Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “chiller”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Photovoltaic and Energy Efficiency Systems Installation (Final Technical Report)

Hackensack University Medical Center's major initiative to create a cleaner healthier and safer environment for patients, employees and the community served by the medical center is built on its commitment to protect the environment and conserve precious energy resources. Since 2004 the Medical Center launched a long term campaign to temper the negative environmental impact of proposed and existing new construction at the medical center and to improve campus wide overall energy efficiency. The plan was to begin by implementing a number of innovative and eco-friendly enhancements to the Gabrellian Women's and Children's Pavilion, in construction at the time, which would lead to Certification by the US Green Building Councils Leadership & Environmental Design (LEED) program. In addition the medical center would evaluate the feasibility of implementing a photovoltaic system in the new construction (in development and planned) to provide clean pollution free electricity. The steps taken to achieve this included conducting a feasibility study complete with architectural and engineering assessments to determine the potential for implementation of a photovoltaic system on the campus and also to conduct an energy survey that would focus on determining specific opportunities and upgrades that would lead to a healthier energy efficient interior environment at the medical center. The studies conducted by the medical center to determine the viability of installing a photovoltaic system identified two key issues that factored into leaderships decision not to implement the solar powered system. These factors were related to the advanced phase of construction of the women's and children's pavilion and the financial considerations to redesign and implement in the ambulatory cancer center. The medical center, in spite of their inability to proceed with the solar aspect of the project upheld their commitment to create a healthier environment for the patients and the community. To achieve a healthier energy efficient interior environment the medical center made substantive upgrades and improvements to the HVAC, plumbing electrical and other operating systems. Measures that were implemented range from use of lighting and plumbing fixture sensors , to reduce electrical and water usage, to use of refrigerants containing hydrochlorofluorocarbons (HCFCs) which cause significantly less depletion of the ozone layer than the refrigerants more commonly used. Additional appropriate energy efficiency component upgrades include the installation of Chiller plants with variable frequency drives (VFDs) and harmonic filters, high efficiency motors, solar window glazing, and lighting/motion sensors.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Building Diagnostic Market Deployment (Final Report)

Operational faults are pervasive across the commercial buildings sector, wasting energy and increasing energy costs by up to about 30% (Mills 2009, Liu et al. 2003, Claridge et al. 2000, Katipamula and Brambley 2008, and Brambley and Katipamula 2009). Automated fault detection and diagnostic (AFDD) tools provide capabilities essential for detecting and correcting these problems and eliminating the associated energy waste and costs. The U.S. Department of Energy's (DOE) Building Technology Program (BTP) has previously invested in developing and testing of such diagnostic tools for whole-building (and major system) energy use, air handlers, chillers, cooling towers, chilled-water distribution systems, and boilers. These diagnostic processes can be used to make the commercial buildings more energy efficient. The work described in this report was done as part of a Cooperative Research and Development Agreement (CRADA) between the U.S. Department of Energy's Pacific Northwest National Laboratory (PNNL) and KGS Building LLC (KGS). PNNL and KGS both believe that the widespread adoption of AFDD tools will result in significant reduction to energy and peak energy consumption. The report provides an introduction and summary of the various tasks performed under the CRADA. The CRADA project had three major focus areas: (1) Technical Assistance for Whole Building Energy Diagnostician (WBE) Commercialization, (2) Market Transfer of the Outdoor Air/Economizer Diagnostician (OAE), and (3) Development and Deployment of Automated Diagnostics to Improve Large Commercial Building Operations. PNNL has previously developed two diagnostic tools: (1) whole building energy (WBE) diagnostician and (2) outdoor air/economizer (OAE) diagnostician. WBE diagnostician is currently licensed non-exclusively to one company. As part of this CRADA, PNNL developed implementation documentation and provided technical support to KGS to implement the tool into their software suite, Clockworks. PNNL also provided validation data sets and the WBE software tool to validate the KGS implementation. OAE diagnostician automatically detects and diagnoses problems with outdoor air ventilation and economizer operation for air handling units (AHUs) in commercial buildings using data available from building automation systems (BASs). As part of this CRADA, PNNL developed implementation documentation and provided technical support to KGS to implement the tool into their software suite. PNNL also provided validation data sets and the OAE software tool to validate the KGS implementation. Finally, as part of this CRADA project, PNNL developed new processes to automate parts of the re-tuning process and transfer those process to KGS for integration into their software product. The transfer of DOE-funded technologies will transform the commercial buildings sector by making buildings more energy efficient and also reducing the carbon footprint from the buildings. As part of the CRADA with PNNL, KGS implemented the whole building energy diagnostician, a portion of outdoor air economizer diagnostician and a number of measures that automate the identification of re-tuning measures.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

