At least 217 records · Page 12

Terry Turbopump Expanded Operating Band Modeling and Simulation Efforts in Fiscal Year 2020 - Progress Report

The Terry Turbine Expanded Operating Band Project is currently conducting testing at Texas A&M University as part of a revised experimental program meant to supplant previous full-scale testing plans under the headings of Milestone 5 and Milestone 6. In consultation with Sandia National Laboratories technical staff and with modeling and simulation support from the same, the hybrid Milestone 5&6 plan is moving forward with experiments aimed at addressing knowledge gaps regarding scale, working fluid, and turbopump self-regulation. Modeling and simulation efforts at Sandia National Laboratories in FY20 fell under the broad umbrella of Milestone 7 and consisted exclusively of MELCOR-related tasks aimed at: 1) Constructing/improving input models of Texas A&M University experiments, 2) Constructing a generic boiling water reactor input model according to best practices with systems-level Teny turbine capabilities, and 3) Adding code capability in order to leverage experimental data/findings, address bugs, and improve general code robustness Project impacts of the Covid-19 pandemic have fortunately been minimal thus far but are mentioned as necessary when discussing the hybrid Milestone 5&6 progress as well as the corresponding Milestone 7 modeling and simulation progress.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Pre-Commercial Scale-Up of a Gas-Fired Absorption Heat Pump

The project sought to advance the maturity of SMTI’s 80 kBTU/hr residential space and water heating GAHP from the engineering prototype stage (TRL-7) to pre-production readiness by addressing manufacturing, balance of system design and installation, cost, reliability, and field application questions. As part of this project, the project team has: (1) Matured the design package for a commercially ready product (2) Demonstrated compliance with relevant ANSI standards (3) Completed manufacturing and assembly process specifications (4) Completed total production cost estimates and capital equipment requirements (5) Initiated component and system level reliability assessments (6) Completed a small field demonstration including measured performance, installation requirements and expected costs, and customer/key stakeholder feedback. (7) Completed a Techno-economic analysis for representative applications and climate zones, including justification for utility incentive programs. (8) Completed a market intelligence report. Scope of Work: A multi-faceted project was completed that included: (a) design for manufacturing tasks for both the sealed system and balance of system, (b) development and trial of key manufacturing processes and techniques, (c) evaluation of component and system level reliability, (d) exploration of make/buy decisions including impact on cost and required capital. Additionally, (e) installation and monitoring of a small number of field test units was completed to demonstrate energy savings and collect customer/installer feedback, and (f) a focused market research task was completed to explore potential barriers and improve market introduction plans. These tasks addressed many of the remaining technical risks regarding long-term reliability, verification of manufacturing cost estimates and identification of cost concerns, identify installation and balance of system design criteria necessary to achieve energy savings and installed cost goals, and identify market barriers and strategies prior to product market introduction.

03 NATURAL GAS↗

Q4FY20 Quarterly Report. LL20-AM-sensor

Tardigrade is an effort to create tunable thermal expansion materials for use in a ruggedized lens housing. This requires new computational algorithms to model and predict thermal performance of meta-materials composed of multiple structured base materials and void-space, along with matching and developing 3D print technology to demonstrate the housing. Project is 13 months into the 30 month on complete project plan. We are continuing effort on 3 main technical thrusts: algorithm development, multi-material additive manufacturing process exploration, and sensor/optics design and engineering. In FY20 we underspent the initial budget, partly due to work restrictions from Covid-19 pandemic, but are working to make up lost time

42 ENGINEERING↗

Tardigrade (NA-22 Quarterly Report)

Tardigrade is an effort to create tunable thermal expansion materials for use in a ruggedized lens housing. This requires new computational algorithms to model and predict thermal performance of meta-materials composed of multiple structured base materials and void-space, along with matching and developing 3D print technology to demonstrate the housing. The project is 24 months into the 36-month plan. We are continuing effort on 3 main technical thrusts: material design algorithm development (transitioning into full 3D design), multi-material additive manufacturing process exploration, and sensor/optics design and engineering. In the last quarter, we have focused on developing the code for 3D Topology Optimization, building data sets for 2D autoencoder training, and finishing lens housing engineering for the microbolometer based test sensor. We are exploring 2 potential multi-material AM technologies, a polymer-based technique in development at LLNL and a metal SLS system produced by Aconity, called the AeroSint deposition head.

