Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “checklists”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

CSP Systems Analysis - Final Project Report

The CSP Systems Analysis project was a three-year effort supporting the Concentrating Solar Power (CSP) Subprogram within the Solar Energy Technologies Office of the U.S. Department of Energy (DOE). The goal of the CSP Systems Analysis project was to provide timely and accurate CSP cost data to the DOE and predict performance and cost for emerging technologies that may impact research directions and industry investment. The project consisted of six, mostly independent tasks. Major accomplishments over the three-year period of performance were as follows. The NREL team maintained current cost estimates for CSP technologies by annual updates to the cost input parameters within NREL's System Advisor Model (SAM). SAM is a performance and cost simulation software that includes technology models for the primary CSP technologies. During the period from 2016 to 2018, the estimated cost within SAM's default CSP molten-salt power tower technology dropped from 13.0 to 11.1 cent/kWh (real dollars without incentives). Power cycle models for the supercritical carbon dioxide (sCO2) Brayton Cycle were developed and made an option within SAM's molten-salt power tower model. These models were subsequently used to evaluate the cost reduction potential of alternative salts. The partial-cooling model was found to provide the greatest cost-reduction potential due to its combination of efficiency and temperature differential across the turbine and thermal energy storage (TES) system. These studies were documented in two journal articles. NREL's optical modeling software SolTrace and SolarPILOT were made more versatile and released as open-source software to the CSP community. These tools help researchers and developers to model and optimize the optical performance of CSP collector systems. The new features were highlighted in a recorded webinar that can be accessed from the NREL SAM website. New models for solar-thermal systems, that is, applications for solar industrial process heat, were developed, validated, and installed within SAM. The analysis includes a 2018 review of linear collectors in the market that are tailored for solar process heat applications. In 2018 the NREL team also developed an annual simulation for a direct steam generation system integrated with a latent-heat TES system. This analysis was submitted for journal publication. The NREL team continued to support the exchange of information and development of CSP guidelines within the international CSP community of SolarPACES. Much of the work under this project was presented at SolarPACES, including the development of a modeling checklist to help CSP stakeholders standardize the models used for estimating CSP performance and cost. The CSP Systems Analysis project also supported DOE requests for tracking and reporting programmatic targets for the CSP Subprogram.

14 SOLAR ENERGY↗

Protocol for Determining Actual Flow Rate in FTWC Duct Systems

This paper is intended to document the theory and methods to determine the actual flow rate in the exhaust system used to ventilate the Flanged Tritium Waste Containers based on realtime instrument readings. Section 1 provides introductory and background material; Section 2 details the various correction factors used to adjust flow readings for ambient air pressure and temperature and other operational parameters. Section 3 provides guidance on implementing this process during venting operations, and Section 4 provides supporting documentation and also a field checklist that can be used by personnel during venting. For Revision 1, a summary of editorial changes made to the paper was added as Section 4.4, as well as a section documenting peer review (Section 4.5).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Module OT Laboratory Test Procedure

This document will detail a test procedure, involving bench and emulation testing, for the Module OT device developed for the joint NREL-SNL DOE CEDS project titled "Modular Security Apparatus for Managing Distributed Cryptography for Command & Control Messages on Operational Technology (OT) Networks." The aim of this document is to create the testing and evaluation protocol for the module for lab-level testing; this includes checklists and experiments for information gathering, functional testing, cryptographic implementation, public key infrastructure, key exchange/authentication, encryption, and implementation testing in the emulation environment.

97 MATHEMATICS AND COMPUTING↗

INL Waste Management Program Assessment Report

This is an INL annual internal waste management program assessment report that will need to be sent to NNSS for review. The report includes a summary and completed checklists based on the NNSS Waste Acceptance Criteria.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Emergency Management Situation Report (April 2019)

After a major disaster, federal assistance will not be available for up to 72 hours. The Federal Emergency Management Agency recommends that everybody have an emergency kit ready for an unforeseen disaster. FEMA has published a checklist of recommended items here, but it is important to remember that this is your emergency kit - this is just a basic list of suggestions that should be modified to your personal needs. FEMA recommends that everyone have a three-day kit at home, a one-day kit at work, and a one-day kit in the car. An earthquake cannot be predicted, but it can be prepared for - during an emergency, you will be thankful you took the time to prepare beforehand.

58 GEOSCIENCES↗

DOE-STD-1112-2019 Review for the 2020 DOELAP Radiobioassy Program Assessment

In compliance with DOE-STD-1112-2019 section 4.6(i) and in preparation for a 2020 DOELAP assessment of Radiobioassay Program, the QA officer, WBC/SLAB Group Leader, BLAB/RML Group Leader, and WBC/SLAB Health Physicists reviewed the program’s performance in accordance with the criteria found in DOE-STD-1112-2019 and in the accompanying checklist provided to the DOELAP assessor community in January 2020.

