mass gain. The modest weight gain precluded severe volatility losses under high velocity burner conditions. The coating surface exhibited colonies of (111)flourite fiber-textured columns separated by craze patterns, with no visible moisture attack. The metastable tetragonal t' YSZ phase was obtained initially, transitioning to equilibrium teq and cubic YSZ, but with little detrimental monoclinic. The thickness of the alumina TGO was ~21 to 23 μm under the heated YSZ face and ~13 to 15 μm on the uncoated, cooler backside. The backside exhibited removal of initial transient TiO2 nodules and partial etching of the underlying Al2O3 scale by volatile hydroxides formed in high temperature, high velocity water vapor. Aerodynamic forces produced some bending of the cantilevered sample via creep. The test indicated exceptional stability of YSZ coatings on Ti2AlC under turbine conditions, with thermal expansion matching playing a key role. The purpose of this study was to demonstrate long term durability of YSZ/MAX phase system in aggressive high temperature burner rig testing. MAX phases have been keenly studied because of their unique crystal structure and intriguing properties (Refs. 1 and 2). Having Mn+1(Al,Si)(C,N)n general composition, they are defined as ceramics, but possess unusual desirable attributes such as high conductivity, thermal shock resistance, easy machinability, and deformation tolerance. The mechanical properties derive from weak M-(Al,Si) bonding in the basal plane that leads to sliding and kinking in preference to catastrophic crack growth. Like most ceramics they are phase stable at high temperatures, generally up to 1500 °C. High temperature oxidation resistance is excellent for alumina-forming Ti3AlC2, Ti2AlC, and Cr2AlC, as reviewed by Tallman, et al. (Ref. 3). Compatibility with α-Al2O3 scales is further enhanced in cyclic exposures by a close matching of thermal expansion coefficients, (Ref. 4) i.e., (~9.3, 10.2, 11.3×10–6/K for Al2O3, Ti2AlC, and YSZ, to be discussed). Turbine environments generally contain 10 percent water vapor in the combustion gases, therefore moisture effects can be a concern for some materials (Ref. 5). Furnace tests of MAX phases in high temperature steam generally showed little effect on Al2O3 scale growth (Ref. 6). However, high velocity and high pressure gas can influence scale losses by the formation of volatile reaction products, such as TiO(OH)2 and Al(OH)3 (Refs. 7 to 10). This phenomenon had been discussed for 1100 to 1300 °C high pressure burner rig tests of Ti2AlC (Ref. 11). A single cubic growth rate parameter kcubic was measurably lower than comparable furnace TGA data, but it could be matched reasonably well if corrected for a slight volatility term. In general, a two-parameter cubic-linear growth-volatility law was believed to apply. Corresponding scale volatility loss rates, directly measured at 1300 °C on a pre-oxidized sample, were moderate (0.012 mg/cm2/h) and largely attributed to removal of the initial TiO2 transient scale. A related CH4 burner study of high purity Cr2AlC MAX phase demonstrated 1200 °C durability after 500 rapid (5 min. heat and 2 min. cool) thermal shock cycling (29 h hot time) (Ref. 12). Heating and cooling rates were ~1000 and 500 °C per minute, with a gas velocity of 5 m/s, producing a 75 °C/mm gradient. A 7 μm Al2O3 surface scale and a 13 μm Cr7C3 depletion zone formed with no signs of failure. No evidence of scale volatility was evident, although weight change was not provided, the velocity was moderate, and the total hot time was not extensive. The same high gradient BRT was used to produce 1400 °C surface temperatures for a YSZ/Cr2AlC/IN738 system in the first study of MAX phases used as bond coats for thermal barrier coatings (TBC) (Ref. 25). Here TBC failure was reported after 745 cycles, with only a 1.5 μm Al2O3 scale entrained within a porous, Cr7C3 bondcoat depletion phase. YSZ thermal barrier coatings have been considered to be a compatible complement to Al-MAX phases because of thermal expansion matching and extremely low volatility in water vapor. Initial studies showed superior oxidative stability up to 1300 °C, for long times (at least 500 h) for Ti2AlC substrates and less (268 h) for Cr2AlC, while withstanding large alumina TGO scale thickness (~35 to 40 μm) (Refs. 13 and 14). By comparison, typical superalloy systems can only survive 1150 °C maximum interface temperatures for extended periods, with a maximum sustained TGO below 10 μm (Ref. 15). High temperature SiC based systems are known to form slow-growing SiO2 scales. But these are subject to rate enhancement and volatile Si(OH)4 products in the presence of water vapor, as described comprehensively by Opila, et al. (Refs. 5, 16 to 19). Net weight losses are generally observed in high velocity, high pressure burner rig studies (e.g., 0.084 mg/cm2/h at 1300 °C) (Ref. 20). Furthermore, the loss rates have been shown from chemical physics to scale with v1/2 and pH2O 2 (Ref. 16). Low activity, moisture-resistant environmental barrier coatings (EBC), such as rare earth silicates, are needed to prevent substrate recession under turbine conditions (Refs. 21 to 23).