36 MATERIALS SCIENCE↗

Tardigrade (Quarterly Report Q1 FY2022)

Tardigrade is an effort to create tunable thermal expansion materials for use in a ruggedized lens housing. This requires new computational algorithms to model and predict thermal performance of meta-materials composed of multiple structured base materials and void-space, along with matching and developing 3D print technology to demonstrate the housing. The project is 27 months into the 36-month plan. We are continuing effort on 3 main technical thrusts: material design algorithm development (transitioning into full 3D design), multi-material additive manufacturing process exploration, and sensor/optics design and engineering. In the last quarter, we have focused on developing the code for 3D Topology Optimization, building data sets for 2D autoencoder training, and finishing lens housing engineering for the microbolometer based test sensor. We are exploring 2 potential multi-material AM technologies, a polymer-based technique in development at LLNL and a metal SLS system produced by Aconity, called the AeroSint deposition head.

36 MATERIALS SCIENCE↗

Supplemental Information Regarding the Application for Remediation of the Flanged Tritium Waste Containers at Los Alamos National Laboratory

This letter is in response to the October 18, 2021 letter from David Gray, Acting Regional Administrator, to Mr. Theodore Wyka, Manager of the National Nuclear Security Administration’s Los Alamos Field Office (NA-LA). That letter requested additional information regarding the Application for remediation of the Flanged Tritium Waste Containers (FTWCs) at Los Alamos National Laboratory (LANL) Technical Area 54, Area G. The Emissions Management Plan for the FTWC Venting Project is attached.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Capacity Density Considerations for Offshore Wind Plants in the United States

The United States is a rapidly emerging market for offshore wind energy, with a project pipeline estimated at over 52 GW as of May 31, 2023 (Musial et al. 2023). The capacity density, measured in megawatts per square kilometer (MW/km 2 ), is a crucial parameter for estimating the magnitude of the development pipeline and the nameplate potential of existing lease areas. The offshore wind energy industry is comprised of diversity of participants, including developers, governmental bodies, investors, environmental advocacy groups, and researchers. These various stakeholders use capacity density in different ways as a key metric for evaluating the potential of individual offshore wind lease area or even a section of ocean space. This report presents our assessment of capacity density values in the current pipeline of emerging U.S. offshore wind farms and a detailed list of the main factors that influence capacity density. This understanding is critical for planning of future lease areas, for estimating the technical resource potential for offshore wind on the U.S. outer continental shelf (OCS), and for estimating ocean space requirements needed for meeting state and national goals for a carbon neutral energy transition.

17 WIND ENERGY↗

Postclosure Criticality Analysis Results

The United States Department of Energy’s (DOE) Office of Nuclear Energy’s Spent Fuel and Waste Science and Technology Campaign seeks to better understand the technical basis, risks, and uncertainty associated with the safe and secure disposition of spent nuclear fuel (SNF) and high-level radioactive waste. Commercial nuclear power generation in the United States has resulted in thousands of metric tons of SNF, the disposal of which is the responsibility of DOE (Nuclear Waste Policy Act of 1982, as amended). Any repository licensed to dispose of SNF must meet requirements regarding the long-term performance of that repository. The evaluation of long-term performance of the repository may need to consider the SNF achieving a critical configuration during the postclosure period. Of particular interest is the potential for this situation to occur in dual-purpose canisters (DPCs), which are currently licensed and being used to store and transport SNF but were not designed for permanent geologic disposal. DOE has been considering disposing of SNF in DPCs to avoid the costs and worker dose associated with repackaging the SNF currently stored in DPCs into repository-specific canisters. This report examines the consequences of postclosure criticality to provide technical support to DOE in developing a disposal plan.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of the Brine Availability Test in Salt (BATS), Including Extended Plan for Experiments at the Waste Isolation Pilot Plant (WIPP)

