Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Transmission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Gulf of Mexico Offshore Wind Transmission - Literature Review and Gaps Analysis: Environmental Considerations, Community Readiness, and Infrastructure

The ability to effectively and efficiently connect offshore wind energy resources to end users in the Gulf of Mexico, requires coordinated transmission planning to ensure that electric transmission facilities can adequately support future offshore development. The Gulf of Mexico has substantial wind resources in both shallow shelf waters and deeper waters off the shelf where fixed bottom and floating wind technologies would be most appropriate. Most interest in offshore wind development to date has been in the central and western portions of the Gulf of Mexico (Louisiana and Texas) in federal and state waters. As a companion study to other federal activities in the offshore wind transmission space, including the Atlantic Offshore Wind Transmission Literature Review and Gaps Analysis, the Atlantic Offshore Wind Transmission Study, the West Coast Offshore Wind Transmission Literature Review and Gaps Analysis, the West Coast Offshore Wind Transmission Study, and the Advancing Offshore Wind Energy in the United States: U. S. Department of Energy Strategic Contributions Toward 30 Gigawatts and Beyond Report, this literature review and gaps analysis for offshore wind transmission in the Gulf of Mexico builds off previous literature reviews and supports the role of federal leadership to facilitate offshore wind energy. The overarching goal of this document is to identify gaps and lay the groundwork to inform coordinated transmission planning, ocean co-use, existing energy infrastructure, and siting associated with offshore wind energy development in the Gulf of Mexico. There are unique regional considerations for offshore wind transmission, which are summarized herein based on a review and assessment of publicly available information.

08 HYDROGEN↗

Empirical Indicators of Transmission Value in the Southeast United States

Concurrent differences in energy price between different parts of the electric grid are a key indicator of the value of additional transmission. In areas without a wholesale electricity market, such as the Southeast, an alternative indicator to price is the Federal Energy Regulatory Commission’s (FERC) system lambda data. This economic metric represents the minimized marginal production costs of thermal generators, including fuel and other variable operation and maintenance expenses. Balancing Authorities report a single system lambda for their entire balancing area. Most Southeastern lambdas exhibit sufficient price variation to support a transmission valuation analysis, although incomplete accounting of congestion costs or scarcity rents during peak load hours may underestimate the true value of transmission capacity. With transmission value defined as the annual average hourly absolute price difference between two regions and FERC’s system lambda data used as a price proxy, we find the following results in the Southeast region during 2012-2023 (reported in $\$2024$/MWh): Intra‐regional findings: Annual averages historically span $\$2$–$\$28$/MWh and average $\$12$/MWh in SERTP and span $\$4$–$\$19$/MWh and average $\$9$/MWh in FRCC, disregarding transmission value driven by anomalous data. The ranges of transmission value reported here are large, spanning an order of magnitude in some cases. Much of this variation is driven by year-to-year changes, with 2022 having a particularly high intra-regional transmission value due to elevated natural gas prices. Inter‐regional corridors: Annual average transmission values across three broader regions range from $\$6$ to $\$28$/MWh with a long-term average of $\$11$/MWh. Much of the transmission value is concentrated in a small portion of hours. Across all regions, severe weather—particularly polar vortex events in January 2018, February 2021, and December 2022—drives the largest price spreads. Seasonal patterns also emerge, with summer afternoons and fall mornings contributing consistently to transmission value, as for example between MISO and SOCO in 2023.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Tribal Engagement in Transmission Planning

The purpose of this white paper is to provide Tribes with information that (a) helps assess whether transmission access is important for their energy goals, and (b) provides guidance on how to engage in transmission planning, if and when doing so would help the Tribe achieve its energy goals. DOE's Office of Indian Energy notes that "Indian Country contains vast untapped energy resources" (OIE 2023). Individual tribes express a wide array of energy needs and goals, ranging from simple access to basic electricity service and energy efficiency tools, to the development of utility-scale generating plants. Access to transmission is a key part of this multifaceted tribal energy picture. About 2.3 percent of the nation's transmission miles are on tribal lands (OIE 2023). Even within that slice, however, circumstances vary widely. Much of that transmission is for local network delivery (138kV or less). There are some large-capacity 500kV lines, but in many cases the Tribe has limited access to them even when they run across the reservation. Some of the Tribes with the largest land area have little transmission, and some such as Navajo Nation and Hopi Tribe have many homes with no access to electricity. This white paper begins with a high-level summary of transmission issues that can affect a Tribe's energy goals. The discussion includes findings from major transmission-related studies, including the 2023 National Transmission Needs Study (GDO 2023). It then discusses strategies that could help a Tribe safeguard its interests when those interests intersect transmission infrastructure planning.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cooperation in Transmission Expansion Planning: Enhancing Grid Reliability and Efficiency Under a Changing Climate