RLUOB Celebration

Los Alamos National Laboratory's newest facility, the Radiological Laboratory Utility Office Building (RLUOB), is also its first to achieve both the Leadership in Energy and Environmental Design (LEED) status and LEED Gold certification from the U.S. Green Building Council (USGBC). From its robust design to its advanced scientific equipment, RLUOB is essential to the Laboratory's national security mission in support of the National Nuclear Security Administration's (NNSA) nuclear weapons program. At more than 200,000 square feet, this building is the only radiological facility within the Department of Energy to have attained LEED Gold, which contributes to NNSA's achievement towards the high performance sustainable building goals outlined in Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance. 'As we celebrate RLUOB being completed almost one year ahead of schedule and having achieved LEED certification at the Gold level, we approach our plutonium mission at Los Alamos and NNSA with a great sense of achievement,' said Don Cook, NNSA's deputy administrator for defense programs. 'RLUOB adds a major component to NNSA's plutonium support capability and RLUOB demonstrates our commitment in helping to deliver President Obama's nuclear security agenda which includes ensuring the safety, security and effectiveness of the nuclear deterrent without testing.' The facility contains laboratories for analytical chemistry and materials characterization of special nuclear material, along with space for offices, training and emergency operations. Its multi-functional purpose makes RLUOB a unique project for which LEED certification was sought. 'LEED certification was a huge goal and one we sought from the very beginning of this project,' said Laboratory Director Charlie McMillan. 'It's an important step forward, allowing us to advance national security science in modern, safer, more efficient infrastructure.' The Laboratory's project team and its contractor partners, especially in coordination with Jacobs Engineering, focused on green design and construction in LEED categories, such as sustainable sites, water efficiency, energy and atmosphere, materials and resources, indoor environmental quality and innovation in design. RLUOB's features include: (1) Building envelope design (orientation, materials and insulation) yielded a 20 percent improvement in energy performance; (2) Incorporation of building materials with 24 percent recycled content; (3) Diversion of 72 percent of construction-generated materials through reuse, recycle and salvage; (4) Roofing comprised of 93 percent highly-reflective materials to reduce heat island effects; (5) High efficiency, gas-fired hot water boilers, air-cooled chillers, thermal storage systems and variable frequency drives for compressors, fans and pumps; (6) Energy efficient lighting for interiors, exteriors, process glove boxes and fume hoods; (7) Water efficient fixtures resulting in 30 percent reduction in usage; (8) Low emission paints and carpeting for improved indoor air quality; (9) Landscaping that doesn't require permanent irrigation; (10) Enhanced building system commissioning; and (11) Comprehensive transportation alternatives, including public transportation, bicycle storage and changing rooms, and a refueling station for government vehicles using alternative fuels. 'RLUOB's LEED certification demonstrates tremendous leadership in green building,' says Rick Fedrizzi, president and CEO of USGBC. 'The urgency of our mission has challenged the industry to move faster and reach further than ever before, and RLUOB serves as a prime example of just how much we can accomplish.'

