Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “compliance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Spatiotemporal Analyses of Groundwater and Shoreline Cr(VI) Concentrations in the 100 Areas at Hanford

Cleanup efforts have been ongoing since the late 1990s to remediate contaminated waste sites and groundwater in the 100 Areas at the U.S. Department of Energy (DOE) Hanford Site. One of the primary contaminants of concern is hexavalent chromium (Cr(VI)), which was used as a corrosion inhibitor in cooling water for nuclear reactors that formerly operated along the shoreline of the Columbia River. Cleanup efforts have included 1) removal, treatment (as needed), and disposal of contaminated sediments; 2) in situ redox manipulation as a permeable reactive barrier; 3) pump-and-treat; 4) soil flushing; and 5) monitored natural attenuation. DOE’s annual groundwater monitoring reports document the significant reductions in Cr(VI) plume areas that have occurred over the past 10 years or more as a result of these cleanup efforts. The Record of Decision for the 100-HR-3 operable unit specified a cleanup level (CUL) for Cr(VI) in groundwater of 48 µg/L to protect human receptors, and a surface water CUL of 10 µg/L to protect aquatic organisms in the Columbia River. The Record of Decision did not specify point-of-compliance locations for the surface water CUL. Data for 2019 from the six groundwater operable units (OUs) in the 100 Areas indicate that the 48 μg/L groundwater CUL has been achieved in 100% of the wells in the 100-BC and 100-NR OUs, and in 89- 97% of the wells in the other OUs (100-KR, 100-HR-D, 100-HR-H, 100-FR). Data for 2019 indicate that 100% of the aquifer tubes monitored for Cr(VI) in the 100 Areas have concentrations below the 48 μg/L groundwater CUL. However, the 10 μg/L standard has not yet been consistently achieved for both inland groundwater monitoring wells and shoreline aquifer tubes. This report describes a series of data analyses performed to identify consistent relationships, if any, between inland well and shoreline Cr(VI) concentrations within the 100 Areas. To this end, select monitoring data for Cr(VI) measured in groundwater and aquifer tubes at the 100 Areas were analyzed for a 10-year period—2010 to 2019. Relationships between inland groundwater plumes and surface-water points of discharge in and along the Columbia River were examined through several analyses that included inland well and aquifer tube concentrations as a function of distance from the shoreline, evaluation of cumulative probability plots, trend analysis, correlation analysis, cluster analysis, and identification of plume trajectories for each of the 100 Areas. The analyses did not identify consistent relationships between inland groundwater Cr(VI) concentrations and shoreline concentrations within the 100 Areas due to several confounding factors influencing groundwater flow directions and Cr(VI) concentrations. The proximity of groundwater Cr(VI) plumes to the river, and the highly dynamic nature of the river, influence the transport behavior of the plumes and create challenges for quantifying attenuation of Cr(VI) between the inland monitoring wells and shoreline concentrations. Other factors contributing to temporal and spatial Cr(VI) concentrations, as supported by some of the data analyses, include the presence of vadose zone sources, variable sorption behavior, and complexities associated with Cr(VI) mass transfer between the upper and lower aquifers and their interactions with the river. Hence, monitoring to assess compliance with target CULs will need to be determined for each area individually since several factors influence Cr(VI) concentrations in the 100 Areas.

54 ENVIRONMENTAL SCIENCES↗

Processing Meteorological Data for the CAP-88 PC Model at Los Alamos National Laboratory

