At least 217 records · Page 12

ASSESSMENT OF THE ABILITY OF STANDARD SLURRY PUMPS TO MIX MISCIBLE AND IMMISCIBLE LIQUIDS IN TANK 50H

Tank 50H is the feed tank for the Saltstone Production Facility (SPF). At present, Tank 50H contains two standard slurry pumps and two Quad Volute slurry pumps. Current requirements and mixing operation is to run three pumps for one hour prior to initiating a feed transfer to SPF. Savannah River Site (SRS) Liquid Waste would like to move one or both of the Quad Volute pumps from Tank 50H to Tank 51H to replace pumps in Tank 51H that are failing. In addition, one of the standard pumps in Tank 50H exhibits high seal leakage and vibration. SRS Liquid Waste requested Savannah River National (SRNL) to conduct a study to evaluate the feasibility of mixing the contents of Tank 50H with one to three standard slurry pumps. To determine the pump requirements to blend miscible and immiscible liquids in Tank 50H, the author reviewed the pilot-scale blending work performed for the Salt Disposition Integration Project (SDIP) and the technical literature, and applied the results to Tank 50H to determine the number, size, and operating parameters needed to blend the tank contents. The conclusions from this analysis are: (1) A single rotating standard slurry pump (with a 13.6 ft{sup 2}/s U{sub 0}D) will be able to blend miscible liquids (i.e., salt solution) in Tank 50H within 4.4 hours. (2) Two rotating standard slurry pumps will be able to blend miscible liquids in Tank 50H within 3.1 hours. (3) Three rotating standard slurry pumps will be able to blend miscible liquids in Tank 50H within 2.5 hours. (4) A single rotating standard slurry pump (with a 13.6 ft{sup 2}/s U{sub 0}D) will disperse Isopar L{reg_sign} droplets that are less than or equal to 15 micron in diameter. If the droplets are less than 15 micron, they will be dispersed within 4.4 hours. Isopar L{reg_sign} provides a lower bound on the maximum size of droplets that will be dispersed by the slurry pumps in Tank 50H. (5) Two rotating standard slurry pumps will disperse Isopar L{reg_sign} droplets less than 15 micron within 3.1 hours, and three rotating standard slurry pumps will disperse Isopar L{reg_sign} droplets less than 15 micron within 2.5 hours. (6) If the Isopar L{reg_sign} droplets are drawn through the pump, they will be further reduced in size, with a maximum drop size less than 15 micron.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ASSESSMENT OF THE ABILITY OF STANDARD SLURRY PUMPS TO MIX SOLIDS WITH LIQUIDS IN TANK 50H

Tank 50H is the feed tank for the Saltstone Production Facility (SPF). In the summer of 2011, Tank 50H contained two standard slurry pumps and two quad volute slurry pumps. Current requirements for mixing operation is to run three pumps for one hour prior to initiating a feed transfer to SPF. Savannah River Site (SRS) Liquid Waste moved both of the Quad Volute pumps from Tank 50H to Tank 51H to replace pumps in Tank 51H that were failing. In addition, one of the standard pumps in Tank 50H exhibits high seal leakage and vibration. SRS Liquid Waste requested Savannah River National Laboratory (SRNL) to conduct a study to evaluate the feasibility of mixing the contents of Tank 50H with one to three standard slurry pumps. To determine the pump requirements to mix solids with liquids in Tank 50H, the author reviewed the pilot-scale blending work performed for the Small Column Ion Exchange Process (SCIX), SRNL computational fluid dynamics (CFD) modeling, Tank 50H operating experience, and the technical literature, and applied the results to Tank 50H to determine the number, size, and operating parameters of pumps needed to mix the solid particles with the liquid in Tank 50H. The analysis determined pump requirements to suspend the solids with no 'dead zones', but did not determine the pump requirements to produce a homogeneous suspension. In addition, the analysis determined the pump requirements to prevent the accumulation of a large amount of solid particles under the telescoping transfer pump. The conclusions from this analysis follow: (1) The analysis shows that three Quad Volute pumps should be able to suspend the solid particles expected ({approx}0.6 g/L insoluble solids, {approx}5 micron) in Tank 50H. (2) Three standard slurry pumps may not be able to suspend the solid particles in Tank 50H; (3) The ability of two Quad Volute pumps to fully suspend all of the solid particles in Tank 50H is marginal; and (4) One standard slurry pump should be able to achieve a cleaning radius larger than 43.5 feet, which will prevent large amounts of solid particles from settling under the telescoping transfer pump (TTP). The report recommends a pump operating approach to maximize the achieved cleaning radius.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Form and Aging of Plutonium in Savannah River Site Waste Tank 18

