Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “control room”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Stabilized Fiber-Optic Distribution of Reference Frequency

An optoelectronic system distributes a reference signal of low noise and highly stabilized phase and frequency (100 MHz) from an atomic frequency standard to a remote facility at a distance up to tens of kilometers. The reference signal is transmitted to the remote station as amplitude modulation of an optical carrier signal propagating in an optical fiber. The stabilization scheme implemented in this system is intended particularly to suppress phase and frequency fluctuations caused by vibrations and by expansion and contraction of the optical fiber and other components in diurnal and seasonal heating and cooling cycles. The system (see figure) comprises several subsystems, the main one being (1) a hydrogen-maser or linear-ion-trap frequency standard in an environmentally controlled room in a signal-processing center (SPC), (2) a stabilized fiber-optic distribution assembly (SFODA), (3) a compensated sapphire oscillator (CSO) in an environmentally controlled room in the remote facility, (4) thermally stabilized distribution amplifiers and cabling from the environmentally controlled room to end users, and (5) performance- measuring equipment.

Calhoun, Malcolm↗

Establishing a value chain for human factors in nuclear power plantcontrol room modernization

Commercial nuclear power plants in the United States (U.S.) have operated reliably and efficiently for decades. With the life extensions of plants now being planned for operation beyond their original operating licenses, there are opportunities to achieve even greater efficiencies, while maintaining high operational reliabilities, with strategic, risk- and economically-informed, upgrades to plant systems and infrastructure. The U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) program supports the commercial nuclear industry’s modernization efforts through research and development (R&D) activities across many areas to help establish the technical and economic bases for modernization activities. The Advanced Instrumentation, Information, and Control Systems Technologies pathway is one R&D focus area for the LWRS program, and has researchers at Idaho National Laboratory working with select utility partners to use human factors and instrumentation and controls R&D to help modernize the plant’s main control room. However, some in the nuclear industry have not been as enthusiastic about using human factors R&D to inform life extension decision making. Part of the reason for this may stem from uncertainty decision-makers have regarding how human factors fits into the value chain for nuclear power plant control room modernization. This paper reviews past work that has attempted to demonstrate the value of human factors, and then describes the value chain concept, how it applies to control room modernization, and then makes a case for how and why human factors is an essential link in the modernization value chain.

Control room modernization↗

Cognitive Aging as a Human Factor: Effects of Age on Human Performance

Nuclear power plant (NPP) control room operators must make ongoing computations and decisions that maximize production and ensure safety, which places a high cognitive burden on the operators. How cognitions such as attention, visuospatial ability, and working memory interact with socio-technical systems to achieve optimal operations is well studied. However, there is an absence of research that examines how cognitive functioning within the NPP control room environment is moderated by developmental aging processes. This is of critical importance because different types of cognitive actions are known to develop and peak at different times across the adult life span, and it is becoming increasingly clear that there is no age at which all cognitive faculties operate at maximum capacity. Thus, given that NPPs are experiencing an aging workforce, it is vital to identify how mission critical cognitions change with age. This paper reviews implications of aging on reactor operators in the current and new fleet. We highlight lessons that can be learned from state-of-the-art human factors research that considers aging, lessons from the large cognitive aging literature, and lessons from aging workers in other industries that use sophisticated socio-technical systems, such as aviation. We also consider the important subject of aging effects versus expertise and present preliminary data that support the premise that age of operator is linked to effective and efficient operations but that this relationship may be moderated by level of operations expertise. In conclusion, we apply these lessons to future considerations for aging research in current nuclear operations and with the advent of advanced modernized control rooms.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

