Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “circuit breakers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

NASA Tech Briefs, August 2008

Customizable Digital Receivers for Radar Two-Camera Acquisition and Tracking of a Flying Target Visual Data Analysis for Satellites A Data Type for Efficient Representation of Other Data Types Hand-Held Ultrasonic Instrument for Reading Matrix Symbols Broadband Microstrip-to-Coplanar Strip Double-Y Balun A Topographical Lidar System for Terrain-Relative Navigation Programmable Low-Voltage Circuit Breaker and Tester Electronic Switch Arrays for Managing Microbattery Arrays Topics covered include: Lower-Dark-Current, Higher-Blue-Response CMOS Imagers; Fabricating Large-Area Sheets of Single-Layer Graphene by CVD; Support for Diagnosis of Custom Computer Hardware; Providing Goal-Based Autonomy for Commanding a Spacecraft; Dynamic Method for Identifying Collected Sample Mass; Optimal Planning and Problem-Solving; Attitude-Control Algorithm for Minimizing Maneuver Execution Errors; Grants Document-Generation System; Heat-Storage Modules Containing LiNO3 3H2O and Graphite Foam; Precipitation-Strengthened, High-Temperature, High-Force Shape Memory Alloys; Improved Relief Valve Would Be Less Susceptible to Failure; Safety Modification of Cam-and-Groove Hose Coupling; Using Composite Materials in a Cryogenic Pump; Using Electronic Noses to Detect Tumors During Neurosurgery; Producing Newborn Synchronous Mammalian Cells; Smaller, Lower-Power Fast-Neutron Scintillation Detectors; Rotationally Vibrating Electric-Field Mill; Estimating Hardness from the USDC Tool-Bit Temperature Rise; Particle-Charge Spectrometer; Automated Production of Movies on a Cluster of Computers; FIDO-Class Development Rover; and Tone-Based Command of Deep Space Probes Using Ground Antennas.

Source record↗

A High Power Density Power System Electronics for NASA's Lunar Reconnaissance Orbiter

A high power density, modular and state-of-the-art Power System Electronics (PSE) has been developed for the Lunar Reconnaissance Orbiter (LRO) mission. This paper addresses the hardware architecture and performance, the power handling capabilities, and the fabrication technology. The PSE was developed by NASA s Goddard Space Flight Center (GSFC) and is the central location for power handling and distribution of the LRO spacecraft. The PSE packaging design manages and distributes 2200W of solar array input power in a volume less than a cubic foot. The PSE architecture incorporates reliable standard internal and external communication buses, solid state circuit breakers and LiIon battery charge management. Although a single string design, the PSE achieves high reliability by elegantly implementing functional redundancy and internal fault detection and correction. The PSE has been environmentally tested and delivered to the LRO spacecraft for the flight Integration and Test. This modular design is scheduled to flight in early 2009 on board the LRO and Lunar Crater Observation and Sensing Satellite (LCROSS) spacecrafts and is the baseline architecture for future NASA missions such as Global Precipitation Measurement (GPM) and Magnetospheric MultiScale (MMS).

Hernandez-Pellerano, A.↗

Skylab Operations Handbook: Orbital Workshop (OWS), Airlock Module (AM), Multiple Docking Adapter (MDA): Systems Descriptions - Volume 1

The Skylab Program consists of three low-earth-orbit missions of the Orbital Assembly (OA) (figure 1.0-1), extending over.an a-month period. The OA consists of the CSM docked to the Saturn Workshop.(SWS). This handbook describes the systems for three of the four major components of the SWS (OWS, AM, and MDA), and also discusses significant interfaces with the Instrument Unit (IU), ATM, and CSM. The other major component of the SWS, the ATM, is treated separately in its own handbook. The OWS, AM, MDA, ATM Deployment Assembly (ATM-DA), Fixed Airlock Shroud (FAS), Payload Shroud (PS), and IU are addressed throughout this document as individual modules from a structural standpoint only. Although normally considered a part of the launch vehicle, the IU is treated in this document as part of the SWS because of its function in preparing the SWS for orbital operation. Section 1.0 describes vehicle and mission configurations of the Skylab program and provides general descriptions of the various systems. Section 2.0 provides detailed systems data covering system interfaces, functional description, subsystems and major components description, component operation, failure modes, performance and design data, operational limitations and restrictions, and instrumentation, and briefly outlines the experiments. Section 3.0 contains illustrations of all panels and identifies the controls and displays, panels, reference designators, nomenclature, functions, circuit breakers, and power sources. The Table of Contents lists in order of appearance all sections, subsections, major paragraphs, illustrations, and tables and provides their respective page locations. Appendix A defines the abbreviations and acronyms employed throughout this handbook, and Appendix B explains the symbols used. Appendix C is a locator index that references component controls contained in Section 3.0. Appendix D is an alphabetical index of paragraph headings, illustrations, and tables, according to the key word, with applicable page numbers. Additional items of significance to the user have been included in the index. The technical level to which this document is written assumes the reader to have general knowledge of engineering terms and principles.

