Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “excavation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Crystalline Disposal R&D at LBNL: FY20 Progress Report

Within the Spent Fuel & Waste Science and Technology (SFWST) Program, research work continues further with the goal to better understand long-term performance of disposal systems in three main geologic rock types: clay/shale, salt, and crystalline rock. This report documents LBNL’s research activities related to investigations of crystalline host rock according to the scope of two work packages: SF-20LB01030207 “Crystalline International Collaborations – LBNL,” and SF-20LB01030203 “Crystalline Disposal R&D – LBNL.” These research activities correspond are related to key Features, Events, and Processes (FEPs), ranked in importance from medium to high, as listed in Table 7 of the Used Fuel Disposition Campaign Disposal Research and Development Roadmap (FCR&D-USED-2011-000065 REV0) (Nutt, 2011). Specifically, these research activities address FEP 2.2.01, Excavation Disturbed Zone (EZD). The results of these research activities provide important insights into understanding and predicting flow and transport processes that could occur in low-permeability crystalline rocks, in which fractures might serve as main conduits for fluid flow and radionuclide transport. The evolution of the EDZ during the excavation of the tunnel as well as the evolution of microcrack growth within the EDZ after the emplacement of backfill are critical for predicting the long- term behavior of the EDZ. A number of factors including stress, temperature, water activity, capillary pressure, chemistry, and mineralogy can affect the rock evolution, which require advanced experimental tools to study it.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Reconstruction of the Room D, B, G, and Q Closure Histories at the Waste Isolation Pilot Plant

Experimental measurements of room closure in salt repositories are valuable for understanding the evolution of the underground and for validating geomechanical models. Room closure was measured during a number of experiments at the Waste Isolation Pilot Plant (WIPP) during the 1980's and 1990's. Most rooms were excavated using a multi-pass mining sequence, where each pass necessarily destroyed some of the mining sequence closure measurement points. These destroyed points were promptly reinstalled to capture the closure after the mining pass. After the room was complete, the mining sequence closure measurement stations were supplemented with remotely read closure measurement stations. Although many aspects of these experiments were thoroughly documented, the digital copies of the closure data were inadvertently destroyed, the non-trivial process of zeroing and shifting the raw closure measurements after each mining pass was not precisely described, the various closure measurements within a given room were not directly compared on the same plot, and the measurements were collected for several years longer than previously reported. Consequently, the hand-written mining sequence closure measurements for Rooms D, B, G, and Q were located in the WIPP archives, digitized, and reanalyzed for this report. The process of reconstructing the mining sequence closure histories was documented in detail and the raw data can be found in the appendices. Within the mid-section of a given room, the reconstructed closure histories were largely consistent with other mining sequence and remotely read closure histories, which builds confidence in the experiments and suggests that plane strain is an appropriate modeling assumption. The reconstructed closure histories were also reasonably consistent with previously published results, except in one notable case: the reconstructed Room Q closure histories 30 days after excavation were about 45 % less than the corresponding closures reported in Munson's 1997 capstone paper.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lawrence Livermore National Laboratory Experimental Test Site 300 (S300): S300 Roadway Improvements - 817 Complex Soil Sampling and Analysis Plan, Addendum 1 (June 2023)

The purpose of this addendum is to amend and update the S300 Roadway Improvements – 817 Complex [project] Soil Sampling and Analysis Plan (SAP) dated May 2023. Field activities to implement the SAP were completed in May 2023 except for SB-17. SB-17 is therefore included in this addendum. In addition, this addendum amends the SAP by covering an expanded scope of work and project limits. The project limits have been expanded to include areas around Building 818. Sampling at the expanded project area is addressed in this addendum by two additional borings for geotechnical and environmental analyses. The project area consists of the access gate and existing access roads for the Process Area complex. Excavation depths are anticipated to be no deeper than 5 feet from current grade. None of the proposed disturbance areas are within known areas of contamination or mapped controlled excavation area (LLNL 2008). Therefore, this addendum proposes a sampling spacing in the vicinity of Building 818 of about 172 feet (Tier 2) in accordance with the Soil Screening and Management Plan (LLNL 2022). The information contained in this addendum supersedes the May 2023 SAP. However, this addendum only addresses elements of the May 2023 SAP that were modified. Elements of the May 2023 SAP that have not been modified are relevant and will remain in effect.