WindSENSE Project Summary: FY2009-2011

Renewable resources, such as wind and solar, are providing an increasingly larger percentage of our energy needs. To successfully integrate these intermittent resources into the power grid while maintaining its reliability, we need to better understand the characteristics and predictability of the variability associated with these power generation resources. WindSENSE, a three year project at Lawrence Livermore National Laboratory, considered the problem of scheduling wind energy on the grid from the viewpoint of the control room operator. Our interviews with operators at Bonneville Power Administration (BPA), Southern California Edison (SCE), and California Independent System Operator (CaISO), indicated several challenges to integrating wind power generation into the grid. As the percentage of installed wind power has increased, the variable nature of the generation has become a problem. For example, in the Bonneville Power Administration (BPA) balancing area, the installed wind capacity has increased from 700 MW in 2006-2007 to over 1300 MW in 2008 and more than 2600 MW in 2009. To determine the amount of energy to schedule for the hours ahead, operators typically use 0-6 hour ahead forecasts, along with the actual generation in the previous hours and days. These forecasts are obtained from numerical weather prediction (NWP) simulations or based on recent trends in wind speed in the vicinity of the wind farms. However, as the wind speed can be difficult to predict, especially in a region with complex terrain, the forecasts can be inaccurate. Complicating matters are ramp events, where the generation suddenly increases or decreases by a large amount in a short time (Figure 1, right panel). These events are challenging to predict, and given their short duration, make it difficult to keep the load and the generation balanced. Our conversations with BPA, SCE, and CaISO indicated that control room operators would like (1) more accurate wind power generation forecasts for use in scheduling and (2) additional information that can be exploited when the forecasts do not match the actual generation. To achieve this, WindSENSE had two areas of focus: (1) analysis of historical data for better insights, and (2) observation targeting for improved forecasts. The goal was to provide control room operators with an awareness of wind conditions and energy forecasts so they can make well-informed scheduling decisions, especially in the case of extreme events such as ramps.

17 WIND ENERGY↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗

Co-Simulation Meets AI: MCP-Driven Power System Analysis

GridGPT, a fine-tuned Generative AI model is designed for on-premise use in grid control rooms. This presentation will demonstrate how eGridGPT can seamlessly integrate with control room solutions to offer operators, engineers, and corporate users enhanced guidance and decision support. It is to show how this innovative AI solution can improve state estimation, boost variable energy forecasting, and optimize grid operations. By leveraging eGridGPT's unique features, audience will learn to unlock new levels of automation, predictive analytics, and reliability within their power systems, ultimately leading to reduced downtime and improved operational efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of intelligent instruments with embedded HTTP servers for control and data acquisition in a cryogenic setup—The hardware, firmware, and software implementation

The power of Ethernet for control and automation technology is being largely understood by the automation industry in recent times. Ethernet with HTTP (Hypertext Transfer Protocol) is one of the most widely accepted communication standards today. Ethernet is best known for being able to control through internet from anywhere in the globe. The Ethernet interface with built-in on-chip embedded servers ensures global connections for crate-less model of control and data acquisition systems which have several advantages over traditional crate-based control architectures for slow applications. This architecture will completely eliminate the use of any extra PLC (Programmable Logic Controller) or similar control hardware in any automation network as the control functions are firmware coded inside intelligent meters itself. Here, we describe the indigenously built project of a cryogenic control system built for linear accelerator at Inter University Accelerator Centre, known as “CADS,” which stands for “Complete Automation of Distribution System.” CADS deals with complete hardware, firmware, and software implementation of the automated linac cryogenic distribution system using many Ethernet based embedded cryogenic instruments developed in-house. Each instrument works as an intelligent meter called device-server which has the control functions and control loops built inside the firmware itself. Dedicated meters with built-in servers were designed out of ARM (Acorn RISC (Reduced Instruction Set Computer) Machine) and ATMEL processors and COTS (Commercially Off-the-Shelf) SMD (Surface Mount Devices) components, with analog sensor front-end and a digital back-end web server implementing remote procedure call over HTTP for digital control and readout functions. At present, 24 instruments which run 58 embedded servers inside, each specific to a particular type of sensor-actuator combination for closed loop operations, are now deployed and distributed across control LAN (Local Area Network). A group of six categories of such instruments have been identified for all cryogenic applications required for linac operation which were designed to build this medium-scale cryogenic automation setup. These devices have special features like remote rebooters, daughter boards for PIDs (Proportional Integral Derivative), etc., to operate them remotely in radiation areas and also have emergency switches by which each device can be taken to emergency mode temporarily. Finally, all the data are monitored, logged, controlled, and analyzed online at a central control room which has a user-friendly control interface developed using LabVIEW{sup ®}. This paper discusses the overall hardware, firmware, software design, and implementation for the cryogenics setup.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