25 ENERGY STORAGE↗

Fuel Cycle Research & Development Technical Monthly – May 2012

Management and Integration LANL - Initial coordination meetings with NE and NA-20 were held the first week of May. Additional meetings, to include NA-82 and the new Proliferation and Terrorism Risk Assessment task are scheduled for June. Work package planning as part of the NTD transition is ongoing. Microcalorimetry LANL - Some parts to attempt repair of a malfunctioning water chiller that has been holding up work on the current detector array have arrived. We will attempt to begin running the compressor/cryostat next week to resume work on commissioning the detector array. We have also been working on a backup plan to temporarily move our system to a different lab space. Completed data analysis and prepared a paper summarizing Pu measurements for peer-review journal. Two members of our team presented work at the SORMA West 2012 conference. Completed data analysis and prepared a milestone report summarizing the development of Monte Carlo tools to study systematic errors. Electrochemical Sensor INL - The second sensor test was stopped short due to the work stand-down. Some activities related to this work have resumed, but not all. The sensor used during the second test was removed from the furnace and it showed cracks and later crumbled when being rinsed for sample preparation. The sensor material will be submitted to SEM analysis once work is resumed in the facilities where analysis is performed. A third sensor test has started. Tests with different arrangements will continue and will be oriented based on post-test analysis of the first three sensor tests. Materials with different annealing temperatures will also be prepared for analysis. Lead slowing down spectrometer LANL - Continued work on perturbation method for LSDS analysis. We are running simulations to delineate issues and are checking additional data libraries to see whether there are differences in simulation results. Electrochemical sensor INL - The second sensor test was stopped short due to the work stand-down. Some activities related to this work have resumed, but not all. The sensor used during the second test was removed from the furnace and it showed cracks and later crumbled when being rinsed for sample preparation. The sensor material will be submitted to SEM analysis once work is resumed in the facilities where analysis is performed. A third sensor test has started. Tests with different arrangements will continue and will be oriented based on post-test analysis of the first three sensor tests. Materials with different annealing temperatures will also be prepared for analysis. Fast Neutron Multiplicity analysis INL - The University of Michigan team continues its work on the post-experiment analysis of the validation data from JRC ISPRA, as well as scoping studies using the simulation tool MCNPX-PoliMi. At INL, our new staff member working on this project is now working to model performance capabilities for the fast-neutrons scintillator design concepts. At INL our primary analysis approach is focused on the Feynman mean-to-variance approach. At the University of Michigan, the primary analysis approach is multiplicity coincidence analysis. Fast Neutron Imaging to Quantify Nuclear Materials ORNL - Completed additional measurements of the two 'trainer' configurations as well as calibration measurements with sources on an x-y stage. The imager was shipped to Pantex for an NA-22 obligation at the end of May. Lead Slowing Down Spectrometer LANL - Continued to look into He4 detector. A Swiss company was located that makes He4 detectors and associated electronics. Had a teleconference with them to assess the possible help we can get from them. We are also looking in to constructing one locally. Ongoing perturbation calculations are providing information on the fundamental systematic error limits of LSDS. In order to achieve separating the contribution of Pu and 235U to the signal, there will need to be tight controls on systematic errors. Multi-isotope Process Monitor PNNL - Attended a training call in advanced multivariate classification and analysis methods. These methods were applied to the multivariate analysis of fuel characteristics based on simulated gamma. Work continued on a computational framework to quantify the impact of gamma-ray counting statistical precision on principal component regression (PCR) analysis of a multi-component (i.e. multi-isotope) gammaray spectrum. Tests of the simulation framework are anticipated to begin in early June. Development of a proposal to instrument H-Canyon is being prepared in conjunction with SRNL and the NNSA's NGSI program is ongoing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Photovoltaic and Energy Efficiency Systems Installation

Hackensack University Medical Center's major initiative to create a cleaner healthier and safer environment for patients, employees and the community served by the medical center is built on its commitment to protect the environment and conserve precious energy resources. Since 2004 the Medical Center launched a long term campaign to temper the negative environmental impact of proposed and existing new construction at the medical center and to improve campus wide overall energy efficiency. The plan was to begin by implementing a number of innovative and eco-friendly enhancements to the Gabrellian Women's and Children's Pavilion, in construction at the time, which would lead to Certification by the US Green Building Councils Leadership & Environmental Design (LEED) program. In addition the medical center would evaluate the feasibility of implementing a photovoltaic system in the new construction (in development and planned) to provide clean pollution free electricity. The steps taken to achieve this included conducting a feasibility study complete with architectural and engineering assessments to determine the potential for implementation of a photovoltaic system on the campus and also to conduct an energy survey that would focus on determining specific opportunities and upgrades that would lead to a healthier energy efficient interior environment at the medical center. The studies conducted by the medical center to determine the viability of installing a photovoltaic system identified two key issues that factored into leaderships decision not to implement the solar powered system. These factors were related to the advanced phase of construction of the women's and children's pavilion and the financial considerations to redesign and implement in the ambulatory cancer center. The medical center, in spite of their inability to proceed with the solar aspect of the project upheld their commitment to create a healthier environment for the patients and the community. To achieve a healthier energy efficient interior environment the medical center made substantive upgrades and improvements to the HVAC, plumbing electrical and other operating systems. Measures that were implemented range from use of lighting and plumbing fixture sensors, to reduce electrical and water usage, to use of refrigerants containing hydrochlorofluorocarbons (HCFCs) which cause significantly less depletion of the ozone layer than the refrigerants more commonly used. Additional appropriate energy efficiency component upgrades include the installation of Chiller plants with variable frequency drives (VFDs) and harmonic filters, high efficiency motors, solar window glazing, and lighting/motion sensors.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