54 ENVIRONMENTAL SCIENCES↗

Brine Availability Test in Salt (BATS) FY24 Update

This report summarizes fiscal year 2024 (FY24) activities centered around a series of field tests in bedded salt at the Waste Isolation Pilot Plant (WIPP) funded by the Office of Spent Fuel and Waste Science and Technology in the Spent Fuel and Waste Disposition (SFWD) program of the US Department of Energy’s Office of Nuclear Energy (DOE-NE). High-level Purpose of Experiments: The Brine Availability Test in Salt (BATS) field tests are revealing both brine occurrence (i.e., where, and how much) and brine migration (i.e., how easily it moves) in the excavation damaged zone (EDZ). This understanding is foundational to develop a safety case for a future heat-generating waste repository in salt, and to starting up a generic repository program in salt to buy down risk. BATS seeks to predict how much brine can flow into both ambient and heated excavations (e.g., boreholes or rooms) in salt. This work is educating and empowering new repository scientists on two fronts: “design and execution of field tests” and “prediction and modeling of coupled processes.” DOE-NE capabilities in salt have grown and been tested through international modeling and benchmarking exercises (e.g., DECOVALEX, RANGERS, KOMPASS, and MEASURES; see Mills et al., 2024). The hands-on expertise we are building is a necessary step towards large-scale disposal demonstrations and eventual implementation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DECOVALEX-2023: Task C Final Report

The Full-scale Emplacement (FE) heater experiment at the Mont Terri Underground Rock Laboratory (URL) was designed and conducted by Nagra to replicate an emplacement tunnel of Nagra’s reference repository design at 1:1 scale. Alongside testing the technical feasibility of constructing disposal tunnels, emplacing waste containers in the tunnels and then backfilling them, the main goals of the FE experiment are (1) to obtain a better understanding of the coupled effects of induced thermo-hydro-mechanical (THM) processes that may occur and (2) to validate existing coupled THM models (Müller et al., 2017). A key aspect of ensuring safety for repositories located in low-permeability rock involves minimizing any damage to the rock itself, thereby preserving its integrity and promoting a stable environment Amongst a number of processes that could damage the rock is the increase in pore pressure due to thermal loading caused by heat emitted from the waste. To reduce the potential damage of the rock, it is important to analyse the evolution of heat over time due to the heat load of the containers and assess possible consequences by coupled THM models. The aim of Task C of DECOVALEX-2023 was to build 3D numerical models of the FE experiment, focussing in particular on the heating induced pore pressure change in the Opalinus Clay. Data from a large number of sensors were available from the FE experiment for model comparison. These sensors measured temperature and relative humidity in the bentonite around the heaters, and temperature, pressure and displacement/strain in the surrounding Opalinus clay. Data were available from the start of excavation (April 2012) up to August 2020 for most sensors (more than 5 years from the start of heating in December 2014). To fulfil the overall aim of the task, the work was broken down into a number of steps, starting with simpler models to build confidence in each team’s approach and then moving to more complex models that better represent the FE experiment. Step 0 consisted of 2D benchmark models, gradually increasing the number of processes that are represented from thermal (T) only models in Step 0a, to coupled thermal hydraulic (TH) models in Step 0b with a representation of changing porosity, to coupled thermo-hydro-mechanical (THM) models in Step 0c, where porosity changes are calculated by the mechanical model. A detailed specification of processes, parameters, initial and boundary conditions was provided for this step, with the ambition that all teams would work towards close agreement in their model results, thus building confidence in the model implementations. vi It was not straightforward to achieve agreement between the teams, so additional steps (Step 0b2, 0b3, 0c2, 0c3) were added along with derivation of some analytical solutions against which the models could be compared. The reasons for the differences between teams were investigated and found to be caused primarily by different conceptual model assumptions (including temperature dependence of the thermal expansion of water), different model formulations (including porosity evolution) and differences in modelled domain sizes, boundary conditions and grid discretisation. This demonstrates that comparisons between multiple modelling teams and/or comparison with analytical results and experimental data are highly beneficial in providing an indication of uncertainty in model predictions. At the conclusion of Step 0, almost all teams had achieved a close agreement in model results and those that had not achieved an agreement knew the reason for this. Step 1 moved from 2D models to 3D models of the FE experiment without adding technical features like shotcrete or EDZ, and only considering the heating phase. Initially the 3D model was tightly specified to continue to build confidence in the model implementations (Step 1a). The results of Step 1a were compared to the data from the FE-experiment without the teams seeing the data. The teams were then provided with a sub-set of the data from the FE-experiment and invited to consider how best to use the large dataset for model comparison (Step 1b). Teams were then asked to use the data provided to calibrate their models, only changing material property values rather than adding features or processes to their models (Step 1c). In Step 1, teams were asked to only model the heating phase of the experiment, so pressure in the Opalinus Clay was reported as change in pressure since the initial conditions were specified rather than modelled. The change from 2D to 3D models was accompanied by an increase in the dispersion of results between the teams. Some of this was resolved during the task, but some remained and is potentially due to model discretisation. Calibration of parameters was useful in improving the fit of the models to the data but the remaining differences indicated that the models were missing features or processes. In Step 2, the teams were asked to update their models with additional features and processes as well as calibrating parameters to try and improve the fit of the models to the data. Teams were encouraged to represent ventilation of the open FE tunnel prior to backfilling with heaters and bentonite and in Step 2, the absolute pressure in the Opalinus Clay was compared between the teams. Teams took different approaches, but there was consideration of adding shotcrete and an EDZ into the model, representing stress change during excavation and different approaches to modelling ventilation of the FE tunnel. Overall, the documented results showed a very good agreement for temperature. The results for porewater pressure evolution showed a significant improvement for most teams compared to Step 1c with a good agreement to the measurements for several teams whereas some teams overpredicted the pressure increase and others overpredicted the drainage effect especially for the sensors close to the heater. Step 3 was an opportunity for teams to use the models developed in Step 1 and Step 2 to make predictions about the temperature and pressure changes that will be expected at the FE experiment over the next few years in light of the planned changes in thermal output of the heaters.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

