Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “WIGGLER MAGNETS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

LCLS Undulator Quadrupole Fiducialization Plan

This note presents the fiducialization plan for the LCLS undulator quadrupoles. The note begins by summarizing the requirements for the fiducialization. A discussion of the measurement equipment is presented, followed by the methods used to perform the fiducialization and check the results. This is followed by the detailed fiducialization plan in which each step is enumerated. Finally, the measurement results and data storage formats are presented. The LCLS is made up of 33 assemblies consisting of an undulator, quadrupole, beam finder wire, and other components mounted on a girder. The components must be mounted in such a way that the beam passes down the axis of each component. In this note, we describe how the ideal beam axis is related to tooling balls on the quadrupole. This step, called fiducialization, is necessary because the ideal beam axis is determined magnetically, whereas tangible objects must be used to locate the quadrupole. The note begins with the list of fiducialization requirements. The laboratory in which the work will be performed and the relevant equipment is then briefly described. This is followed by a discussion of the methods used to perform the fiducialization and the methods used to check the results. A detailed fiducialization plan is presented in which all the steps of fiducialization are enumerated. A discussion of the resulting data files and directory structure concludes the note.

43 PARTICLE ACCELERATORS↗

Vertically polarizing undulator with the dynamic compensation of magnetic forces for the next generation of light sources

A short prototype (847-mm-long) of an Insertion Device (ID) with the dynamic compensation of ID magnetic forces has been designed, built, and tested at the Advanced Photon Source (APS) of the Argonne National Laboratory. The ID magnetic forces were compensated by the set of conical springs placed along the ID strongback. Well-controlled exponential characteristics of conical springs permitted a very close fit to the ID magnetic forces. Several effects related to the imperfections of actual springs, their mounting and tuning, and how these factors affect the prototype performance has been studied. Finally, series of tests to determine the accuracy and reproducibility of the ID magnetic gap settings have been carried out. Based on the magnetic measurements of the ID B{sub eff}, it has been demonstrated that the magnetic gaps within an operating range were controlled accurately and reproducibly within ±1 μm. Successful tests of this ID prototype led to the design of a 3-m long device based on the same concept. The 3-m long prototype is currently under construction. It represents R and D efforts by the APS toward APS Upgrade Project goals as well as the future generation of IDs for the Linac Coherent Light Source (LCLS)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Optimization of the Coherent Intensity from Multi-Segment Undulators by Phase Matching

The use of inline insertion devices at third-generation synchrotron radiation sources can result in destructive interference effects if the relative phase between the devices is not properly adjusted. The destructive interference can strongly affect the emission spectrum and coherent wavefront of a compound insertion device. We simulate the photon source generated by a dual-inline elliptically polarizing undulator (EPU) situated in a low-{beta} straight section of the planned NSLS-II storage ring and show that a magnetic chicane with adjustable field integral can be used to phase-match the devices. Furthermore, we show that the maximum coherent intensity is delivered by a focusing x-ray beamline if the chicane is adjusted to phase-match the off-axis and red-shifted radiation. Such a system will be installed at the coherent soft x-ray (CSX) beamline of the NSLS-II in order to provide the highest possible coherent flux for coherent soft x-ray scattering experiments.

36 MATERIALS SCIENCE↗

FULL ELECTROMAGNETIC SIMULATION OF FREE-ELECTRON LASER AMPLIFIER PHYSICS VIA THE LORENTZ-BOOSTED FRAME APPROACH

Numerical simulation of some systems containing charged particles with highly relativistic directed motion can by speeded up by orders of magnitude by choice of the proper Lorentz-boosted frame[1]. A particularly good example is that of short wavelength free-electron lasers (FELs) in which a high energy electron beam interacts with a static magnetic undulator. In the optimal boost frame with Lorentz factor gamma_F , the red-shifted FEL radiation and blue shifted undulator have identical wavelengths and the number of required time-steps (presuming the Courant condition applies) decreases by a factor of 2(gamma_F)**2 for fully electromagnetic simulation. We have adapted the WARP code [2]to apply this method to several FEL problems involving coherent spontaneous emission (CSE) from pre-bunched ebeams, including that in a biharmonic undulator.