West, W. D.↗

Remote switch actuator

The invention provides a device and method for actuating electrical switches remotely. The device is removably attached to the switch and is actuated through the transfer of a user's force. The user is able to remain physically removed from the switch site obviating need for protective equipment. The device and method allow rapid, safe actuation of high-voltage or high-current carrying electrical switches or circuit breakers.

42 ENGINEERING↗

OPNET/Simulink Based Testbed for Disturbance Detection in the Smart Grid

The important backbone of the smart grid is the cyber/information infrastructure, which is primarily used to communicate with different grid components. A smart grid is a complex cyber physical system containing a numerous and variety number of sources, devices, controllers and loads. Therefore, the smart grid is vulnerable to grid related disturbances. For such dynamic system, disturbance and intrusion detection is a paramount issue. This paper presents a Simulink and Opnet based co-simulated platform to carry out a cyber-intrusion in cyber network for modern power systems and the smart grid. The IEEE 30 bus power system model is used to demonstrate the effectiveness of the simulated testbed. The experiments were performed by disturbing the circuit breakers reclosing time through a cyber-attack. Different disturbance situations in the considered test system are considered and the results indicate the effectiveness of the proposed co-simulated scheme.

Cyber Attacks↗

Architecture and Methods for Substation SCADA Cybersecurity: Best Practices

There are over 3000 electricity providers in the United States, encompassing investor and publicly owned utilities as well as electric cooperatives. There has been ongoing trends to increasingly automate and provide remote control and monitoring of electric energy delivery systems. The deployment of computer network technologies has increased the efficiency and reliability of electric power infrastructure. However, the increased use of digital communications has also increased the vulnerability to malicious cyber attacks [1]. In 2004 the National Research Councils (National Academies) formed a committee of specialists to address these vulnerabilities and propose possible solutions with an objective to prioritize the R&D needs for developing countermeasures. The committee addressed many potential concerns in the electric power delivery system and classified them based upon different criteria and presented recommendations to minimize the gap between the academic research directions and the needs of the electric utility industry. The complexity and diversity of the electric power delivery system in the U.S. has opened many ports for attackers and intruders [1]. This complexity and diversity is attributed to the fact that power delivery system is a network of substations, transmission and distribution lines, sub-networks of controlling, sensing and monitoring units, and human operator involvement for running the system [1]. Accordingly, any incident such as the occurrence of a fault or disturbance in this complex network cannot be deferred and should be resolved within an order of milliseconds, otherwise there is risk of large-scale outages similar to the occurrences in India and the U.S. in 2003 [2]. There are three main vulnerabilities in supervisory control and data acquisition (SCADA) systems commonly identified—physical vulnerability, cyber vulnerability and personal vulnerability [1]. In terms of cyber threats, SCADA systems are the most critical elements in the electric power grid in the U.S. Unauthorized access to a SCADA system could enable/disable unexpected equipment (such as disable the protection system or a circuit breaker) which could cause large scale disruptions of electric power delivery. This paper provides an overview of power system SCADA technologies in transmission substations (Section 2) and summarizes the best practices for implementing a cyber security program. After introducing SCADA system operations in Section 2, a description of the security challenges for SCADA systems is presented in Section 3. In Section 4, NECRC Critical Infrastructure Protection standards CIP-002 through CIP-009 are summarized. An overview of industry best practices is presented in Section 5.