E-Area Low-Level Waste Facility Inadvertent Human Intruder Limits and Doses in Support of the PA2022

This report documents the inadvertent human intruder (IHI) analysis for the E-Area Low-Level Waste Facility (ELLWF) at the Savannah River Site (SRS), near Aiken, South Carolina. This analysis supports the revised ELLWF Performance Assessment (PA), complying with the Department of Energy standard for operation of low-level waste disposal facilities (USDOE, 2017). The ELLWF is an operating waste disposal facility and is scheduled to continue accepting waste to 2065. One task of the revised PA is to establish waste inventory limits for the various disposal units at ELLWF. This is done by modeling future contaminant release and transport through applicable pathways to human receptors, comparing predicted doses per disposed curie with applicable performance measures, to obtain inventory limits which will assure that doses to receptors do not exceed performance measures. This report documents results of modeling future doses to one class of receptor, the inadvertent human intruder. It is assumed that after site closure, public knowledge of the site is lost, and IHIs will engage in activities on the ELLWF that will disrupt the closure cap, causing dose to the IHI. Following USDOE (2017), six different stylized exposure scenarios are considered, simulating activities by an IHI which could result in a radiological dose. The six scenarios are: • Acute – Basement Construction: IHI constructs a basement and encounters waste during excavation which is inadvertently mixed with clean soil and diluted. • Acute – Well Drilling: IHI drills a water well through waste and is exposed to drill cuttings mixed with clean soil that are brought to the surface. • Acute – Discovery: IHI begins constructing a basement but stops when encountering the riprap in the final closure cap and is exposed to photon radiation from unexcavated material residing in the undisturbed waste zone. • Chronic – Agriculture: Resident IHI is exposed to waste that was excavated for basement construction and mixed with native soil in the intruder’s vegetable garden. • Chronic – Post-Drilling: Resident IHI is exposed to waste from drill cuttings mixed with native soil and scattered in the garden area. • Chronic – Residential: Resident IHI is exposed to external radiation while in home located above waste with shielding provided by the concrete basement floor and any soil or engineered material remaining between the basement and waste. Dose calculations are performed using the SRNL Dose Toolkit (Aleman, 2023), following the approach of Smith et al (2019). Calculations are performed separately for 27 of the 33 disposal units (DUs) at ELLWF and are radionuclide specific. The results of the IHI analysis include: • Dose Factors: mrem per disposed curie (acute) and mrem/yr per disposed curie (chronic) for each parent radionuclide, for each DU. • Inventory Limits: in curies, for each parent radionuclide, for each DU. • Estimated Dose to IHI: mrem (acute) and mrem/yr (chronic), for each DU, given its projected closure inventory without inventory biases applied. Most DU-specific IHI inventory limits are in the range of 10 3 to 10 7 curies per nuclide. The lowest inventory limits are associated with gamma-emitters such as Sn-126, Ra-226, Th-232, and Cm-248. Radionuclides with short half-lives such as Pu-241, and nuclides which are pure beta emitters or which decay by electron capture, such as Ni-59 and Ni-63, have the highest limits. For the 27 evaluated DUs, predicted IHI doses are shown in Table ES-1. The maximum acute dose is 1.18 mrem, at ST23, much less