DRI Renewable Energy Center

The primary objective of this project was to utilize a flexible, energy-efficient facility, called the DRI Renewable Energy Experimental Facility (REEF) to support various renewable energy research and development (R&D) efforts, along with education and outreach activities. The REEF itself consists of two separate buildings: (1) a 1200-ft2 off-grid capable house and (2) a 600-ft2 workshop/garage to support larger-scale experimental work. Numerous enhancements were made to DRI's existing renewable power generation systems, and several additional components were incorporated to support operation of the REEF House. The power demands of this house are satisfied by integrating and controlling PV arrays, solar thermal systems, wind turbines, an electrolyzer for renewable hydrogen production, a gaseous-fuel internal combustion engine/generator set, and other components. Cooling needs of the REEF House are satisfied by an absorption chiller, driven by solar thermal collectors. The REEF Workshop includes a unique, solar air collector system that is integrated into the roof structure. This system provides space heating inside the Workshop, as well as a hot water supply. The Workshop houses a custom-designed process development unit (PDU) that is used to convert woody biomass into a friable, hydrophobic char that has physical and chemical properties similar to low grade coal. Besides providing sufficient space for operation of this PDU, the REEF Workshop supplies hot water that is used in the biomass treatment process. The DRI-REEF serves as a working laboratory for evaluating and optimizing the performance of renewable energy components within an integrated, residential-like setting. The modular nature of the system allows for exploring alternative configurations and control strategies. This experimental test bed is also highly valuable as an education and outreach tool both in providing an infrastructure for student research projects, and in highlighting renewable energy features to the public.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Direct Evaporative Precooling Model and Analysis: Development and Simulations of an Improved Algorithm for Import into EnergyPlus and Applications to Commercial Buildings in the United States

Evaporative condenser pre-cooling expands the availability of energy saving, cost effective technology options (market engagement) and serves to broaden the range of options in upcoming codes and equipment standards (impacting regulation). Commercially available evaporative pre-coolers provide a low cost retrofit for existing packaged rooftop units, commercial unitary split systems, and air cooled chillers. We map the impact on energy savings and peak energy reduction in three building types (medium office, secondary school, and supermarket) in 16 locations with four levels of pad effectiveness and show the effect for HVAC systems using either refrigerants R22 or R410A (See Section 5.4). EnergyPlus simulations are conducted with an improved algorithm for estimating the condenser pre-cooling wet bulb efficiency. EnergyPlus version 5.0.0 provides an option for a curve-fit form of calculating evaporative cooling efficiency (currently available only for evaporative pads used for space cooling, not condenser precooling). This option requires a large body of empirical data to obtain the 11 parameters required in the polynomial equation and, being a general curve fit, it is also not physically meaningful. Our study departs from this approach by presenting an alternative mathematical model that is physically intuitive, simpler in form, and provides better agreement with manufacturer’s data. In this report, we describe the simpler algorithm and provide the metrics that show how it is an improvement over the algorithm used in EnergyPlus version 5.0.0. We then generate performance values that can be directly input into EnergyPlus for simulations. By this process, we examine the annual and peak energy reductions of three building types (medium office, secondary school and supermarket) in 16 locations within the U.S. These three building types were chosen because they have distinctive loads, zones, and equipment. In addition to performing the requisite calculations, computer algorithms were developed for use with EnergyPlus to simulate the performance of commercial units under a variety of operating parameters. Performance maps were generated and estimated energy savings and peak demand reductions were calculated. Performance curves that were used in these EnergyPlus simulations were shared with the National Renewable Energy Laboratory (NREL) and with the Florida Solar Energy Center (FSEC) for possible inclusion in the next update to EnergyPlus.

air conditioner↗

Demonstration with Energy and Daylighting Assessment of Sunlight Responsive Thermochromic (SRT) Window Systems