Process modeling; injection molding; long-fiber thermoplastic; fiber orientation; fiber lengt This report provides a summary of the effects of aging on and the expected forms of plutonium in Tank 18 waste residues. The findings are based on available information on the operational history of Tank 18, reported analytical results for samples taken from Tank 18, and the available scientific literature for plutonium under alkaline conditions. These findings should apply in general to residues in other waste tanks. However, the operational history of other waste tanks should be evaluated for specific conditions and unique operations (e.g., acid cleaning with oxalic acid) that could alter the form of plutonium in heel residues. Based on the operational history of other tanks, characterization of samples from the heel residues in those tanks would be appropriate to confirm the form of plutonium. During the operational period and continuing with the residual heel removal periods, Pu(IV) is the dominant oxidation state of the plutonium. Small fractions of Pu(V) and Pu(VI) could be present as the result of the presence of water and the result of reactions with oxygen in air and products from the radiolysis of water. However, the presence of Pu(V) would be transitory as it is not stable at the dilute alkaline conditions that currently exists in Tank 18. Most of the plutonium that enters Savannah River Site (SRS) high-level waste (HLW) tanks is freshly precipitated as amorphous plutonium hydroxide, Pu(OH) 4(am) or hydrous plutonium oxide, PuO 2(am,hyd) and coprecipitated within a mixture of hydrous metal oxide phases containing metals such as iron, aluminum, manganese and uranium. The coprecipitated plutonium would include Pu 4+ that has been substituted for other metal ions in crystal lattice sites, Pu 4+ occluded within hydrous metal oxide particles and Pu 4+ adsorbed onto the surface of hydrous metal oxide particles. The adsorbed plutonium could include both inner sphere coordination and outer sphere coordination of the plutonium. PuO 2(am,hyd) is also likely to be present in deposits and scales that have formed on the steel surfaces of the tank. Over the operational period and after closure of Tank 18, Ostwald ripening has and will continue to transform PuO 2(am,hyd) to a more crystalline form of plutonium dioxide, PuO 2(c) . After bulk waste removal and heel retrieval operations, the free hydroxide concentration decreased and the carbonate concentration in the free liquid and solids increased. Consequently, a portion of the PuO 2(am,hyd) has likely been converted to a hydroxy-carbonate complex such as Pu(OH) 2 (CO 3 ) (s) . or PuO(CO 3 ) · xH 2 O (am) . Like PuO 2(am,hyd) , Ostwald ripening of Pu(OH) 2 (CO 3 ) (s) or PuO(CO 3 ) · xH 2 O (am) would be expected to occur to produce a more crystalline form of the plutonium carbonate complex. Due to the high alkalinity and low carbonate concentration in the grout formulation, it is expected that upon interaction with the grout, the plutonium carbonate complexes will transform back into plutonium hydroxide. Although crystalline plutonium dioxide is the more stable thermodynamic state of Pu(IV), the low temperature and high water content of the waste during the operating and heel removal periods in Tank 18 have limited the transformation of the plutonium into crystalline plutonium dioxide. During the tank closure period of thousands of years, transformation of the plutonium into a more crystalline plutonium dioxide form would be expected. However, the continuing presence of water, reaction with water radiolysis products, and low temperatures will limit the transformation, and will likely maintain an amorphous Pu(OH) 4 or PuO 2(am,hyd) form on the surface of any crystalline plutonium dioxide produced after tank closure. X-ray Absorption Spectroscopic (XAS) measurements of Tank 18 residues are recommended to confirm coordination environments of the plutonium. If the presence of PuO(CO 3 ) (am,hyd) is confirmed by XAS, it is recommended that experiments be conducted to determine if plutonium carbonates are transformed back into PuO 2(am,hyd) upon contact with grout.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

OVERVIEW OF ENHANCED HANFORD SINGLE-SHELL TANK (SST) INTEGRITY PROJECT - 12128

To improve the understanding of the single-shell tanks integrity, Washington River Protection Solutions, LLC, the USDOE Hanford Site tank contractor, developed an enhanced Single-Shell Tank (SST) Integrity Project in 2009. An expert panel on SST integrity, consisting of various subject matters experts in industry and academia, was created to provide recommendations supporting the development of the project. This panel developed 33 recommendations in four main areas of interest: structural integrity, liner degradation, leak integrity and prevention, and mitigation of contamination migration, Seventeen of these recommendations were used to develop the basis for the M-45-10-1 Change Package for the Hanford Federal Agreement and Compliance Order, which is also known as the Tri-Party Agreement. The change package identified two phases of work for SST integrity. The initial phase has been focused on efforts to envelope the integrity of the tanks. The initial phase was divided into two primary areas of investigation: structural integrity and leak integrity. If necessary based on the outcome from the initial work, a second phase would be focused on further definition of the integrity of the concrete and liners. Combined these two phases are designed to support the formal integrity assessment of the Hanford SSTs in 2018 by Independent Qualified Registered Engineer. The work to further define the DOE's understanding of the structural integrity SSTs involves preparing a modern Analysis of Record using a finite element analysis program. Structural analyses of the SSTs have been conducted since 1957, but these analyses used analog calculation, less rigorous models, or focused on individual structures. As such, an integrated understanding of all of the SSTs has not been developed to modern expectations. In support of this effort, other milestones will address the visual inspection of the tank concrete and the collection of concrete core samples from the tanks for analysis of current mechanics properties. The work on the liner leak integrity has examined the leaks from 23 tanks with liner failures. Individual leak assessments are being developed for each tank to identify the leak cause and location. Also a common cause study is being performed to take the data from individual tanks to look for trends in the failure. Supporting this work is an assessment of the leak rate from tanks at both Hanford and the Savannah River Site and a new method to locate leak sites in tank liner using ionic conductivity. A separate activity is being conducted to examine the propensity for corrosion in select single shell tanks with aggressive waste layers. The work for these two main efforts will provide the basis for the phase two planning. If the margins identified aren't sufficient to ensure the integrity through the life of the mission, phase two would focus on activities to further enhance the understanding of tank integrity. Also coincident with any phase-two work would be the integrity analysis for the tanks, which would be complete in 2018. With delays in the completion of waste treatment facilities at Hanford, greater reliance on safe, continued storage of waste in the single shell tanks is increased in importance. The goal of integrity assessment would provide basis to continue SST activities till the end of the treatment mission.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WRPS MEETING THE CHALLENGE OF TANK WASTE