than the DOE performance measure of 500 mrem (USDOE, 2017). The highest chronic dose is 37.2 mrem/yr at ST02, below the DOE performance measure of 100 mrem/yr. Also shown are estimated inventory sums of fractions (SOFs) at closure in 2065, for groundwater (GW) and IHI pathways. For each DU, the inventory is constrained by the GW pathway. For most DUs, the IHI SOFs are approximately 1000 times lower than the GW SOF values, and the IHI pathway does not drive risk for any disposal unit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Co-Design of a Fully Electric Hybrid Hydraulic-Electric Architecture (FE-HHEA) for Off-Road Mobile Machines

Off-road mobile machines, such as excavators and wheel-loaders, are typically actuated by hydraulics using internal combustion engines as their power sources. There is a trend towards fully electrifying these machines and improving their efficiencies due to environmental regulations and concerns. In this paper, a control co-design methodology is used to design a Fully Electrified Hybrid Hydraulic-Electric Architecture (FE-HHEA) for an excavator that drastically reduces energy consumption and minimizes the sizes of costly electric components. By optimizing both control operation and the physical design, the co-design methodology takes into account the interaction between these two aspects. The design methodology also illustrates how the system architecture evolves from the previously developed IC engine powered HHEA with the engine replaced by an electric motor to a seemingly very different architecture with fewer components. The optimized system reduces energy consumption by 71% over the baseline system and uses electrical components that are 1/3 the size of an alternate fully electric architecture.

33 ADVANCED PROPULSION SYSTEMS↗

Using Fission-Track Radiography Coupled with Scanning Electron Microscopy for Efficient Identification of Solid-Phase Uranium Mineralogy at a Former Uranium Pilot Mill (Grand Junction, Colorado)

At a former uranium pilot mill in Grand Junction, Colorado, mine tailings and some subpile sediments were excavated to various depths to meet surface radiological standards, but residual solid-phase uranium below these excavation depths still occurs at concentrations above background. The combination of fission-track radiography and scanning electron microscope energy-dispersive X-ray spectroscopy (SEM-EDS) provides a uniquely efficient and quantitative way of determining mineralogic associations of uranium that can influence uranium mobility. After the creation of sample thin sections, a mica sheet is placed on those thin sections and irradiated in a nuclear research reactor. Decay of the irradiated uranium creates fission tracks that can be viewed with a microscope. The fission-track radiography images indicate thin section sample areas with elevated uranium that are focus areas for SEM-EDS work. EDS spectra provide quantitative elemental data that indicate the mineralogy of individual grains or grain coatings associated with the fission-track identification of elevated uranium. For the site in this study, the results indicated that uranium occurred (1) with coatings of aluminum–silicon (Al/Si) gel and gypsum, (2) dispersed in the unsaturated zone associated with evaporite-type salts, and (3) sorbed onto organic carbon. The Al/Si gel likely formed when low-pH waters were precipitated during calcite buffering, which in turn retained or precipitated trace amounts of Fe, As, U, V, Ca, and S. Understanding these mechanisms can help guide future laboratory and field-scale efforts in determining long-term uranium release rates to groundwater.

