Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Technical Program Elements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Recovery of Space Shuttle Columbia and Return to Flight of Space Shuttle Discovery

NASA has come a long way in our journey to reduce the risks of operating the Spse Shuttle system. The External Tank bipod Thermal Protection System has been redesigned to eliminate the proximate cause of the Columbia accident. In all areas, we have applied the collective knowledge and capabilities of our Nation to comply with the Columbia Accident Investigation Board recommendations and to raise the bar beyond that. We have taken prudent technical action on potential threats to review and verify the material condition of all critical areas where failure could result in catastrophic loss of the crew and vehicle. We are satisfied that critical systems and elements should operate as intended-safely and reliably. While we will never eliminate all the risks from our human space flight programs, we have eliminated those we can and reduced, controlled, and/or mitigated others. The remaining identified risks will be evaluated for acceptance. Our risk reduction approach has its roots in the system safety engineering hierarchy for hazard abatement long employed in aerospace systems engineering. The components of the hierarchy are, in order of precedence, to: design/redesign; eliminate the hazard/risk; reduce the hazard/risk; and control the hazard/risk and/or mitigate the consequence of the remaining hazard/risk through warning devices, special procedures/capabilities, and/or training. This proven approach to risk reduction has been applied to potential hazards and risks in all critical areas of the Space Shuttle and has guided us through the technical challenges, failures, and successes present in return to flight endeavors. This approach provides the structured deliberation process required to verify and form the foundation for accepting any residual risk across the entire Space Shuttle Program by NASA leadership.

Rudolphi, Michael U.↗

Medical System Foundation Overview for Long-Duration Lunar Orbit and Surface Operations Missions

The Human Research Program (HRP) Exploration Medical Capability (ExMC) Element has developed a Medical System Foundation for Level of Care IV, as defined by NASA’s space flight human-system standards, for long-duration lunar orbit and surface operation missions by employing a systems engineering approach using model-based systems engineering tools. This Foundation model includes a concept of operations; functional decomposition; clinical content (medical conditions, capabilities, and resources); associated functional, interface and non-functional technical requirements; and traces to the current versions of NASA standards documents and parent-level (Program- and Vehicle habitat system level) requirements. Collectively, these components constitute a foundation that serves as a starting point for a medical system that meets the Level of Care IV requirement. The Foundation was developed by a multidisciplinary team consisting of systems engineers, scientists, and clinicians across NASA, and information is presented in an easily accessible format that is understandable across disciplines. Stakeholders can use the Foundation to analyze the traces between medical capabilities, medical conditions, medical resources, and requirements and to identify medical system interfaces with other vehicle systems/subsystems. It can also be used as a basis for performing trades on risks vs. medical system mass and volume allocation. This discussion will focus on the processes through which the Medical System Foundation was developed, how the Foundation builds a bridge between the medical and engineering domains and facilitates communication between these communities, and how these processes can be applied more broadly to a crew health and performance system and other system domains. The presentation also discusses Foundation modifications based on the recently updated versions of the NASA 3001 Standards.

S. Lumpkins↗

Space shuttle program: Shuttle Avionics Integration Laboratory. Volume 7: Logistics management plan

The logistics management plan for the shuttle avionics integration laboratory defines the organization, disciplines, and methodology for managing and controlling logistics support. Those elements requiring management include maintainability and reliability, maintenance planning, support and test equipment, supply support, transportation and handling, technical data, facilities, personnel and training, funding, and management data.

Source record↗

Large space systems technology program

Technical challenges of shuttle-era large space systems include the development of space-configured spacecraft concepts, compatibility with the space transportation system, and cost effectiveness. The objectives and organization of NASA's large space structures program are outlined and program elements are discussed. The technology for the offset wrap-rip and the maypole (hoop/column) antenna concepts are discussed as well as analysis techniques for predicting the electromagnetic performance of a broad class of large reflectors. Deployable systems, assembly methods, and modular control systems for space platforms are described. Assembly equipment and devices, surface sensors and shape control, control and stabilization, and integrated analysis and design are also considered.

James, R. L., Jr.↗

Service offerings and interfaces for the ACTS network of earth stations

The NASA Advanced Communications Technology Satellite (ACTS) will use a network of about 20 earth stations to operate as a Mode 1 network. This network will support two ACTS program objectives: to verify the technical performance of ACTS Mode 1 operation in GEO and to demonstrate the types and quality of services that can be provided by an ACTS Mode 1 communications system. The terrestrial interface design is a critical element in assuring that these network earth stations will meet the objectives. In this paper, the applicable terrestrial interface design requirements, the resulting interface specifications, and the associated terrestrial input/output hardware are discussed. A functional block diagram of a network earth station is shown.

