CalTestBed - Parthian Energy: Electromagnetic Sensing of Pre-mature Cell Failure (CRADA Final Report)

We had lengthy discussions with Parthian on the interpretation of the original SOW as laid out in the original proposal and on whether or not these tasks were allowable under the rules set by Cal Test Bed. There were also discussions on program limitations on purchasing equipment. We were engaged with vendors identified by Parthian as companies from which we could lease equipment, and in most cases, came to find, that these products were only available for purchase. As a result, we configured translational stages into an x-y plotter arrangement and established computer control over the setup as a step toward building our own system for acquiring data to meet Parthian's requirements. The project reached its scheduled end prior to the start of testing and was allowed to elapse uncompleted.

25 ENERGY STORAGE↗

Prospects and Challenges in the Management of Non-Retrievable Radioactive Waste in the Russian Federation - 17212

In 2011, the Federal Law 'On the Management of Radioactive Waste' was enacted in the Russian Federation setting a framework for the Unified State System for Radioactive Waste Management and establishing a mandatory requirement for safe radioactive waste (RW) disposal. Particular category of 'non-retrievable RW' was defined given the amount of RW generated by that time, the issues associated with relevant sites, as well as the experience gained during the implementation of nuclear legacy programs. It was specified that in situ disposal is the preferred management option for this category of waste rather than RW retrieval and re-disposal due to relevant radiation and financial aspects. In 2011 - 2015, a set of high-priority tasks on taking the inventory of accumulated RW was accomplished. This work also provided for demonstrating the feasibility and making key decisions on the final stages on their lifecycle and relevant end-state strategies. Facilities holding non-retrievable RW were divided into two categories: - subject to transition into near-surface storage facilities by constructing additional safety barriers; - subject to controlled long-term storage followed by remediation. Efforts on a number of surface liquid RW storage water reservoirs falling under the first category launched back in the 20. century were completed. The new federal program provides for a set of follow-up efforts to be completed at 12 facilities. As it comes to the second category, the main task was to develop a set of safety management options, as well as some computational methods to demonstrate the feasibility of the selected end-state strategies. The most considerable efforts were made at the Techa Cascade of water reservoirs being the largest liquid radioactive waste (LRW) storage facility in the world that holds over 360 million m{sup 3} of waste with uncertain legal status, the lack of relevant computational models to predict its state. The paper summarizes the data on defining the end states of non-retrievable RW, completed and scheduled efforts on implementing relevant long-term safety strategies. The paper focuses on subsurface repositories and near-surface LRW storage reservoirs considered as common types of facilities holding non-retrievable RW. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transportation and Systems Analysis Collaborations in Support of a Federal Consolidated Interim Storage Facility

The U.S. Department of Energy’s Integrated Waste Management (IWM) program under the Office of Nuclear Energy is planning for the future transportation, storage, and eventual disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from nuclear power plant sites across the United States. To better enable informed decision-making regarding the back end of the nuclear fuel cycle, the IWM program has been sponsoring the development and application of system analysis tools capable of analyzing various options for managing SNF and HLW. With these tools, integrated waste management system (IWMS) architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). System analyses and assessments typically use these modeling and simulation tools to investigate implications of changes in various assumptions and parameters such as acceptance rates, receipt logic, facility capacities and capabilities, use of standardized canisters, start and stop dates of facilities, etc. The Next Generation System Analysis Model (NGSAM) is an agent-based simulation toolkit that is used for a system-level simulation and analysis focused on SNF management in the United States. An analyst using NGSAM has the ability to define several factors like the number of storage facilities, capacity at each facility, transportation schedules, shipment rates, and other conditions. NGSAM’s primary purpose is to provide a system analyst with capabilities to model the IWMS and gain insights into SNF and HLW management alternatives including the impact of system choices, associated cost estimates, and development of integrated yet flexible approaches. IWM is also developing the Stakeholder Tool for Assessing Radioactive Transportation (START). START is a web-based geospatial tool developed to provide visualization and initial evaluation of transportation options associated with future SNF and HLW shipment planning and operations. This includes characterizing safety, economic, and environmental conditions on and in proximity to shipment origins as well as along prospective transportation routes. Information from the START tool can be presented/shared as maps, graphics, geospatial files, and tabular form to enable easy data representation and export functionality. The system analysis, NGSAM, and START teams had been working closely for several years before formalizing this collaboration. START provides the SNF routing information for use in NGSAM. System analysts use the NGSAM tool to generate results (schedule, costs, infrastructure acquisitions, shipment rates, etc.). Subject-matter experts and system analysts work together to inform how NGSAM should model the waste management system. Specifically, this paper discusses the collaborations between the system analysis, NGSAM, and START teams and their accomplishments over the past year. Some examples of these efforts include calibrating and adding data to the START output files to meet NGSAM needs, gaining a better understanding of START data used in NGSAM, as well as how updates in START data could result in an improved NGSAM analysis. Detailed examples of various tasks that have been performed by the team will be discussed in the full paper. Continued efforts in this direction are expected in the coming years.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Transportation and System Analysis Collaborations in Support of a Federal Consolidated Interim Storage Facility

