Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “charge storage”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Influence of Thermal Energy Storage Integration Strategy on System Performance and Refrigerant Charge for Small-Scale R290 Heat Pumps

As small-scale (2.5 – 5 kW) heat pumps across the US increase straining the grid during peak hours, integrated heat pump thermal energy storage (HP-TES) systems can assist by load shifting. However, challenges arise when assembling these systems, as direct refrigerant-phase change material (PCM) heat exchangers (HXs) increase refrigerant charge, and indirect secondary loops degrade HP-TES performance. In this work, direct and indirect HP-TES configurations were sized using commercially available HXs to compare the available load shift time and performance at similar refrigerant charges. For the same indirect 5 kW HP-TES refrigerant charge, directly HP-TES can operate up to 72 and 145 minutes in cooling and heating modes, respectively, using small diameter tubes. Using Modelica, COP increases for direct and indirect HP-TES were 22% and 9%, respectively, given the parasitic losses in the indirect HP-TES. Overall, small-scale direct HP-TES can have comparable refrigerant charges with indirect HP-TES maximizing COP improvements.

25 ENERGY STORAGE↗

CERF: IM3 Projected Western US Power Plant Locations

Overview The Capacity Expansion Regional Feasibility (CERF) model is an open-source geospatial python package that provides new power plant locations at a 1km resolution. The model ingests U.S. state or regional-scale electricity system capacity expansion plans, such as those produced by the Global Change Analysis Model (GCAM-USA), and identifies feasible, site-specific locations for individual new power plants (renewable and non-renewable). CERF combines high-resolution geospatial suitability analyses with an economic algorithm that selects individual plant siting locations based on grid interconnection costs and the locational marginal value of new generation. The model incorporates a wide range of dynamic constraints and opportunities, such as protected lands, population density, existing infrastructure, and water availability. This dataset provides CERF power plant siting results for IM3 Phase 2 simulations across eight different scenarios for the Western US through 2055. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States (see, https://tgw-data.msdlive.org/). These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 CERF siting results in this dataset correspond to capacity expansion plans in the GCAM-USA IM3 Phase 2 simulation data and are available for each of the above scenarios. Data Details Temporal Range: 2015-2055 in 5-year timesteps. Note that 2015 is the experiment base year and 2020 and beyond represent model simulation years. Spatial Range: Plant locations are provided for the eleven states in the Western US including Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington, and Wyoming. Spatial Resolution: 1 km-squared, provided in x and y coordinates Geospatial Projection: Albers Equal Area Conic (ESRI:102003) File Type: csv The dataset contains subdirectories for each of the eight scenarios described in the overview. Each scenario folder contains two subfolders with the following information: 1. Power Plant Data This directory contains a single .csv file of power plant locations for both pre-existing (non-CERF sited plants in operation in 2015) and new (CERF-sited) power plants across the temporal range along with additional CERF model output parameters for CERF-sited plants. Plant with a siting year earlier than 2020 correspond to facilities that are operational leading into the first timestep CERF simulation. For a more detailed description of CERF model output parameters, see the CERF model documentation. Note that the cerf_plant_id parameter is unique within each scenario file but not across scenario files. Parameter Descriptions scenario - Name of scenario cerf_plant_id - Unique siting identifier cerf_sited - If True, indicates that plant was sited by CERF model. If False, indicates pre-existing facility region_name - Name of region (state) tech_id - Technology ID tech_name - Full generation technology name inclusive of cooling type (if applicable) and additional characteristics tech_simple - Simplified generation technology type unit_size_mw - Power plant unit size (MW) xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) index - Index position in the flattend 2D array buffer_in_km - Exclusion buffer around site (km) sited_year - Year of siting retirement_year - Year of retirement lmp_zone - Locational marginal price (LMP) zone ID locational_marginal_price_usd_per_mwh - Locational marginal price ($/MWh) generation_mwh_per_year - Generation output (MWh/yr) operating_cost_usd_per_year - Cost of plant operations ($/yr) net_operational_value - Net operational value based on LMP and and operating costs ($/yr) interconnection_cost - Cost of interconnection for transmission & gas pipeline (if applicable) net_locational_cost -- Difference of interconnection cost and operating value ($/yr) capacity_factor_fraction - Capacity factor (fraction) carbon_capture_rate_fraction - Carbon capture rate (fraction) fuel_co2_content_tons_per_btu - Fuel CO2 content (tons/Btu) fuel_price_usd_per_mmbtu - Fuel price ($/MMBtu) fuel_price_esc_rate_fraction - Fuel price escalation rate (fraction) heat_rate_btu_per_kWh - Heat rate (Btu/kWh) lifetime_yrs - Technology lifetime for annuity (years) operational_life_yrs - Operational lifetime for retirement (years) variable_om_usd_per_mwh - Variable operation and maintenance costs of yearly capacity use ($/MWh) variable_om_esc_rate_fraction - Variable operation and maintenance costs escalation rate (fraction) carbon_tax_usd_per_ton - Carbon tax ($/ton) carbon_tax_esc_rate_fraction - Carbon tax escalation rate (fraction) 2. Storage Data This directory contains information on new and pre-existing energy storage facilities operational in each timestep along with various storage operational parameters. The 2015 timestep provides pre-existing energy storage data and corresponds with facilities that are operational leading into the first model simulation timestep. Note that coordinates in the storage files correspond to the interconnection point on the grid (substation location), not individual energy storage locations. Energy storage is added in a cumulative process at each given interconnection point. That is, each individual file provides the total operational storage capacity interconnected to the specified substation for the given timestep, inclusive of previously installed storage at that location and new storage installed in that timestep at that location. Parameters scenario - Name of scenario timestep - Simulation timestep name - Unique storage identifier s_typ - Type of energy storage technology (battery or pumped storage hydro) s_node - Node ID of interconnecting substation xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) charge_rate - Maximum charge rate (power capacity) of storage system (MW) discharge_rate - Maximum discharge rate (power capacity) of storage system (MW) duration - Duration of storage system (hours) max_SoC - Allowed maximum state of charge (energy capacity) of storage system (MWh) min_SoC -Allowed minimum state of charge (energy capacity) of storage system (MWh) charge_eff - Efficiency of charge (fraction between 0 and 1) discharge_eff - Efficiency of discharge (fraction between 0 and 1) Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program.

