Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TEST PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Recent wake turbulence flight test programs

In early flight tests the size and intensity of the wake vortexes generated by aircraft ranging in size from the Learjet to the C-5A and the B-747 were studied to determine the effects of aircraft configuration, weight, and speed. Early problems were related to vortex marking, the measurement of separation distance, and test techniques. Recent tests conducted with B-747 showed that vortexes were alleviated by reducing the deflection of the outboard flaps. It was found that a more rapid dissipation of the vortex system can be obtained through alterations in the span lift distribution.

Tymczyszyn, J. J.↗

Results of an interlaboratory fatigue test program conducted on alloy 800H at room and elevated temperatures

The experimental approach adopted for low cycle fatigue tests of alloy 800H involved the use of electrohydraulic test systems, hour glass geometry specimens, diametral extensometers, and axial strain computers. Attempts to identify possible problem areas were complicated by the lack of reliable data for the heat of Alloy 800H under investigation. The method adopted was to generate definitive test data in an Interlaboratory Fatigue Test Program. The laboratories participating in the program were Argonne National Laboratory, Battelle Columbus, Mar-Test, and NASA Lewis. Fatigue tests were conducted on both solid and turbular specimens at temperatures of 20, 593, and 760 C and strain ranges of 2.0, 1.0, and 0.5 percent. The subject test method can, under certain circumstances, produce fatigue data which are serious in error. This approach subsequently was abandoned at General Atomic Company in favor of parallel gage length specimens and axial extensiometers.

Ellis, J. R.↗

Results of an interlaboratory fatigue test program conducted on alloy 800H at room and elevated temperatures

The experimental approach adopted for low cycle fatigue tests of alloy 800H involved the use of electrohydraulic test systems, hour glass geometry specimens, diametral extensometers, and axial strain computers. Attempts to identify possible problem areas were complicated by the lack of reliable data for the heat of Alloy 800H under investigation. The method adopted was to generate definitive test data in an Interlaboratory Fatigue Test Program. The laboratories participating in the program were Argonne National Laboratory, Battelle Columbus, Mar-Test, and NASA Lewis. Fatigue tests were conducted on both solid and turbular specimens at temperatures of 20, 593, and 760 C and strain ranges of 2.0, 1.0, and 0.5 percent. The subject test method can, under certain circumstances, produce fatigue data which are serious in error. This approach subsequently was abandoned at General Atomic Company in favor of parallel gage length specimens and axial extensometers.

Ellis, J. R.↗

Lunar mass spectrometer test program

The procedures used and the results are described, which were obtained in a test program to demonstrate the performance of a candidate lunar mass spectrometer. The instrument was designed to sample and measure gases believed to exist in the lunar atmosphere at the surface. The instrument consists of a cold cathode ion source, a small quadrupole mass analyzer, and an off-axis electron multiplier ion-counting detector. Instrument resolution, sensitivity, and S/N ratio were demonstrated over the mass range 0-150 amu and over a partial pressure range from ntorr to ptorr. The subject analyzer was also prepared for extended testing, in conjunction with two other candidate instruments, in a large molecular beam vacuum facility.

Torney, F. L.↗

Uniform engine testing program phase 7: NASA Lewis Research Center second entry

The propulsion and Energetics Panel, Working Group 15, of the Advisory Group for Aerospace Research and Development (AGARD) is sponsoring a Uniform Engine Testing Program (UETP). In this program, two jet engines were tested under identical conditions in certain NATO altitude and ground-level facilities as a means of correlating these facilities. With this second entry, NASA documented engine deterioration that may have occurred since inception of the UETP. Additionally, NASA investigated anomalies discovered during review of data from the five facilities which had participated in the program between the two NASA entries.

Biesiadny, T. J.↗

Mars Exploration Rover thermal test program overview

In January 2004, two Mars Exploration Rovers (MER) landed on the surface of Mars to begin their mission as robotic geologists. A year prior to these historic landings, both rovers and the spacecraft that delivered them to Mars, were completing a series of environmental tests in facilities at the Jet Propulsion Laboratory. This paper describes the test program undertaken to validate the thermal design and verify the workmanship integrity of both rovers and the spacecraft. The spacecraft, which contained the rover within the aeroshell, were tested in a 7.5 m diameter thermal vacuum chamber. Thermal balance was performed for the near earth (hot case) condition and for the near Mars (cold case) condition. A solar simulator was used to provide the solar boundary condition on the solar array. IR lamps were used to simulate the solar heat load on the aeroshell for the off-sun attitudes experienced by the spacecraft during its cruise to Mars. Each rover was tested separately in a 3.0 m diameter thermal vacuum chamber over conditions simulating the warmest and coldest expected Mars diurnal temperature cycles. The environmental tests were conducted in a quiescent nitrogen atmosphere at a pressure of 8 to 10 Torr. In addition to thermal balance testing, the science instruments on board the rovers were tested successfully in the extreme environmental conditions anticipated for the mission. A solar simulator was not used in these tests.

thermal vacuum test↗

Balloon launched Viking decelerator test program

Four BLDT flights were conducted during the summer of 1972. The purpose of these tests was to qualify the Viking parachute system behind the full-scale Viking entry vehicle over the maximum range of entry conditions anticipated in the Viking '75 soft landing on Mars. A summary of the test series is presented. Test conditions ranged from a Mach number of 2.0 to 0.5 and dynamic pressure from 11.7 to 4.4 psf. This range of conditions covers the uncertainty in entry conditions at Mars due to atmospheric and entry performance uncertainties. Emphasis is placed on parachute performance and simulated Mars entry vehicle motions as influenced by the parachute performance. Conclusions are presented regarding the ability of the parachute to perform within the operational parameters required for a successful soft Martian landing. A list of references which covers all reports in the qualification test program is included.