58 GEOSCIENCES↗

Smooth plains and continuous deposits of craters and basins

Apollo 16 photographic data are analyzed which suggest that smooth plains are related in origin to large primary cratering events, and that the plains material is mainly the ejecta of local and regional primary impact craters with only minor contributions from distant craters and basins. This material, then, has been emplaced in its present location by secondaries of distant craters and directly by primary craters near the site. Calculations indicate that the material excavated from large primary craters typically excavates much larger amounts of material from local terrain when it impacts in the secondary crater field. There is a correlation between the extent of development of smooth plains inside large high-land craters and the erosional state of the crater rims and walls. It is incorrect to consider the continuous deposits to be solely basin ejecta.

Oberbeck, V. R.↗

Nevada Test Site craters used for astronaut training

Craters produced by chemical and nuclear explosives at the Nevada Test Site were used to train astronauts before their lunar missions. The craters have characteristics suitable for reconnaissance-type field investigations. The Schooner test produced a crater about 300 m across and excavated more than 72 m of stratigraphic section deposited in a fairly regular fashion so that systematic observations yield systematic results. Other features common on the moon, such as secondary craters and glass-coated rocks, are present at Schooner crater. Smaller explosive tests on Buckboard Mesa excavated rocks from three horizontal alteration zones within basalt flows so that the original sequence of the zones could be determined. One crater illustrated the characteristics of craters formed across vertical boundaries between rock units. Although the exercises at the Nevada Test Site were only a small part of the training of the astronauts, voice transcripts of Apollo missions 14, 16, and 17 show that the exercises contributed to astronaut performance on the moon.

Moore, H. J.↗

Impact flows and crater scaling on the moon

The axisymmetric distribution of stress, internal energy, and particle velocity resulting from the impact of an iron meteoroid with a gabbroic anorthosite lunar crust has been calculated for the regime in which shock-induced melting and vaporization take place. Comparison of impact flow fields, with phase changes in silicates taken into account, with earlier results demonstrate that in the phase-change case where the 15-km/s projectile has penetrated some two projectile radii into the moon, the peak stress in the flow is about 0.66 Mbar at a depth of 66 km, and the stress has decayed to about 66 kbar at a depth of 47 km. Rapid attenuation occurs because of the high rarefaction velocity of the high-pressure phases associated with a 35% (zero-pressure) density increase. This feature of the phase-change flow tends to concentrate strongly the maximum shock pressures along the meteoroid trajectory (axis) and makes the conical zone along which high internal energy deposition occurs both shallow and narrow. Examination of the gravitational energies required to excavate larger craters on the moon indicates the importance of gravity forces acting during the excavation of craters having radii in the range greater than about 2 to 140 km.

Okeefe, J. D.↗

Some correlation of rock exposure ages and regolith dynamics

Exposure age information on lunar rocks and regolith turnover rates are correlated. If plotted in a cumulative fashion, the distribution of spallogenic noble-gas exposure ages is remarkably parallel to the rate at which various fractions of the regolith surface are cratered and/or excavated. It appears that the rate at which lunar rocks are excavated from within the regolith is strongly controlled by the impact environment. Some suggestions for future refinement of regolith dynamics are presented.

