Preliminary Analysis of Nuclear-Powered Data Center Scenarios

This report provides a comprehensive analysis of the potential for nuclear energy to meet the growing energy demands of data centers (DCs). It evaluates the technical, economic, and socio-environmental implications of coupling Nuclear Power Plants (NPPs) with DCs, providing initial responses to several key research questions: What is the potential increased energy demand from DCs in the U.S., in the short, medium and long term? The U.S. is experiencing a rapid increase in energy demand from DCs, with projections indicating a total increase of 24-74 GWy(e) by 2028. Meeting this demand with nuclear energy would require 27–85 GWe of installed capacity. While this surge is expected to slow in the long term, the DC industry needs reliable, scalable, and clean energy sources. How much nuclear capacity can be deployed to meet DC demand and in which timeframe? Several pathways for increasing nuclear capacity were identified, including uprates, restarts of recently retired reactors, power purchase agreements with existing fleet, and new construction. Approximately 20‒28 GWe of nuclear capacity could be dedicated to DCs by the early 2030s. How much High Assay Low Enriched Uranium (HALEU) would be needed to support some nuclear deployment scenarios for DCs? Meeting the deployment targets announced by Google and Amazon for the Kairos Power Fluoride-Salt-Cooled High-Temperature Reactor or KP-FHR (~500 MWe by 2035) and the Xe-100 (~1 GWe by 2040), respectively, requires ramping up 19.75% enriched HALEU production to ~6 t/yr by 2040. What types of nuclear energy/DC coupling options exist, and what are the different benefits/challenges? Five coupling options were analyzed, ranging from grid-connected configurations to colocated, behind-the-meter setups. Key design considerations include the proximity to high- and/or medium-voltage transmission lines, the desired internal fault tolerance, and the sources of alternative/backup power during outages. Each coupling option offers unique benefits and challenges in terms of reliability, system costs, regulation, timeline, etc. A list of NPP/DC deployment scenarios was developed, considering existing or newly built NPP or DC projects. Colocated DCs with new small modular reactors or large reactors on greenfield and brownfield sites are the focus of this report. What types of reactors, especially what size, may be incentivized by DCs? Reactor sizing optimization revealed that the ideal reactor size and number of units depend on DC demand, coupling configurations defined in this report, and other economic factors. Larger reactors are preferred for high-demand DCs and grid-connected systems, while larger number of smaller reactors are better suited for DC configurations without grid backup. Which sites may be compatible with co-located nuclear-powered DCs? Siting those projects is a complicated evaluation factoring local water resources, grid connection availability and reliability, IT infrastructure, local work force, proximity to population zones, etc. For this effort greenfield and brownfield sites such as retired coal-fired plants were used to evaluate this question. This evaluation is not meant to recommend any particular site but it highlights key siting criteria and demonstrates large-scale site availability. What are the socio-economic impacts of co-located nuclear-powered DCs? Those projects generate substantial economic benefits to the local economy, particularly in urban settings. Hyperscale DCs colocated with nuclear power plants (sized around 1 GW of power) can create nearly 1,700 jobs for annual operations and more than 7,300 jobs among the supply chain and local businesses as a result of increased household spending. Rural projects also provide significant benefits, but at lower magnitudes compared to urban deployments.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Accelerating Low-Income Financing and Transactions (LIFT) for Solar Access Everywhere (Final Technical Report)

The Accelerating Low-Income Financing and Transactions (LIFT) for Solar Access Everywhere project’s goal was to expand Low-to-Moderate Income (LMI) solar access for homeowners and renters. The LIFT project researched and gathered data on 453 LMI community solar project across the country. Following three years of research, the project delivered three groundbreaking research papers in June 2022, focused on 1) customer experience, 2) the growth of community solar programs, and 3) project-level financial best practices for serving LMI communities. These were followed by a user-friendly web-based Toolkit allowing users to interact with project data and key findings in November 2022. The customer experience research examined community solar subscribers’ primary motivations to join and remain satisfied with projects. Our research identified 453 projects across the country that dedicated some portion of the system capacity to LMI households. Seventeen of these projects participated in the LIFT customer experience research, allowing the project team to survey their customers and gain insight into how LMI subscribers feel about community solar and the programs that serve them. Subscribers in our sample indicated that the most critical issue that motivated them to participate in their program, however, was not savings but helping the environment. This was true for both LMI and non-LMI subscribers. Helping the environment was also the most important issue for LMI subscribers to measure how well their program was working for them. LIFT also explored how rapidly community solar has grown since its inception in 2006, publishing results in the Growth of U.S. Community Solar Serving LMI Households report. The results showed that community solar projects serving LMI households are one of the fastest growing segments of the solar industry. The report identifies and recommends ways developers should overcome real or perceived risks to LMI customer acquisition and subscriber management. Through the analysis of community solar project finance research, LIFT showed that most community solar projects serving LMI households are financed in the same ways mainstream community solar projects are financed. The value stacks and financial returns are no different, although LMI inclusion and participation rate varied across programs in our sample, ranging from between 10% and 100%. Based on the findings from the LIFT research, the team built a web-based user-friendly Toolkit, consisting of case studies, project finance best practices, and several tools built around the national dataset of 453 community solar projects that serve LMI households. These allow users to engage with the dataset in multiple ways; to explore the landscape of LMI community solar in the U.S., and to design community solar projects to optimize LMI inclusion, equity, and savings levels. The Toolkit also includes a library of LIFT-generated and LIFT-curated resources for users to learn more about how to best serve LMI communities through community solar. LIFT officially published the Toolkit on October 31, 2022, followed by a launch event (public webinar) on November 17, 2022. The core LIFT partners continue to engage in outreach and dissemination efforts to promote the LIFT Toolkit and research publications. Our driving motivation is to continue enabling solar developers to leverage the findings of this three-year research effort. By implication, the LIFT Toolkit is designed for use by utilities, energy service providers, and financiers or investors as a learning and decision-making tool to rapidly scale project models that optimize LMI inclusion and maximize real household savings.

14 SOLAR ENERGY↗