Electricity grids are challenged to maintain reliability during more intense and frequent extreme weather events due to climate change. This challenge is exacerbated by multi-sector electrification and power sector decarbonization through increased reliance on variable renewable energy, which necessitates the expansion of transmission infrastructure. However, transmission expansion planning is often complicated by intertwined planning authorities and jurisdictions, and allocation of large capital investment needs. These factors cause authorities to manage transmission investments individually (i.e., only/mostly intraregional planning), which can lead to suboptimal transmission networks. This study investigates the potential benefits of cooperative transmission expansion planning (i.e., both intraregional and interregional planning that optimizes transmission investments across the entire physical system). Using sectoral and economic optimization, and machine learning models, it analyzes the impact of different levels of cooperation among transmission planning regions within U.S. Western Interconnection in 2019 and 2059 via an iterative investment process. Furthermore, it examines the effects of future climate change on transmission cooperation by simulating historical heat waves from 2019 under conditions of 2059. The results indicate that cooperative transmission planning leads to lower wholesale electricity prices, decreased energy outages, and reduced greenhouse gas emissions. However, the advantages of collaboration diminish during widespread heat waves, despite remaining beneficial especially for regions like California Independent System Operator with substantial solar installations. The study underscores the importance of transmission cooperation in reducing costs and enhancing reliability, emphasizing the need for strategic investments in storage to address challenges posed by future extreme weather events with varying spatial scales.

Capacity Expansion Model↗

Transmission Line Security Monitor: Final Report

The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Abiotic and biotic factors jointly influence the contact and environmental transmission of a generalist pathogen

The joint influence of abiotic and biotic factors is important for understanding the transmission of generalist pathogens. Abiotic factors such as temperature can directly influence pathogen persistence in the environment and will also affect biotic factors, such as host community composition and abundance. At intermediate spatial scales, the effects of temperature, community composition, and host abundance are expected to contribute to generalist pathogen transmission. We use a simple transmission model to explain and predict how host community composition, host abundance, and environmental pathogen persistence times can independently and jointly influence transmission. Our transmission model clarifies how abiotic and biotic factors can synergistically support the transmission of a pathogen. The empirical data show that high community competence, high abundance, and low temperatures correlate with high levels of transmission of ranavirus in larval amphibian communities. Discrete wetlands inhabited by larval amphibians in the presence of ranavirus provide a compelling case study comprising distinct host communities at a spatial scale anticipated to demonstrate abiotic and biotic influence on transmission. We use these host communities to observe phenomena demonstrated in our theoretical model. These findings emphasize the importance of considering both abiotic and biotic factors, and concomitant direct and indirect mechanisms, in the study of pathogen transmission and should extend to other generalist pathogens with the capacity for environmental transmission.

59 BASIC BIOLOGICAL SCIENCES↗

Modulation by orexin A of spontaneous excitatory and inhibitory transmission in adult rat spinal substantia gelatinosa neurons