CERF↗

Systems and methods for managing energy storage operations

An energy storage device (ESD) manager determines charge conditions that result in charge-related aging of an energy storage device (ESD), such as a battery, cell, or the like. The ESD manager may determine charge-related costs for charge operations, which may quantify charge-related aging imposed by subjecting ESD to specified charge conditions. The ESD manager may evaluate and/or modify charge operations to reduce charge-related aging. The ESD manager may be further configured to model charge-related aging behavior over time and/or under variable charge conditions. The ESD manager may configure charge operations to ensure that charge-related performance loss remains below a threshold for a specified usage duration.

Gering, Kevin L.↗

Evaluation of thermal energy storage for central receiver concentrating solar power plants under charging cycles through structural assessment

Electricity production by concentrated solar power (CSP) systems has stood out among energy transition alternatives due to their large generation capacity (between 30 MW and 400 MW) and high capacity factor (80%) when incorporating thermal storage systems (TES). Although TES tanks in operation worldwide are made of austenitic steels with remarkable mechanical and anticorrosive properties, operational failures have been reported due to low-cycle fatigue, creep, and the abrupt release of residual stresses generated during tank manufacturing. A critical operation for salt tanks is the initial daily charging operation, given the low fluid level and the thermal gradients between the inventory and the salt entering the tank. This study presents a structural simulation of a 39.6 m-diameter molten salt tank for central receiver CSP plants, accounting for temperature and pressure variations during charging and different sparger ring inlet configurations. The initial pre-stressed condition of the floor, resulting from the manufacture of welded plates, is used as a boundary condition. The fatigue and creep life analyses were performed in accordance with the ASME BPVC and API standards. It was found that the tank's floor is in a less favourable mechanical condition than the wall, due to its initial manufacturing condition and the maximum temperature differences during charging. A critical zone was identified in an area affected by residual stress on the floor and under the sparger ring. The baseline sparger ring configuration, with 52 2-inch-diameter orifices and a flow direction of 90 degrees , results in an average floor stress of approximately 25 MPa and creep damage after 1.2 years of tank operation.