This document lays out a set of near-future investigations in salt, the third phase of BATS (BATS 3). This phase is planned to answer the few remaining issues from the first two phases of BATS (BATS 1 and BATS 2), and to prepare for a subsequent large-scale demonstration phase. The BATS experiments are the first part of a larger plan to conduct field experiments to answer specific technical questions, improve the technical basis for disposal of heat-generating radioactive waste in salt (Stauffer et al., 2015; SNL et al., 2020), and demonstrate readiness for disposal of radioactive waste in salt, including large, hot waste packages.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NSTTF Voucher Program RPPR-1 (Final Report)

Sandia issued a Request for Proposals (RFP) to solicit proposals from industry, academia, research laboratories, government agencies, and individuals on the use of the National Solar Thermal Test Facility (NSTTF) to increase CSP technology market adoption across the United States. The voucher funds will be used to cover the cost of NSTTF test facilities usage and technical staff support for analysis, design and test planning and execution. Sandia will collect submitted proposals, coordinate their review through DOE SETO, and work in partnership or under contract with the applicants to complete the funded research. Through this program, participants will be supported in their use of the world class facilities and expertise available at the NSTTF at Sandia in Albuquerque, NM to accelerate the advancement of CST technologies toward meeting 2030 SETO goals for CSP. The goals of this semi-annual reporting period were to complete all administrative tasks and contracting, begin testing on three of the vouchers, and report on initial findings. The fourth voucher (University of Michigan) is predicated on the results of an ongoing heat exchanger test that is expected to conclude by the end of FY22.

14 SOLAR ENERGY↗

Analysis of the Effects of Postclosure Criticality on Repository Performance

The United States Department of Energy’s (DOE) Office of Nuclear Energy’s Disposal Research & Development Campaign seeks to better understand the technical basis, risks, and uncertainty associated with the safe and secure disposition of spent nuclear fuel (SNF) and high-level radioactive waste (HLW). Commercial nuclear power generation in the United States has resulted in thousands of metric tons of SNF, the disposal of which is the responsibility of DOE (Nuclear Waste Policy Act of 1982, as amended). Any repository licensed to dispose of SNF will be subject to requirements regarding the long-term performance of that repository. Evaluating the long-term performance of the repository may consider the consequences of the SNF achieving a critical configuration during the postclosure period. Of particular interest is the potential for this to occur in dual-purpose canisters (DPCs), which are currently licensed and being used to store and transport SNF but were not designed for permanent geologic disposal. DOE has been considering disposing of SNF in DPCs to avoid the costs and worker dose associated with repackaging the SNF currently stored in DPCs into repository-specific canisters. This report examines the consequences of postclosure criticality to provide technical support to DOE in developing a disposal plan.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Strategic Planning for Energy-Resilient Communities

Distributed energy resources (DERs) offer flexibility and community benefits in both blue- and black-sky conditions. Outside of a power disruption, they can provide significant cost savings and reduce grid stress during times of high demand. During a disruption to the central grid, these technologies can meet critical energy needs through the use of battery storage. However, communities must consider many planning and design dimensions and tradeoffs to integrate energy systems that meet financial and resilience goals. This presentation, given at the 2026 State Energy Conference of North Carolina, defines resilience in an energy context, discusses strategies and best practices for planning resilient energy systems and sites, including resilience hubs and microgrids, highlights NLR tools and capabilities for helping communities in this space, and features successful case studies in North Carolina related to energy resilience.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Progress towards the POCO of UK Highly Active Storage Tanks - 20112

In the UK Highly Active (HA) waste is stored in stainless steel Highly Active Storage Tanks (HASTs) prior to encapsulation in glass in one of three operating vitrification plants. Significant progress has been made towards the reduction in the volume of HA Liquor (HAL) stored in these HASTs and several tanks currently operate at heel levels. In recent years a strategy has been developed towards the Post Operational Clean Out (POCO) of the tanks and significant progress has been made in confirming this strategy since it was last presented at WMS [1]. For a variety of reasons changes to associated operational assumptions have also been made. This paper will highlight recent progress and changes associated with the strategy, including a description of some of the challenges that have been overcome and associated technical work undertaken. It will also detail current plans to POCO the HASTs, as quickly as possible, while minimising the risk and continuing to support other ongoing reprocessing and clean-up programmes as part of the overall UK clean-up mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Low-Yield Nuclear Monitoring (LYNM) Experimental Science Plan