Highlights: • Orexin A produced membrane depolarization in substantia gelatinosa neurons. • Orexin A increased spontaneous l-glutamate release in substantia gelatinosa neurons. • Orexin A facilitated GABAergic transmission in substantia gelatinosa neurons. • Orexin A facilitated glycinergic transmission in substantia gelatinosa neurons. • All of orexin A activities were due to orexin-1 but not orexin-2 receptor activation. Hypothalamic neuropeptides, orexins A and B, differently inhibit nociceptive behavior. This difference is possibly due to a distinction between orexins A and B in modulating synaptic transmission in spinal substantia gelatinosa (SG) neurons that play a pivotal role in regulating nociceptive transmission. Although we previously reported a modulatory action of orexin B on synaptic transmission in adult rat SG neurons, it has not been fully examined how the transmission is affected by orexin A. The present study examined the effects of orexin A on spontaneous excitatory and inhibitory transmission in SG neurons of adult rat spinal cord slices by using the whole-cell patch-clamp technique. Like orexin B, orexin A produced an inward current at −70 mV and/or increased the frequency of spontaneous excitatory postsynaptic current without changing its amplitude. Half-maximal effective concentration values for their effects were 0.0045 and 0.030 μM, respectively; the former value was four-fold smaller than that of orexin B while the latter value was comparable to that of orexin B. Orexin A enhanced not only glycinergic but also GABAergic transmission, although only glycinergic transmission was facilitated by orexin B in the majority of neurons tested. Orexin A activities were inhibited by an orexin-1 receptor antagonist (SB334867) but not an orexin-2 receptor antagonist (JNJ10397049), as different from orexin B whose activation was depressed by JNJ10397049 but not SB334867. These results indicate that orexin A has a different action from orexin B in SG neurons in efficacy for inward current production and in GABAergic transmission enhancement, possibly owing to orexin-1 but not orexin-2 receptor activation. This difference could contribute to at least a part of the distinction between orexins A and B in antinociceptive effects.

60 APPLIED LIFE SCIENCES↗

Improving estimates of transmission capital costs for utility-scale wind and solar projects to inform renewable energy policy

Estimating the overall costs of transmission needed to integrate variable renewable energy (VRE) onto the grid is challenging. An improved understanding of these transmission costs would support electricity system planning as VRE penetrations increase. This paper brackets VRE transmission capital costs using multiple approaches based on interconnection studies, actual transmission projects, capacity-expansion simulation models, and aggregated U.S. VRE-related transmission expenditures. Each approach possesses advantages and drawbacks, and combining the approaches lends confidence to the results. The resulting range of average levelized VRE transmission costs is 1– 10 dollars/MWh, which is generally lower than earlier estimates in the literature. These transmission capital costs can increase the direct plant-level levelized cost of VRE by 3%–33%, based on levelized costs of energy of 29– 56 dollars/MWh for utility-scale wind and 36–46 dollars/MWh for utility-scale solar. As VRE deployment continues to expand, policy makers can use this information to (1) assess the benefits of transmission avoidance and deferral when comparing distributed energy resources versus utility-scale projects, (2) evaluate the potential costs of large-scale public transmission investments, and (3) better analyze system-level costs of utility-scale VRE technologies. Future research can expand on the framework presented here by providing a review of operation and maintenance costs for transmission systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Final Report for Transmission of Information by Acoustic Communication along Metal Pathways in Nuclear Facilities