14 SOLAR ENERGY↗

Impedance Modeling for Mixed Conductors with Simultaneous Insertion & Electrocatalytic Reactions: A Case Study of Transition-Metal Hydroxides in Aqueous Electrolyte

Electrochemical impedance spectroscopy (EIS) is commonly used to investigate the kinetics of mixed ionic–electronic conductor (MIEC) electrodes. Across various applications, MIECs exhibit ionic (e.g., insertion) and/or electronic (e.g., electrocatalytic) charge transfer reactions at the electrode/electrolyte interface. Bulk storage and transport of charge carriers also couple with these interfacial reactions. Here, we build a generalized, physics-based impedance model for MIECs with an ion-blocking current collector and explore how bulk and interfacial resistance, chemical capacitance, and DC polarization affect the impedance response. Using transition metal hydroxides as a case study, we provide guidance on extracting reaction kinetics or bulk resistance from the Nyquist plots in interface- or bulk-controlled conditions, respectively. Generalizing our EIS analysis enables a robust analysis of MIEC kinetics for a diverse set of systems.

36 MATERIALS SCIENCE↗

SPECs Early-Stage Decision Model: User Manual

The SPECs Early-Stage Decision (ESD) model is central to the SPECs procurement solutions toolkit. The ESD model is an Excel-based spreadsheet model, which provides information about the economic and strategic value of a proposed battery-storage project or solar-plus-storage (solar-plus) project. The model can be used to explore combinations of storage-related project value streams in order to define a potential project, while educating co-op decision-makers about project benefits and costs. A sensitivity analysis function speeds the development of "what-if" scenarios. A gap analysis function solves for top-priority metrics and supports the inclusion of hard-to-monetize strategic values, such as the value of storage to defer costly system upgrades in light of increasing distributed solar and other distributed energy resources (DERs). Model outputs include the utility data, assumptions, and use-case scenarios that are recommended content for the requests for proposals (RFPs). The model may also provide an initial "sanity check" for RFP responses, supporting further discussions among utility staff, vendors and stakeholders. The ESD is not a "finance-grade" modeling tool, and users are cautioned to be mindful of its limitations, but the model has been reviewed by users, who recommend it as a way to drive faster and better project design and planning, as well as to facilitate better communications with vendors, grid partners, and stakeholders.

14 SOLAR ENERGY↗

Charging infrastructure access and operation to reduce the grid impacts of deep electric vehicle adoption

Electric vehicles will contribute to emissions reductions in the United States, but their charging may challenge electricity grid operations. We present a data-driven, realistic model of charging demand that captures the diverse charging behaviours of future adopters in the US Western Interconnection. We study charging control and infrastructure build-out as critical factors shaping charging load and evaluate grid impact under rapid electric vehicle adoption with a detailed economic dispatch model of 2035 generation. We find that peak net electricity demand increases by up to 25% with forecast adoption and by 50% in a stress test with full electrification. Locally optimized controls and high home charging can strain the grid. Shifting instead to uncontrolled, daytime charging can reduce storage requirements, excess non-fossil fuel generation, ramping and emissions. Our results urge policymakers to reflect generation-level impacts in utility rates and deploy charging infrastructure that promotes a shift from home to daytime charging.

33 ADVANCED PROPULSION SYSTEMS↗

Sparse chronology strategy for integrating seasonal energy storage in capacity expansion models

Here, this study develops the sparse chronology method to enhance the representative period framework in capacity expansion models, enabling the effective integration of long-duration energy storage modeling. Traditional representative period methods cannot capture the state of charge of seasonal energy storage systems because they do not establish effective inter-day linkages to connect the state of charge between periods. The sparse chronology approach addresses this limitation by establishing inter-day linkages that allow state of charge to shift inter-seasonally. At the same time, it groups identical representative days into partitions, applying constraints sparsely and implicitly to reduce computational load further. Validation results demonstrate that this method successfully simulates long-duration energy storage patterns, achieving close alignment with a continuous yearly benchmark model, with seasonal trends and state of charge cycles clearly represented. The computational load analysis reveals that the sparse chronology method efficiently applies constraints on maximum and minimum state of charge limits within the representative day framework, eliminating the need for detailed constraints on each individual day. By partitioning representative days and constraining only the start and end of each partition, the method significantly decreases computational requirements. Simulation results show that sparse chronology closely approximates the continuous yearly method's accuracy, even with as few as 20 representative days, achieving correlation values with the benchmark of nearly 0.9 in state of charge plots. Furthermore, it maintains computational efficiency, requiring only 4 % of the solver time compared to the continuous yearly method with 20 representative days. This approach allows capacity expansion models to incorporate long-duration energy storage with high temporal, spatial, and technological resolution, enabling more detailed modeling for large-scale power systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Construction of MoS 2 /MoO 3 Heterostructure with Ultrafast-Charged and Superior Low-Temperature Sodium Storage Properties