The U.S. Department of Energy’s Integrated Waste Management (IWM) program under the Office of Nuclear Energy is planning for the future transportation, storage, and eventual disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from nuclear power plant and waste custodian sites across the United States. To better enable informed decision-making regarding the back end of the nuclear fuel cycle, the IWM program has been sponsoring the development and application of system analysis tools capable of analyzing various options for managing SNF and HLW. With these tools, integrated waste management system (IWMS) architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). System analyses and assessments typically use these modeling and simulation tools to investigate implications of changes in various assumptions and parameters such as acceptance rates, receipt logic, facility capacities and capabilities, use of standardized canisters, start and stop dates of facilities, etc. The Next Generation System Analysis Model (NGSAM) is an agent-based simulation toolkit that is used for a system-level simulation and analysis focused on SNF management in the United States. NGSAM’s primary purpose is to provide a system analyst with capabilities to model the IWMS and gain insights into SNF and HLW management alternatives including the impact of system choices, associated cost estimates, and development of integrated yet flexible approaches. An analyst using NGSAM can define several factors like the number of storage facilities, capacity at each facility, transportation schedules, shipment rates, and other conditions. IWM is also developing the Stakeholder Tool for Assessing Radioactive Transportation (START). START is a web-based geospatial tool developed to provide the visualization and initial evaluation of transportation options associated with future SNF and HLW shipment planning and operations. This includes characterizing safety, economic, and environmental conditions at and in proximity to shipment origins as well as along prospective transportation routes. Information from the START tool can be presented/shared as maps, graphics, geospatial files, and tabular form to enable easy data representation and export functionality. The system analysis, NGSAM, and START teams have been working closely for several years before formalizing this collaboration. START provides the SNF transportation routing information for use in NGSAM. System analysts use the NGSAM tool to generate results (schedule, costs, infrastructure acquisitions, shipment rates, etc.). Subject-matter experts and system analysts work together to inform how NGSAM should model the waste management system. Specifically, this paper discusses the collaborations between the system analysis, NGSAM, and START teams and their accomplishments over the past year. Some examples of these efforts include calibrating and adding data to the START output files to meet NGSAM needs, gaining a better understanding of START data used in NGSAM as well as how updates in START data could result in an improved NGSAM analysis. Detailed examples of various tasks that have been performed by the team will be discussed in the full paper. Continued efforts in this direction are expected in the coming years.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Verification and validation of developed short-term forecasting models

