NASA NTRS1979
The results and outcome of thermal tests conducted to evaluate the performance of the protective coat of paint on the solid rocket booster (SRB) thermal protection system are discussed. A problem was uncovered during a series of tests on the SRB instrumentation islands in AEDC Tunnel C on 13 January 1979. The white protective paint or the Turco coating on the thermal protection system panels began to flow soon after the panels were exposed to the flow. This presented a serious problem especially since the critical pressure sensing, parachute opening baroswitches located on the frustum of the SRB were most likely to be contaminated by the paint flowing down the sides of the SRB nose cone. Because the first two flight articles were already completed, it was necessary to find a solution to the existing paint problem. It was found that all the coatings tested, except the Hypalon, had similar undesirable flow characteristics. Also even the Hypalon, which did not flow, would bubble up and disintegrate when it was applied on top of the new Turco. Recently, the Turco coating was removed from an MSA-:11 panel by dissolving the paint with a certain agent. This was done in two ways, by dissolving and removing almost all of the paint on one side of the panel and dissolving and removing about 50% of the paint on the other. The panel was then coated with Hypalon and tested as before in the Hot Gas Facility. No evidence of any paint flow nor any adverse performance of MSA was observed.