The Environmental Protection and Compliance-Compliance Programs (EPC-CP) group at Los Alamos National Laboratory (LANL) uses the Clean Air Act Assessment Package 1988 (CAP-88, Littleton 2020) PC model (Version 4.1) to estimate radiological doses for a set of areal sectors surrounding a release location, in order to satisfy the Environmental Protection Agency (EPA) National Emission Standards for Hazardous Air Pollutants (NESHAP) dose calculation requirement in 40 CFR 61 Subpart H. Among several types of data that must be prepared for CAP-88 input is a text file of meteorological data (“WIND” file), consisting of the joint frequency of wind direction, wind speed, and atmospheric stability categories. EPC-CP produces customized WIND files by running a CAP-88 utility program on a user generated text file of wind data in a different format, known as a STability ARray (STAR) file (Turner, 1964). At LANL, EPC-CP meteorologists prepare customized STAR files with data over desired time periods at selected meteorological towers. A custom program written in Precision Visuals -Workstation Analysis and Visualization Environment (PV-WAVE), a commercial Fortran-like language, is used to read LANL meteorological data and write a STAR file; the executable filename is “Star.out”. However, the outdated PV-WAVE utility program is being phased out by EPC-CP, due to the inefficient process to run it and an inability to modify the code. To preserve the ability to create customized meteorological data for CAP-88 in a way that will be easy to use and maintain, a new replacement utility program, written in the Python programming language, has been developed. The new, improved program reads a data file from any LANL meteorological tower, and at each desired observation time, determines the wind direction, wind speed, and stability categories defined in the CAP-88 documentation. The frequencies of all combinations of the three sets of categories are calculated and written to a file in the STAR format, which can later be converted to a WIND file for input into CAP-88.

54 ENVIRONMENTAL SCIENCES↗

Integrated Project Review (IPR) Program

Environmental Protection and Compliance Division (EPC-DO) owns institutional responsibility for compliance with Federal, State, and local environmental requirements. EPC SMEs want to know about all activities and projects being conducted at the Lab. Our regulatory framework requires LANL customers to use the Integrated Review Tool which includes PRID, EXID, and Siting. SD400 Environmental Management System, Rev 5 states all new/modified work, activities, operations and projects at the Lab must be reviewed for applicable environmental requirements through the IRT.

54 ENVIRONMENTAL SCIENCES↗

Hanford Waste Treatment Plant LAB Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The WTP LAB stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the ANSI/HPS N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the DV of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAB stacks were performed at normal operating conditions. The maximum 6 DV value from the scale model testing determines the maximum conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be = 20°. Second, the velocity uniformity at the full-scale stack must be = 20% COV. Finally, the velocity uniformity results for the actual and scale model stacks must agree within 5% COV. In general, these criteria were met through the full-scale stack tests at the LAB facility. Some specific items for each scale model and full-scale stack comparison should be noted in assessing the validity of the verification tests. The LB-C2 scale model stacks were performed with single fan operations at then-minimum flow conditions. These conditions resulted in DV values that were too low to meet the DV range criterion, and therefore are unable to be used in qualifying single fan operations on the full-scale stack. However, the single fan operations demonstrated COV values for velocity uniformity as well as flow angles that were comparable to the dual-fan operations at high flows. Overall, the test conditions and test results were within the range of acceptable values based on current design flow rates. Single fan operations are expected to only occur infrequently for maintenance needs and is therefore not a planned operating condition at this time. The LB-S1 scale model stacks were performed at three fan combinations, and in each combination, at least one test was performed at the then-minimum flow conditions as well as at then-maximum flow conditions. While the then-minimum flow conditions result in a DV range that is lower than the verification test DV value, and therefore does not meet the criterion, these tests are un-necessary for the verification test acceptance. The normal and maximum flow conditions from the scale model stack tests meet the DV range criterion, and the velocity uniformity test results compare favorably with the full-scale stack results. The LB-S2 scale model stacks were performed at nominally the same maximum flow condition; however, the 6 DV value for Fan A operation was slightly lower than the full-scale stack test DV. The COV values from the scale model stacks were comparable between the Fan A and Fan B results, and the overall test conditions are within the range of acceptable values. The stack verification is therefore considered acceptable for both Fan A and Fan B operations. The verification tests were performed at flows that were appreciably higher than the design conditions, and further elevated flow rates would be beyond the range of acceptable DV. Based on these stack verification test results, the three LAB filtered exhaust stacks meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard. Further changes to the system configuration or operating conditions that are outside the bounds described in this and the scale model test reports (Glissmeyer, Flaherty, and Piepel (2001), Glissmeyer and Geeting (2013)) may require additional tests and additional analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Site Environmental Report for 2020, Sandia National Laboratories, California