Washington River Protection Solutions (WRPS) is the Hanford tank operations contractor, charged with managing one of the most challenging environmental cleanup projects in the nation. The U.S. Department of Energy hired WRPS to manage 56 million gallons of high-level radioactive waste stored in 177 underground tanks. The waste is the legacy of 45 years of plutonium production for the U. S. nuclear arsenal. WRPS mission is three-fold: safely manage the waste until it can be processed and immobilized; develop the tools and techniques to retrieve the waste from the tanks, and build the infrastructure needed to deliver the waste to the Waste Treatment Plant (WTP) when it begins operating. WTP will 'vitrify' the waste by mixing it with silica and other materials and heating it in an electric melter. Vitrification turns the waste into a sturdy glass that will isolate the radioactivity from the environment. It will take more than 20 years to process all the tank waste. The tank waste is a complex highly radioactive mixture of liquid, sludge and solids. The radioactivity, chemical composition of the waste and the limited access to the underground storage tanks makes retrieval a challenge. Waste is being retrieved from aging single-shell tanks and transferred to newer, safer double-shell tanks. WRPS is using a new technology known as enhanced-reach sluicing to remove waste. A high-pressure stream of liquid is sprayed at 100 gallons per minute through a telescoping arm onto a hard waste layer several inches thick covering the waste. The waste is broken up, moved to a central pump suction and removed from the tank. The innovative Mobile Arm Retrieval System (MARS) is also being used to retrieve waste. MARS is a remotely operated, telescoping arm installed on a mast in the center of the tank. It uses multiple technologies to scrape, scour and rake the waste toward a pump for removal. The American Reinvestment and Recovery Act (ARRA) provided nearly $326 million over two-and-a-half years to modernize the infrastructure in Hanford's tank farms. WRPS issued 850 subcontracts totaling more than $152 million with nearly 76 percent of that total awarded to small businesses. WRPS used the funding to upgrade tank farm infrastructure, develop technologies to retrieve and consolidate tank waste and extend the life of two critical operating facilities needed to feed waste to the WTP. The 222-S Laboratory analyzes waste to support waste retrievals and transfers. The laboratory was upgraded to support future WTP operations with a new computer system, new analytical equipment, a new office building and a new climate-controlled warehouse. The 242-A Evaporator was upgraded with a control-room simulator for operator training and several upgrades to aging equipment. The facility is used to remove liquid from the tank waste, creating additional storage space, necessary for continued waste retrievals and WTP operation. The One System Integrated Project Team is ajoint effort ofWRPS and Bechtel National to identify and resolve common issues associated with commissioning, feeding and operating the Waste Treatment Plant. Two new facilities are being designed to support WTP hot commlsslomng. The Interim Hanford Storage project is planned to store canisters of immobilized high-level radioactive waste glass produced by the vitrification plant. The facility will use open racks to store the 15-foot long, two-foot diameter canisters of waste, which require remote handling. The Secondary Liquid Waste Treatment Project is a major upgrade to the existing Effluent Treatment Facility at Hanford so it can treat about 10 million gallons of liquid radioactive and hazardous effluent a year from the vitrification plant. The One System approach brings the staff of both companies together to identify and resolve WTP safety issues. A questioning attitude is encouraged and an open forum is maintained for employees to raise issues. WRPS is completing its mission safely with record-setting safety performance. Since WRPS took over the Hanford Tank Operations Contract in October 2008, the recordable injury rate has decreased 43 percent, while the lost work-days rate decreased by 30 percent. The company recently surpassed three million hours worked without a lost workday accident.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford single-shell tanks leak causes and locations - 15509