Horz, F.↗

Topographic domes on Ganymede - Ice vulcanism or isostatic upwarping

Two formation processes are considered for two gently sloping domeshaped features on the surface of Ganymede, lying on grooved terrain and having diameters of roughly 250 km: (1) water vulcanism, triggered by a major impact, and (2) the isostatic upwarping of a crater formed in a thin crust. Numerical simulations show the volume of the domes to be consistent with eruption through fractures created by an impact that excavates partly through a thin crust. Isostatic upwarp rates calculated as a function of effective crustal temperature indicate that upwarping could also create such a dome if the impact excavated to a depth where the crust was sufficiently warm and mobile. Morphologic evidence suggests that both processes may have been important and, if either of the proposed models is correct, it is strongly implied that grooved terrain formation occurred prior to the thickening and stiffening of Ganymede's crust.

Squyres, S. W.↗

Remote sensing studies of lunar dark-halo impact craters - Preliminary results and implications for early volcanism

A summary of the nature and origin of lunar dark-halo craters is presented. New remote sensing data for dark-haloed impact craters were obtained and interpreted. A variety of spectral, thermal, radar, and photogeologic data are presented which confirm the hypothesis that Copernicus H crater excavated mare basalt from beneath lighter deposits emplaced by the Copernicus impact event. Multispectral imagery suggests that analogous impact re-exposure of basaltic material on the ejecta blankets of other large Copernican and Eratosthenian craters resulted in the formation of other dark-halo craters. Preliminary analyses of near-infrared spectra of dark-haloed impact craters in the Schickard-Schiller region are consistent with the hypothesis that basaltic material was excavated from beneath light plains. These light plains may have been emplaced as a result of the Orientale impact event. Additional evidence is presented which suggests that both pre- and post-Orientale volcanic activity was more prevalent in this region than has previously been recognized.

Hawke, B. R.↗

Petrologic variations in Apollo 16 surface soils

Source rock, maturation history and intrasite variation data are derived for the Apollo 16 regolith by comparing modal analyses of 15 surface soils with rake and rock sample data. Triangular source rock component plots show that Apollo 16 soils have similar source rocks that are well homogenized throughout the site. The site can be divided into three soil petrographic provinces. Central site soils are mature, well homogenized, and enriched in glass. They are probably the most typical Cayley Plains materials present. North Ray soils are immature to submature, containing North Ray ejecta. South Ray soils are mature, but contain small amounts of fresh impact melts and plagioclase, due perhaps to the breakdown of blocky South Ray ejecta. The different compositions and physical properties of North and South Ray ejecta support the hypothesis that the latter event excavated Cayley material, while the former excavated Descartes materials.

Houck, K. J.↗

A summary of Viking sample-trench analyses for angles of internal friction and cohesions

Analyses of sample trenches excavated on Mars, using a theory for plowing by narrow blades, provide estimates of the angles of internal friction and the cohesions of the Martian surface materials. Angles of internal friction appear to be the same as those of many terrestrial soils because they are generally between 27 degrees and 39 degrees. Drift material, at the Lander 1 site, has a low angle of internal friction (near 18 degrees). All the materials excavated have low cohesions, generally between 0.2 and 10 kPa. The occurrence of cross bedding, layers of crusts, and blocky slabs shows that these materials are heterogeneous and that they contain planes of weakness. The results reported here have significant implications for future landed missions, Martian eolian processes, and interpretation of infrared temperatures.

Moore, H. J.↗

Bunte Breccia of the Ries - Continuous deposits of large impact craters

The 26-km-diameter Ries impact crater in south Germany and the mechanism of ejection and emplacement associated with its formation about 15 Myr ago are discussed in detail, and the implications of the findings for models of crater formation on earth, moon, and planets are considered. Field observations and laboratory tests on 560-m core materials from nine locations are reported. The continuous deposits (Bunte Breccia) are found to be a chaotic mixture resulting from deposition at ambient temperatures in a highly turbulent environment, probably in the ballistic scenario proposed by Oberbeck et al. (1975), with an emplacement time of only about 5 min. Further impact parameters are estimated using the 'Z model' of Maxwell (1977): initial radius = 6.5 km, excavation depth = 1650 m, excavation volume = 136 cu km, and transient cavity volume = 230 cu km. The interpretation of lunar and planetary remote-sensing and in situ evidence from impact craters is reviewed in the light of the Ries findings. Numerous photographs, maps, diagrams, and tables illustrate the investigation.

Horz, F.↗