Sandia National Laboratories, California (SNL/CA) is a Department of Energy (DOE) facility. The management and operations of the facility are under a contract with the DOE's National Nuclear Security Administration (NNSA). On May 1, 2017, the name of the management and operating contractor changed from Sandia Corporation to National Technology & Engineering Solutions of Sandia, LLC (NTESS). The DOE, NNSA, Sandia Field Office administers the contract and oversees contractor operations at the site. DOE and its management and operating contractor for Sandia are committed to safeguarding environmental protection, compliance, and sustainability and to ensuring the validity and accuracy of the monitoring data presented in this Annual Site Environmental Report. This Site Environmental Report for 2020 was prepared in accordance with DOE Order 231.1B, Environment, Safety and Health Reporting (DOE 2012). The report provides a summary of environmental monitoring information and compliance activities that occurred at SNL/CA during calendar year 2020, unless noted otherwise. General site and environmental program information is also included.

54 ENVIRONMENTAL SCIENCES↗

Rules of Use Report Engineering evaluations of nuclear material storage containers against the packaging requirements at TA-55

A set of obligations in the yearly storage container surveillance program, ensures that a retrospective approach is applied with loaded containers in inventory to confirm compliance with all “users” to ensure nuclear material storage container requirements are being followed. Validation that packaged containers are properly used, within a specific set of container types prescribed “bounding conditions of use,” is based on meeting requirements as identified in operating procedures associated with TA55-DOP-091, TA-55 Nuclear Material Packaging, and PA-RD-01022, Nuclear Material Packaging Requirements. The surveillance plan obligation requires the application of local area nuclear material accountability software or (LANMAS) to produce queries. The data queries are used to assess attributes of containers in storage these investigations are conducted on a bi-annual basis. This rules of use (ROU) compliance process ensures proper usage of storage containers as containment systems and therefore provides effective worker protection. It is structured as a supporting effort by implementing aspects of PA-AP-01207, Nuclear Material Container Safety Management at TA-55.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Energy Efficiency and Performance Evaluation of Self-Contained, Medium Temperature, Reach-In Refrigerated Display Cases

This project was part of an effort by Commonwealth Edison Company (ComEd) to evaluate the energy and peak demand saving potential of emerging technologies in the Chicago area. This document focuses on the assessment of energy-efficient, medium-temperature, self-contained refrigerated display cases utilizing environmentally friendly refrigerants. The results of this evaluation will be considered by CLEAResult to develop a new energy efficiency rebate measure for ComEd's incentive programs. This rebate measure will become an addition to the Technical Reference Manual (TRM). In 2016, the United Nations passed the Kigali Montreal Protocol Amendment which placed restrictions on certain types of refrigerants. In compliance with this amendment, the US Environmental Protection Agency (EPA) placed a ban on the manufacture of refrigeration systems using hydrofluorocarbons including R134a starting in January 2020. Although the ban has halted manufacture, the EPA continues to allow the use of these refrigerants. Therefore, it is critical to provide incentives for replacing these refrigerants with other environmentally friendly and energy-efficient alternatives. The energy-efficient refrigerator cases evaluated here (referred to as EE Case A and B) contain environmentally-friendly refrigerants in compliance with the EPA hydrofluorocarbon ban. These consist of natural refrigerant propane (R290), and HFC drop-in hydrofluoroolefin R513a, respectively. These cases also contain other energy-efficient components including efficient lighting, more robust evaporator and condenser fans and different-sized heat exchangers. EE Case A is also built with materials that better insulate the case, which improves energy efficiency. To ascertain the energy efficiency contribution of these design components, the consumption of the evaporator and condenser fan motors, compressor, and lighting/controller were evaluated individually. The medium-temperature, self-contained reach-in refrigerated display case was selected due to its widespread use in convenience stores and small supermarkets. Self-contained refrigeration has also seen increased use in restaurants due to curbside pickup during the COVID-19 pandemic. For this study, the refrigerated display cases' performance was evaluated in a controlled environmental chamber at representative indoor dry-bulb and humidity conditions found in supermarkets within ComEd's service territory climate zone. The test method used in this project was foundationally inspired by the ANSI/ASHRAE 72-2018 method of testing. However, modifications to the ANSI/ASHRAE test methodology were implemented to better represent customer operation of the units. In addition to the indoor supermarket conditions, the cases were also evaluated at the "upper target," or environmental conditions used in ANSI/ASHRAE 72-2018. The case total power and case components were metered to obtain their daily power (kW) and energy consumption(kWh). The cases were filled with thermal filler mass to replicate thermal mass of product loading. Additionally, product simulators were used to provide product temperature information. Door actuators were mounted to each of the cases' three doors to replicate regular door openings and effects of shopper traffic.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Analysis in Support of Disposition of Tank 48 Legacy Material