Coney, T. A.↗

Third Report of the Task Force on the Shuttle-Mir Rendezvous and Docking Missions

In May 1994, the Task Force on the Shuttle-Mir Rendezvous and Docking Missions was established by the NASA Advisory Council. Its purpose is to review Phase 1 (Shuttle-Mir) planning, training, operations, rendezvous and docking, and management and to provide interim reports containing specific recommendations to the Advisory Council. Phase 1 represents the building block to create the experience and technical expertise for an International Space Station. The Phase 1 program brings together the United States and Russia in a major cooperative and contractual program that takes advantage of both countries' capabilities. The content of the Phase 1 program consists of the following elements as defined by the Phase 1 Program Management Plan, dated October 6, 1994: Shuttle-Mir rendezvous and docking missions; astronaut long duration presence on Mir Requirements for Mir support of Phase 1 when astronauts are not on board; outfitting Spektr and Priroda modules with NASA science, research, and risk mitigation equipment Related ground support requirements of NASA and the Russian Space Agency (RSA) to support Phase 1 Integrated NASA and RSA launch schedules and manifests The first meeting of the Task Force was held at the Johnson Space Center (JSC) on May 24 and 25, 1994 with a preliminary report submitted to the NASA Advisory Council on June 6, 1994. The second meeting of the Task Force was held at JSC on July 12 and 13, 1994 and a detailed report containing a series of specific recommendations was submitted on July 29, 1994. This report reflects the results of the third Task Force meeting which was held at JSC on 11 and 12 October, 1994. The briefings presented at that meeting reviewed NASA's response to the Task Force recommendations made to date and provided background data and current status on several critical areas which the Task Force had not addressed in its previous reports.

Source record↗

Results from Electrochemical Leach Experiments under the DOE Technical Assistant Program

The activities described in this (report) are related to the analysis and testing of graphite and mine tailing samples provided by the Recipient for the extraction and recovery of embedded metals. This report focused on recovery of platinum group metals (PGMs), which appear in relatively high abundance, particularly technically important elements ruthenium and rhodium. Work performed involved assessment of materials followed by extraction tests using two methods. A novel electrochemically-driven route was compared to a chemical route for extraction of the metals. The electrochemically driven route showed similar results while producing the lixiviant in the electrochemical cell, hence reducing chemical requirements.

42 ENGINEERING↗

History of Space Shuttle Main Engine Turbopump Bearing Testing at the Marshall Space Flight Center

The Space Shuttle is propelled into orbit by two solid rocket motors and three liquid fed main engines. After the solid motors fall away, the shuttle engines continue to run for a total time of 8 minutes. These engines are fed propellants by low and high pressure turbopumps. A critical part of the turbopump is the main shaft that supports the drive turbine and the pump inducer and impeller. Rolling element bearings hold the shaft in place during rotation. If the bearings were to fail, the shaft would move, allowing components to rub in a liquid oxygen or hydrogen environment, which could have catastrophic results. These bearings are required to spin at very high speeds, support radial and axial loads, and have high wear resistance without the benefit of a conventional means of lubrication. The Rocketdyne built Shuttle turbopumps demonstrated their capability to perform during launches; however, the seven hour life requirement was not being met. One of the limiting factors was the bearings. In the late 1970's, an engineering team was formed at the Marshall Space Flight Center (MSFC), to develop a test rig and plan for testing the Shuttle s main engine high pressure oxygen turbopump (HPOTP) bearings. The goals of the program were to better understand the operation of bearings in a cryogenic environment and to further develop and refine existing computer models used to predict the operational limits of these bearings. In 1982, testing began in a rig named the Bearing and Seal Material Tester or BSMT as it was commonly called. The first testing investigated the thermal margin and thermal runaway limits of the HPOTP bearings. The test rig was later used to explore potential bearing improvements in the area of increased race curvatures, new cage materials for better lubrication, new wear resistant rolling element materials, and other ideas to improve wear life. The most notable improvements during this tester s time was the incorporation of silicon nitride balls and bronze filled polytetrafluoroethylene (PTFE) cage inserts into the bearings and the anchoring of the SHABERTH bearing model and SINDA thermal computer model for cryogenic bearing analysis. In the mid 1990's, Pratt and Whitney (P&W) won the contract to deliver new high pressure turbopumps for the Shuttle s engines. P&W used two new bearing materials for the rings, Cronidur 30 and AISI 9310 steel and testing was needed on these new materials. A test rig had been designed and delivered to MSFC for testing hydrostatic bearings but with the need by Pratt to validate their bearings, the rig was reconfigured for testing of two ball bearings or a ball bearing and a roller bearing. The P&W bearings are larger than the Rocketdyne bearings and could not be installed in the BSMT. This new test rig was called the LH2 test rig and began operation in 1995. The LH2 test rig accumulated 75,000 seconds of run time in hydrogen. This test rig was valuable in two areas: validating the use of silicon nitride balls and rollers in Alternate Turbopump Development (ATD) bearings, which Pratt eventually used, and in proving the robustness of the balls and rollers after river marks appeared on the surface of the rolling elements. Individual test reports have been presented at conferences and symposiums throughout the years. This paper is a comprehensive report of all the bearing testing done at Marshall. It represents thousands of hours of dedication and labor in all engineering and technical fields that made this program a success.