43 PARTICLE ACCELERATORS↗

Undulator Radiation Damage Experience at LCLS

The SLAC National Accelerator Laboratory has been running the Linac Coherent Light Source (LCLS), the first x-ray Free Electron Laser since 2009. Undulator magnet damage from radiation, produced by the electron beam traveling through the 133-m long straight vacuum tube, has been and is a concern. A damage measurement experiment has been performed in 2007 in order to obtain dose versus damage calibrations. Radiation reduction and detection devices have been integrated into the LCLS undulator system. The accumulated radiation dose rate was continuously monitored and recorded. In addition, undulator segments have been routinely removed from the beamline to be checked for magnetic (50 ppm, rms) and mechanic (about 0.25 µm, rms) changes. A reduction in strength of the undulator segments is being observed, at a level, which is now clearly above the noise. Recently, potential sources for the observed integrated radiation levels have been investigated. The paper discusses the results of these investigation as well as comparison between observed damage and measured dose accumulations and discusses, briefly, strategies for the new LCLS-II upgrade, which will be operating at more than 300 times larger beam rate.

43 PARTICLE ACCELERATORS↗

Some aspects of achieving an ultimate accuracy during insertion device magnetic measurements by a Hall probe

An extensive test of a new Senis 2-axis Hall probe was done at the Advanced Photon Source using the Undulator A device and calibration system. This new probe has clear advantages compared with previously used Bell and Sentron Hall probes: very stable zero offset (less than the noise of 0.026 G) and compensated planar Hall effect. It can be used with proper calibration even for first and second field integral measurements. A comparison with reference measurements by long stretched coil shows that the difference in the first field integral measurement results for a 2.4-m-long Undulator A device is between 17 G cm for the best of four Hall probes used for the test and 51 G cm for the worst of them for all gap ranges from 10.5 mm to 150 mm.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Development of cryogenic undulators with PrFeB magnets at SOLEIL

Short period high field undulators are of interest for X-ray brilliance enhancement in synchrotron radiation applications and for compact Free Electron Lasers. Cryogenic in-vacuum undulators [1] are one of the possible solutions. At SOLEIL, PrFeB magnets were directly chosen, even if still under development at that time. Indeed, they enable to avoid the spin transition reorientation phenomenon which occurs with NdFeB magnets [2] and the magnets can be cooled down directly at 77 K. The first selected grade CR53 from Hitachi presents a remanence of 1.35 T at 293 K and 1.57 T at 77 K, with a coercivity of 1355 kA/m at 293 K and 6000 kA/m at 77 K. A 2 m long cryogenic undulator of period 18 mm was first built in-house, with a specific Hall probe bench directly installed in the final vacuum chamber. This first cryogenic undulator has been in operation on the storage ring for 4 years [3]. A second U18 cryo-ready undulator using a slightly different magnet grade with a higher coercivity and modules with magnets surrounded by two half poles for easier magnetic optimization is under construction. A third 3 m long cryo-ready undulator U15 with a period of 15 mm is under development. It will be first used for the LUNEX5 FEL [4, 5] project (COXINEL demonstration of FEL amplification with a laser wakefield acceleration [6]). The measurement bench will include a correction of the Hall probe position and angle, the field integrals will be measured with a stretched wire.