The electrochemical reaction kinetics of sodium-ion batteries (SIBs) become sluggish at low temperatures, resulting in significant reductions in energy density and power density. Rational design of anode materials with excellent low-temperature performance is of great significance for promoting the application of SIBs under extreme conditions. Here, in this study, the spontaneous hydrolysis and oxidation reactions of MoS 2 in aqueous solution are used to successfully construct the MoS 2 /MoO 3 heterostructure. The formation of built-in electric fields at the MoS 2 /MoO 3 heterointerfaces improves the electrochemical reaction kinetics, thereby enhancing the rate performance. In addition, the dual-phase material can effectively buffer the volume strain during the cycle process, thereby improving the cycle stability. Thus, the MoS 2 /MoO 3 displays ultrafast charging properties at room temperature (up to 244.6 mAh g –1 at 40 A g –1 , discharge/charge in 22 s). Even at −40 °C, it also exhibits a high capacity of 303.7 mAh g –1 and superior cycling performance (capacity retention rate up to 92.9% after 900 cycles at 2 A g –1 ).

MoS2↗

Electrostatic harvester device

An electrostatic harvester device for charging an energy storage device is provided. The electrostatic harvester device comprises an inductor, a variable capacitor device, a semiconductor device, and a plurality of transistors. The inductor is operable to receive electric charge and store the electric charge. The variable capacitor device is configured to receive electric charge from the inductor and to change capacitance in response to physical stimulation. The semiconductor device is operable to allow electric current to flow from the variable capacitor device. The transistors are operable to connect at least two of the aforementioned devices. At least one of the transistors comprises at least one of gallium nitride or aluminum gallium nitride.

Wilson, Amy Charlene↗

Resilient and Cost-Effective Hybrid Li-Ion Battery Energy Storage System for Sites with Solar Generation and Electric Vehicle (EV) Charging (CRADA Final Report, CRD-19-00799)

The batteries of an energy storage system designed for multiple use-cases are traditionally selected to withstand the highest rate at which a battery is discharged relative to its maximum capacity (C-rate) and cycling requirements of the most intense use-case. However, this is not cost-effective given that the price of the batteries is strongly correlated to C-rate and cyclability. We propose to establish design guidelines for a hybrid energy storage system and test an edge controller that uses high-power and high-energy batteries for high- cyclability use cases such as frequency regulation and electric vehicle (EV) charging and low-cost batteries for low-power and low-cyclability use cases such as summer peak loads. The three main objectives of this proposal are (i) establishing sizing guidelines for such a hybrid storage system, (ii) installing a hybrid storage system in the Energy Systems Integration Facility (ESIF) sized based on those guidelines, and (iii) testing an edge controller specific for the system through hardware tests.

14 SOLAR ENERGY↗

CyDER: A Cyber Physical Co-simulation Platform for Distributed Energy Resources in Smartgrids