Gibson, Howard↗

Technical Oversight of the Nancy Grace Roman Space Telescope Optical Telescope Assembly (OTA) Element Procurement: Opportunities, Challenges, & Lessons Learned (2024 Update)

Nancy Grace Roman Space Telescope Optical Telescope Assembly (OTA) is an out-of-house procurement from L3Harris currently being integrated and tested in Rochester, NY. Building upon L3Harris’s decades of success producing world-class optical systems for government and commercial customers offers NASA a proven partner and a tremendous opportunity for high performance and value. Inheriting significant portions of the telescope (including the primary and secondary mirror, composite metering structures and alignment drives) from a previous program presents the opportunity to save cost and schedule but constrains the design space for the unique challenges of the Roman mission. This seminar will cover a brief description of the OTA and its history, some of the challenges posed by incorporating an established product line and inherited hardware into a Class A mission, and some approaches and lessons learned that may be helpful for those structuring new missions or providing technical oversight of out-of-house procurements.

Joshua Abel↗

The Design, Verification and Performance of the James Webb Space Telescope

The James Webb Space Telescope (JWST) is NASA’s flagship mission successor to the highly successful Hubble Space Telescope. It is an infrared observatory featuring a cryogenic 6.6 m aperture, deployable Optical Telescope Element (OTE) with a payload of four science instruments (SIs) assembled into an Integrated Science Instrument Module (ISIM) that provide imagery and spectroscopy in the near-infrared band between 0.6 and 5 μm and in the mid-infrared band between 5 and 28.1 μm. JWST was successfully launched on 2021 December 25 aboard an Ariane 5 launch vehicle. All 50 major deployments were successfully completed on 2022 January 8. The observatory performed all midcourse correction maneuvers and achieved its operational mission orbit around the Sun–Earth second Lagrange point (L2). All commissioning and calibration activities have been completed, and JWST has begun its science mission. This paper will provide a description of the driving requirements and their technical challenges, the engineering processes involved in the design formulation, the resulting observatory design, the verification programs that proved it to be flightworthy, and the measured on-orbit performance of the observatory. Since companion papers will describe the details of the OTE and SIs, this paper will concentrate on describing the key features of the observatory architecture that accommodates these elements, particularly those features and capabilities associated with accommodating the radiometric and image-quality performance.

Galaxy evolution↗

An Educational Program on Concentrated Solar Power and Heliostats for Power Generation and Industrial Processes