The Low-Yield Nuclear Monitoring (LYNM) Program is a long-term NNSA research and development effort designed to improve the United States’ explosion monitoring capabilities, particularly with respect to low-yield and potentially evasive underground nuclear testing. The LYNM Program focuses on researching, discovering, and exploiting unique and useful signatures, from all available technologies and sensors (e.g., seismic, acoustic, electromagnetic, gases, and particulates (both stable and radioactive)). Four Department of Energy laboratories participate in LYNM and together are referred to as the ‘quad-lab’. The R&D program execution is performed under NNSA defined structures known as “ventures”. Four science ventures were established: 1) Explosion Source Functions; 2) Containment of Low-Yield Underground Tests; 3) Local Signatures; 4) Dynamic Monitoring Networks. To organize and execute the large field scale experiment a fifth venture was established: 5) Physics Experiment One (PE-1). As part of the LYNM Program, a series of experiments are planned at various scales and levels of venture involvement. These vary from those that involve a subset of labs and/or LYNM ventures (e.g., small experiments), to full quad-lab LYNM Program field-scale integrated experiments. Such experiments may involve chemical explosions with tracer materials or other means of simulating the expected signals from a nuclear explosion. The LYNM Program does not conduct actual nuclear explosions. Since 1992, the U.S. has observed a moratorium on underground nuclear explosions. This document is intended to provide the underlying scientific basis for the LYNM planned experimental work. Each specific LYNM experiment will develop a goals, objectives, and requirements (GOR) plan following the guidance in this document. The LYNM technical staff will define the numbers and types of experiments required over the course of the Program based on technical needs and within funding constraints. As with any scientific experiment series, the number and types of experiments may change based upon the experimental results obtained. An experiment that agrees with models/codes/software signature predictions may need fewer repetitions/variations, depending upon the level of statistical rigor desired, as compared to one in which the predictions and experimental data do not match. The large LYNM field-scale integrated experiments require the longest lead-time for planning, and these are discussed in more detail near the end of this document.

58 GEOSCIENCES↗

Best Practices in Integrated Resource Planning: A guide for planners developing the electricity resource mix of the future

Most states today require regulated electric utilities to file an IRP every 1 to 5 years, and some utilities voluntarily prepare these plans. Planning needs have changed in recent years due to emerging load growth, plant retirements, rising costs, and more extreme weather events – among other factors. In response, Synapse Energy Economics and Lawrence Berkeley National Laboratory produced a joint report, Best Practices in Integrated Resource Planning: A guide for planners developing the electricity resource mix of the future. The guide offers best planning practices for electricity systems undergoing a major transition, but also contains a wealth of practical guidance to develop technically sophisticated, clearer, more effective, and state-of-the-art electric utility resource plans. The guide is for resource planning professionals and stakeholders involved in resource planning processes. This diverse group includes utility personnel tasked with conducting resource planning and making investment decisions, state regulatory commissions that develop planning guidance and oversee the resource planning process, and stakeholders that represent a wide range of interests—utility consumer advocates, environmental groups, industrial customers, local governments, independent power producers, and many other

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Strategic Energy Plan: Playa de Ponce, Ponce, Puerto Rico