Pleotint, LLC was able to successfully extrude thermochromic interlayer for use in the fenestration industry. Pleotint has developed a thermochromic sytem that requires two thermochromic colors to make a neutral color when in the tinted state. These two colors were assembled into a single interlayer called a tri-layer prelam by Crown Operations for use in the glass lamination industry. Various locations, orientations, and constructions of thermochromic windows were studied with funds from this contract. Locations included Australia, California, Costa Rica, Indiana, Iowa, Mexico. Installed orientations included vertical and skylight glazing applications. Various constructions included monolithic, double pane, triple pane constructions. A daylighting study was conducted at LinEl Signature. LinEl Signature has a conference room with a sylight roof system that has a west orientation. The existing LinEl Signature conference room had constant tint 40% VLT transparent skylights. Irradiance meters were installed on the interior and exterior sides of a constant tint skylight. After a month and a half of data collection, the irradiance meters were removed and the constant tint skylights were replaced with Pleotint thermochromic skylight windows. The irradiance meters were reinstalled in the same locations and irradiance data was collected. Both data sets were compared. The data showed that there was a linear relationship with exterior and interior irradiance for the existing constant tint skylights. The thermochromic skylights have a non-linear relationship. The thermochromic skylights were able to limit the amount of irradiance that passed through the thermochromic skylight. A second study of the LinEl Signature conference was performed using EnergyPlus to calculate the amount of Illuminance that passed through constant tint skylights as compared to thermochromic skylights. The constant tint skylights transmitted Illuminance is 2.8 times higher than the thermochromic skylights during the months of May, June, July, August and 1.9 times higher than the thermochromic skylight during the months of March, April, September, October. Calculated illuminance levels were much more consistent as compared to the existing constant tint skylights installed at LinEl Signature. This allows for a more comfortable interior space in regard to glare discomfort and interior lighting control. Lawrence Berkeley National Laboratory was contracted to characterize the performance of the thermochromic interlayer and thermochromic window systems. Thermochromic interlayer was characterized with spectrometer equipment. The thermochromic window systems were characterized using LBNL’s Advanced Window Test Facility. A copy of the report can be found in the Appendix. Iowa State University was contracted to compare thermochromic window technology to constant tint technology. Iowa State University conducted the testing at the Energy Resource Station (ERS). The ERS has the ability to simultaneously test side-by-side competing building technologies. The building is equipped with two identical air handling units, each with its own dedicated and identical chiller. One air handling unit supplies the four test rooms designated as the A rooms and the other unit serves the four test rooms designated as the B rooms. There is one A test room and one B test rooms arranged as pairs in a side-by-side design with each pair having a different exposure. There is a pair of test rooms that face the south, an east and west facing pair. Each of the test rooms is a mirror image of its match with identical construction. The rooms are unoccupied; however, the capability to impose false loads on the rooms exists. The false loads and room lighting can be scheduled to simulate various usage patterns. A copy of the report can be found in the Appendix. GARD Analytics was contracted to compare EnergyPlus building simulations to the data recorded at the Iowa ERS. The goal of this research was to validate the building simulation software developed by the US Department of Energy. EnergyPlus is a whole building software package that includes thermochromic window system algorithms. The accuracy of these thermochromic window system algorithms were of special interest for this research.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evaluation Framework and Analyses for Thermal Energy Storage Integrated with Packaged Air Conditioning

Few third-party guidance documents or tools are available for evaluating thermal energy storage (TES) integrated with packaged air conditioning (AC), as this type of TES is relatively new compared to TES integrated with chillers or hot water systems. To address this gap, researchers at the National Renewable Energy Laboratory conducted a project to improve the ability of potential technology adopters to evaluate TES technologies. Major project outcomes included: development of an evaluation framework to describe key metrics, methodologies, and issues to consider when assessing the performance of TES systems integrated with packaged AC; application of multiple concepts from the evaluation framework to analyze performance data from four demonstration sites; and production of a new simulation capability that enables modeling of TES integrated with packaged AC in EnergyPlus. This report includes the evaluation framework and analysis results from the project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of a Water Based, Critical Flow, Non-Vapor Compression cooling Cycle