HIPED: Machine learning framework for spherical tokamak pedestal prediction and optimization

We introduce a Machine Learning framework, HIPED (HeIght and width Predictor for Edge Dynamics), for predicting and optimizing pedestal and core performance in spherical tokamak plasmas. Trained on pedestal and core datasets from the third MAST-U campaign, HIPED provides accurate estimates of pedestal height and width. The results reveal notable differences compared with conventional aspect-ratio studies; for instance, a simple power-law relation between pedestal width and height has very low accuracy. Instead, additional parameters such as normalized plasma pressure, elongation, and Greenwald fraction significantly improve accuracy. HIPED can also be trained only on `control room parameters' to inform experimentalists of which controllable parameters to adjust for improving core-integrated performance. The framework further includes a multi-objective optimization scheme that helps guide experimental planning and optimization. We find Pareto-optimal discharges with respect to various features, including distance from edge-localized modes and normalized plasma pressure, track their parameter trajectories over time, and identify the control room parameters required for these Pareto-optimal discharges. This provides a framework for systematically optimizing core and edge performance according to different experimental priorities.

Parisi, Jason F. [Princeton Plasma Physics Laborat↗

R&D ERL: Beam dynamics, parameters and physics to be learned

The R&D ERL facility at BNL aims to demonstrate CW operation of ERL with average beam current in the range of 0.1-1 ampere, combined with very high efficiency of energy recovery. The ERL is being installed in one of the spacious bays in Bldg. 912 of the RHIC/AGS complex (Fig. 1). The bay is equipped with an overhead crane. The facility has a control room, two service rooms and a shielded ERL cave. The control room is located outside of the bay in a separate building. The single story house is used for a high voltage power supply for 1 MW klystron. The two-story unit houses a laser room, the CW 1 MW klystron with its accessories, most of the power supplies and electronics The ERL R&D program has been started by the Collider Accelerator Department (C-AD) at BNL as an important stepping-stone for 10-fold increase of the luminosity of the Relativistic Heavy Ion Collider (RHIC) using relativistic electron cooling of gold ion beams with energy of 100 GeV per nucleon. Furthermore, the ERL R&D program extends toward a possibility of using 10-20 GeV ERL for future electron-hadron/heavy ion collider, MeRHIC/eRHIC. These projects are the driving force behind the development of ampere-class ERL technology, which will find many applications including light sources and FELs. The intensive R&D program geared towards the construction of the prototype ERL is under way: from development of high efficiency photo-cathodes to the development of new merging system compatible with emittance compensation.

43 PARTICLE ACCELERATORS↗

A new APDS approach - alarm processing based on alarm prioritization - 201

We take for granted that the advances in technology bring improvements to the conditions in which humans perform activities associated to them. Is that the case for digital alarm systems in nuclear power plants? The answer is not that simple. A review of the related literature, shows that still, the single most significant problem with alarm systems, is the large number of alarm messages presented to the operator at once. This is an issue that affects analog I and C control rooms with conventional annunciators and gets aggravated in digital I and C based control rooms. Digital alarm systems present the alarms in the form of lists in computer screens. This kind of presentation forces the operator to scroll or navigate pages to review the active alarms. Also, the alarm lists do not allow the operator to apply the pattern recognition practices acquired during training when using with fixed position alarm systems. An Alarm Processing and Diagnostic System (APDS) facilitates the alarm monitoring task by applying alarm reduction techniques based on alarm priorities. It allows the operators to focus on the most important alarms during plant upsets. A new generation of APDS should be based in an improved alarm analysis methodology. To develop such methodology, Tecnatom reviewed applicable standards and our own alarm analysis experiences. This paper documents the process and conclusions of the methodology development. (authors)