97 MATHEMATICS AND COMPUTING↗

Collaborative Defense of Transmission and Distribution Protection and Control Devices Against Cyber Attacks (CODEF) DE-OE0000674. ABB Inc. Final Scientific/Technical Report

This report summarizes the activities conducted under the DOE-OE funded project DEOE0000674, where ABB Inc. (ABB), in collaboration with University of Illinois at Urbana-Champaign (UIUC), Bonneville Power Administration (BPA), and Ameren-Illinois (Ameren-IL) pursued the development of a system of collaborative defense of electrical substation’s intelligent electronic devices against cyber-attacks (CODEF). An electrical substation with CODEF features will be more capable of mitigating cyber-attacks especially those that seek to control switching devices. It leverages the security extensions of IEC 61850 to empower existing devices to collaborate in identifying and blocking malicious intents to trip circuit breakers, mis-coordinate devices settings, even though the commands and the measurements comply with correct syntax. The CODEF functions utilize the physics of electromagnetic systems, electric power engineering principles, and computer science to bring more in depth cyber defense closer to the protected substation devices.

97 MATHEMATICS AND COMPUTING↗

Adaptive Fault Current-Limiting Control of MMC for Protection of Multiterminal HVDC Systems: Preprint

For the development of multi-terminal high voltage DC (MTDC) transmission, it is critical to design the protection system that can selectively isolate the faulty area from the healthy part of the dc grid using DC circuit breakers (DCCBs) while ensuring continuous operation of converter stations in the healthy part. However, because of the lack of fault current blocking capability in half-bridge (HB) modular multilevel converters (MMCs), when a dc fault occurs, the rising fault currents can quickly reach the blocking threshold within a few milliseconds and disrupt the operation of MMCs in the healthy part. Large DC reactors are often considered in series with DCCBs to reduce the rate of rise of fault currents and prevent blocking of MMCs in the healthy part of the grid. However, large DC reactors can prohibitively increase the cost of the system, particularly when they are considered in an offshore environment, for instance in offshore wind projects. Large dc reactors can also introduce stability issues and create post-fault oscillations. This paper presents an adaptive fault current limiting control method for MMCs to avoid their blocking and enable continuous operation of MTDC systems. It contains two parts: The first part is based on circulating current feedforward control that emulates virtual reactors in each arm of an MMC, which is immediately activated when the fault current starts to increase, to reduce the rate of rise of the fault current; the second part is triggered when the fault current exceeds a preset threshold by temporarily bypassing the SMs, serving as a complement to the fault current limiting effect of the first part. Both parts do not require fault detection signal and they are activated automatically during faults. Simulation case studies of a four-terminal bipolar MMC-HVDC system are presented to demonstrate the effectiveness of the proposed control methods.

active fault current limiting↗

Adaptive protection algorithm and system

An adaptive protection algorithm and system for protecting electrical distribution systems traces the flow of power through a distribution system, assigns a value (or rank) to each circuit breaker in the system and then determines the appropriate trip set points based on the assigned rank.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ARC-SAFE: Accelerated Response semiconducting Contactors and Surge Attenuation For DC Electrical systems (Final Scientific/Technical Report)

The landscape of power transmission and distribution is quickly evolving as more power conversion is done through power electronics and transmitted or distributed at medium voltage direct current (MVDC). As power electronics tend to store less energy and be less resilient to faults than conventional power transformers, a reliable and fast protection against faults is critical to protect power electronics (PE) based infrastructure, especially for medium- and high-voltage applications. This motivates the development of PE based protection circuits to replace slower contemporary electromechanical breakers. In this project a novel PE based MVDC circuit breaker is developed; the new design is comprised of 1) a normally-on leg made of commercially-available, cascaded SiC junction field effect transistors (JFETs) with a passive balancing network, and 2) a normally-off leg based on an optically-triggered gallium nitride (GaN) photoconductive semiconductor switch (PCSS). The normally-off leg was designed to be quickly turned on, to divert current to an auxiliary dissipative circuit, as the normally-on leg is turned off. This approach, using solid-state devices, was selected for a high-performance, fast-switching operation for the DC circuit breaker as compared to approaches that use slower mechanical switches. To be practical, the circuit breaker must have low conduction loss (low Ron) in the normally-on leg and fast coordinated triggering of the normally-off leg to avoid damage from inductive flyback, which could be considerable for long lengths of cable.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Architecture, Voltage, and Components for a Turboelectric Distributed Propulsion Electric Grid