61 RADIATION PROTECTION AND DOSIMETRY↗

CY20 AIHA Internal Audit of ALAB and NIF-HPL and CY20 Management Review of ALAB

An internal audit was performed in ALAB to ISO 17025:2017; EPA LQST and AIHA requirements using the current AIHA Checklist. The scope of the internal audit was the annual review of AIHA-accredited industrial hygiene methods performer in both ALAB and NIF HPL. The Internal audit resulted in 3 deficiencies and 3 comments.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Document Traceability Internal Audit of the Analytical Laboratory Report on 08-26-2021

An internal audit was performed in ALAB 8/25/21 to the NELAC 2016 Standard requirements using the NELAC 2016 checklist (TNI 2016 CSDP-Volume1Checklist-Master-2-15-18-v9). The scope of the internal audit was a document traceability of the environmental testing in LRF-00118, LRF00095, and LRF 00133 performed in ALAB. The internal audit resulted in five deficiencies and two comments. The deficiencies were addressed using the ALAB non-conformance reporting system, see ALAB NCRs 10002742-10002746. FRM-5100 Management Observation and NCRs are attached.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

SolarAPP+ Pilot Analysis: Performance and Impact of Instant, Online Solar Permitting

The National Renewable Energy Laboratory (NREL) led a collaborative effort to develop the Solar Automated Permit Processing Plus (SolarAPP+), a no-cost solar permitting software solution to address residential solar photovoltaic (PV) permitting resource constraints and streamline solar adoption processes among authorities having jurisdiction (AHJs). The SolarAPP+ is an online portal that automates permit plan review, enabling an instant permit approval process for code-compliant residential PV systems. Based on national model building, electrical, and fire codes, the SolarAPP+ automatically performs a compliance check of permit inputs against code requirements and produces an inspection checklist that can be used to verify installation practices, workmanship, and adherence to the approved design. NREL conducted a two-phase pilot with five participating AHJs and 16 solar contractors, spanning from November 2020 through December 2021, evaluating the ability of SolarAPP+ to deliver instant permits and its impact on four critical areas within each AHJ: permit review timelines; solar adoption timelines; AHJ time saved; and inspection results. The pilot confirmed that SolarAPP+ reduced permit review times to less than one day, reduced solar adoption timelines by an average of 12 days, saved an estimated 2,067 staff hours, and had comparable inspection results to those found in traditional permitting. The pilot further identified key lessons for improving SolarAPP+, including ways to streamline SolarAPP+ adoption, development of training resources, and expansion of supported products.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Rooftop Solar PV Quality and Safety in Developing Countries - Key Issues and Potential Solutions

To scale solar photovoltaic (PV) deployment in developing countries, the technology must be safe and reliable, meeting both customer and utility expectations. However, challenges exist in achieving these goals. Because PV systems are novel and complex, the majority of consumers are unable to distinguish between low- and high-quality systems; many may invest based on price alone. Suboptimal PV system performance and safety incidents can have downstream impacts on the solar industry and customer adoption because of unmet expectations and negative publicity. Rooftop solar system components vary in quality, and inadequate training could lead to poor installation practices. And even if inspection checklists, certification procedures, and standards are available, they may not be widely used in countries if they are not mandatory, the workforce is not aware of them, or installers lack the technical capacity to comply. Despite the numerous solar quality and safety challenges developing countries may face, lessons learned and best practices from around the world can address them.

14 SOLAR ENERGY↗

A Geophysicist's Guide to the Fairfield Nodes

This report details how to successfully use the Fairfield Nodal ZLand seismic instruments to collect data, including preparation steps prior to deploying the instruments, how to record data during a field campaign, and how to retrieve recorded data from the instruments after their deployment. This guide will walk through each step for the novice user, as well as provide a checklist of critical steps for the advanced user to ensure successful, efficient field campaigns and seismic data collection. Currently, use of the seismic nodal instruments is highly limited due to the detailed nature and prior knowledge required to successfully set up, use, and retrieve data from these instruments. With this guide, all interested users will have the knowledge required to perform a seismic deployment and collect data with the Fairfield Nodal instruments.