Un Nuevo Amanecer Inc. (UNA), a community-based NGO (501C(3)), sought technical assistance through the U.S. Department of Energy's (DOE's) Energy Technology Innovation Partnership Project (ETIPP) to develop a strategic energy plan (SEP) for the community of Playa de Ponce on the south coast of Puerto Rico. A SEP helps communities identify energy goals and priority projects, and outline strategies and actions to build a shared path toward their energy vision. The primary goal of this SEP is to collaboratively explore pathways for the community's energy future. Researchers from the National Laboratory of the Rockies (NLR) engaged with the community for a period of seven months and facilitated a series of in-person community engagement workshops along with ETIPP regional partner Puerto Rico Hispanic Federation, UNA, and community leaders. The SEP workshops were held twice, March 18-20 and June 24-26, 2025. Through facilitated discussions, the community worked together to define and articulate a clear vision for its short-, medium-, and long-term energy goals. The workshops played a key role in identifying the specific strategies and priority projects that would best suit the needs of the community. The discussions outlined the community's energy aspirations, establishing a shared vision, setting goals, and outlining the priority actions needed to bring them to fruition. During the workshops, the community shared some of the most pressing energy challenges that they face on a regular basis, such as high energy costs that disproportionately impact an aging population and unreliable electricity during extreme weather events that result in frequent power outages. These issues have also exacerbated risks to public health and safety of the community. In response, UNA requested technical assistance through ETIPP to inform the development of a SEP tailored to Playa de Ponce to support its energy vision. This document explores four community-driven energy strategies aligned with that vision. Figure 1 shows the strategies outlined in this plan, which are categorized into three focus areas as identified by the community: energy reliability; safety and security; and stakeholder participation, education, and capacity building. This document serves as a shared roadmap for developing and implementing energy solutions that meet the needs of Playa de Ponce. It is intended to serve as a public resource for the community, UNA, and local authorities - providing tools, information and a shared foundation to inform future implementation efforts. This plan is intended to complement ongoing planning frameworks at the municipal, regional, and island-wide levels. As a living document, this SEP can evolve alongside Playa de Ponce's changing energy goals, while offering a framework to help them realize their energy vision.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Technical Assistance Opportunities for Tribes

The National Renewable Energy Laboratory (NREL) offers many forms of technical assistance for Tribes to support local clean energy priorities and challenges. With broad support from the U.S. Department of Energy (DOE) and local partners, NREL provides technical expertise to enable data-driven, informed clean energy decision making. Technical assistance may address energy strategy, project financing, policy design and development, data analysis, economic development, infrastructure planning, energy justice, climate change, resilience, or other energy priorities. NREL has a long history of partnering with Tribes and Tribal organizations, including in Alaska Native Villages where the extreme Arctic climate poses unique energy challenges. NREL works directly with Tribes to find solutions that address their self-defined energy priorities, challenges, and goals.

Alaska native village↗

Energy Technology Proving Ground Program Plan

New methods of energy production and distribution are required to meet clean energy goals and demands across all U.S. energy sectors. Idaho National Laboratory’s (INL) Integrated Energy Systems (IES) initiative is enabling clean energy research, development, and demonstration (RD&D) activities. To date, IES demonstration programs have been limited by distributed infrastructure and a lack of large-scale facilities to accommodate industry-scale research of Technical Readiness Level (TRL) 6-8 technologies. The IES initiative plans to eliminate these constraints by establishing a new research complex at INL known as the Energy Technology Proving Ground (Proving Ground) to be led by the Energy and Environment Science and Technology Directorate. The Energy and Environment Science and Technology (EES&T) directorate, one of five Idaho National Laboratory (INL) RD&D organizations, focuses on clean energy technologies that anchor the industry-enabling research of the Proving Ground. The Proving Ground will combine diverse clean energy systems into lean integrated test bed of independent multiscale capabilities available to the government and commercial industries to perform research; and will enable INL’s goal of becoming a Net-Zero entity by 2031. This program encompasses existing and new research space at both the in-town Research and Education Campus (REC) and the Arco desert site (the Site). The Proving Ground will support the maturation of IES technologies from TRL 1 through 8 by providing the infrastructure and capabilities needed to sustain a continuum of RD&D from basic science to industry-scale. To establish The Proving Ground and meet INL’s net-zero goals by 2031, nine research program areas have been identified within the IES initiative that require expanded and new capital infrastructure. This program plan provides guidance for establishing the Proving Ground at the Site for plug-and-play pilot testing and proofing of integrated energy system functionality including fission and renewable energy sources for industry driven application platforms.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