This report contains the characterization of six 200-mL Tank 48H samples: HTF-48-21-74, HTF-48-21-75, HTF-48-21-76, HTF-48-21-81, HTF-48-21-82, and HTF-48-21-83. The effort supports a Systems Engineering Evaluation (SEE) recommendation involving a Tank 48H decantation strategy that would remove liquid volume and grout the solids. The first three Tank 48H samples were surface samples taken after a quiescent period in the tank. The quiescent period allowed settling of the solids, these being mostly potassium tetraphenylborate. These three surface samples had no measurable solids, though a settling haze could be seen. The latter three samples were taken at 48, 25, and 10 inches from the bottom of Tank 48H immediately after tank mixing pumps had been run. Those samples contained measurable insoluble solids that were readily visible. All six samples were analyzed to provide chemical and radionuclide concentrations as defined as the "Limit" and "Target" in the Saltstone Production Facility (SPF) Waste Acceptance Criteria (WAC) and per the compliance strategy in the Tank Farm Waste Compliance Plan (WCP). Samples were analyzed by many methods to determine pH, density/specific gravity, radioactive isotopes, soluble and insoluble elements, total solids, total insoluble solids, organic and inorganic mercury, volatile and semi-volatile chemicals, and anions. Photographs of the settling of small samples were taken over time and are displayed in this report. The extent of settling was very significant, showing that surface sample liquids are similar to filtrates. However, Cs-137 measurements exceeded WAC limits in all surface samples (1.1E+07 vs. 1.3E+06). The solids were found to contain very high cesium activity, measured as high as 1.1E+10 dpm/gram. Sodium was in the range of 4.24 to 4.74 M for all samples, so the solids would tend to settle with time and would not be at risk of floating without air entrainment. No organic mercury was detected in this work.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-closure Nuclear Criticality Safety Evaluations for Disposition of Criticality Control Overpacks at the Waste Isolation Pilot Plant