Recent advancements in machine learning (ML) and artificial intelligence (AI) technologies provide an opportunity for leveraging data-driven algorithms to predict future nuclear power plant (NPP) operating conditions by using recorded plant process data. Successfully implementing these models can lead to cost-reducing, conditioned-based predictive maintenance through optimized maintenance schedules and a reduction of unnecessary maintenance activities. This report discusses the verification and validation of short-term forecasting processes (i.e., data cleaning, feature selection, model optimization, and forecasting) developed in previous reports. The verification and validation (V&V) process demonstrates the expected precision and accuracy when the ML model encounters new datasets from different systems. Shapley additive explanations were used as the primary means of feature selection across these different data set. Individual models were trained for each data set, then validated through a cross-validation procedure. In this report, two different ML models were tasked to predict variables from three different plant process data sets with varying prediction horizons. The results indicate that support vector regression (SVR) outperformed long short-term memory (LSTM) neural networks in regard to each data set and each prediction horizon in this study, but further tuning and optimization could improve long short-term memory results. However, each forecasting model showed reduced performance as the prediction horizon was extended from 1 hour to 1 day ahead. Research is ongoing to evaluate the optimal input variable space, which is based on a given set of process parameters, to further improve forecasting accuracy.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Dynamic Charging Rendezvous and Motion Planning for a Multi-AGV Team Including a Mobile Charging Host

Teams of automated battery-powered electric vehicles have the potential to execute complex mission tasks in off-road environments for agriculture, military, and other applications. Limited onboard energy reserves hinder their adoption in large-scale resource-constrained environments, where recharging is a necessity. It may be infeasible to install a network of static charging stations in off-road environments. For this reason, dedicated mobile host vehicles with charging capabilities are proposed as a means to increase range and capabilities of the multivehicle team. Here, in this study, we consider an ad hoc planning framework, where results from a high-confidence trajectory planner are leveraged to plan charging rendezvous between a host and other worker vehicles in a receding horizon fashion to provide high confidence that energy reserves will not be prematurely exhausted. The core problem is posed so as to minimize the impact of recharging on the mission in terms of task delays, overall energy utilization, and costs of fast charging. Through extensive Monte Carlo simulations of an off-road mission, we show a decrease in task delays without substantial increases in energy needs by updating the charging rendezvous plan during the mission. However, if updates are made too often, model mismatch may cause unnecessary cycling and mission failure.

Energy constraints↗

Enabling machine learning-ready HPC ensembles with Merlin

With the growing complexity of computational and experimental facilities, many scientific researchers are turning to machine learning (ML) techniques to analyze large scale ensemble data. With complexities such as multi-component workflows, heterogeneous machine architectures, parallel file systems, and batch scheduling, care must be taken to facilitate this analysis in a high performance computing (HPC) environment. Here, we present Merlin, a workflow framework to enable large ML-friendly ensembles of scientific HPC simulations. By augmenting traditional HPC with distributed compute technologies, Merlin aims to lower the barrier for scientific subject matter experts to incorporate ML into their analysis. As a producer–consumer workflow model, Merlin enables multi-machine, cross-batch job, dynamically allocated yet persistent workflows capable of utilizing surge-compute resources. Key features of Merlin are a flexible HPC-centric interface, low per-task overhead, multi-tiered fault recovery, and a hierarchical sampling algorithm that allows for $\mathscr{O}$(N) task execution and $\mathscr{O}$(N ln N) task queuing to ensembles of millions of tasks. In addition to Merlin’s design, we test the algorithm’s performance in an HPC center and demonstrate the ability to enqueue 40 million simulations in 100 s, with a 30 millisecond per-task overhead that is independent of ensemble size. Finally, we describe some example applications that Merlin has enabled on leadership-class HPC resources, such as the ML-augmented optimization of nuclear fusion experiments and the calibration of infectious disease models to study the progression of and possible mitigation strategies for COVID-19.