Historically 67 assumed and known leaking tanks in the single-shell tank (SST) system were identified at the Hanford Site. The US DOE, Washington River Protection Solutions LLC., and the State of Washington, Department of Ecology identified 25 of the 67 tanks as likely having had liner leaks by a comprehensive review of current and historical data. The remaining tanks are those with potential leaks from sources other than liner failures such as overfilling the tanks or the failure of process lines connecting SSTs. The location of the leaks was determined, based largely on logging radiological data from dry wells installed around the tank and/or radiological data from laterals installed under select tanks. The dry wells and laterals provide the best indication of the vicinity of the leak location, but not necessarily the exact location of the leak. Twenty of the 25 liner leaks appear to have occurred at or near the bottom of the tanks. Many of the tanks appeared to have multiple leak locations. Leak locations could not be determined for all tanks with the available data. Three of the tanks showed apparent sidewall leaks. Potential causes for liner leaks that were evaluated included tank design features, tank construction conditions, waste temperature, tank waste chemistry conducive to different types of corrosion (uniform corrosion, nitrate induced stress corrosion cracking, pitting, crevice, and liquid-air interface corrosion), and bulges in the tank bottom. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Inspection Technology Advancements for Hanford Double Shell Tank Integrity Verification - 16150

The Hanford double-shell tanks (DSTs) were constructed in southeastern Washington State between 1968 and 1986 to store nuclear waste. Most of the tank waste came from the Hanford nuclear weapons program, which has been stopped for more than 25 years. The tanks will be needed for many years to come until suitable vitrification and permanent storage solutions are developed. These tanks are nominally 45 ft. deep from the dome peak to the floor. The inner tank is nominally 75 ft. dia. and the outer tank is nominally 80 ft. dia., leaving a 2.5 ft. annulus between the two side tank walls. The waste management program (under direction of Washington River Protection Solutions, WRPS) manages inspections of these DSTs from the annulus to justify their continued safe service and to avoid the high cost of new replacement tanks. Over time, the Hanford Tank Farm contractors, currently WRPS, have increased their ultrasound inspections of these tanks. Pacific Northwest National Laboratory has worked with the Hanford Tank Farm contractors for more than 15 years to advance applicable tank nondestructive inspection technology for improved performance and cost reduction. Past, present, and planned technology advancements are addressed in this paper, including tank wall ultrasonic testing examination, extreme value statistical analysis, phased array for the tank wall, transmit/receive tandem synthetic aperture focusing technique knuckle examination, and electromagnetic acoustic transducer screening of the tank wall including mill-scale compensation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cesium Exchange onto Crystalline Silicotitanate from Blended Hanford Tank Wastes

The Tank Side Cesium Removal (TSCR) system was developed to filter and remove cesium (Cs and 137 Cs) from Hanford tank waste supernate in preparation for vitrification. The Cs removal will be conducted with crystalline silicotitanate (CST) ion exchange media. Under the planned waste-processing strategy, the tank waste supernate will be queued for TSCR processing in tank 241-AP-107 (AP-107). Once AP-107 tank waste volume is sufficiently depleted, the waste supernate from tank 241-AP-105 (AP-105, the holding tank before transfer to AP-107) will be transferred to tank AP-107. Supernate from another tank will be transferred to the holding tank, AP-105, for eventual transfer to tank AP-107. These supernate streams will undergo blending in tanks AP-107 and AP-105; the volume blend ratios will be driven by how much the tank waste supernate volumes are depleted before the next tank waste is added. The consequence of tank waste blending on Cs uptake by CST was of interest and was tested via batch contacts; results are reported herein.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of Hanford Single Shell Tank (SST) Structural Integrity

To improve the understanding of the single-shell tanks (SSTs) integrity, Washington River Protection Solutions, LLC (WRPS), the USDOE Hanford Site tank contractor, developed an enhanced Single-Shell Tank Integrity Project (SSTIP) in 2009. An expert panel on SST integrity, consisting of various subject matters experts in industry and academia, was created to provide recommendations supporting the development of the project. This panel developed 33 recommendations in four main areas of interest: structural integrity, liner degradation, leak integrity and prevention, and mitigation of contamination migration, Seventeen of these recommendations were used to develop the basis for the M-45-10-1 Change Package for the Hanford Federal Agreement and Compliance Order, which is also known as the Tri-Party Agreement. The structural integrity of the tanks is a key element in completing the cleanup mission at the Hanford Site. There are eight primary recommendations related to the structural integrity of Hanford Single-Shell Tanks. Six recommendations are being implemented through current and planned activities. The structural integrity of the Hanford is being evaluated through analysis, monitoring, inspection, materials testing, and construction document review. Structural evaluation in the form of analysis is performed using modern finite element models generated in ANSYS. The analyses consider in-situ, thermal, operating loads and natural phenomena such as earthquakes. Structural analysis of 108 of 149 Hanford Single-Shell Tanks has concluded that the tanks are structurally sound and meet current industry standards. Analysis of the remaining Hanford Single-Shell Tanks is scheduled for FY2014. Hanford Single-Shell Tanks are monitored through a dome deflection program. The program looks for deflections of the tank dome greater than 1/4 inch. No such deflections have been recorded. The tanks are also subjected to visual inspection. Digital cameras record the interior surface of the concrete tanks, looking for cracks and other surface conditions that may indicate signs of structural distress. The condition of the concrete and rebar of the Hanford Single-Shell Tanks is currently being tested and planned for additional activities in the near future. Concrete and rebar removed from the dome of a 65 year old tank was tested for mechanics properties and condition. Results indicated stronger than designed concrete with additional Petrographic examination and rebar completed. Material properties determined from previous efforts combined with current testing and construction document review will help to generate a database that will provide indication of Hanford Single-Shell Tank structural integrity.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tank 11H Low Temperature Aluminum Dissolution and Inhalation Dose Potential Analyses at Savannah River Site – 26018