The Waste Isolation Pilot Plant (WIPP) is a geological repository in southern New Mexico that provides for disposal of transuranic (TRU) wastes from atomic energy defense activities. The Sandia National Laboratories (Sandia) Report, Consideration of Nuclear Criticality When Disposing of Transuranic Waste at the Waste Isolation Pilot Plant, addresses nuclear criticality safety based on the projected inventory characteristics for the initial compliance certification application of WIPP in 1996. As the inventory, waste forms, and disposal package designs change, revised or new analyses are necessary to demonstrate acceptability for these configurations within the WIPP safety basis and compliance with 10,000-year post-closure standards of the US Environmental Protection Agency (EPA). Saylor and Scaglione evaluated criticality control overpacks (CCOs) in 2017 based on conservative assumptions for post-closure repository structural conditions with resulting effects on containers and container spacing, The Saylor and Scaglione evaluation of CCOs addressed a single waste configuration that represents the Surplus Plutonium Disposition Program’s dilute and dispose waste form and composition. This initial CCO study demonstrated that 50 grams of boron carbide (B 4 C) per CCO is sufficient to ensure post-closure criticality safety based on a well-mixed waste composition, and Oak Ridge National Laboratory (ORNL) subsequently determined that this amount of B 4 C does not require constraints on moisture or plastic present as moderator. The Saylor and Scaglione analysis conservatively assumes repository room closure that eliminates all space between fissile gram equivalent (FGE) 239 Pu masses. The close-packed array was selected based on limited availability of repository salt creep modeling results at that time. In 2019, Brickner provided additional evaluations for pipe overpack containers (POCs), building on the conservative basis provided by Saylor and Scaglione. Brickner’s 2019 analysis made use of new geomechanical data for post-closure spacing that rely on advances in repository modeling as documented in the work by Reedlunn and Bean. This current CCO evaluation for generic waste materials expands on earlier work performed at ORNL and includes evaluation of CCOs across a much broader range of possible waste compositions and geometries. This evaluation is intended to provide input for the required feature, event and process (FEP) screening to determine if post-closure criticality must be included as an event in the 10,000-year regulatory evaluation. As such, the approach to modeling post-closure criticality presented in this report has been coordinated with the Sandia team responsible for FEP screening. The resulting analysis supports disposition of fissile materials in the CCO containing up to 380 FGE 239 Pu and expands conditions acceptable for disposal of fissile material in CCOs. This evaluation builds on the methodology of Saylor and Scaglione and Brickner, using the most recently available geomechanical data for CCO spacing under salt creep compaction scenarios provided by Reedlunn and Bean. The broad range of fissile material configurations analyzed in this report are intended to account for configurations that may occur during the post-closure disposal time period, and it also includes waste configurations that are not physically possible to support analysis of conditions that influence neutron fluence.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Site Composite Analysis: Recharge and Inventory Sensitivity Analyses for the A Trenches, BC Cribs and Trenches, and PUREX Area Vadose Zone Models

The main objectives of the composite analysis (CA) compliance case vadose zone (VZ) facet are to simulate transport of radionuclide releases from the surface to the water table, and to provide radionuclide transfer rates to groundwater for inclusion into the Plateau-to-River (P2R) saturated zone (SZ) model (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). The CA compliance case approach to address the scale and distribution of contaminant sources in the VZ facet is to subdivide the Hanford Site Central Plateau into 26 models that contain contaminant sources and liquid discharges likely to commingle during migration through the VZ to the water table

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis in Support of Disposition of Tank 48 Legacy Material

This report contains the characterization of six 200-mL Tank 48H samples: HTF-48-21-74, HTF-48-21-75, HTF-48-21-76, HTF-48-21-81, HTF-48-21-82, and HTF-48-21-83. The effort supports a Systems Engineering Evaluation (SEE) recommendation involving a Tank 48H decantation strategy that would remove liquid volume and grout the solids. The first three Tank 48H samples were surface samples taken after a quiescent period in the tank. The quiescent period allowed settling of the solids, these being mostly potassium tetraphenylborate. These three surface samples had no measurable solids, though a settling haze could be seen. The latter three samples were taken at 48, 25, and 10 inches from the bottom of Tank 48H immediately after tank mixing pumps had been run. Those samples contained measurable insoluble solids that were readily visible. All six samples were analyzed to provide chemical and radionuclide concentrations as defined as the "Limit" and "Target" in the Saltstone Production Facility (SPF) Waste Acceptance Criteria (WAC) and per the compliance strategy in the Tank Farm Waste Compliance Plan (WCP). Samples were analyzed by many methods to determine pH, density/specific gravity, radioactive isotopes, soluble and insoluble elements, total solids, total insoluble solids, organic and inorganic mercury, volatile and semi-volatile chemicals, and anions. Photographs of the settling of small samples were taken over time and are displayed in this report. The extent of settling was very significant, showing that surface sample liquids are similar to filtrates. However, Cs-137 measurements exceeded WAC limits in all surface samples (1.1E+07 vs. 1.3E+06). The solids were found to contain very high cesium activity, measured as high as 1.1E+10 dpm/gram. Sodium was in the range of 4.24 to 4.74 M for all samples, so the solids would tend to settle with time and would not be at risk of floating without air entrainment. No organic mercury was detected in this work.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Composite Analysis Vadose Zone Transport of Selected Radionuclides Released from DOE O 435.1 Sources.