97 MATHEMATICS AND COMPUTING↗

Reaching new peaks for the future of the CMS HTCondor Global Pool

The CMS experiment at CERN employs a distributed computing infrastructure to satisfy its data processing and simulation needs. The CMS Submission Infrastructure team manages a dynamic HTCondor pool, aggregating mainly Grid clusters worldwide, but also HPC, Cloud and opportunistic resources. This CMS Global Pool, which currently involves over 70 computing sites worldwide and peaks at 350k CPU cores, is employed to successfully manage the simultaneous execution of up to 150k tasks. While the present infrastructure is sufficient to harness the current computing power scales, CMS latest estimates predict a noticeable expansion in the amount of CPU that will be required in order to cope with the massive data increase of the High-Luminosity LHC (HL-LHC) era, planned to start in 2027. This contribution presents the latest results of the CMS Submission Infrastructure team in exploring and expanding the scalability reach of our Global Pool, in order to preventively detect and overcome any barriers in relation to the HL-LHC goals, while maintaining high effciency in our workload scheduling and resource utilization.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Development and Application of a Risk Analysis Toolkit for Plant Resources Optimization

This report summarizes the R&D activities of the Risk Informed Asset Management (RIAM) project during fiscal year 2020 (FY20). This project focuses on the development of methods designed to optimize plant operations (e.g., maintenance/replacement schedule, optimal maintenance posture) provided system/component health/cost data. This project development lives in cooperation with the Plant Health Management (PHM) project which focuses on the development of methods that integrate component health data and propagate such information at the system level to evaluate most relevant sources of risk. This year’s activities for the RIAM project focused on the continuation of schedule optimization algorithms developed in FY19. While in FY19 we focused on both deterministic and stochastic capital budgeting methods, in FY20 we moved forward by implementing two versions of schedule optimization methods. The first one reformulates the capital budgeting problem in a distributionally robust form which allows the user to rely on data directly rather than proposing a distribution from the data itself. The second version reformulates the capital budgeting explicitly using risk measures as variables to maximize/minimize. Lastly, we focused on the development of methods designed to identify the optimal maintenance posture based on the Pareto Frontier analysis. Rather than performing a tradeoff analysis (i.e., identify the absolute best posture), the Pareto Frontier analysis performs a trade space exploration approach (i.e., identify value and costs of several postures and have the analyst perform the task of imposing desired value and cost constraints). This is performed by identifying maintenance postures that maximize value (e.g., system availability) and minimize operational costs, i.e., the Pareto frontier in a value-cost trade space.

97 MATHEMATICS AND COMPUTING↗

Assessment of the Electrical Substation-Grid Testbed with Inside/Outside Devices and Distributed Ledger Technology

The electrical substation-grid testbed was created to integrate the GOOSE and/or DNP (Distributed Network Protocol) messages with time synchronized sources and Distributed Ledger Technology (DLT). The objective was to study the impact of faults and cyber-events at an electrical substation with inside (protective relays) and outside (power meters) substation devices. The electrical substation-grid testbed was based on the design of a 34.5/ 12.47 kV electrical substation (sectionalized bus configuration) with two power transformers, connected to radial power lines and load feeders. The electrical substation-grid testbed was installed at 252 lab space (Advanced Power System Protection), Grid Research Integration and Deployment Center (GRID-C), Oak Ridge National Laboratory. This testbed was created for Task 5, DarkNet project. The electrical substation-grid testbed was created to simulate fault and/or cyber events that could potentially result in damage to the electrical infrastructure. In addition, tests were run that are usually not allowed to be performed in an operational electrical power grid, because these test scenarios could trip breakers and/or generate fault situations that could potentially damage equipment. The number of tests performed in the electrical substation-grid testbed were executed in a better way than in a real electrical substation and/or power grid, because multiple tests could be run in a short period of time, and complex permits, and safety/ schedule restrictions like in a real electrical substation environment were not needed. The electrical substation-grid testbed was created using real measurement, communication, and protection devices that are used by electrical utilities, to have same conditions that we could observe in a real power grid or electrical substation. The electrical substation-grid testbed was based on using a real time simulator and expansion box with amplifiers that were wired to electrical substation-grid devices. This hardware-in-the-loop (HIL) was provided by protective relays, power meters, ethernet switches, remote terminal units, synchronized timing network clock, DLT devices, workstations, and servers. This report includes the design, installation, and assessment of the electrical substation-grid testbed that was similar to an operational electrical substation, integrating the power system protection, communication, and control systems. The results for the electrical substation-grid testbed were based on:• verifying the analog signals for protective relays and power meters, • observing the synchronized time source frame at devices, • authenticating the GOOSE (IEC 61850) and DNP messages from power meters and protective relays, and • verifying the trip conditions of protective relays at fault tests with the power system fault event detection, using DLT devices. For future work, the electrical substation-grid testbed with protective relays and power meters, using DLT and synchronized time source from DarkNet, will be used to study the impact of cyber-events at inside and outside substation devices. Advanced algorithms for detecting cyber-events produced by non-desired protective relay settings will be studied, to improve the detection and reliability of protection, control, and communication systems at power grids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Ad Hoc File Systems for High-Performance Computing