Currently, there is approximately 34 million gallons of high-level radioactive tank waste in the Tank Farm at the Savannah River Site (SRS). The ultimate goal of operations at the Tank Farm is to remove the high level waste (HLW) from the tanks followed by stabilization of the waste through vitrification of the HLW into glass or grouting the decontaminated waste into saltstone. After bulk removal of the HLW consisting of sludge, saltcake, and supernatant, further efforts are made to reduce the residual waste present in the tank in order to declare preliminary cease waste removal (PCWR) signifying completion of HLW removal. These reduction efforts can include tank washing to remove soluble salts and radioisotopes and dissolution of solids including aluminum. Aluminum in the form of gibbsite and boehmite is relatively insoluble in water. Through addition of aqueous sodium hydroxide, the aluminum can be dissolved at mild temperatures. In order for the waste tank to meet closure mode requirements of the Concentration, Storage, and Transfer Facilities (CSTF), which includes the Tank Farm, Documented Safety Analysis (DSA), a component of the safety basis, the inhalation dose potential (IDP) and the radiolytic hydrogen generation rate of the stored waste must be demonstrated to be lower than their respective designated limits. These parameters are calculated from measured radiochemical analyses of isotopes that emit a high amount of radioactivity including Cs-137, Sr-90, Pu-238, Pu-239, Pu-240, Pu-241, Am-241, and Cm-244. Following the low temperature aluminum dissolution (LTAD) process, Tank 11H slurry samples were pulled from the tank and sent to Savannah River National Laboratory (SRNL) to measure the extent of aluminum dissolution, hydroxide concentration, densities of slurry and supernatant, weight percent solids analyses, and radionuclide activities. The analyses of the composite sample found that approximately 90% of the total aluminum in the slurry was dissolved, indicating successful reduction of the insoluble aluminum in the waste tank. Additionally, the weight percent insoluble solids (slurry basis) measurement of the composite sample was found to be approximately 1%, demonstrating that minimal solids still remain in the tank. Finally, the radiochemical analyses of the composite sample determined that the waste contents of the tank met the IDP and radiolytic hydrogen generation rate requirements of the CSTF DSA. These measurements have shown that the LTAD process in Tank 11H was successful in waste reduction efforts and a positive step towards declaring PCWR and tank closure at SRS.

Dekarske, John [Savannah River National Laboratory↗

Analysis of Tank 13H (HTF-13-14-156, 157) Surface and Subsurface Supernatant Samples in Support of Enrichment Control, Corrosion Control and Sodium Aluminosilicate Formation Potential Programs

The 2H Evaporator system includes mainly Tank 43H (feed tank) and Tank 38H (drop tank) with Tank 22H acting as the DWPF recycle receipt tank. The Tank 13H is being characterized to ensure that it can be transferred to the 2H evaporator. This report provides the results of analyses on Tanks 13H surface and subsurface supernatant liquid samples to ensure compliance with the Enrichment Control Program (ECP), the Corrosion Control Program and Sodium Aluminosilicate Formation Potential in the Evaporator. The U-235 mass divided by the total uranium averaged 0.00799 (0.799 % uranium enrichment) for both the surface and subsurface Tank 13H samples. This enrichment is slightly above the enrichment for Tanks 38H and 43H, where the enrichment normally ranges from 0.59 to 0.7 wt%. The U-235 concentration in Tank 13H samples ranged from 2.01E-02 to 2.63E-02 mg/L, while the U-238 concentration in Tank 13H ranged from 2.47E+00 to 3.21E+00 mg/L. Thus, the U-235/total uranium ratio is in line with the prior 2H-evaporator ECP samples. Measured sodium and silicon concentrations averaged, respectively, 2.46 M and 1.42E-04 M (3.98 mg/L) in the Tank 13H subsurface sample. The measured aluminum concentration in Tanks 13H subsurface samples averaged 2.01E-01 M.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Refinement of Modeling Techniques for the Structural Evaluation of Hanford Single-Shell Nuclear Waste Storage Tanks