The CyDER project aimed at developing an open-source, modular and scalable co-simulation platform for power grids with large shares of Distributed Energy Resources (DERs). The project partners are the Lawrence Berkeley National Lab (LBNL), Lawrence Livermore National Lab (LLNL), PG&E, SolarCity, and ChargePoint. The prime recipient is LBNL; SolarCity and ChargePoint were partners for the project’s first two years. Increased DER integration introduces a number of challenges in power grid operation including a more dynamic interaction between the transmission grid and distribution grids, and increased modeling complexity. Although specialized software exists to precisely model different components of the power system, it is far from trivial to integrate all various models and perform a holistic simulation. Instead of replicating all models in a common simulation program, a commonly accepted approach to tackle this model diversity is to couple third-party simulators and models through a co-simulation platform that coordinates information exchange among the various components. Following this line of research, this project’s objective was to develop a co-simulation platform based on a widely accepted industrial standard called Functional Mockup Interface (FMI). Within this process, the project developed models compliant with the FMI standard, called Functional Mockup Units (FMUs), and used them to perform various operational and planning power system analyses. Relying and building upon an industrial standard is the main differentiation of this project compared with previous or parallel efforts in the co-simulation area. Particular emphasis was put on delivering software utilities to facilitate setting up and running co-simulations by end-users. Furthermore, a strong aspect of this project is demonstrating that co-simulation techniques can be used to perform Hardware-in-the-Loop (HIL) simulations that couple software components (e.g., simulated models) with hardware components (e.g., real devices such PV systems and batteries). The long-term goal of CyDER project is to help establish FMI as a powerful standard for co-simulation and promote adoption by electric utilities and other interested stakeholders. The main accomplishments of the project include the development of several FMUs including distribution and transmission grid models, PV inverters with Volt/Var/Watt controllers, batteries, and predictive optimal controllers. Additionally, a unique software package was developed, called SimulatorToFMU, which is capable of exporting any Python-driven simulator or Python script as an FMU. This is an important contribution towards establishing FMI as one of the main co-simulation standards, because more and more third-party programs for sub-system modeling and simulation are delivered with Python APIs. The CyDER platform was used to perform PV hosting capacity analyses in real utility feeders with and without smart inverter controls, battery storage, and EV charging. Smart inverter controls include conventional Volt/Var/Watt controls for reactive power support and active power curtailment, but also predictive controls that optimize the charging and discharging profile of the battery connected on the DC side in order to minimize the customer’s economic benefit. Finally, an important result of this project is delivering an experimental setup that consists of residential-scale PV inverters with battery storage, a real-time grid simulator with an ideal voltage source as grid emulator, and micro Phasor Measurement Units (PMUs). All these components and additional software modules are coupled to one another using the FMI standard and can be co-simulated with the CyDER platform.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integration of Pumped Heat Energy Storage with Fossil-Fired Power Plant (Final Report)

The project team of Southwest Research Institute ® (SwRI ® ), Malta Inc. (Malta), and Luminant Generation Company LLC (Luminant) completed a feasibility study for the integration of a 100-MW, 10-hour (1000-MWh) Malta Pumped Heat Energy Storage (MPHES) system with multiple full-sized fossil-fired electricity generation units (EGU) in Luminant portfolio. MPHES is a long-duration, molten-salt-energy storage technology that uses turbomachinery and heat exchangers to transfer energy to a thermal storage media when charging, and removes the heat in a similar fashion when discharging. With high round trip efficiency (60-65%) and long lifespan (30+ years), MPHES provides economic benefits to the fossil-asset owners that can be scaled to integrate with assets across their portfolio. This technology uses hardware components, workforce personnel, and skillsets similar to those used by fossil EGUs, allowing for synergy when co-locating the two technologies. Luminant has approximately 39,000 megawatts of generation across 12 states, operating in six of the seven competitive markets in the U.S. and powered by a diverse portfolio of natural gas, nuclear, coal, and solar facilities. The DeCordova plant in Granbury, Texas, a simple cycle natural gas peaker power plant, was used as the fossil-fired asset in this project. The local market in Granbury, Texas has many influences, including several nearby power plants, a Luminant-owned nuclear plant (Comanche Peak), and substantial wind energy, which causes both negative pricing at night and high market volatility. Reducing false starts of the DeCordova plant and better responding to market volatility would be an economic advantage. Luminant is currently integrating battery storage plant on site to begin addressing these challenges. Integrating long-duration storage, like MPHES, would expand this capability beyond one hour of storage and have the potential to greatly reduce the total number of gas turbine starts. The MPHES charging requirement could help offset the overnight operating costs of Comanche Peak, which cannot load follow, and the nearby Luminant-owned Wise County combined cycle plant that cycles too often. Following the assessment of Luminant’s ERCOT-based portfolio for integration compatibility with Malta’s PHES system and the project tasks of conceptual study, technoeconomic analysis, technology gap assessment, and commercialization plan, the project team effort has resulted in several key outcomes: (1) Identification of market trends in a high-wind penetration market outside a major metropolitan area; (2) Creation of a dispatching model for the MPHES system and the pairing of Li-ion battery with a gas turbine in a real time market; (3) Revenue and cost estimations for operating MPHES alongside a gas peaker plant with real dispatching considerations and comparison with variations in the Malta implementation, including doubling the storage capacity and using two discharge drivetrains; (4) Potential carbon emission reductions possible by replacing gas turbine operation with Malta PHES operation; and (5) Summary of literature-based future market predictions for Texas.