The objective of this project was to design and implement a comprehensive educational and applied research program in Concentrated Solar Thermal Power (CSTP) and heliostat technologies at Northeastern University. In alignment with the U.S. Department of Energy's Heliostat Consortium (HelioCon) goals, the project aimed to expand student and public understanding of CSTP systems while simultaneously contributing to workforce development and the broader decarbonization strategy. A particular emphasis was placed on integrating hands-on student design projects and publicly disseminating educational content relevant to CSTP systems. The project addressed a critical gap in renewable energy education: CSTP and heliostats, despite their importance in utility-scale solar energy, are rarely included in standard mechanical engineering programs. This project established new pathways for students to engage with the topic through the creation of a 4-credit graduate/senior elective course, development of five industry-facing short courses, and the inclusion of CSTP-based capstone design projects. Over two academic years, 36 students across six senior design teams developed and tested technologies such as deformable heliostats, beacon-based tracking systems, and solar-powered pyrolizers for biomass-to-biochar conversion. Concurrently, 30 undergraduate and graduate students were enrolled in the new academic course centered around CSTP principles. To ensure the relevance and accessibility of the short course content, the project team engaged with industry professionals, technical policy stakeholders, and potential course participants through structured surveys and informal consultations. Feedback from 28 respondents guided the structure, length, and delivery format of the courses - resulting in a modular design broken into five workshops. The feedback emphasized the need for flexible, asynchronous delivery and practical case studies, particularly in areas such as heliostat control, thermal storage, and solar fuel production. This engagement helped align the courses with the evolving knowledge demands of the renewable energy workforce and ensured that participants from both technical and policy backgrounds could meaningfully benefit from the material. The research and educational activities advanced the understanding of heliostat control systems, optical performance under misalignment, and thermal system integration in solar-driven pyrolysis applications. Methods and designs explored in this project proved to be both technically effective and economically feasible at the lab scale. Prototypes were constructed using commercially available components and custom-fabricated elements, demonstrating that meaningful performance improvements can be achieved with modest material and fabrication costs, supporting the feasibility of student-led research in this field. The public benefit of this project is twofold. First, it cultivates a pipeline of engineers trained to be familiar with CSTP principles, an essential workforce need identified by the Department of Energy for achieving its 2030 cost and deployment targets. Second, it contributes openly accessible educational materials, course content, and experimental frameworks to the broader community, enabling other institutions to adopt or adapt similar programming. Through outreach activities, curriculum integration, and technical exposure, this project contributes to a more informed and capable renewable energy workforce while supporting innovation in heliostat and CSTP system design. A new technical report is being prepared to document the development of the course and its outcomes, with plans to publish it in the ASME Open Access Journal of Engineering to ensure global accessibility, free of cost.

14 SOLAR ENERGY↗

Development of a Software Safety Process and a Case Study of Its Use

Research in the year covered by this reporting period has been primarily directed toward: continued development of mock-ups of computer screens for operator of a digital reactor control system; development of a reactor simulation to permit testing of various elements of the control system; formal specification of user interfaces; fault-tree analysis including software; evaluation of formal verification techniques; and continued development of a software documentation system. Technical results relating to this grant and the remainder of the principal investigator's research program are contained in various reports and papers.

Knight, J. C.↗

Constellation Architecture and System Margins Strategy

NASA's Constellation Program (CxP) is responsible for the definition, design, development, and operations of the flight, ground, and mission operations elements being developed by the United States for the human exploration of the Moon, Mars, and beyond. This paper provides an overview of the latest CxP technical architecture baseline, driving requirements, and reference missions for initial capability to fly to the International Space Station (ISS) and to the Moon. The results of the most recent design decisions and analyses supporting the architecture, including the Ares I, Ares V, Orion crew exploration vehicle, and the Altair lunar lander will be presented.

Muirhead, Brian↗

Safety & Mission Assurance (SMA) Activities in Support of Artemis I and Plans for Artemis II

The Artemis I mission in 2022 accomplished humanity’s first venture beyond Low-Earth Orbit (LEO) with a human-rated spacecraft in over fifty years. Artemis comprises several key Program elements – Multi-Purpose Crew Vehicle (MPCV) Orion Crew Module, Service Module, Launch Abort System; the Space Launch System (SLS) and the Exploration Ground System (EGS). Much of our human spaceflight experience with crewed lunar missions is captured in historical program documents, but first-hand knowledge is limited to a few spaceflight veterans. Missions to LEO have offered the opportunity of direct, near-instantaneous communications and assistance, and the ability to return to Earth within a matter of hours in case of emergency. Outward-bound missions do not have these features and will require a more autonomous and reliable spacecraft. The assessment of compliance with applicable safety requirements and adequacy of hazard controls and verifications is the responsibility of the MPCV Safety and Engineering Review Panel (MSERP), along with a Joint [NASA/ESA] Safety and Engineering Review Panel (JSERP) for the review of the European Service Module (ESM). The MSERP has two features that are relatively unique amongst NASA safety panels. First, NASA Engineering was added as a Panel co-chair, which enhanced the Engineering organization’s engagement and level of understanding of hazard analysis methodology and results. The MSERP has representation from each office, including Flight Operations Directorate (FOD) and Health and Medical Technical Authority, supporting the Orion Program in addition to the Engineering and Safety Technical Authority co-chairs. Second, the JSERP has a second set of co-chairs from ESA Engineering and ESA Product Assurance and Safety organizations, which recognizes the international arrangement as one of partnership. This paper will focus on SMA processes, activities, and plans for the Orion element and explore unique challenges associated with Artemis II as we approach the flight of the first crewed Orion vehicle.