ABSTRACT Several tanks at the Hanford Site (in Washington State, USA) belong to the first generation of underground nuclear waste storage tanks known as single shell tanks (SSTs). These tanks were constructed between 1943 and 1964 and are well beyond their design life. This article discusses the structural analysis approach and modeling challenges encountered during the ongoing analysis of record (AOR) for evaluating the structural integrity of the SSTs. There are several geometrical and material nonlinearities and uncertainties to be dealt with while performing the modern finite element analysis of these tanks. The analysis takes into account the temperature history of the tanks and allowable mechanical operating loads of these tanks for proper estimation of creep strains and thermal degradation of material properties. The loads prescribed in the AOR models also include anticipated loads that these tanks may see during waste retrieval and closure. Due to uncertainty in a number of inputs to the models, sensitivity studies were conducted to address questions related to the boundary conditions to realistically or conservatively represent the influence of surrounding tanks in a tank farm, the influence of backfill excavation slope, the extent of backfill and the total extent of undisturbed soil surrounding the backfill. Because of the limited availability of data on the thermal and operating history for many of the individual tanks, some of the data was assumed or interpolated. However, the models developed for the analysis of record represent the bounding scenarios and include the loading conditions that the tanks were subjected to or anticipated. The modeling refinement techniques followed in the AOR resulted in conservative estimates for force and moment demands at various sections in the concrete tanks. This article discusses the modeling aspects related to Type-II and Type-III SSTs. The modeling techniques, methodology and evaluation criteria developed for evaluating the structural integrity of SSTs at Hanford are in general applicable to any similar tanks or underground concrete storage structures.

Waste Managament, Single Shell Tanks, Structural E↗

One System Integrated Project Team: Retrieval and Delivery of Hanford Tank Wastes for Vitrification in the Waste Treatment Plant - 13234

The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety-conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank wastes and for building and operating the WTP. The tank wastes are the result of Hanford's nearly fifty (50) years of plutonium production. In the intervening years, waste characteristics have been increasingly better understood. However, waste characteristics that are uncertain and will remain as such represent a significant technical challenge in terms of retrieval, transport, and treatment, as well as for design and construction of WTP. What also is clear is that the longer the waste remains in the tanks, the greater the risk to the environment and the people of the Pacific Northwest. The goal of both projects - tank operations and waste treatment - is to diminish the risks posed by the waste in the tanks at the earliest possible date. About two hundred (200) WTP and TOC employees comprise the IPT. Individual work groups within One System include Technical, Project Integration and Controls, Front-End Design and Project Definition, Commissioning, Nuclear Safety and Engineering Systems Integration, and Environmental Safety and Health and Quality Assurance (ESH and QA). Additional functions and team members will be added as the WTP approaches the operational phase. The team has undertaken several initiatives since its formation to collaborate on issues: (1) alternate scenarios for delivery of wastes from the tank farms to WTP; (2) improvements in managing Interface Control Documents; (3) coordination on various technical issues, including the Defense Nuclear Facilities Nuclear Safety Board's Recommendation 2010-2; (4) deployment of the SmartPlant{sup R} Foundation-Configuration Management System; and (5) preparation of the joint contract deliverable of the Operational Readiness Support Plan. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Structural Analysis Results of Thermal, Operating and Seismic Analysis for Hanford Single-Shell Tank Integrity - 12261

Since Hanford's 149 Single-Shell Tanks (SSTs) are well beyond their design life, the U.S. Department of Energy has commissioned a state of the art engineering analysis to assess the structural integrity of the tanks to ensure that they are fit for service during the cleanup and closure phase. The structural integrity analysis has several challenging factors. There are four different tank sizes in various configurations that require analysis. Within each tank type there are different waste level and temperature histories, soil overburden depths, tank floor arrangements, riser sizes and locations, and other on-tank structures that need to be addressed. Furthermore, soil properties vary throughout the tank farms. This paper describes the structural integrity analysis that was performed for the SSTs using finite element models that incorporate the detailed design features of each tank type. The analysis was performed with two different models: an ANSYS static model for the Thermal and Operating Loads Analysis, and an ANSYS dynamic model for the seismic analysis. The TOLA analyses simulate the waste level and thermal history and it included a matrix of analysis cases that bounded the material property uncertainties. The TOLA also predicts the occurrence of concrete thermal degradations and cracking, reinforcement yielding, and soil plasticity. The seismic analysis matrix included uncertainty in waste properties, waste height and the soil modulus. In seismic analysis the tank concrete was modeled as a linear elastic material that was adjusted for the present day degraded conditions. Also, the soil was treated as a linear elastic material while special modeling techniques were used to avoid soil arching and achieve proper soil pressure on the tank walls. Seismic time histories in both the horizontal and vertical directions were applied to the seismic model. Structural demands from both Thermal and Operating Loads Analysis and seismic models were extracted in the form of section forces and moments for sections throughout the tank under the appropriate load combinations. These demands were evaluated against the American Concrete Institute (ACI) code requirements for nuclear safety-related concrete structures as defined in ACI-349-06. Structural integrity analysis of Hanford's Type II and Type III Single-Shell Tanks (SSTs) was performed using finite element models (ANSYS software) that incorporate the detailed design features of each tank type. The analysis was performed with two different models: a static model for the Thermal and Operating Loads Analysis, and a dynamic model for the seismic analysis. Structural demands from both Thermal and Operating Loads Analysis and seismic models were evaluated against the American Concrete Institute (ACI) code requirements for nuclear safety-related concrete structures as defined in ACI-349-06. The ratio of demand to capacity (D/C) was reported as a measure of structural integrity for the applicable ACI-349-06 load combinations. Although the Type II and Type III analysis matrix showed varying demands depending on the material combinations, all of the tank regions that are critical to structural stability passed the ACI 349-06 acceptance criteria. This was true for the conservative combination of maximum recorded thermal loads and maximum soil overburden depth combined with the analysis matrix of bounding material property combinations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Corrective Maintenance Paradigm Shift at Hanford's Tank Farms - 20077