43 PARTICLE ACCELERATORS↗

Conceptual design of front ends for the advanced photon source multi-bend achromats upgrade

The proposed Advanced Photon Source (APS) upgrade from a double-bend achromats (DBA) to multi-bend achromats (MBA) lattice with ring energy change from 7 GeV to 6 GeV and beam current from 100 mA to 200 mA poses new challenges for front ends. All front ends must be upgraded to fulfill the following requirements: 1) handle the high heat load from two insertion devices in either inline or canted configuration, 2) include a clearing magnet in the front end to deflect and dump any electrons in case the electrons escape from the storage ring during swap-out injection with the safety shutters open, 3) incorporate the next generation x-ray beam position monitors (XBPMs) into the front end to meet the new stringent beam stability requirements. This paper presents the evaluation of the existing APS front ends and standardizes the insertion device (ID) front ends into two types: one for the single beam and one for the canted beams. The conceptual design of high heat load front end (HHLFE) and canted undulator front end (CUFE) for APS MBA upgrade is presented.

43 PARTICLE ACCELERATORS↗

Use of the Lorentz-Boosted Frame Transformation to Simulate Free-Electron Laser Amplifier Physics

Recently [1]it has been pointed out that numerical simulation of some systems containing charged particles with highly relativistic directed motion can by speeded up by orders of magnitude by choice of the proper Lorentz boosted frame. A particularly good example is that of short wavelength free-electron lasers (FELs) in which a high energy (E0>_ 250 MeV) electron beam interacts with a static magnetic undulator. In the optimal boost frame with Lorentz factor gamma F, the red-shifted FEL radiation and blue shifted undulator have identical wavelengths and the number of required time-steps (presuming the Courant condition applies) decreases by a factor of g2 F for fullyelectromagnetic simulation. We have adapted the WARP code [2]to apply this method to several FEL problems including coherent spontaneous emission (CSE) from pre-bunched e-beams, and strong exponential gain in a single pass amplifier configuration. We discuss our results and compare with those from the"standard" FEL simulation approach which adopts the eikonal approximation for propagation ofthe radiation field.

43 PARTICLE ACCELERATORS↗

Use of the Lorentz-Boosted Frame Transformation to Simulate Free-Electron Laser Amplifier Physics

Recently it has been pointed out that numerical simulation of some systems containing charged particles with highly relativistic directed motion can by speeded up by orders of magnitude by choice of the proper Lorentz boosted frame. A particularly good example is that of short wavelength free-electron lasers (FELs) in which a high energy (E{sub 0}{>=}250 MeV) electron beam interacts with a static magnetic undulator. In the optimal boost frame with Lorentz factor {gamma}F, the red-shifted FEL radiation and blue shifted undulator have identical wavelengths and the number of required time-steps (presuming the Courant condition applies) decreases by a factor of {gamma}{sub F}{sup 2} for fully electromagnetic simulation.We have adapted the WARP code to apply this method to several FEL problems including coherent spontaneous emission (CSE) from pre-bunched e-beams, and strong exponential gain in a single pass amplifier configuration. We discuss our results and compare with those from the 'standard' FEL simulation approach which adopts the eikonal approximation for propagation of the radiation field.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

First Measurements and Results With a Stretched Wire Test Setup

The LINAC Coherent Light Source [LCLS] is a free electron laser, designed to produce high brilliant X-ray beams using Self Amplified Spontaneous Emission [SASE]. Due to the physics of SASE, the electron beam has to be held very precisely on the same trajectory as the X-ray light beam generated by the undulator magnets. To optimize the SASE output, trajectory deviations between both beams have to be minimized to a few micrometers along the entire undulator section and held stable over the time period between beam-based-alignment processes. Consequently, extremely high position stability of all magnets in the undulator section is required to operate the LCLS successfully. The knowledge of any magnet movement exceeding few micrometers during periods of several weeks is essential for efficient X-ray generation. A well known principle of monitoring transverse component positions along beam lines is the application of stretched wires, associated with suitable wire position sensors and electronics. The particular challenge at LCLS is the required wire system performance in conjunction with the length of the undulator section and the large number of monitors. Verification of system stability and resolution under real conditions is the primary goal of this test setup. A stretched wire test setup has been implemented to gain experience for the final design of a wire system, which will meet the position monitoring requirements in the LCLS undulator section. The report briefly introduces the system's architecture and describes first measurements and results.