Paul J. Collier↗

Capability Building Progression of an Insider Threat Mitigation Program at International Nuclear Power Plant

With threats to nuclear facilities continuously evolving, the development and implementation of insider threat mitigation programs is increasingly important. The Office of International Nuclear Security within the U.S. Department of Energy’s National Nuclear Security Administration (DOE/NNSA’s) developed the “Insider Threat Mitigation Program: Facility Implementation Handbook” to assist organizations to be better positioned to minimize the risks posed by malicious insiders. The handbook identified eight elements that contribute to the development and implementation of insider threat mitigation programs. This report outlines the development of a capability building progression of an insider threat mitigation program at international nuclear power plants. This information can be stand-alone or be accompanied by a technical exchange with subject matter experts to support development and implementation of programs with interested international partners.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Analysis of Shroud Options in Support of the Human Exploration of Mars

In support of the Mars Design Reference Architecture (DRA) 5.0, the NASA study team analyzed several shroud options for use on the Ares V launch vehicle.1,2 These shroud options included conventional "large encapsulation" shrouds with outer diameters ranging from 8.4 to 12.9 meters (m) and overall lengths of 22.0 to 54.3 meters, along with a "nosecone-only" shroud option used for Mars transfer vehicle component delivery. Also examined was a "multi-use" aerodynamic encapsulation shroud used for launch, Mars aerocapture, and entry, descent, and landing of the cargo and habitat landers. All conventional shroud options assessed for use on the Mars launch vehicles were the standard biconic design derived from the reference shroud utilized in the Constellation Program s lunar campaign. It is the purpose of this paper to discuss the technical details of each of these shroud options including material properties, structural mass, etc., while also discussing both the volume and mass of the various space transportation and surface system payload elements required to support a "minimum launch" Mars mission strategy, as well as the synergy, potential differences and upgrade paths that may be required between the Lunar and Mars mission shrouds.

Feldman, Stuart↗

On the X-34 FASTRAC-Memorandums of Misunderstanding

Engineers at MSFC designed, developed, and tested propulsion systems that helped launch Saturn I, IB, and V boosters for the Apollo missions. After the Apollo program, Marshall was responsible for the design and development of the propulsion elements for the Shuttle launch vehicle, including the solid rocket boosters, external tank and main engines. Each of these systems offered new propulsion technological challenges that pushed engineers and administrators beyond Saturn. The technical challenges presented by the development of each of these propulsion systems helped to establish and sustain a culture of engineering conservatism and was often accompanied by a deep level of penetration into contractors that worked on these systems.

Hawkins, Lakiesha V.↗

Lessons Learned from Medical System Foundation Development for Long-Duration Lunar Orbit and Lunar Surface Missions

The Human Research Program (HRP) Exploration Medical Capability (ExMC) Element has been tasked with the development of Medical System Foundations for Level of Care IV for both short-duration lunar orbital missions and, subsequently, long-duration lunar orbital and surface operations missions. These Medical System Foundations serve as a framework to aid in early medical system design and mission planning. The content of both Foundation models is similar, consisting of a concept of operations, functional decomposition, clinical content (medical conditions, capabilities, and resources), technical requirements (interface, non-functional, and functional), and traces between these components and to the NASA standards documents and parent-level (Program- and Vehicle habitat system-level) requirements. Additionally, the development of both Foundations employed systems engineering principles and a model-based systems engineering (MBSE) approach. Throughout the development of these Foundations, ExMC has strived to improve the efficiency and robustness of its processes and to be more responsive to change (i.e., in design reference mission parameters and assumptions) and to stakeholders’ feedback. The most significant improvements made between the short- and long-duration Foundation models during this transformation process are the following: • Replacement of the traditional document-based ConOps with a model-based ConOps according to MBSE principles, which facilitated more efficient understanding of the material and the consolidation of all relevant information into a centralized location. • Utilization of an agile approach with tasks organized into sprints. This approach enabled solicitation of more frequent usability feedback from stakeholders, incorporation of more human factors reviews into the sprints, and more efficient tasking of team members. This presentation will discuss the journey of developing both Foundation models, as well as the lessons learned and resulting improvements made between the Short- and Long-Duration models.

M Kaetzer↗