Hanford's Tank Farms facilities have been used to safely store waste for over 70 years, with the first single-shell tanks being constructed in 1943. Tank Farm facilities consist of 149 single-shell tanks, 28 double-shell tanks, an evaporator facility, and wastewater treatment facilities. Tank Farm facilities are aging, with a tremendous corrective maintenance burden on the Tank Farm contractor. The mission of Tank Farm facilities is soon changing from waste storage to waste staging for the Hanford Waste Treatment and Immobilization Plant (WTP). WTP operations will demand a significant increase in Tank Farm facility operations, in which corrective maintenance outage windows will shrink drastically. This realization has forced the Tank Farm contractor to consider a paradigm shift in Tank Farm facilities Maintenance planning, and the use of reliability Engineering tools. The Tank Farm Production Operations Engineering Cognizant System Engineering (CSE) organization has led the way in motivating this paradigm shift. This shift has been realized through the use of: 1) technical exchange with other Department of Energy (DOE) contractors to develop improvements in the CSE program, 2) a shift from the use of lagging to leading system health indicators, and 3) a Plant Health Committee to unite Engineering, Operations, and Maintenance personnel toward a productive maintenance strategy. The CSE organization has held several technical exchanges with other DOE contractors to discuss CSE concepts, and how to better maintain aging infrastructure. The technical exchange with other contractors has greatly reduced the time required to make improvements in the Tank Farm CSE program. Other DOE contractors have already faced issues surrounding aging infrastructure, and have vast experience in improving the reliability and usable life of structures and components in nuclear facilities. The past CSE program used lagging health indicators to determine the health of systems. The key lagging indicator used to determine system health was availability, which is the percentage of time that a facility was ready for operation compared to the time the facility was demanded for operation. Availability was a good indicator of health in the waste storage mission of Tank Farms, where safe storage was the most important function of the facility, and where maintenance outage windows were typically long-duration. In current and future operations, outage windows are reducing, resulting in the need for much more reliable systems. Systems that have had high availability may suddenly become inoperable due to a failed component or sub-system. In several instances, the use of availability as an indicator of system health failed to predict system/equipment failure before its occurrence. In discussions with other DOE contractors, a set of reliability tools, including leading indicators of health, has been implemented in the CSE program. This primarily involves the use of failure modes and effects analysis and the study of equipment failure to develop system monitoring plans that focus on trending data to detect oncoming equipment failure ahead of time. In addition, the use of a Plant Health Committee has added significantly to the paradigm shift from a corrective maintenance philosophy to the use of predictive and preventive maintenance. The Plant Health Committee is a chartered team consisting of Engineering, Operations, and Maintenance personnel. CSEs use this forum to present the results of their performance monitoring, including the presentation of health via leading health indicators. The most positive aspect of this committee is the communication that it creates within these critical organizations. The Operations and Maintenance organization benefit from focusing maintenance on the reliability-centered focus provided by Engineering. Engineering benefits from the operational experience of the Operations organization and from the failure data that can be provided by Maintenance personnel. The continued use of the Plant Health Committee is expected to further decrease maintenance outage times, in better support of oncoming 24/7 operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Computational Fluid Dynamics (CFD) Simulations of Jet Mixing in Tanks of Different Scales