47 OTHER INSTRUMENTATION↗

Post-Closure Inspection Report for the Tonopah Test Range and Nevada Test and Training Range, Nevada for Calendar Year 2020 (Rev. 0)

This report provides the results of the annual post-closure use restriction (UR) inspections at corrective action sites (CASs) located on the Tonopah Test Range (TTR) and Nevada Test and Training Range (NTTR). This report covers post-closure UR inspections for calendar year 2020, and includes visual inspections and repair activities completed at the following corrective action units (CAUs): • CAU 407, Roller Coaster RadSafe Area (TTR) • CAU 424, Area 3 Landfill Complexes (TTR) • CAU 453, Area 9 UXO Landfill (TTR) • CAU 487, Thunderwell Site (TTR). Note: CAU 400, Bomblet Pit and Five Points Landfill (TTR) (CASs TA-19-001-05PT, Ordnance Disposal Pit; and TA-55-00-TAB2, Ordnance Disposal Pit) no longer requires inspection and reporting, as described in the Post-Closure Inspection Report for the Tonopah Test Range and Nevada Test and Training Range, Nevada for Calendar Year 2019. Site figures are included in Appendix A. The Post-Closure Inspection Plans and Record of Technical Change modifying the requirements for each UR are included in Appendix B. The Post-Closure Inspection Checklists are included in Appendix C. Field Notes are included in Appendix D. Appendix E, Inspection Photographs, does not include photographs because none were taken during the 2020 post-closure inspections. Appendix F, Post-Closure Vegetation Monitoring Report, does not include any data because vegetation monitoring was not conducted or required at any CAU in 2020. Visual inspections were conducted according to the post-closure requirements outlined in specific CAU and CAS URs, and approved by NDEP. The annual post-closure inspections for CASs associated with CAUs 407, 424, 453, and 487 were conducted on May 20, 2020. No maintenance or repair issues were noted at CAUs 487, or at CASs associated with CAU 424 (except CASs 03-08-002-A304 and 03-08-002-A308). Maintenance items and subsequent repairs include the following: • CAU 407, CAS TA-23-001-TARC (Roller Coaster RadSafe Area): A UR sign was loose and was rehung during the inspection. • CAU 424, CAS 03-08-002-A304 (Landfill Cell A3-4): The northeast monument needed a UR sign. The UR sign was attached to the monument on August 11, 2020. • CAU 424, CAS 03-08-002-A308 (Landfill Cell A3-8): The southeast monument needed additional lava rock. The lava rock was added during the inspection. • CAU 453, CAS 09-55-001-0952 (Area 9 Landfill): Two animal burrows were noted in the western portion of the northern and southern trenches (one burrow per trench). The animal burrows were repaired on August 11, 2020.

54 ENVIRONMENTAL SCIENCES↗

SolarAPP+ Performance Review (2022 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have those specifications automatically reviewed for code compliance, and receive instant approval for code-compliant systems. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. SolarAPP+ is available to authorities having jurisdiction (AHJs) at no cost. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through conventional AHJ permitting processes. As of the end of 2022, the National Renewable Energy Laboratory (NREL) had contacted over 1,500 AHJs with significant solar permitting volume regarding SolarAPP+. Of those, 607 AHJs had at least expressed interest in the platform. 16 AHJs had begun piloting the platform and 15 of these had publicly launched the platform by the end of 2022. In 2022, 206 installers submitted 11,092 permits through the SolarAPP+ platform, including 708 permits for solar+storage systems. SolarAPP+ permits accounted for around 37% of all permits issued in participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 8 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved between 3,500 and 13,900 hours of AHJ staff time in 2022. Finally, we find evidence that SolarAPP+ may improve inspection outcomes, with SolarAPP+ projects failing inspections about 28% less frequently than traditional projects.

14 SOLAR ENERGY↗

Multi-Unit Dwelling Plug-in EV Charging Innovation Pilots (Final Report)