Expansion of a high-pressure liquid refrigerant through the use of a thermostatic expansion valve or other device is commonplace in vapor-compression cycles to regulate the quality and flow rate of the refrigerant entering the evaporator. In vapor-compression systems, as the condensed refrigerant undergoes this expansion, its pressure and temperature drop, and part of the liquid evaporates. We (researchers at Kansas State University) are developing a cooling cycle that instead pumps a high-pressure refrigerant through a supersonic converging-diverging nozzle. As the liquid refrigerant passes through the nozzle, its velocity reaches supersonic (or critical-flow) conditions, substantially decreasing the refrigerant’s pressure. This sharp pressure change vaporizes some of the refrigerant and absorbs heat from the surrounding conditions during this phase change. Due to the design of the nozzle, a shockwave trips the supersonic two-phase refrigerant back to the starting conditions, condensing the remaining vapor. The critical-flow refrigeration cycle would provide space cooling, similar to a chiller, by running a secondary fluid such as water or glycol over one or more nozzles. Rather than utilizing a compressor to raise the pressure of the refrigerant, as in a vapor-cycle system, the critical-flow cycle utilizes a high-pressure pump to drive refrigerant liquid through the cooling cycle. Additionally, the design of the nozzle can be tailored for a given refrigerant, such that environmentally benign substances can act as the working fluid. This refrigeration cycle is still in early-stage development with prototype development several years away. The complex multi-phase flow at supersonic conditions presents numerous challenges to fully understanding and modeling the cycle. With the support of DOE and venture-capital investors, initial research was conducted at PAX Streamline, and later, at Caitin. We (researchers at Kansas State University) have continued development of the cycle and have gained an in-depth understanding of the governing fundamental knowledge, based on the laws of physics and thermodynamics and verified with our testing results. Through this research, we are identifying optimal working fluid and operating conditions to eventually demonstrate the core technology for space cooling or other applications.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Novel Controls for Time-Dependent Economic Dispatch of Combined Cooling Heating and Power (CCHP)

The research and development effort detailed in this report directly addresses the challenge of reducing U.S. industrial energy and carbon intensity by contributing to an increased understanding of potential CCHP technology, the CCHP market and the challenges of widespread adoption. This study developed a number of new tools, models, and approaches for the design, control, and optimal dispatch of various CCHP technologies. The UC Irvine campus served as a ‘living laboratory’ of new CCHP technologies and enabled the design and demonstration of several novel control methods. In particular, the integration of large scale thermal energy storage capable of shifting an entire day of cooling demand required a novel approach to the CCHP dispatch optimization. The thermal energy storage proved an economically viable resource which reduced both costs and emissions by enabling generators and chillers to operate under steady high efficiency conditions at all times of the day.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Demonstration of Intelligent Control and Fan Improvements in Computer Room Air Handlers

This report documents a demonstration of the energy-efficiency improvement provided by a new control system for computer room air handling devices. It also analyzes measured and reported air handling device fan power associated with changing the fan type. A 135,000 square foot commercial data center was used for the demonstration. All air handling units were upgraded with improved efficiency fans, and a control system that automatically adjusts the fan speed for the air handling units was added. Power measurements were collected for a baseline and for a period with the fan speed control system active. Changing the fan type resulted in a savings of 47 percent of energy used by the air handling equipment and associated chiller plant energy needed to cool the air handlers themselves. The addition of the fan speed control resulted in an additional 37 percent savings in the same two categories. The combined savings for the two improvements for the same categories was 66 percent compared to the data center fitted with the original fans without a control system. The energy use reduction provided by the complete air handling device improvement program for the whole data center site is estimated to be 2.9 million kilowatt hours per year—an overall data center site savings of 8.0 percent. The reduced electrical energy use at the site provides a 1.9 million pound yearly reduction of carbon dioxide emissions. This demonstration showed that fan upgrades and a control system addition provide cost-effective improvements for data centers, with a payback reported to be under two years without utility incentives. In addition to the control system providing energy savings, the data collection and visual analysis capabilities provided immediate and long-term benefits. It is recommended that data center operators consider investing in fan upgrades and/or adding fan speed control for computer room air handlers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Field data collection of miscellaneous electrical loads in Northern California: Initial results