42 ENGINEERING↗

AVESTAR Center for Operational Excellence of Electricity Generation Plants

To address industry challenges in attaining operational excellence for electricity generation plants, the U.S. Department of Energy’s (DOE) National Energy Technology Laboratory (NETL) has launched a world-class facility for Advanced Virtual Energy Simulation Training and Research (AVESTARTM). This presentation will highlight the AVESTARTM Center simulators, facilities, and comprehensive training, education, and research programs focused on the operation and control of high-efficiency, near-zero-emission electricity generation plants. The AVESTAR Center brings together state-of-the-art, real-time, high-fidelity dynamic simulators with full-scope operator training systems (OTSs) and 3D virtual immersive training systems (ITSs) into an integrated energy plant and control room environment. AVESTAR’s initial offering combines--for the first time--a “gasification with CO2 capture” process simulator with a “combined-cycle” power simulator together in a single OTS/ITS solution for an integrated gasification combined cycle (IGCC) power plant with carbon dioxide (CO2) capture. IGCC systems are an attractive technology option for power generation, especially when capturing and storing CO2 is necessary to satisfy emission targets. The AVESTAR training program offers a variety of courses that merge classroom learning, simulator-based OTS learning in a control-room operations environment, and immersive learning in the interactive 3D virtual plant environment or ITS. All of the courses introduce trainees to base-load plant operation, control, startups, and shutdowns. Advanced courses require participants to become familiar with coordinated control, fuel switching, power-demand load shedding, and load following, as well as to problem solve equipment and process malfunctions. Designed to ensure work force development, training is offered for control room and plant field operators, as well as engineers and managers. Such comprehensive simulator-based instruction allows for realistic training without compromising worker, equipment, and environmental safety. It also better prepares operators and engineers to manage the plant closer to economic constraints while minimizing or avoiding the impact of any potentially harmful, wasteful, or inefficient events. The AVESTAR Center is also used to augment graduate and undergraduate engineering education in the areas of process simulation, dynamics, control, and safety. Students and researchers gain hands-on simulator-based training experience and learn how the commercial-scale power plants respond dynamically to changes in manipulated inputs, such as coal feed flow rate and power demand. Students also analyze how the regulatory control system impacts power plant performance and stability. In addition, students practice start-up, shutdown, and malfunction scenarios. The 3D virtual ITSs are used for plant familiarization, walk-through, equipment animations, and safety scenarios. To further leverage the AVESTAR facilities and simulators, NETL and its university partners are pursuing an innovative and collaborative R&D program. In the area of process control, AVESTAR researchers are developing enhanced strategies for regulatory control and coordinated plant-wide control, including gasifier and gas turbine lead, as well as advanced process control using model predictive control (MPC) techniques. Other AVESTAR R&D focus areas include high-fidelity equipment modeling using partial differential equations, dynamic reduced order modeling, optimal sensor placement, 3D virtual plant simulation, and modern grid. NETL and its partners plan to continue building the AVESTAR portfolio of dynamic simulators, immersive training systems, and advanced research capabilities to satisfy industry’s growing need for training and experience with the operation and control of clean energy plants. Future dynamic simulators under development include natural gas combined cycle (NGCC) and supercritical pulverized coal (SCPC) plants with post-combustion CO2 capture. These dynamic simulators are targeted for use in establishing a Virtual Carbon Capture Center (VCCC), similar in concept to the DOE’s National Carbon Capture Center for slipstream testing. The VCCC will enable developers of CO2 capture technologies to integrate, test, and optimize the operation of their dynamic capture models within the context of baseline power plant dynamic models. The objective is to provide hands-on, simulator-based “learn-by-operating” test platforms to accelerate the scale-up and deployment of CO2 capture technologies. Future AVESTAR plans also include pursuing R&D on the dynamics, operation, and control of integrated electricity generation and storage systems for the modern grid era. Special emphasis will be given to combining load-following energy plants with renewable and distributed generating supplies and fast-ramping energy storage systems to provide near constant baseload power.

97 MATHEMATICS AND COMPUTING↗

Telerobotic Excavator Designed to Compete in NASA's Lunabotics Mining Competition