Smialek, James L.↗

Test Results of PIP2IT MEBT Vacuum Protection System

The central part of PIP-II program of upgrades pro-posed for the Fermilab injection complex is an 800 MeV, 2 mA, CW-compatible SRF linac. Acceleration in super-conducting cavities begins from a low energy of 2.1 MeV, so that the first cryomodule, Half Wave Resonator (HWR) borders the warm Medium Beam Transport (MEBT) line. To minimize the amount of gas that may enter the SRF linac in a case if a vacuum failure occurs in the warm front end, a vacuum protection system is envisioned to be used in the PIP-II MEBT. It features a fast closing valve with two sensors and a differential pumping insert. The system prototype was installed in the PIP-II Injector Test (PIP2IT) accelerator and successfully tested in several modes modelling the vacuum failures. The report presents the design of the vacuum protection system and results of its tests.

43 PARTICLE ACCELERATORS↗

High Power Radiofrequency Operation of the Radiofrequency Quadrupoles in the Spallation Neutron Source

The Spallation Neutron Source (SNS) recently took delivery of a third Radiofrequency Quadrupole (RFQ03) that will ultimately be installed on the front-end (FE) of the SNS Linac. The first RFQ (RFQ01) operated in the SNS FE for more than a decade before being replaced with the second RFQ (RFQ02). RFQ01 was relocated to the Beam Test Facility (BTF) where it operated for five more years. The RFQ02 was initially installed in the BTF for high power testing and used with H- beam for BTF operation. It replaced RFQ01 in the SNS FE in 2017 and has been operating for beam production since then. There are some differences between the three RFQs. RFQ01 has a square cross-section with pi-mode stabilizing loops (PISLs) with the structure being fabricated using two layers of materials, GlidCop outside and OFHC inside. RFQ02 and RFQ03 has an octagonal cross-section with end-wall stabilizer rods and was fabricated using OFHC only. RFQ01 suffered some field flatness distortion incidents that resulted in degradation in beam transmission efficiency and required RF tuning. RFQ02 has performed well but had a melted RF seal in the high energy end wall, that was ultimately mitigated by a redesign of the end flange seals. The SNS decided to order RFQ03 that has a design that followed that of RFQ02 closely, but end-wall contacts were modified to prevent RF seal failure. This report presents the testing, installation, high power RF operation, and design improvements of the RFQ03.