Transmission of information using elastic waves on existing metallic pipes provides an alternative communication option for a nuclear facility. The advantages of this approach consist of transmitting information through barriers, such as the containment building wall. A viable candidate for acoustic communication channel is a chemical volume control system (CVCS) stainless steel pipe, which penetrates through the containment building wall. A laboratory bench-scale system consisting of a nuclear grade CVCS-like pipe and ultrasonic transducers was assembled for a preliminary communication system analysis. Because of low bandwidth and spectral dispersion of ultrasonic transducers, on off keying (OOK) protocol was chosen for data communication. Operation of the acoustic communication during normal and post-accident conditions involves data transmission on the CVCS pipe, which according to literature guidelines, will be at 50°C and 150°C, respectively. Preliminary communication system development was performed using paintbrush PZT transducers capable of continuous operation at temperatures up to 80°C. Next, high-temperature LiNbO 3 acoustic transducers, originally developed for flow metering applications of EBRII reactor at Argonne, were utilized to develop a high-temperature acoustic communication system. A Gaussian pulse shape filter was introduced to suppress ringing and thus reduce inter-symbol interference. This resulted in enhancement of data transmission bitrate. Heating tapes, temperature controllers, and thermal insulation were installed on the laboratory pipe to study acoustic communication at elevated temperature. This included development of custom insertion heating elements for controlling temperature at pipe ends. Demonstrations of communication at high temperature included transmission of images and text files. Main achievements thus far include demonstration of transmission of 90KB image at the bitrate of 10Kbps with bit error rate smaller than 10 -3 across the pipe heated to 50°C and 150°C. Final phase of project development involved investigating strategies for deployment of the ultrasonic communication system in a representative environment. Mechanisms Engineering Test Loop (METL) facility at ANL was chosen as a viable candidate for communication system demonstration. Analysis of piping manifolds at METL has shown that in a typical scenario, ultrasonic signals have to be transmitted over straight and bent piping sections. This report describes preliminary studies on transmission of information with ultrasonic shear waves across bent piping sections. A test article consisting of a stainless steel pipe bent at 90° was developed for laboratory analysis of ultrasonic signal transmission. The bent piping test article developed by welding two straight pipes to an elbow. For consistency, the diameter and wall thickness of the bent pipe is the same as that of the straight pipe utilized in prior studies. COMSOL computer simulations were performed to study ultrasonic refracted shear wave coupling and transmission across bent piping. Preliminary evaluations of ultrasonic shear wave transmission were conducted with piezoelectric (PZT) and LiNbO 3 transducers, with the signals recorded with previously developed LabView interface. Preliminary results have shown significant dispersion of transmitted signals, most likely due to reflections and scattering by piping welds. Signal distortion compensation algorithm based on time reversal modulation (TRM) was initially investigated for transmission through solids, and demonstrated for signals transmitted over the bent pipe. Using TRM, it was shown that communication bitrates of 100Kbps were achievable, in principle.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Transmission overhaul estimates for partial and full replacement at repair

Timely transmission overhauls increase in-flight service reliability greater than the calculated design reliabilities of the individual aircraft transmission components. Although necessary for aircraft safety, transmission overhauls contribute significantly to aircraft expense. Predictions of a transmission's maintenance needs at the design stage should enable the development of more cost effective and reliable transmissions in the future. The frequency is estimated of overhaul along with the number of transmissions or components needed to support the overhaul schedule. Two methods based on the two parameter Weibull statistical distribution for component life are used to estimate the time between transmission overhauls. These methods predict transmission lives for maintenance schedules which repair the transmission with a complete system replacement or repair only failed components of the transmission. An example illustrates the methods.

Savage, M.↗

Transmission line design for the lunar environment

How the mass, operating temperature, and efficiency of a transmission line operating on the moon are affected by its operating parameters, the lunar environment, and the choice of materials is examined. The key transmission line parameters which have an effect on mass, operating temperature, and efficiency are voltage, power loss, and waveform. The choice of waveform for transmission will be influenced by the waveform of the source and load, and therefore an analysis of both DC and AC transmission is necessary for a complete understanding of lunar power transmission. The data presented are for the DC case only; however, the discussion of the environmental effects and of material selection is pertinent to both AC and DC transmission. The operating voltage is shown to be a key parameter in transmission line design. The role efficiency plays in transmission line design is also examined. The analyses include above- and below-the-surface operation for both a vacuum-insulated, two-wire, transmission line, and a solid-dielectric-insulated, coaxial, transmission line.

Gaustad, Krista L.↗

Airplane Ice Detector Based on a Microwave Transmission Line

An electronic instrument that could detect the potentially dangerous buildup of ice on an airplane wing is undergoing development. The instrument is based on a microwave transmission line configured as a capacitance probe: at selected spots, the transmission-line conductors are partly exposed to allow any ice and/or liquid water present at those spots to act as predominantly capacitive electrical loads on the transmission line. These loads change the input impedance of the transmission line, as measured at a suitable excitation frequency. Thus, it should be possible to infer the presence of ice and/or liquid water from measurements of the input impedance and/or electrical parameters related to the input impedance. The sensory transmission line is of the microstrip type and thus thin enough to be placed on an airplane wing without unduly disturbing airflow in flight. The sensory spots are small areas from which the upper layer of the microstrip has been removed to allow any liquid water or ice on the surface to reach the transmission line. The sensory spots are spaced at nominal open-circuit points, which are at intervals of a half wavelength (in the transmission line, not in air) at the excitation frequency. The excitation frequency used in the experiments has been 1 GHz, for which a half wavelength in the transmission line is .4 in. (.10 cm). The figure depicts a laboratory prototype of the instrument. The impedance-related quantities chosen for use in this version of the instrument are the magnitude and phase of the scattering parameter S11 as manifested in the in-phase (I ) and quadrature (Q) outputs of the phase detector. By careful layout of the transmission line (including the half-wavelength sensor spacing), one can ensure that the amplitude and phase of the input to the phase detector keep shifting in the same direction as ice forms on one or more of the sensor areas. Although only one transmission-line sensor strip is used in the laboratory version, in a practical application, it could be desirable to install multiple strips on different areas to detect localized icing. In that case, a multiplexer should be used to connect the various strips to the phase detector for sequential measurements. Experiments have been performed with freezing and thawing of water and of water/glycol mixtures. The experiments have shown that, whether or not glycol is present, it is possible to distinguish between liquid water and ice via the I and Q outputs; in particular, the equipment can be adjusted so that when water freezes, I decreases and Q increases. With respect to the operation of this instrument, the main effect of glycol is to increase the freezing or thawing time.