20 FOSSIL-FUELED POWER PLANTS↗

Harvesting Wave Energy to Power Acoustic Transmitters Using Triboelectric Nanogenerator

Wave energy has the largest reserves and widest distribution among blue energy sources. However, the conversion and utilization of ocean wave energy are challenging. In this work, we developed a contact-separation mode triboelectric nanogenerator (TENG) with a simple structure for harvesting wave energy and powering marine sensors and transmitters and performed detailed electrical characterization under controlled laboratory conditions. A prototype power management circuit (PMC) was implemented to improve the output performance of the TENG. The output from the PMC could charge up a storage capacitor for powering sensors and electronics. Eventually, the TENG was integrated within a water-proof enclosure and tested using a custom-built wave simulator to evaluate the device performance in a more representative scenario. The device sustainably powered up an array of 27 LEDs and was able to charge up a capacitor up to 1.8 V for driving an acoustic transmitter. The results demonstrate that TENG technology shows great promise in harvesting low-frequency ocean wave energy.

Yang, Yang↗

Cryogenic energy storage: Standalone design, rigorous optimization and techno-economic analysis

Energy storage allows flexible use and management of excess electricity and intermittently available renewable energy. Cryogenic energy storage (CES) is a promising storage alternative with a high technology readiness level and maturity, but the round-trip efficiency is often moderate and the Levelized Cost of Storage (LCOS) remains high. The complex flowsheets with intricate thermodynamics at cryogenic temperatures as well as the presence of multiple loops and refrigeration cycles pose considerable challenges for rigorous model-based design and optimization of CES systems. We present an optimization strategy that couples rigorous process simulation and Bayesian optimization with flowsheet decomposition and identification of hidden coupling constraints to optimally design standalone CES systems. Further refinement is done via a local search using the limited-memory Broyden–Fletcher–Goldfarb–Shanno algorithm. Here our results indicate that it is possible to achieve more than 52% round-trip efficiency and an LCOS of $153/MWh for a standalone 100 MW/400 MWh CES system limited to short-term storage with daily charging–discharging. However, a detailed techno-economic assessment reveals that the LCOS considering total capital investment may exceed $267/MWh when all direct and indirect costs of installation and operation are considered.

25 ENERGY STORAGE↗

Grid regulation services for energy storage devices based on grid frequency

Disclosed herein are representative embodiments of methods, apparatus, and systems for charging and discharging an energy storage device connected to an electrical power distribution system. In one exemplary embodiment, a controller monitors electrical characteristics of an electrical power distribution system and provides an output to a bi-directional charger causing the charger to charge or discharge an energy storage device (e.g., a battery in a plug-in hybrid electric vehicle (PHEV)). The controller can help stabilize the electrical power distribution system by increasing the charging rate when there is excess power in the electrical power distribution system (e.g., when the frequency of an AC power grid exceeds an average value), or by discharging power from the energy storage device to stabilize the grid when there is a shortage of power in the electrical power distribution system (e.g., when the frequency of an AC power grid is below an average value).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Backup Power Performance of Solar-plus-Storage Systems during Routine Power Interruptions: A Case Study Application of Berkeley Lab’s PRESTO Model

This technical brief estimates the expected performance of a solar photovoltaic and energy storage system (PVESS) for providing backup power during short-duration power interruption events, accounting for the unpredictable nature of those events. The analysis relies on the Power Reliability Event Simulation TOol (PRESTO), a publicly available model developed by Berkeley Lab to simulate the occurrence of short-duration power interruption events at the county-level. A separate storage dispatch model is then used to simulate PVESS operation and backup performance for each of the large number of interruption events produced by PRESTO. In performing this simulation, the analysis accounts for how the customer operates its battery on a day-to-day basis—in this case, we assume the battery is cycled each day in response to time-of-use rates—and how that, in turn, impacts the battery’s state of charge at the beginning of each interruption event. The analysis presented here is intended to demonstrate an application of the PRESTO model as well as to illustrate some of the key determinants of PVESS backup power performance during short-duration power interruption events. The analysis focuses initially on a typical single-family home in Maricopa County, Arizona, and includes a limited set of scenarios related to system sizing, backup power configuration, and whether the customer charges its battery storage system from the grid during normal operating conditions. The analysis also presents comparative results for two other counties, in Massachusetts (Middlesex) and California (Los Angeles), illustrating how regional differences in climate, interruption patterns, and retail rate structures can affect PVESS performance as a backup power source. In the conclusions, we highlight a number of other important considerations for evaluating PVESS backup power capabilities.

14 SOLAR ENERGY↗