Ren, Haitao↗

Failure Analysis for Molten Salt Thermal Energy Storage Tanks for In-Service CSP Plants

Thermal Energy Storage (TES) is a fundamental component in concentrating solar power (CSP) plants to increase the plant's dispatchability, capacity factor, while reducing the levelized cost of electricity. In central receivers CSP plants, nitrate molten salts have been used for several years for operation temperatures of up to 565 degrees C. Despite many efforts to advance nitrate salt to higher operation temperatures (even considering a replacement with molten chloride salts) to achieve higher energy conversion efficiencies, the 565 degrees C temperature is currently considered the state-of-the art. Although molten salt tanks have been broadly deployed in commercial CSP plants worldwide, several failures have been reported in these tanks after a few months or years of operation, causing significant economic loss and mistrust in CSP technologies. Most of these failures are associated with the infancy of the technology and multiple issues related to tank design, fabrication, commissioning, and aggressive operation. A technical standard dedicated to the design and fabrication of molten nitrate TES tanks does not exist today. Current in-service molten salt tanks have been generally designed based on the American Petroleum Institute's (API) 650 and ASME Section II standards. The API 650 code provides guidelines for dimensions and fabrication for oil storage tanks up to 260 degrees C. The ASME standard provides allowable stress values for various materials at a range of temperatures and conditions. Both standards seem to be limited for molten salt TES tanks where high temperatures, thermal cycling, and transient conditions are expected. In 2020, NREL released the Concentrating Solar Power Best Practices Study (NREL/TP-5500-75763) that summarized multiple issues in CSP plants, along with potential alternatives and recommendations to address those issues based on information collected from participants representing about 80% of operating CSP plants in the world. One of the recommendations from this study was the development of accurate and validated models to evaluate the plant's transient operation, capable of capturing the effect of short-term clouds and operator response, while being flexible in being adapted to various spatial and temporal resource data. The "Failure Analysis for Molten Salt Thermal Energy Tanks for In-Service CSP Plants" project was inspired on this recommendation and was focused on (1) the development and validation of a physics-based model for a representative, commercial-scale molten salt tank, (2) performing simulations to evaluate the behavior of the tank as a function of typical plant operation conditions, (3) understanding tank failures mechanisms, (4) determining the residual stress and distortion in the tank floor after welding fabrication and evaluating their impact in the stresses developed in the tank during operation, (5) assessing the impact of key operation parameters on the temperature and stress distribution, (6) conduct a preliminary evaluation of design features to reduce stress and improve tank's reliability, and (7) estimate the tank's service life based on the stress developed under diverse operation scenarios. From the analysis conducted in the project and presented in this report, it was found that maximum stresses surpassing the yield strength point of the stainless steel (SS) 347H are developed on the tank floor near the perimeter. These large stresses are strongly influenced by the initial residual stresses and distortion of the tank floor after welding fabrication. During operation, large stresses are developed in the tank floor at high operation temperatures with large salt inventory levels during transient operation. High stresses are also related to elevated temperature gradients in the tank floor that could be attributed to insufficient mixing within the salt inflow and the salt inventory. Based on the analysis, creep is the predominant failure mechanism. However, the large stress levels could favor the plastic deformation into buckles, and crack formation due to stress relaxation cracking during cycle operation. A lifetime below 3 years was estimated for the typical plant operation conditions and a specific initial residual stress and deformation distribution of the tank floor. The estimated life agrees with the service time to failure reported in several commercial molten salt tanks. Desing and operation guidelines can be extracted from the analysis presented in this report, which could be adopted by tank manufacturers and CSP operators to advance toward an ultimate solution for tank failures by reducing residual and operational stresses to achieve a tank service life of more than 30 years. Addressing failures in molten salt TES tanks is fundamental for the CSP industry's survivability, but it is also important for other industrial and power generation applications using this technology, including nuclear and concentrating solar thermal.