Nearly one-third of residences in the U.S. are multi-unit dwellings (MUDs), e.g., apartments and condominiums, and MUDs with five or more units account for approximately 45% of rental households. While 80% of EV charging takes place at home, less than 5% of home charging takes place at MUDs. With public electric vehicle (EV) charging still underdeveloped, lack of access to reliable home charging is a major barrier to EV adoption for MUD residents. Challenges to siting electric vehicle supply equipment (EVSE) at MUDs include the high upfront cost of EVSE installation, physical and/or electrical infrastructure constraints, a lack of clear incentives for property managers to invest in installing EV charging for tenants, and a limited number of EV charging service providers that offer solutions adapted to the unique needs of MUDs. Through award DE-EE0008473 from the U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy (EERE), Center for Sustainable Energy (CSE), Energetics, and Forth, along with a diverse team of partners, led a three-year project to address barriers to EV charging at MUDs by developing an online toolkit geared toward residents, homeowner associations (HOAs), and property managers. The project, referred to as Vehicle Charging Innovations – Multi-Unit Dwellings (VCI-MUD project), engaged stakeholders across the country to identify real and perceived barriers to EV charging at MUDs and explored innovative technologies that attempt to alleviate the identified barriers. Over the course of three and a half years, the project conducted 60 interviews with industry stakeholders, compiled findings in an easy-to-use toolkit, and disseminated the toolkit across national, regional, state, and local channels. Key findings and outcomes of the VCI-MUD project include: Identifying six primary barriers to the installation of EV charging at MUDs; Developing five fact sheets and eight case studies highlighting innovative charging solutions to address barriers, including real-world operational and financial data; Developing a user-friendly, online empowerment toolkit with five important points for “making your pitch” to support EV charging to assist residents, property managers, building managers, and HOAs explore options for MUD charging. The VCI-MUD online toolkit was designed with replicability in mind. It includes general tools and guides to evaluate EV charging demand, gauge readiness for EV charging installation, and develop actionable plans. The fact sheets and case studies highlight the diversity of emerging MUD EV charging solutions, featuring different geographic and structural installation scenarios and providing interested parties with a menu of options, rather than prescribing a one-size-fits-all solution. The following resources are included in the toolkit to provide MUD stakeholders with all the information needed to navigate EV charging installation at their MUD location: Empowerment Toolkit – Easy-to-read FAQ overview, stakeholder roles and responsibilities, and additional resources for MUD EV charging installations; Charging Basics – Glossary of terms and descriptions of charging features, installation and operating expenses; EV Charging Survey Templates – Resident-to-Resident, Property Manager-to-Resident and HOA-to-Resident template letters with pre-populated template questions; Technology Selection Tool – Charging barrier fact sheets and case study examples; Installation Checklist – Submittal document requirements for EVSE installations; MUD Building Self-Evaluation Survey – Self-guided evaluation of potential barriers to EV charging installation at MUD locations; Curbside Resources – Case studies and fact sheets for curbside charging options; Find a Certified Electrician – Approved list of certified EV charging installers; “Right-to-Charge” State Legal References – Legal requirements for charging equipment at MUD locations. The online toolkit was promoted extensively in the final six months of the project and will continue to be disseminated by the Clean Cities Coalitions and other partners after the end of the VCI-MUD project to encourage, support, and demonstrate viable solutions for vehicle charging infrastructure in MUDs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Agile Training [Slides]

The purpose of this course is to help you recognize the main characteristics of the Agile approach to training and to implement the Agile Training Checklist in training development.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

SolarAPP+ Performance Review (2023 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. SolarAPP+ is available to AHJs at no cost. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2023, the National Renewable Energy Laboratory (NREL) had contacted over 1,700 AHJs with significant solar permitting volume regarding SolarAPP+. Of those, 793 AHJs had expressed interest in the platform as of the end of 2023. 161 AHJs had begun piloting the platform and 97 of these had publicly launched the platform by the end of 2023. In 2023, 668 installers submitted 18,906 permits through the SolarAPP+ platform, including 4,834 permits submitted as part of a solar plus storage program. SolarAPP+ permits accounted for around 43% of all permits issued in participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 14.5 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 7,200 hours of AHJ staff time in 2023. Finally, we estimate that SolarAPP+ eliminated over 150,000 business days in permitting-related delays in 2023.

14 SOLAR ENERGY↗

A Tutorial Set to Prepare for Science with the Vera C. Rubin Observatory

In this poster the Rubin Observatory's Community Science team (CST) presents its current suite of tutorials, which are designed to help people make use of simulated data sets in preparation for the upcoming Legacy Survey of Space and Time (LSST). We will show examples of the tutorial contents, provide custom learning modules for different astronomical fields, and describe the online environment for data analysis (the Rubin Science Platform; RSP). We will also supply a checklist for how to obtain an RSP account and access the tutorials. All are welcome to drop by the poster or the Rubin booth in the exhibit hall with questions.

79 ASTRONOMY AND ASTROPHYSICS↗

Use Case-Informed Framework for Utility Cloud Migration

This white paper presents a comprehensive methodology for assessing utilities’ cloud postures and frameworks. It aims to produce a roadmap and strategy for a cloud-enabled grid future, providing guidance for integrators, asset owners, and operators. Instead of offering a yes or no answer for cloud implementation, this framework offers strategic guidance on responsibly preparing for and deploying cloud solutions. This paper delves into cloud-service models pertinent to the electric sector, dissecting the shared responsibility model and elucidating what on-premise infrastructure as a service (IaaS), platform as a service (PaaS), and software as a service (SaaS) entail. A pivotal consideration within the context of the shared responsibility model is the allocation of responsibility for foundational security aspects—a decision that will be informed by a comprehensive risk assessment. The ensuing discussion will present a checklist of certifications necessary for a secure cloud transition, equipping utilities with the knowledge to navigate this digital transformation with confidence and with a strategic roadmap. Furthermore, the paper outlines gaps in understanding the U.S. government’s role in shaping technology development and responsible use. Its purpose is to aid decision-making by offering support for risk-informed solutions that benefit those managing assets and operating in the cloud environment. The primary objective is to enhance the resilience and future readiness of a decarbonized electric grid, with cloud solutions as one viable option. The paper synthesizes information on current and future grid architectures and applications, considering both conservative and progressive energy transitions, along with scalable and distributed computing considerations.

24 POWER TRANSMISSION AND DISTRIBUTION↗