For long-duration in-space storage of cryogenic propellants, an axial jet mixer is one concept for controlling tank pressure and reducing thermal stratification. Extensive ground-test data from the 1960s to the present exist for tank diameters of 10 ft or less. The design of axial jet mixers for tanks on the order of 30 ft diameter, such as those planned for the Ares V Earth Departure Stage (EDS) LH2 tank, will require scaling of available experimental data from much smaller tanks, as well designing for microgravity effects. This study will assess the ability for Computational Fluid Dynamics (CFD) to handle a change of scale of this magnitude by performing simulations of existing ground-based axial jet mixing experiments at two tank sizes differing by a factor of ten. Simulations of several axial jet configurations for an Ares V scale EDS LH2 tank during low Earth orbit (LEO) coast are evaluated and selected results are also presented. Data from jet mixing experiments performed in the 1960s by General Dynamics with water at two tank sizes (1 and 10 ft diameter) are used to evaluate CFD accuracy. Jet nozzle diameters ranged from 0.032 to 0.25 in. for the 1 ft diameter tank experiments and from 0.625 to 0.875 in. for the 10 ft diameter tank experiments. Thermally stratified layers were created in both tanks prior to turning on the jet mixer. Jet mixer efficiency was determined by monitoring the temperatures on thermocouple rakes in the tanks to time when the stratified layer was mixed out. Dye was frequently injected into the stratified tank and its penetration recorded. There were no velocities or turbulence quantities available in the experimental data. A commercially available, time accurate, multi-dimensional CFD code with free surface tracking (FLOW-3D from Flow Science, Inc.) is used for the simulations presented. Comparisons are made between computed temperatures at various axial locations in the tank at different times and those observed experimentally. The affect of various modeling parameters on the agreement obtained are assessed.

Breisacher, Kevin↗

One System Integrated Project Team: Retrieval And Delivery Of The Hanford Tank Wastes For Vitrification In The Waste Treatment Plant

The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank wastes and for building and operating the WTP. The tank wastes are the result of Hanford's nearly fifty (50) years of plutonium production. In the intervening years, waste characteristics have been increasingly better understood. However, waste characteristics that are uncertain and will remain as such represent a significant technical challenge in terms of retrieval, transport, and treatment, as well as for design and construction ofWTP. What also is clear is that the longer the waste remains in the tanks, the greater the risk to the environment and the people of the Pacific Northwest. The goal of both projects - tank operations and waste treatment - is to diminish the risks posed by the waste in the tanks at the earliest possible date. About two hundred (200) WTP and TOC employees comprise the IPT. Individual work groups within One System include Technical, Project Integration & Controls, Front-End Design & Project Definition, Commissioning, Nuclear Safety & Engineering Systems Integration, and Environmental Safety and Health and Quality Assurance (ESH&QA). Additional functions and team members will be added as the WTP approaches the operational phase. The team has undertaken several initiatives since its formation to collaborate on issues: (1) alternate scenarios for delivery of wastes from the tank farms to WTP; (2) improvements in managing Interface Control Documents; (3) coordination on various technical issues, including the Defense Nuclear Facilities Nuclear Safety Board's Recommendation 2010-2; (4) deployment of the SmartPlant Foundation-configuration Management System; and (5) preparation of the joint contract deliverable of the Operational Readiness Support Plan.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Estimating Residual Solids Volume In Underground Storage Tanks

The Savannah River Site liquid waste system consists of multiple facilities to safely receive and store legacy radioactive waste, treat, and permanently dispose waste. The large underground storage tanks and associated equipment, known as the 'tank farms', include a complex interconnected transfer system which includes underground transfer pipelines and ancillary equipment to direct the flow of waste. The waste in the tanks is present in three forms: supernatant, sludge, and salt. The supernatant is a multi-component aqueous mixture, while sludge is a gel-like substance which consists of insoluble solids and entrapped supernatant. The waste from these tanks is retrieved and treated as sludge or salt. The high level (radioactive) fraction of the waste is vitrified into a glass waste form, while the low-level waste is immobilized in a cementitious grout waste form called saltstone. Once the waste is retrieved and processed, the tanks are closed via removing the bulk of the waste, chemical cleaning, heel removal, stabilizing remaining residuals with tailored grout formulations and severing/sealing external penetrations. The comprehensive liquid waste disposition system, currently managed by Savannah River Remediation, consists of 1) safe storage and retrieval of the waste as it is prepared for permanent disposition; (2) definition of the waste processing techniques utilized to separate the high-level waste fraction/low-level waste fraction; (3) disposition of LLW in saltstone; (4) disposition of the HLW in glass; and (5) closure state of the facilities, including tanks. This paper focuses on determining the effectiveness of waste removal campaigns through monitoring the volume of residual solids in the waste tanks. Volume estimates of the residual solids are performed by creating a map of the residual solids on the waste tank bottom using video and still digital images. The map is then used to calculate the volume of solids remaining in the waste tank. The ability to accurately determine a volume is a function of the quantity and quality of the waste tank images. Currently, mapping is performed remotely with closed circuit video cameras and still photograph cameras due to the hazardous environment. There are two methods that can be used to create a solids volume map. These methods are: liquid transfer mapping / post transfer mapping and final residual solids mapping. The task is performed during a transfer because the liquid level (which is a known value determined by a level measurement device) is used as a landmark to indicate solids accumulation heights. The post transfer method is primarily utilized after the majority of waste has been removed. This method relies on video and still digital images of the waste tank after the liquid transfer is complete to obtain the relative height of solids across a waste tank in relation to known and usable landmarks within the waste tank (cooling coils, column base plates, etc.). In order to accurately monitor solids over time across various cleaning campaigns, and provide a technical basis to support final waste tank closure, a consistent methodology for volume determination has been developed and implemented at SRS.