14 SOLAR ENERGY↗

Limitations and Failures of the Layzer Model

We report several limitations and failure modes of the recently expanded Layzer model for hydrodynamic instabilities. The failures occur for large initial amplitudes, for stable accelerations, and for spikes in two-fluid systems.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Intensity-Modulated Radiotherapy for Tumors of the Nasal Cavity and Paranasal Sinuses: Clinical Outcomes and Patterns of Failure

Purpose: To report outcomes in patients treated with intensity-modulated radiotherapy (IMRT) for tumors of the paranasal sinuses and nasal cavity (PNS/NC). Methods/Materials: Between June 2000 and December 2009, 52 patients with tumors of the PNS/NC underwent postoperative or definitive radiation with IMRT. Twenty-eight (54%) patients had squamous cell carcinoma (SCC). Twenty-nine patients (56%) received chemotherapy. The median follow-up was 26.6 months (range, 2.9-118.4) for all patients and 30.9 months for living patients. Results: Eighteen patients (35%) developed local-regional failure (LRF) at median time of 7.2 months. Thirteen local failures (25%) were observed, 12 in-field and 1 marginal. Six regional failures were observed, two in-field and four out-of-field. No patients treated with elective nodal radiation had nodal regional failure. Two-year local-regional control (LRC), in-field LRC, freedom from distant metastasis (FFDM), and overall survival (OS) were 64%, 74%, 71%, and 66% among all patients, respectively, and 43%, 61%, 61%, and 53% among patients with SCC, respectively. On multivariate analysis, SCC and >1 subsite involved had worse LRC (p = 0.0004 and p = 0.046, respectively) and OS (p = 0.003 and p = 0.046, respectively). Cribriform plate invasion (p = 0.005) and residual disease (p = 0.047) also had worse LRC. Acute toxicities included Grade {>=}3 mucositis in 19 patients (37%), and Grade 3 dermatitis in 8 patients (15%). Six patients had Grade {>=}3 late toxicity including one optic toxicity. Conclusions: IMRT for patients with PNS/NC tumors has good outcomes compared with historical series and is well tolerated. Patients with SCC have worse LRC and OS. LRF is the predominant pattern of failure.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Comprehensive, Quantitative Risk Assessment of CO 2 Geologic Sequestration (Final Technical Report)

A Quantitative Failure Modes and Effects Analysis (QFMEA) was developed to conduct comprehensive, quantitative risk assessments on CO 2 capture, transportation, and sequestration or use in deep saline aquifers, enhanced oil recovery operations, or enhanced coal bed methane operations. The model identifies and characterizes potential risks; identifies the likely failure modes, causes, effects and methods of detection; lists possible risk prevention and risk mitigation steps; estimates potential damage recovery costs, mitigation costs and costs savings resulting from mitigation; and ranks (prioritizes) risks according to the probability of failure, the severity of failure, the difficulty of early failure detection and the potential for fatalities. The QFMEA model generates the necessary information needed for effective project risk management. Diverse project information can be integrated into a concise, common format that allows comprehensive, quantitative analysis, by a cross-functional team of experts, to determine: What can possibly go wrong? How much will damage recovery cost? How can it be prevented or mitigated? What is the cost savings or benefit of prevention or mitigation? Which risks should be given highest priority for resolution? The QFMEA model can be tailored to specific projects and is applicable to new projects as well as mature projects. The model can be revised and updated as new information comes available. It accepts input from multiple sources, such as literature searches, site characterization, field data, computer simulations, analogues, process influence diagrams, probability density functions, financial analysis models, cost factors, and heuristic best practices manuals, and converts the information into a standardized format in an Excel spreadsheet. Process influence diagrams, geologic models, financial models, cost factors and an insurance schedule were developed to support the QFMEA model. Comprehensive, quantitative risk assessments were conducted on three (3) sites using the QFMEA model: (1) SACROC Northern Platform CO 2 -EOR Site in the Permian Basin, Scurry County, TX, (2) Pump Canyon CO 2 -ECBM Site in the San Juan Basin, San Juan County, NM, and (3) Farnsworth Unit CO 2 -EOR Site in the Anadarko Basin, Ochiltree County, TX. The sites were sufficiently different from each other to test the robustness of the QFMEA model.