This report describes efforts to measure energy use of miscellaneous electrical loads (MELs) in 880 San Francisco Bay Area homes during the summer of 2012. Ten regions were selected for metering: Antioch, Berkeley, Fremont, Livermore, Marin County (San Rafael, Novato, Fairfax, and Mill Valley), Oakland/Emeryville, Pleasanton, Richmond, San Leandro, and Union City. The project focused on three major categories of devices: entertainment (game consoles, set-top boxes, televisions and video players), home office (computers, monitors and network equipment), and kitchen plug-loads (coffee/espresso makers, microwave ovens/toaster ovens/toasters, rice/slow cookers and wine chillers). These categories were important to meter because they either dominated the estimated overall energy use of MELs, are rapidly changing, or there are very little energy consumption data published. A total of 1,176 energy meters and 143 other sensors were deployed, and 90% of these meters and sensors were retrieved. After data cleaning, we obtained 711 valid device energy use measurements, which were used to estimate, for a number of device subcategories, the average time spent in high power, low power and “off” modes, the average energy use in each mode, and the average overall energy use. Consistent with observations made in previous studies, we find on average that information technology (IT) devices (home entertainment and home office equipment) consume more energy (15.0 and 13.0 W, respectively) than non-IT devices (kitchen plug-loads; 4.9 W). Opportunities for energy savings were identified in almost every device category, based on the time spent in various modes and/or the power levels consumed in those modes. Future reports will analyze the collected data in detail by device category and compare results to those obtained from prior studies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Case Study of The ARRA-Funded GSHP Demonstration at the Natural Sources Building, Montana Tech

Under the American Recovery and Reinvestment Act (ARRA), 26 ground source heat pump (GSHP) projects were competitively selected in 2009 to demonstrate the benefits of GSHP systems and innovative technologies for cost reduction and/or performance improvement. One of the selected demonstration projects was proposed by Montana Tech of the University of Montana for a 56,000 sq ft, newly constructed, on-campus research facility – the Natural Resources Building (NRB) located in Butte, Montana. This demonstrated GSHP system consists of a 50 ton water-to-water heat pump and a closed-loop ground heat exchanger with two redundant 7.5 hp constant-speed pumps to use water in the nearby flooded mines as a heat source or heat sink. It works in conjunction with the originally installed steam HX and an air-cooled chiller to provide space heating and cooling. It is coupled with the existing hot water and chilled water piping in the building and operates in the heating or cooling mode based on the outdoor air temperature. The ground loop pumps operate in conjunction with the existing pumps in the building hot and chilled water loops for the operation of the heat pump unit. The goal of this demonstration project is to validate the technical and economic feasibility of the demonstrated commercial-scale GSHP system in the region, and illustrate the feasibility of using mine waters as the heat sink and source for GSHP systems. Should the demonstration prove satisfactory and feasible, it will encourage similar GSHP applications using mine water, thus help save energy and reduce carbon emissions. The actual performance of the system is analyzed with available measured data for January through July 2014. The annual energy performance is predicted and compared with a baseline scenario, with the heating and cooling provided by the originally designed systems. The comparison is made in terms of energy savings, operating cost savings, cost-effectiveness, and environmental benefits. Finally, limitations in conducting the analysis are identified and recommendations for improvement in the control and operation of such systems are made.

15 GEOTHERMAL ENERGY↗

Experimental Design and Comparative Testing of a Hybrid-Cooled Computer Cluster [Thesis}

With water cooling becoming an affordable option both at home and at scale, it is important to consider the possible benefits over air cooling. There are several methods of liquid cooling, notables include: immersion, cold water cooling, and warm water cooling. The total cost of ownership is difficult to determine with these options as each has a different impact on the data center. Considering retrofit, over a new data center, introduces unforeseen variables that make cost analysis a challenge. Besides the added costs of additional infrastructure, and the cost to remove old, the upfront costs could be daunting. Therefore a cost analysis would be a study of its won. This study however hopes to reveal the resulting tradeoffs in temperature, performance, and power usage presented in the case between classical airflow based heat sink mechanisms to water provided directly at the heatsink. Having control over a discrete chiller will provide answers to the CPU temperatures, power usage, and performance at various inlet water temperatures. To water or to air?

97 MATHEMATICS AND COMPUTING↗

A Demonstration System for Capturing Geothermal Energy from Mine Waters beneath Butte, Montana

Executive Summary An innovative 50-ton ground-source heat pump (GSHP) system was installed to provide space heating and cooling for a 56,000 square foot (5,200 square meter) building in Butte Montana, in conjunction with its heating and chiller systems. Butte is a location with winter conditions much colder than the national average. The GSHP uses flooded mine waters at 78F (25C) as the heat source and heat sink. The heat transfer performance and efficiency of the system were analyzed using data from January through July 2014. This analysis indicated that for typical winter conditions in Butte, Montana, the GSHP could deliver about 88% of the building’s annual heating needs. Compared with a baseline natural-gas/electric system, the system demonstrated at least 69% site energy savings, 38% source energy savings, 39% carbon dioxide emissions reduction, and a savings of $17,000 per year (40%) in utility costs. Assuming a $10,000 per ton cost for installing a production system, the payback period at natural gas costs of $9.63/MMBtu and electricity costs of $0.08/kWh would be in the range of 40 to 50 years. At higher utility prices, or lower installation costs, the payback period would obviously be reduced.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of Fault Models for Hybrid Fault Detection and Diagnostics Algorithm: October 1, 2014 -- May 5, 2015