The second annual NASA Lunabotics Mining competition is to be held in May 23-28, 2011. The goal of the competition is for teams of university level students to design, build, test and compete with a fully integrated lunar excavator on a simulated lunar surface. Our team, named Lunar Solutions I, will be representing Temple University's College of Engineering in the competition. The team's main goal was to build a robot which is able to compete with other teams, and ultimately win the competition. The main challenge of the competition was to build a wireless robot that can excavate and collect a minimum of 10 kilograms of the regolith material within 15 minutes. The robot must also be designed to operate in conditions similar to those found on the lunar surface. The design of the lunar excavator is constrained by a set of requirements determined by NASA and detailed in the competition's rulebook. The excavator must have the ability to communicate with the "main base" wirelessly, and over a Wi-Fi network. Human operators are located at a remote site approximately 60 meters away from the simulated lunar surface upon which the robot must excavate the lunar regolith surface. During the competition, the robot will operate in a separate area from the control room in an area referred to as the "Lunarena." From the control room, the operators will have to control the robot using visual feedback from cameras placed both within the arena and on the robot. Using this visual feedback the human operators control the robots movement using both keyboard and joystick commands. In order to place in the competition, a minimum of 10 kg of regolith material has to be excavated, collected, and dumped into a specific location. For that reason, the robot must be provided with an effective and powerful excavation system. Our excavator uses tracks for the drive system. After performing extensive research and trade studies, we concluded that tracks would be the most effective method for transporting the excavator. When designing the excavation system, we analyzed several design options from the previous year's competition. We decided to use a front loader to collect the material, rather than a conveyer belt system or auger. Many of the designs from last year's competition used a conveyer belt mechanism to mine regolith and dump it into a temporary storage bin place on the robot. Using the front end loader approach allowed us to combine the scooping system and storage unit, which meant that the excavation system required less space.

Nash, Rodney↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

Radio frequency mixing modules for superconducting qubit room temperature control systems

As the number of qubits in nascent quantum processing units increases, the connectorized RF (radio frequency) analog circuits used in first generation experiments become exceedingly complex. The physical size, cost, and electrical failure rate all become limiting factors in the extensibility of control systems. We have developed a series of compact RF mixing boards to address this challenge by integrating I/Q quadrature mixing, intermediate frequency/LO (local oscillator)/RF power level adjustments, and direct current bias fine tuning on a 40 × 80 mm 2 four-layer printed circuit board with electromagnetic interference shielding. The RF mixing module is designed to work with RF and LO frequencies between 2.5 and 8.5 GHz. The typical image rejection and adjacent channel isolation are measured to be ~27 dBc and ~50 dB. By scanning the drive phase in a loopback test, the module short-term amplitude and phase linearity are typically measured to be 5 ×10 -4 (V pp /V mean ) and 1 ×10 -3 radian (pk-pk). The operation of the RF mixing board was validated by integrating it into the room temperature control system of a superconducting quantum processor and executing randomized benchmarking characterization of single and two qubit gates. We measured a single-qubit process infidelity of 9.3(3) × 10 -4 and a two-qubit process infidelity of 2.7(1) × 10 -2 .

47 OTHER INSTRUMENTATION↗

Conceptual Design, Implementation and Commissioning of Data Acquisition and Control System for Negative Ion Source at IPR

Negative ion Experimental facility has been setup at IPR. The facility consists of a RF based negative ion source (ROBIN)--procured under a license agreement with IPP Garching, as a replica of BATMAN, presently operating in IPP, 100 kW 1 MHz RF generators and a set of low and high voltage power supplies, vacuum system and diagnostics. 35 keV 10A H- beam is expected from this setup. Automated successful operation of the system requires an advanced, rugged, time proven and flexible control system. Further the data generated in the experimental phase needs to be acquired, monitored and analyzed to verify and judge the system performance. In the present test bed, this is done using a combination of PLC based control system and a PXI based data acquisition system. The control system consists of three different Siemens PLC systems viz. (1) S-7 400 PLC as a Master Control, (2) S-7 300 PLC for Vacuum system control and (3) C-7 PLC for RF generator control. Master control PLC directly controls all the subsystems except the Vacuum system and RF generator. The Vacuum system and RF generator have their own dedicated PLCs (S-7 300 and C-7 respectively). Further, these two PLC systems work as a slave for the Master control PLC system. Communication between PLC S-7 400, S-7 300 and central control room computer is done through Industrial Ethernet (IE). Control program and GUI are developed in Siemens Step-7 PLC programming software and Wincc SCADA software, respectively. There are approximately 150 analog and 200 digital control and monitoring signals required to perform complete closed loop control of the system. Since the source floats at high potential ({approx}35 kV); a combination of galvanic and fiber optic isolation has been implemented. PXI based Data Acquisition system (DAS) is a combination of PXI RT (Real time) system, front end signal conditioning electronics, host system and DAQ program. All the acquisition signals coming from various sub-systems are connected and acquired by the PXI RT system, through only fiber optics link for signal conditioning, electrical isolation and better noise immunity. Real time and Host application programs are developed in LabVIEW and the data shall be stored with a facility of online display of selected parameters. Mathematical calculations and report generation will take place at the end of each beam shot. The paper describes in detail about the design approach, implementation strategy, program development, commissioning and operational test result of ROBIN through a data acquisition and control system.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Operating Room Environment Control. Part A: a Valve Cannister System for Anesthetic Gas Adsorption. Part B: a State-of-the-art Survey of Laminar Flow Operating Rooms. Part C: Three Laminar Flow Experiments