Storage backends of parallel compute clusters are still based mostly on magnetic disks, while newer and faster storage technologies such as flash-based SSDs or non-volatile random access memory (NVRAM) are deployed within compute nodes. Including these new storage technologies into scientific workflows is unfortunately today a mostly manual task, and most scientists therefore do not take advantage of the faster storage media. One approach to systematically include nodelocal SSDs or NVRAMs into scientific workflows is to deploy ad hoc file systems over a set of compute nodes, which serve as temporary storage systems for single applications or longer-running campaigns. This paper presents results from the Dagstuhl Seminar 17202 “Challenges and Opportunities of User-Level File Systems for HPC” and discusses application scenarios as well as design strategies for ad hoc file systems using node-local storage media. The discussion includes open research questions, such as how to couple ad hoc file systems with the batch scheduling environment and how to schedule stage-in and stage-out processes of data between the storage backend and the ad hoc file systems. Also presented are strategies to build ad hoc file systems by using reusable components for networking and how to improve storage device compatibility. Various interfaces and semantics are presented, for example those used by the three ad hoc file systems BeeOND, GekkoFS, and BurstFS. Their presentation covers a range from file systems running in production to cutting-edge research focusing on reaching the performance limits of the underlying devices.

97 MATHEMATICS AND COMPUTING↗

C-SAW: a framework for graph sampling and random walk on GPUs

Many applications require to learn, mine, analyze and visualize large-scale graphs. These graphs are often too large to be addressed efficiently using conventional graph processing technologies. Fortunately, recent research efforts find out graph sampling and random walk, which significantly reduce the size of original graphs, can benefit the tasks of learning, mining, analyzing and visualizing large graphs by capturing the desirable graph properties. This paper introduces C-SAW, the first framework that accelerates Sampling and Random Walk framework on GPUs. Particularly, C-SAW makes three contributions: First, our framework provides a generic API which allows users to implement a wide range of sampling and random walk algorithms with ease. Second, offloading this framework on GPU, we introduce warp-centric parallel selection, and two novel optimizations for collision migration. Third, towards supporting graphs that exceed the GPU memory capacity, we introduce efficient data transfer optimizations for out-of-memory and multi-GPU sampling, such as workload-aware scheduling and batched multi-instance sampling. Taken together, our framework constantly outperforms the state of the art projects in addition to the capability of supporting a wide range of sampling and random walk algorithms.