54 ENVIRONMENTAL SCIENCES↗

Environmental control system transducer development study

A failure evaluation of the transducers used in the environmental control systems of the Apollo command service module, lunar module, and portable life support system is presented in matrix form for several generic categories of transducers to enable identification of chronic failure modes. Transducer vendors were contacted and asked to supply detailed information. The evaluation data generated for each category of transducer were compiled and published in failure design evaluation reports. The evaluation reports also present a review of the failure and design data for the transducers and suggest both design criteria to improve reliability of the transducers and, where necessary, design concepts for required redesign of the transducers. Remedial designs were implemented on a family of pressure transducers and on the oxygen flow transducer. The design concepts were subjected to analysis, breadboard fabrication, and verification testing.

Brudnicki, M. J.↗

Report of the NASA Ad Hoc Committee on failure of high strength structural materials

An analysis of structural failures that have occurred in NASA programs was conducted. Reports of 231 examples of structural failure were reviewed. Attempts were made to identify those factors which contributed to the failures, and recommendations were formulated for actions which would minimize their effects on future NASA programs. Two classes of factors were identified: (1) those associated with deficiencies in existing materials and structures technology and (2) those attributable to inadequate documentation or communication of that technology.

Brown, W. F., Jr.↗

Safety Hazards of Batteries and Hydrogen Storage Systems in Proximity

This report addresses the safety concerns and mitigations for battery failures and their impact on hydrogen storage systems. Through an analysis of failure modes, this report highlights the risks posed by thermal runaway and chemical emissions caused by batteries. Although rare, battery thermal failure events may prompt the opening of the relief valve on the hydrogen tank. Strategies such as battery management systems, thermal management systems, and multiple thermally activated pressure relief devices can mitigate these risks. Potential simulations and experiments to better quantify the unique risks posed by lithium-ion batteries near tanks are suggested. Improving safety standards will enable integration of batteries and hydrogen storage systems in various energy storage technologies.

08 HYDROGEN↗

EEPROM bit failure investigation

This paper reports the investigation findings concerning of the EEPROM single bit failures that were observed on a recent NASA space mission.

EEPROM↗

Assessment of 20 kW S-band transmitter

The performance history of the 20-kW S-band transmitter, installed at three 64-meter antennas and six 26-meter antennas in the DSN, is reviewed. A number of failures and discrepancy reports are characteristic of the wearout phase of a failure curve. The type of failures are reviewed and four options toward reducing the number and cost of failures are reviewed. These are: existing (no change), refurbish, redesign and replacement. The options are compared on a ten year life cycle cost basis using FY77 expenditures for existing equipment as a base. It was concluded that benefits, in terms of reduction of outrage time, increase with an increase of expenditure toward improvement.

Dickinson, R.↗

Small-Satellite Mission Failure Rates

The purpose of this report is to determine the failure rate of small-satellite missions launched between the years 2000 and 2016. This analysis considers the rates of both partial and total mission failure, as well as the failures attributable to failure of the launch vehicle. This study observed that between the years of 2000 to 2016, 41.3% of all small satellites launched failed or partially failed. Of these small satellite missions, 24.2% were total mission failures, another 11% were partial mission failures, and 6.1% were launch vehicle failures. The small satellite failure data reveals an increase in the failure rate as the yearly launch rate has increased. The period 2000 to 2008 averaged 15 launches per year, during which 28.6% of the small satellite missions failed or partially failed. The period from 2009 to 2016 averaged 48 launches per year, during which 42.6% of the small satellite missions failed or partially failed. The launch vehicle failure rate for both periods was the same at around 6.1%. The implication is that for modern small satellite missions, almost one out of every two small satellite missions will result in either a total or a partial mission failure. Counting the partial mission successes as “successful missions” reduces the failure rate, but only to 38.2% for the period 2009 to 2016.

Small Satellite↗