The main objectives of the composite analysis (CA) compliance case vadose zone (VZ) facet are to simulate transport of radionuclide releases from the surface to the water table, and to provide radionuclide transfer rates to groundwater for inclusion into the Plateau-to-River (P2R) saturated zone (SZ) model (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). The parallel exascale version of the Subsurface Transport Over Multiple Phases (eSTOMP1) simulator is used to simulate flow and transport for the CA VZ models. The CA compliance case approach to address the scale and distribution of contaminant sources in the VZ facet is to subdivide the Hanford Site Central Plateau into 26 models that contain contaminant sources and liquid discharges likely to commingle during migration through the VZ to the water table.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Oklahoma State University – Industrial Assessment Center (Final Report)

Our first primary objective is to provide industrial assessments to clients in Oklahoma, Arkansas, Kansas, and north and northwest Texas, including the Texas Panhandle (about 10% of the state of Texas). This geographical region extends about 400 miles north and south and about 600 miles east and west. In addition, the partnership links two universities, Oklahoma State University (OSU) and Wichita State University (WSU) within our region together in a significant collaboration focused on improving our region’s industrial competitiveness. Our second primary objective is to produce competent, motivated energy engineers. Student training will be a combination of classroom work, individual mentoring, and on-the-job training. The focus will be on energy conservation technologies, in conjunction with increased productivity, the economics of the same, and client relationships including client recruiting, on-site assessment, reporting, and client-related communications. Finally, we will work to provide resources and expertise to complement the first two primary objectives. The effectiveness and efficiency of our IAC will be measured, internally, by four broad criteria: (1) client benefits, (2) student development and acceptance after graduation, (3) regional/national contribution to lowering energy use and reducing pollutants, and (4) compliance with DOE/FM requirements. Client-related benefits include client contacts, timeliness of assessments and reports, the value of recommendations provided, and the value of recommendations implemented. Student development includes many students trained and the level of training provided in energy, waste, and productivity-related technologies as well as teamwork and communication skills. The contribution to lower national energy use and waste production is a natural outcome of the program. Compliance with DOE/FM requirements includes timeliness of reports, participation in Best Practices activities, contributions to EERE goals and objectives, and other requirements as communicated to the IAC.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Distributed Energy Resource Cybersecurity Framework and Cyber Range Integration

Distributed energy resource (DER) systems feature complex, data-driven communications networks that require careful system coordination and constant vigilance to ensure that grid assets are secure. Because DERs are an important component of the decarbonization strategy, agencies need to secure energy data that could implicate issues of national security if compromised. To help federal energy managers assess, monitor, and manage cybersecurity while achieving decarbonization, the National Renewable Energy Laboratory's (NREL's) Distributed Energy Resource Cybersecurity Framework (DER-CF) offers a comprehensive, web-based assessment tool focusing on cyber governance or policies, technical management, and physical security. The DER-CF currently presents users with a series of pertinent cybersecurity questions that are used to generate a site-specific report and recommendations. This paper outlines a plan to integrate the DER-CF with another key asset-NREL's cyber range-to visualize cybersecurity resilience and compliance and to enhance the usability and accessibility of the DER-CF for federal facility energy managers and planners. This integration will result in a visualization environment to interpret and interact with compliance data. Its development will include regular conversations with stakeholders to assess the effectiveness of these efforts, refine the visualization capability, and ensure its value to our partners.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hanford Waste Treatment Plant LAB Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Waste Treatment Plant laboratory (LAB) facility stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAB stacks were performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing determines the range of conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. Based on these DV values, the corresponding stack flow rates for each of the LAB stacks are 625 to 47,237 scfm for LB-C2, 1,704 to 103,131 scfm for LB-S1, and 467 to 18,088 scfm for LB-S2. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be =20°. Second, the velocity uniformity at the full-scale stack must be =20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack tests at the LAB facility. Flow angle results were primarily less than 10 degrees, except for the LB-C2 Fan A results, which were an average of 17.6 degrees; all flow angle results were within the =20° criterion. The velocity uniformity results for each test condition averaged between 1.5 and 3.5% COV, which were all within the range of the target %COV values from the scale model tests. Based on these stack verification test results, the three LAB filtered exhaust stack sampling locations meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes single-fan as well as dual-fan operations for LB-C2, each of the dual-fan operating conditions for LB-S1, and each single-fan operating condition for LB-S2. Further changes to the system configuration or operating conditions that are outside the bounds described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant Low Activity Waste Facility Stack Effluent Monitoring - Sampling Probe Location Qualification Evaluation