Ngo, Phong↗

Investigating the effects of cooperative transmission expansion planning on grid performance during heat waves with varying spatial scales

There is growing recognition of the advantages of interregional transmission capacity to decarbonize electricity grids. A less explored benefit is potential performance improvements during extreme weather events. This study examines the impacts of cooperative transmission expansion planning using an advanced modeling chain to simulate power grid operations of the United States Western Interconnection in 2019 and 2059 under different levels of collaboration between transmission planning regions. Two historical heat waves in 2019 with varying geographical coverage are replayed under future climate change in 2059 to assess the transmission cooperation benefits during grid stress. The results show that cooperative transmission planning yields the best outcomes in terms of reducing wholesale electricity prices and minimizing energy outages both for the whole interconnection and individual transmission planning regions. Compared to individual planning, cooperative planning reduces wholesale electricity prices by 64.3 % and interconnection-wide total costs (transmission investments + grid operations) by 34.6 % in 2059. It also helps decrease greenhouse gas emissions by increasing renewable energy utilization. However, the benefits of cooperation diminish during the widespread heat wave when all regions face extreme electricity demand due to higher space cooling needs. Despite this, cooperative transmission planning remains advantageous, particularly for California Independent System Operator with significant diurnal solar generation capacity. This study suggests that cooperation in transmission planning is crucial for reducing costs and increasing reliability both during normal periods and extreme weather events. It highlights the importance of optimizing the strategic investments to mitigate challenges posed by wider-scale extreme weather events of the future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An improved physics-based approach for unfolding megavoltage bremsstrahlung spectra using transmission analysis

Purpose: To develop a physics-based approach to improve the accuracy and robustness of the ill-conditioned problem of unfolding megavoltage bremsstrahlung spectra from transmission data. Methods: Spectra are specified using a rigorously-benchmarked functional form. Since ion chambers are the typical detector used in transmission measurements, the energy response of a Farmer chamber is calculated using the EGSnrc Monte Carlo code, and the effect of approximating the energy response on the accuracy of the unfolded spectra is studied. A proposal is introduced to enhance spectral sensitivity by combining transmission data measured with multiple detectors of different energy response and by combining data from multiple attenuating materials. Monte Carlo methods are developed to correct for nonideal exponential attenuation (e.g., scatter effects and secondary attenuation). The performance of the proposed methods is evaluated for a diverse set of validated clinical spectra (3.5-25 MV) using analytical transmission data with simulated experimental noise. Results: The approximations commonly used in previous studies for the ion-chamber energy response lead to significant errors in the unfolded spectra. Of the configurations studied, the one with best spectral sensitivity is to measure four full transmission curves using separate low-Z and high-Z attenuators in conjunction with two detectors of different energy response (the authors propose a Farmer-type ion chamber, once with a low-Z, and once with a high-Z buildup cap material), then to feed the data simultaneously to the unfolding algorithm. Deviations from ideal exponential attenuation are as much as 1.5% for the smallest transmission signals, and the proposed methods properly correct for those deviations. The transmission data with enhanced spectral sensitivity, combined with the accurate and flexible spectral functional form, lead to robust unfolding without requiring a priori knowledge of the spectrum. Compared with the commonly-used methods, the accuracy is improved for the unfolded spectra and for the unfolded mean incident electron kinetic energy by at least factors of three and four, respectively. With simulated experimental noise and a lowest transmission of 1%, the unfolded energy fluence spectra agree with the original spectra with a normalized root-mean-square deviation, %{Delta}({psi}), of 2.3%. The unfolded mean incident electron kinetic energies agree, on average, with the original values within 1.4%. A lowest transmission of only 10% still allows unfolding with %{Delta}({psi}) of 3.3%. Conclusions: In the presence of realistic experimental noise, the proposed approach significantly improves the accuracy and robustness of the spectral unfolding problem for all therapy and MV imaging beams of clinical interest.