43 PARTICLE ACCELERATORS↗

LCLS Undulator Test Plan

This note presents the test plan for the LCLS undulators. The undulators will be measured and tuned in the Magnetic Measurement Facility at SLAC. The requirements for tuning are well established and are summarized. A brief discussion of the measurement equipment is presented. This is followed by the detailed test plan in which each step is enumerated. Finally, the measurement results and storage format are presented. The LCLS consists of 33 undulator segments, hereafter referred to as undulators, plus 6 spares and one reference undulator. The undulators must be tuned to meet strict requirements. They must also be fiducialized to allow alignment with other components. This note details the plan for tuning and fiducializing the LCLS undulators. The note begins with the list of tuning and fiducialization requirements. The laboratory in which the work will be performed and the relevant equipment is then briefly described. This is followed by a detailed test plan in which all the steps of tuning and fiducialization are enumerated.

43 PARTICLE ACCELERATORS↗

EPICS controlled sample mounting robots at the GM/CA CAT.

GM/CA CAT at Sector 23 of the advanced photon source (APS) is an NIH funded facility for crystallographic structure determination of biological macromolecules by X-ray diffraction [R.F. Fischetti, et al., GM/CA canted undulator beamlines for protein crystallography, Acta Crystallogr. A 61 (2005) C139]. The facility consists of three beamlines; two based on canted undulators and one on a bending magnet. The scientific and technical goals of the CAT emphasize streamlined, efficient throughput for a variety of sample types, sizes and qualities, representing the cutting edge of structural biology research. For this purpose all three beamlines are equipped with the ALS-style robots [C.W.Cork, et al. Status of the BCSB automated sample mounting and alignment system for macromolecular crystallography at the Advanced Light Source, SRI-2003, San-Francisco, CA, USA, August 25-29, 2003] for an automated mounting of cryo-protected macromolecular crystals. This report summarizes software and technical solutions implemented with the first of the three operational robots at beamline 23-ID-B. The automounter's Dewar can hold up to 72 or 96 samples residing in six Rigaku ACTOR magazines or ALS-style pucks, respectively. Mounting of a crystal takes approximately 2 s, during which time the temperature of the crystal is maintained near that of liquid nitrogen.

43 PARTICLE ACCELERATORS↗

A Vibrating Wire System For Quadrupole Fiducialization

A vibrating wire system is being developed to fiducialize the quadrupoles between undulator segments in the LCLS. This note provides a detailed analysis of the system. The LCLS will have quadrupoles between the undulator segments to keep the electron beam focused. If the quadrupoles are not centered on the beam axis, the beam will receive transverse kicks, causing it to deviate from the undulator axis. Beam based alignment will be used to move the quadrupoles onto a straight line, but an initial, conventional alignment must place the quadrupole centers on a straight line to 100 {micro}m. In the fiducialization step of the initial alignment, the position of the center of the quadrupole is measured relative to tooling balls on the outside of the quadrupole. The alignment crews then use the tooling balls to place the magnet in the tunnel. The required error on the location of the quadrupole center relative to the tooling balls must be less than 25 {micro}m. In this note, we analyze a system under construction for the quadrupole fiducialization. The system uses the vibrating wire technique to position a wire onto the quadrupole magnetic axis. The wire position is then related to tooling balls using wire position detectors. The tooling balls on the wire position detectors are finally related to tooling balls on the quadrupole to perform the fiducialization. The total 25 {micro}m fiducialization error must be divided between these three steps. The wire must be positioned onto the quadrupole magnetic axis to within 10 {micro}m, the wire position must be measured relative to tooling balls on the wire position detectors to within 15 {micro}m, and tooling balls on the wire position detectors must be related to tooling balls on the quadrupole to within 10 {micro}m. The techniques used in these three steps will be discussed. The note begins by discussing various quadrupole fiducialization techniques used in the past and discusses why the vibrating wire technique is our method of choice. We then give an overview of the measurement system showing how the vibrating wire is positioned onto the quadrupole axis, how the wire position detectors locate the wire relative to tooling balls without touching the wire, and how the tooling ball positions are all measured. The novel feature of this system is the vibrating wire which we discuss in depth. We analyze the wire dynamics and calculate the expected sensitivity of the system. The note should be an aid in debugging the system by providing calculations to compare measurements to.