The Hanford Tank Waste Treatment and Immobilization Plant low activity waste (LAW) facility stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAW stacks were performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing determines the range of conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. Based on these DV values, the corresponding stack flow rates for each of the LAW stacks are 815–55,758 scfm for LV-S1, 980–112,078 scfm for LV-S2, 264–22,901 scfm for LV-S3, and 981–79,832 scfm for LV-C2. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be =20°. Second, the velocity uniformity at the full-scale stack must be =20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack tests at the LAW facility. Flow angle results were primarily less than 10°, except for one LV-S2 Fan A result, which was 13.2°; all flow angle results were within the =20° criterion. The velocity uniformity results for each test condition ranged between 1.5 COV and 9.2% COV, which were all within the range of the target % COV values from the scale model tests. Based on these stack verification test results, the four LAW filtered exhaust stack sampling locations meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes single-fan operating conditions for LV-S1 and LV-S2, dual-fan operations for LV-S3 at both the continuous air monitor and record sampler locations, and both the single-fan as well as the dual-fan operations for LV-C2. Further changes to the system configuration or operating conditions that are outside the bounds described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Using Information Automation and Human Technology Integration to Implement Integrated Operations for Nuclear

The purpose of the research effort described in this report is to develop and demonstrate an approach to the design and implementation of advanced, automated systems intended to increase operational efficiencies at nuclear power plants. In particular, we describe methods for considering human-technology integration (HTI) issues throughout the various phases of system design, test, and implementation and how these considerations help promote effective design. This research project will develop planning tools and comprehensive guidance on how HTI principles and methods, in combination with information automation technologies, can enable effective data integration and coordination for full nuclear plant modernization. Specifically, this research project will develop an approach to automate the mapping of data from plant systems and processes to application needs, thereby significantly reducing the amount of human workload currently required for the execution of these tasks. In addition to developing an automated solution as a replacement for these tasks, this research will also analyze digitalization’s effectiveness in reducing operational costs of compliance related activities. Compliance activities are estimated to account for as much as 50% of operations and maintenance (i.e., non-fuel and non-capital) costs of plant operation.

97 MATHEMATICS AND COMPUTING↗

Hanford Waste Treatment Plant Effluent Management Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Hanford Tank Waste Treatment and Immobilization Plant Effluent Management facility (EMF) stack monitor location was qualified using the LV-S1 scale model stack as a baseline, augmented by the LB-S1 and LV-S2 scale model stacks to address the Direct Feed Low Activity Waste Effluent Management Facility Vessel Vent Process (DVP) injection into the main Active Confinement Ventilation (ACV) system duct. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale models and its sampling locations were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the EMF stack was performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing determines the range of stack flow rates for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. Based on the LV-S1 scale model test DV values, the corresponding stack flow rates for the EMF stack are as listed in Table S1. Table S1. Effluent Management Facility Stack Qualified Flow Range. Stack Parameter EM-1 Minimum Qualified Stack Flow (scfm) 781 Maximum Qualified Stack Flow (scfm) 53,432 The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be =20°. Second, the velocity uniformity at the full-scale stack must be =20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack test at the EMF. Flow angle results were less than 5°; all flow angle results were within the =20° criterion. The velocity uniformity results for each test condition ranged between 2.2% COV and 4.3% COV, which were all within the range of the target % COV values from the scale model tests on the LV-S1, LB-S1, and LV S2 scale models. Based on these stack verification test results, the EMF filtered exhaust stack sampling location meets the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes each combination of ACV fan with the DVP exhausters. Further changes to the system configuration or operating conditions that are outside the qualified flow rates described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