61 RADIATION PROTECTION AND DOSIMETRY↗

Electricity Transmission, Pipelines, and National Trails: An Analysis of Current and Potential Intersections on Federal Lands in the Eastern United States, Alaska, and Hawaii

As has been noted in many reports and publications, acquiring new or expanded rights-of-way for transmission is a challenging process, because numerous land use and land ownership constraints must be overcome to develop pathways suitable for energy transmission infrastructure. In the eastern U.S., more than twenty federally protected national trails (some of which are thousands of miles long, and cross many states) pose a potential obstacle to the development of new or expanded electricity transmission capacity. However, the scope of this potential problem is not well-documented, and there is no baseline information available that could allow all stakeholders to study routing scenarios that could mitigate impacts on national trails. This report, Electricity Transmission, Pipelines, and National Trails: An Analysis of Current and Potential Intersections on Federal Lands in the Eastern United States, was prepared by the Environmental Science Division of Argonne National Laboratory (Argonne). Argonne was tasked by DOE to analyze the “footprint” of the current network of National Historic and Scenic Trails and the electricity transmission system in the 37 eastern contiguous states, Alaska, and Hawaii; assess the extent to which national trails are affected by electrical transmission; and investigate the extent to which national trails and other sensitive land use types may be affected in the near future by planned transmission lines. Pipelines are secondary to transmission lines for analysis, but are also within the analysis scope in connection with the overall directives of Section 368 of the Energy Policy Act of 2005, and because of the potential for electrical transmission lines being collocated with pipelines.

24 POWER TRANSMISSION AND DISTRIBUTION↗

STATE RESEARCH, OUTREACH AND TECHNICAL ASSISTANCE TO IMPROVE THE NATION’S TRANSMISSION AND DISTRIBUTION SYSTEMS

The goal of the project 'State Research, Outreach and Technical Assistance to Improve the Nation's Transmission and Distribution Systems' was for the National Association of State Energy Officials (NASEO) to partner with the National Governors Association (NGA) Center for Best Practices, the National Conference of State Legislators (NCSL), and the National Association of Regulatory Utility Commissioners (NARUC) to assist DOE's Office of Electricity Delivery and Energy Reliability (OE) in its effort to modernize and expand America's electric delivery system. NASEO focused on key transmission and distribution issues where coordination between the federal and state governments was critical. Throughout the duration of this program, NASEO engaged in monthly coordination - occasionally more often - with NGA, NCSL and NARUC. NASEO staff and General Counsel Jeff Genzer also had regular face-to-face meetings, phone calls and emails with OE staff to learn from DOE and share information and feedback from the state energy offices on transmission and distribution. To commence work on this project, NASEO met with OE, NGA, NCSL and NARUC in January 2005 and remained committed to regular communications with all involved entities throughout the duration of this project. NASEO provided comments and analysis to the other partners on deliverable reports under this award. This award provided support to NASEO's Energy Production Committee (chaired by Dub Taylor of Texas, followed by Tom Fuller of Wyoming) to plan and host sessions at NASEO's Annual Meeting and Energy Outlook Conferences. Sessions included presentations from state, DOE, national laboratory and private sector experts on transmission, distribution, distributed energy resources, integrating renewable resources into the electricity grid. NASEO disseminated information to its members through emails and its website on transmission and distribution technology and policy. NASEO was an active member of the National Council on Electricity Policy as part of its transmission and distribution work. The National Council on Electricity Policy (National Council) is a venture between NASEO, NARUC, NCSL, National Association of Clean Air Agencies (NACAA) and the National Governors Association (NGA). The National Council also includes several federal members including FERC, DOE, and the U.S. Environment Protection Agency (EPA). NASEO members serve on the policy committee and NASEO General Council Jeff Genzer is a member of the National Council's Executive Committee. NASEO staff participated on regularly scheduled policy committee and executive committee calls and helped to plan agendas and publications for various state decision-makers. Specifically, NASEO organized state energy officials and participating in formulating the agenda for meetings, including the Mid-Atlantic Distributed Generation Workshop in New Jersey in September 2007. NASEO shared the results of these meetings through its website, email communications and direct conversations with state energy officials. NASEO participated as a member of the National Action Plan for Energy Efficiency (NAPEE) Leadership Committee, representing the interests and expertise of the state energy offices. In addition, NASEO was part of the Long-Term Vision Committee. NASEO members also participated in these activities and NASEO has encouraged further efforts of its membership with regards to NAPEE. NASEO has worked to ensure that its membership has the most timely and accurate information about transmission and distribution technology and policy. Its work with other associations has facilitated greater partnerships to enhance activities across the nation and encourage state energy offices to collaborate with public utility commissions, legislatures and executives to improve modern transmission and distribution. NASEO has identified transmission and distribution as a key area for further action.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Alteration of intersubunit acid–base pair interactions at the quasi-threefold axis of symmetry of Cucumber mosaic virus disrupts aphid vector transmission