43 PARTICLE ACCELERATORS↗

First Results of the LCLS Laser-Heater System

he very bright electron beam required for an x-ray free electron laser (FEL), such as the LCLS, is susceptible to a microbunching instability in the magnetic bunch compres sors, prior to the FEL undulator. The uncorrelated electron energy spread in the LCLS can be increased by an order of magnitude to provide strong Landau damping against the instability without degrading the FEL performance. To this end, a ‘laser-heater’ system has been installed in the LCLS injector, which modulates the energy of a 135-MeV electron bunch with an IR laser beam in a short undulator, enclosed within a four-dipole chicane. The last half of the chicane time-smears the energy modulation leaving an effective thermal energy spread increase. We present the first commissioning results of this system, its operational issues, its impact on the microbunching instability, and finally its effect on the FEL performance.

43 PARTICLE ACCELERATORS↗

Commissioning a Vibrating Wire System for Quadrupole Fiducialization

Quadrupoles will be placed between the undulator segments in LCLS to keep the electron beam focused as it passes through. The quadrupoles will be assembled with their respective undulator segments prior to being placed into the tunnel. Beam alignment will be used to center the quadrupoles, along with the corresponding undulators, on the beam. If there is any displacement between the undulator and the quadrupole axes in the assemblies, the beam will deviate from the undulator axis. If it deviates by more than 80{micro}m in vertical or 140{micro}m in horizontal directions, the undulator will not perform as required by LCLS. This error is divided between three sources: undulator axis fiducialization, quadrupole magnetic axis fiducialization, and assembly of the two parts. In particular, it was calculated that the quadrupole needs to be fiducialized to within 25{micro}m in both vertical and horizontal directions. A previous study suggested using a vibrating wire system for finding the magnetic axis of the quadrupoles. The study showed that the method has high sensitivity (up to 1{micro}m) and laid out guidelines for constructing such a system. There are 3 steps in fiducializing the quadrupole with the vibrating wire system. They are positioning the wire at the magnet center (step 1), finding the wire with position detectors (step 2), and finding the quadrupole tooling ball positions relative to the position detector tooling balls (step 3). A previous study investigated the error associated with each step by using a permanent quadrupole magnet on an optical mover system. The study reported an error of 11{micro}m for step 1 and a repeatability of 4{micro}m for step 2. However, the set up used a FARO arm to measure tooling balls and didn't allow to accurately check step 2 for errors; an uncertainty of 100{micro}m was reported. Therefore, even though the repeatability was good, there was no way to check that the error in step 2 was small. Following the recommendations of that study, we used a CMM (Coordinate Measuring Machine) instead of the FARO arm for measuring the tooling balls. In addition, a roller cam positioner system replaced the optical movers for moving the quadrupole. With the exception of the quadrupole itself, the system was identical to what will be used in fiducializing the undulator quadrupoles. In this study, we investigate the new vibrating wire set up, including the error associated with each step of fiducialization. A vibrating wire system was constructed to fiducialize the quadrupoles between undulator segments in the LCLS. This note is a continuation of previous work to study the ability of the system to fulfill the fiducialization requirements.