This report describes models of building faults created for OpenStudio to support the ongoing development of fault detection and diagnostic (FDD) algorithms at the National Renewable Energy Laboratory. Building faults are operating abnormalities that degrade building performance, such as using more energy than normal operation, failing to maintain building temperatures according to the thermostat set points, etc. Models of building faults in OpenStudio can be used to estimate fault impacts on building performance and to develop and evaluate FDD algorithms. The aim of the project is to develop fault models of typical heating, ventilating and air conditioning (HVAC) equipment in the United States, and the fault models in this report are grouped as control faults, sensor faults, packaged and split air conditioner faults, water-cooled chiller faults, and other uncategorized faults. The control fault models simulate impacts of inappropriate thermostat control schemes such as an incorrect thermostat set point in unoccupied hours and manual changes of thermostat set point due to extreme outside temperature. Sensor fault models focus on the modeling of sensor biases including economizer relative humidity sensor bias, supply air temperature sensor bias, and water circuit temperature sensor bias. Packaged and split air conditioner fault models simulate refrigerant undercharging, condenser fouling, condenser fan motor efficiency degradation, non-condensable entrainment in refrigerant, and liquid line restriction. Other fault models that are uncategorized include duct fouling, excessive infiltration into the building, and blower and pump motor degradation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

District Energy Corporation SW 40th Street Thermal Energy Plant

The overall deliverable from the project is the design, construction and commissioning of a detention facility heating and cooling system that minimizes ownership costs and maximizes efficiency (and therefore minimizes environmental impact). The primary deliverables were the proof of concept for the application of geothermal systems for an institutional facility and the ongoing, quarterly system operating data downloads to the Department of Energy . The primary advantage of geothermal based heat pump systems is the higher efficiency of the system compared to a conventional chiller, boiler, cooling tower based system. The higher efficiency results in a smaller environmental foot print and lower energy costs for the detention facility owner, Lancaster County. The higher efficiency for building cooling is primarily due to a more constant compressor condensing temperature with the geothermal well field acting as a thermal “sink” (in place of the conventional system’s cooling tower). In the heating mode, Ground Couple Heat Pump (GCHP) systems benefits from the advantage of a heat pump Coefficient of Performance (COP) of approximately 3.6, significantly better than a conventional gas boiler. The geothermal well field acting as a thermal “source” allows the heat pumps to operate efficiently in the heating mode regardless of ambient temperatures. The well field is partially located in a wetland with a high water table so, over time, the project will be able to identify the thermal loading characteristics of a well field located in a high water table location. The project demonstrated how a large geothermal well field can be installed in a wetland area in an economical and environmentally sound manner. Finally, the SW 40th Street Thermal Energy Plant project demonstrates the benefits of providing domestic hot water energy, as well as space heating, to help balance well filed thermal loading in a cooling dominated application. During the period of August 2012 thru March 2014, with the detention facility occupied for the final seven months, the well field supply water temperatures to the heat pumps dropped to a minimum of 39°F and reached a maximum temperature of 68 °F while providing 15,819 MMBtu of cooling energy and 27,467 MMBtu of heating energy. During this period the peak recorded system cooling load was 610 tons and the peak heating load was 8.4 MMBtu. The DEC is currently evaluating the most beneficial electric rate for plant operations. Total project cost of $16.9 million was approximately $3.2 million less than the estimate provided in the grant application. The reduction in project costs were primarily due to favorable construction material prices as well as strong competition in the local construction contractor market. The DEC plant reached the substantial completion milestone in December 2011 and began providing thermal service to the detention facility in January 2012 when the building’s HVAC system was ready to accept heating service. The plant reached commercial operating status on August 1, 2012. However, due to construction delays, the detention facility was not occupied until September of 2013. The detention facility construction delays also impacted the installation and commissioning of the project’s dedicated domestic hot water heat pump. Final coordination with the detention facility’s building management system vendor to establish network links for the exchange of date is currently being completed. This will allow the development of control sequences for the optimal operation of the domestic hot water system.

15 GEOTHERMAL ENERGY↗