The development of a wholly superconducting turboelectric distributed propulsion system presents unique opportunities for the aerospace industry. However, this transition from normally conducting systems to superconducting systems significantly increases the equipment complexity necessary to manage the electrical power systems. Due to the low technology readiness level (TRL) nature of all components and systems, current Turboelectric Distributed Propulsion (TeDP) technology developments are driven by an ambiguous set of system-level electrical integration standards for an airborne microgrid system (Figure 1). While multiple decades' worth of advancements are still required for concept realization, current system-level studies are necessary to focus the technology development, target specific technological shortcomings, and enable accurate prediction of concept feasibility and viability. An understanding of the performance sensitivity to operating voltages and an early definition of advantageous voltage regulation standards for unconventional airborne microgrids will allow for more accurate targeting of technology development. Propulsive power-rated microgrid systems necessitate the introduction of new aircraft distribution system voltage standards. All protection, distribution, control, power conversion, generation, and cryocooling equipment are affected by voltage regulation standards. Information on the desired operating voltage and voltage regulation is required to determine nominal and maximum currents for sizing distribution and fault isolation equipment, developing machine topologies and machine controls, and the physical attributes of all component shielding and insulation. Voltage impacts many components and system performance.

electric faults↗

Cost Controls in the Cloud

The pay-as-you-go model used by most Cloud Service Providers shifts ownership of resource procurement from finance and management teams to IT, engineering, development and other stakeholders. This requires individual contributors to adopt a more "cost conscious" approach to development, and for projects to invest time into the creation of automated cost controls and cost-focused monitoring. This talk will presents some patterns and examples of cost controls based on our experience managing a multi-tenant cloud environment.

circuit breaker↗

Analysis of Transient Recovery Voltage at the Terminals of Breakers Using Current-Limiting Reactors

Current-limiting reactors (CLR) are known to have a significant effect on transition processes during short circuits (SC) leading to excesses beyond the permissible values of the transient recovery voltage (TRV) at the terminals of breakers for short-circuit currents, which in turn can lead to failure of the breakers. It is shown that the traditional (generally accepted) method for calculating transient recovery voltages based on using a circuit with the reactor replaced by lumped parameters is not suitable for magnetized CLR, and in the case of uncontrolled CLR can yield erroneous results. It is argued that there is a need to account for the distribution of the winding parameters of current-limiting reactors in calculations of the TRV at the contacts of breakers as they interrupt short circuits and relevant analytic expressions are derived.

42 ENGINEERING↗

Evaluation of high-voltage, high-power, solid-state remote power controllers for amps

The Electrical Power Branch at Marshall Space Flight Center has a Power System Development Facility where various power circuit breadboards are tested and evaluated. This project relates to the evaluation of a particular remote power controller (RPC) energizing high power loads. The Facility equipment permits the thorough testing and evaluation of high-voltage, high-power solid-state remote power controllers. The purpose is to evaluate a Type E, 30 Ampere, 200 V dc remote power controller. Three phases of the RPC evaluation are presented. The RPC is evaluated within a low-voltage, low-power circuit to check its operational capability. The RPC is then evaluated while performing switch/circuit breaker functions within a 200 V dc, 30 Ampere power circuit. The final effort of the project relates to the recommended procedures for installing these RPC's into the existing Autonomously Managed Power System (AMPS) breadboard/test facility at MSFC.

Callis, Charles P.↗

BioMass PDU Electrical Design Study UPDATE

The BioMass Process Demonstration Unit (PDU) electrical system is used for the power distribution and control of the many motors and process required loads. Study requirements include a complete system analysis and equipment evaluation, which includes conductor sizing, transformer sizing, breaker and fuse sizing, short-circuit analysis, load-flow analysis, protective-device coordination, arc-flash-hazard analysis, and a multi-state code and grounding review.

09 BIOMASS FUELS↗