43 PARTICLE ACCELERATORS↗

Longitudinal Diagnostics for Short Electron Beam Bunches

Single-pass free electron lasers require high peak currents from ultra-short electron bunches to reach saturation and an accurate measurement of bunch length and longitudinal bunch profile is necessary to control the bunch compression process from low to high beam energy. The various state-of-the-art diagnostics methods from ps to fs time scales using coherent radiation detection, RF deflection, and other techniques are presented. The use of linear accelerators as drivers for free electron lasers (FEL) and the advent of single-pass (SASE) FELs has driven the development of a wide range of diagnostic techniques for measuring the length and longitudinal distribution of short and ultra-short electron bunches. For SASE FELs the radiation power and the length of the undulator needed to achieve saturation depend strongly on the charge density of the electron beam. In the case of X-ray FELs, this requires the accelerator to produce ultra-high brightness beams with micron size transverse normalized emittances and peak currents of several kA through several stages of magnetic bunch compression. Different longitudinal diagnostics are employed to measure the peak current and bunch profile along these stages. The measurement techniques can be distinguished into different classes. Coherent methods detect the light emitted from the beam by some coherent radiation process (spectroscopic measurement), or directly measure the Coulomb field traveling with the beam (electro-optic). Phase space manipulation techniques map the time coordinate onto a transverse dimension and then use conventional transverse beam diagnostics (transverse deflector, rf zero-phasing). Further methods measure the profile or duration of an incoherent light pulse emitted by the bunch at wavelengths much shorted than the bunch length (streak camera, fluctuation technique) or modulate the electron beam at an optical wavelength and then generate a narrow bandwidth radiation pulse with the longitudinal profile of the beam mapped onto (optical replicator). The operational needs for bunch length measurements to have fast acquisitions, to be used in feedback systems, to distinguish pulse to pulse changes and to be nondestructive or parasitically have resulted into developing many of the diagnostics into single-shot techniques and in the following the main discussion will emphasize them.

43 PARTICLE ACCELERATORS↗

Study of an HHG-Seeded Free-Electron Laser for the LBNL Next Generation Light Source

The Next Generation Light Source (NGLS) is a high repetition rate free-electron laser facility proposed by Lawrence Berkeley National Laboratory (LBNL). The proposed facility will provide multiple FEL lines with varying spectral characteristics to satisfy a broad soft X-ray physics programme. At this stage of the project a number of FEL technologies and concepts are being investigated for possible implementation on the facility. In this report we consider a free-electron laser seeded by a Higher Harmonic Generation (HHG) source in which a high power (and consequently relatively low repetition rate) laser pulse is injected into a chamber of inert gas. Through a process of ionisation and recombination coherent higher harmonics of the laser are emitted from the gas and can be injected into an FEL system as a seed field. Further harmonic upconversion can be done within the FEL system to enable temporally coherent FEL output at wavelengths much shorter than, and pulse energies orders of magnitude higher than, the HHG source emission. The harmonic conversion within the FEL works in the following way. The seed field induces an energy modulation within the electron bunch at the start of the modulator. This energy modulation grows within the modulator due to the FEL interaction and starts to convert into a density modulation, or bunching, at the seed wavelength. However, this bunching also has components at higher harmonics which retain the longitudinal coherence of the initial seed. The beam passes through a magnetic chicane, which shears the longitudinal phase space to maximise the bunching at the required harmonic, then a further undulator which is tuned to this harmonic. If this second undulator is short it acts as a further modulator, and because the beam is pre-bunched at the modulator resonance there is a strong coherent burst of radiation which acts to modulate the electron beam energy in much the same way the input laser seed field acted in the first modulator. This second modulator is followed by a second bunching chicane and then a final long radiator tuned to a yet higher harmonic of the laser seed - the final output wavelength. Alternatively, the second undulator can be the radiator itself, in which case only one harmonic conversion from seed wavelength to final output is necessary. We initially consider the case of a 400kW peak power HHG seed source at wavelength 12nm (currently considered the cutoff wavelength for sufficient seed power to dominate shot noise in the electron beam) which is converted in either one or two stages or harmonic conversion to FEL emission at 1nm. We then consider the implications of a factor of ten reduction in seed power to 40kW.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