97 MATHEMATICS AND COMPUTING↗

OPTOM: Optimization of Parabolic Trough - Operations & Maintenance

The US Department of Energy’s SunShot goals look to reduce the cost of Concentrating Solar Power (CSP) technology to 5¢/kWh for baseload plants. This is about a 50% reduction from current costs. To achieve this cost target, a significant reduction in operation and maintenance (O&M) costs of 40 to 50% is likely needed. Advances are needed in the O&M practices of CSP plants if the technology is to achieve the SunShot cost goals. Digitization of plant performance and O&M data has become a new best practice in the world of renewable energy asset management. Owners and operators of large photovoltaic and wind power plants are working to digitize performance and O&M data at their existing assets, to improve their management of the facilities, to increase performance, reduce O&M costs, and lower the overall life cycle cost of ownership. CSP power plants are behind the curve of other technologies on the digitization of plant information to aid in the plant asset management. This project directly addresses the objective of digitizing the O&M data of the solar field, focusing on three areas: 1) creating a framework for sharing data and information, 2) creating a system for monitoring and managing the maintenance of the solar field collectors, and 3) developing analytic tools to identify issues in the solar field. According to the NREL CSP Best Practices Study, the current practice at many CSP plants is to rely on paper lists, spreadsheets, and email for monitoring and managing problems and maintenance in the solar field. The key element to digitize solar field O&M is the creation of a centralized data archive that all users and systems can interface with. This project developed a centralized relational database framework that allows users and applications to access and share data. Conventional power plants utilize Computerized Maintenance Management Systems (CMMSs) to track the corrective, preventive (scheduled), and predictive maintenance of equipment and subsystems in the power plant. CSP plants use these systems in the power block, but while these systems specialize at tracking maintenance on up to thousands of pieces of equipment, they are not well suited for tracking the tens or hundreds of thousands of components in large commercial CSP or photovoltaic solar fields. In this project we developed a new software application referred to as FieldStatus (TM). This is a specialized database program that is used to track the status of each collector and its components. This application is designed to complement the existing CMMS to enable improved tracking and management of maintenance activities in the solar field. One of the major maintenance tasks for solar fields is maintaining the cleanliness of the mirrors. Although seemingly a relatively straight forward task, it has often proven challenging to maintain high levels of cleanliness in an efficient and cost-effective manner. This project developed new tools and metrics for monitoring and optimizing solar field cleaning resources and overall solar field cleanliness.

14 SOLAR ENERGY↗

Extremely Low Resource Optical Identifier: A License Plate for Your Satellite

Space object identification is vital for operating spacecraft, space traffic control, and space situational awareness, but initial determination, maintenance, and recovery of identity are all difficult, expensive, and error prone, especially for small objects like CubeSats. Attaching a beacon or license plate with a unique identification number to a space object before launch would greatly simplify the task, but radio beacons are power hungry and can cause interference. This work describes a new concept for a satellite license plate: the extremely low resource optical identifier. The extremely low resource optical identifier is a milliwatt-scale self-powered autonomous optical beacon that can be attached to any space object to transmit a persistent identification signal to ground stations. A system appropriate for a low-Earth-orbit CubeSat or other small space object can fit in a package with the area of a postage stamp and a few millimeters thick; and it requires no power, data, or control from the host object. The concept has been validated with ground tests, and the first flight-test unit is scheduled for launch in 2018. The unique identification number of a low-Earth-orbit satellite can be determined unambiguously in a single orbital pass over a low-cost ground station.

79 ASTRONOMY AND ASTROPHYSICS↗

Development of programmable logic in a rapid, automated, and repeatable fashion for safety-related applications - 385

Digital safety platform considerations for power plant modernization or new build efforts involve a burdensome task of implementing a large number of software-based functions onto a designated platform to match the plant's architecture. This problem is not unique to any particular safety-related platform solution, but is prevalent across the landscape of current Qualified and Licensed Safety-related Instrumentation and Control (I and C) Solutions. As an example when implementing a RG 1.97 compliant Post Accident Monitoring System (PAMS) solution with the Lockheed Martin Nuclear Protection and Control (NuPAC) safety platform, 72 unique software loads are needed to configure the Qualified Display System (QDS). Large scale development and customization efforts to upgrade existing plant functions or systems require the licensee to assume the cost and technical risk necessary to undergo a digital based upgrade. Often the cost, schedule, and technical risk outweighed the benefit of modernization efforts due to the unknown hurdles and past projects that overran cost and schedule projections. Lockheed Martin's Engineering Production Suite (EPS) minimizes the licensee risk and expense associated with modernization efforts through a developer's toolkit for rapid, automated, and repeatable development of Programmable Logic used to implement plant functions and architectures for use on the Lockheed Martin NuPAC platform. This paper describes a use case where by EPS can create system level representations, simulate system functions, partition logic designs to accommodate hardware constraints through logic partitioning, automate the assembly of Application Specific Programmable Logic (ASPL), generate system test cases, program the NuPAC hardware, and perform testing throughout the design workflow. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