In the atomic model of Cucumber mosaic virus (CMV), six amino acid residues form stabilizing salt bridges between subunits of the asymmetric unit at the quasi-threefold axis of symmetry. To evaluate the effects of these positions on virion stability and aphid vector transmissibility, six charged amino acid residues were individually mutated to alanine. All of the six engineered viruses were viable and exhibited near wild type levels of virion stability in the presence of urea. Aphid vector transmissibility was nearly or completely eliminated in the case of four of the mutants; two mutants demonstrated intermediate aphid transmissibility. For the majority of the engineered mutants, second-site mutations were observed following aphid transmission and/or mechanical passaging, and one restored transmission rates to that of the wild type. CMV capsids tolerate disruption of acid–base pairing interactions at the quasi-threefold axis of symmetry, but these interactions are essential for maintaining aphid vector transmissibility. - Highlights: ► Amino acids between structural subunits of Cucumber mosaic virus affect vector transmission. ► Mutant structural stability was retained, while aphid vector transmissibility was disrupted. ► Spontaneous, second-site mutations restored aphid vector transmissibility.

60 APPLIED LIFE SCIENCES↗

SU-E-T-98: Dependence of Radiotherapy Couch Transmission Factors On Field Size and Couch-Isocenter Distance

Purpose: The dosimetric effect of the treatment couch is non-negligible in today's radiotherapy treatment. To accurately include couch in dose calculation, we investigated the dependence of couch transmission factors on field size and couch-isocenter distance. Methods: Couch transmission factors for Varian Exact Couch were determined by taking the ratios of ionization of a posterior-anterior beam with and without the couch in the beam path. Measurements were performed at the isocenter using a PTW cylindrical ionization chamber (Model 31030) with an Aluminum buildup cap of 1.1 cm thick for the 6 MV photon beam. Ionization readings for beam sizes ranging from 2 × 2 cm2 to 40 × 40 cm2 were taken. Transmission factors for couch-isocenter distances ranging from 3 cm to 20 cm were also investigated. Results: The couch transmission factors increased with the field size approximately in an exponential manner. For the field sizes that we tested, the transmission factor ranged from 0.976 to 0.992 for couch-isocenter distance of 3 cm. The transmission factor was also monotonically dependent on couch-isocenter separation distance, but in a lighter magnitude. For the tested couch heights, the transmission factor ranged from 0.974 – 0.972 for 2 × 2 cm2 field size and 0.992 – 0.986 for 40 × 40 cm2 field size. The dependence on couch-isocenter distance is stronger for larger field size. Conclusions: The transmission factor of a radiotherapy treatment couch increases with field size of the radiation beam and its distance from the isocenter. Such characterization of the couch transmission factor helps improve the accuracy of couch modeling for radiotherapy treatment planning.

60 APPLIED LIFE SCIENCES↗