An anesthetic gas flow pop-off valve canister is described that is airtight and permits the patient to breath freely. Once its release mechanism is activated, the exhaust gases are collected at a hose adapter and passed through activated coal for adsorption. A survey of laminar air flow clean rooms is presented and the installation of laminar cross flow air systems in operating rooms is recommended. Laminar flow ventilation experiments determine drying period evaporation rates for chicken intestines, sponges, and sections of pig stomach.

Meyer, J. S.↗

Haven't a Cue? Mapping the CUE Space as an Aid to HRA Modeling

Advances in automation present a new modeling environment for the human reliability analysis (HRA) practitioner. Many, if not most, current day HRA methods have their origin in characterizing and quantifying human performance in analog environments where mode awareness and system status indications are potentially less comprehensive, but simpler to comprehend at a glance when compared to advanced presentation systems. The introduction of highly complex automation has the potential to lead to: decreased levels of situation awareness caused by the need for increased monitoring; confusion regarding the often non-obvious causes of automation failures, and emergent system dependencies that formerly may have been uncharacterized. Understanding the relation of incoming cues available to operators during plant upset conditions, in conjunction with operating procedures, yields insight into understanding the nature of the expected operator response in this control room environment. Static systems methods such as fault trees do not contain the appropriate temporal information or necessarily specify the relationship among cues leading to operator response. In this paper, we do not attempt to replace standard performance shaping factors commonly used in HRA nor offer a new HRA method, existing methods may suffice. In this paper we strive to enhance current understanding of the basis for operator response through a technique that can be used during the qualitative portion of the HRA analysis process. The CUE map is a means to visualize the relationship among salient cues in the control room that help influence operator response, show how the cognitive map of the operator changes as information is gained or lost, and is applicable to existing as well as advanced hybrid plants and small modular reactor designs. A brief application involving loss of condensate is presented and advantages and limitations of the modeling approach and use of the CUE map are discussed.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Development of a Fleet-Level Human Factors Engineering Program to Support the Digital Modernization of Multiple Turbine Control Systems

A number of years ago, Duke Energy and the United States (U.S.) Department of Energy (DOE) entered into a collaboration to support Duke’s digital upgrade activities for the main control rooms at three of their commercial nuclear power stations. The collaboration specifically focused on the human factors engineering (HFE) aspects of Duke’s plans to upgrade the legacy turbine control systems (TCS) at their Brunswick, Robinson, and Harris plants. This TSC upgrade involved installing a common digital control system (DCS), or distributed instrumentation and control (I&C) system platform, which multiple digital plant control systems can be integrated onto as the control rooms are modernized over time. Given the breadth and depth of the scope of this upgrade, DOE researchers at Idaho National Laboratory (INL) with expertise in human factors collaborated with Duke throughout the entire HFE life cycle to help ensure the upgrade was performed in a manner consistent with regulatory human factors review criteria, such as the U.S. Nuclear Regulatory Commission’s (NRC) Human Factors Engineering Program Review Model (NUREG 0711, 2012). This paper describes the HFE researchers performed through the early and middle phases of these TCS upgrades. Specific HFE activities include: 1) the development of a human factors program management plan, 2) performing an operational experience review, 3) evaluating the design human system interface while it was still in the early stages of development, and 4) developing a framework to help map these HFE activities to NUREG-0711 to help understand and catalog the value of different types and phases of human performance data collection. These four HFE activities are described in more detail below.

99 GENERAL AND MISCELLANEOUS↗