When Every Drum is a Win - Tackling a Thirty-Five Thousand Drum Legacy - 20064

Cameco Corporation's (Cameco) Port Hope Conversion Facility (PHCF) was previously owned by the federal Crown Corporation, Eldorado Nuclear, which held a significant inventory of legacy waste material at the time Cameco was formed in 1988. As a result, Cameco was granted an allocation of 150,000 cubic metres of space in the Long-Term Waste Management Facility (LTWMF) located in the Municipality of Port Hope (MPH), which opened to the receipt of Cameco material in June 2018. Cameco is currently undertaking a major site cleanup and renewal of its Port Hope Conversion Facility (PHCF) which is known as the Vision in Motion (VIM) project. Over its operating history, Eldorado accumulated an inventory of over 35,000 drums of accumulated waste that was primarily stored at two offside warehouse locations. In 2017 and 2018, the project focused on repackaging two well characterized legacy wastes (magnesium fluoride slag and depleted uranium titanium oxide) from one of the two offsite locations. At the conclusion of this work, approximately 15,000 drums of these wastes had been repackaged and disposed of at the LTWMF. There remained approximately 1000 drums from this location that either could not be repackaged safely or were different waste types and required further verification and/or processing. The buildings at this location were scheduled for demolition in early 2019, which triggered the development of a process for triaging legacy drums in August 2018, which allowed for preparation and shipment of approximately half of these drums to the LTWMF by March 2019, with the remainder moved to the second offsite warehouse location in February 2019 for further characterization which is ongoing. This paper will discuss key lessons learned as the drummed legacy waste disposal inventory has been reduced to approximately half of the initial inventory. This will include the development of an alternate packaging process; prioritization of characterization activities and selection of techniques where minimal inventory information is available; determination of next step(s) for each drum as it is assessed; key safety considerations; and how to make inroads into an overwhelming task while under public and regulatory scrutiny. In a relatively short period of time, significant progress has been made to organize and gather information about the legacy waste, update the inventory records and determine the most appropriate pathways (i.e. LTWMF disposal, disposal at another appropriate facility, site storage until future processing and/or disposal). Since 2017 the volume of the decades-old legacy waste inventory has decreased significantly. With the majority of the known materials safely disposed of at the LTWMF, every drum removed from the endless rows of 20,000 pyramidally-stacked waste drums with limited history that is safely characterized, prepared and shipped is considered a win. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Same Data, Different Audiences: Using Personas to Scope a Supercomputing Job Queue Visualization

Domain-specific visualizations sometimes focus on narrow, albeit important, tasks for one group of users. This focus limits the utility of a visualization to other groups working with the same data. While tasks elicited from other groups can present a design pitfall if not disambiguated, they also present a design opportunity—namely, the development of visualizations that support multiple groups. This development choice presents a trade-off of broadening the scope but limiting support for the more narrow tasks of any one group, which in some cases can enhance the overall utility of the visualization. We investigate this scenario through a design study where we develop Guidepost, a notebook-embedded visualization of data that helps scientists assess compute wait times, machine learning researchers understand prediction accuracy, and system maintainers analyze usage trends. We adapt the use of personas for visualization design from existing literature in the HCI and design domains, applying them to categorize tasks based on their uniqueness across stakeholder personas. Under this model, tasks shared between all groups should be supported by interactive visualizations and tasks unique to each group can be deferred to scripting with notebook-embedded visualization design. We evaluate our visualization through real-world case studies and a task-focused evaluation with nine participants. We observe that together, Guidepost's visual encodings, interactions, and export capabilities support the tasks of our differing personas.

97 MATHEMATICS AND COMPUTING↗