Moog, R. D.↗

Mechanical environmental test program for the Communications Technology Satellite

This paper describes the spacecraft and subsystem level mechanical environmental test program which was developed for the Communications Technology Satellite (CTS). At the spacecraft level it includes sine and random vibration, static loading, centrifuge loading, pyrotechnic and separation shock simulation and (tentatively) acoustics. At the subsystem level it entails the same type of environmental exposure as applicable. Matrices of system and subsystem tests are presented showing type, level and hardware status for each major test.

Buckingham, R.↗

An Overview of the NASA Aeronautics Test Program Strategic Plan

U.S. leadership in aeronautics depends on ready access to technologically advanced, efficient, and affordable aeronautics test capabilities. These systems include major wind tunnels and propulsion test facilities and flight test capabilities. The federal government owns the majority of the major aeronautics test capabilities in the United States, primarily through the National Aeronautics and Space Administration (NASA) and the Department of Defense (DoD), however an overarching strategy for management of these national assets was needed. Therefore, in Fiscal Year (FY) 2006 NASA established the Aeronautics Test Program (ATP) as a two-pronged strategic initiative to: (1) retain and invest in NASA aeronautics test capabilities considered strategically important to the agency and the nation, and (2) establish a strong, high level partnership with the DoD Test Resources Management Center (TRMC), stewards of the DoD test and evaluation infrastructure. Since then, approximately seventy percent of the ATP budget has been directed to underpin fixed and variable costs of facility operations within its portfolio and the balance towards strategic investments in its test facilities, including maintenance and capability upgrades. Also, a strong guiding coalition was established through the National Partnership for Aeronautics Testing (NPAT), with governance by the senior leadership of NASA s Aeronautics Research Mission Directorate (ARMD) and the DoD's TRMC. As part of its strategic planning, ATP has performed or participated in many studies and analyses, including assessments of major NASA and DoD aeronautics test capabilities, test facility condition evaluations and market research. The ATP strategy has also benefitted from unpublished RAND research and analysis by Ant n et al. (2009). Together, these various studies, reports and assessments serve as a foundation for a new, five year strategic plan that will guide ATP through FY 2014. Our vision for the future is a balanced portfolio of aeronautics ground and flight test capabilities that advance U.S. leadership in aeronautics in the short and long term. Key to the ATP vision is the concept of availability, not necessarily ownership; that is, NASA does not have to own and operate all facilities that are envisioned for future aeronautics testing. However, ATP will enable access to capabilities which are needed but not owned by NASA through strategic partnerships and reliance agreements. This paper will outline the major aspects of the ATP strategic plan for achieving its mission.

Marshall, Timothy J.↗

Package Testing Program Process for Validation and Verification of Software

The purpose of this document is to define the process for validation and verification (V&V) of software used to test the thermal data acquisition equipment in the Oak Ridge National Laboratory (ORNL) Package Testing Program (PTP) as part of the testing configuration(s). This process adheres to all applicable ORNL Standards Based Management System requirements and correlates with the PTP Quality Management System and the Software Quality Assurance Plan.

97 MATHEMATICS AND COMPUTING↗

Optimizing subsystem test programs

The goal of reduction of space system costs is pursued in the areas of standardization of subsystem test requirements as well as overall subsystem test program resource requirements. A number of standard components are being developed by NASA. The rationale for the various environmental tests applicable to future missions and launch vehicles is discussed. The need for and approach to developing standard component specifications is presented. In addition, a method for reduction of test expenditures utilizing indexes of mission effect and hardware history as indicators of test requirements is proposed.

Meyer, W. H.↗

The UH-1H helicopter icing flight test program: An overview

An ongoing joint NASA/Army program to study the effects of ice accretion on unprotected helicopter rotor aerodynamic performance is discussed. This program integrates flight testing, wind tunnel testing, and analytical modeling. Results are discussed for helicopter flight testing in the Canadian NRC hover spray rig facility to measure rotor aero performance degradation and document rotor ice accretion characteristics. The results of dry wind tunnel testing of airfoil sections with artificial ice accretions and predictions of rotor performance degradation using available rotor performance codes and the wind tunnel data are presented. An alternative approach to conducting future helicopter icing flight programs is discussed.

Shaw, R. J.↗

The UH-1H helicopter icing flight test program - An overview

An ongoing joint NASA/Army program to study the effects of ice accretion on unprotected helicopter rotor aerodynamic performance is discussed. This program integrates flight testing, wind tunnel testing, and analytical modeling. Results are discussed for helicopter flight testing in the Canadian NRC hover spray rig facility to measure rotor aero performance degradation and document rotor ice accretion characteristics. The results of dry wind tunnel testing of airfoil sections with artificial ice accretions and predictions of rotor performance degradation using available rotor performance codes and the wind tunnel data are presented. An alternative approach to conducting future helicopter icing flight programs is discussed.

Shaw, R. J.↗

The Approach and Landing Test program of the Space Shuttle Orbiter 101

The Approach and Landing Test (ALT) program was conducted in late 1976 through November 1977 to investigate the low speed characteristics of the Orbiter alone. The innovative aspects of the Orbiter are discussed along with the ALT program and the testing methodology used. The Shuttle Transportation System concept is briefly reviewed. The ALT was a first step towards operational missions for the Shuttle. The prime objective of the ALT was to verify the systems design and integrated operation of the Orbiter, and to demonstrate the capability of the Orbiter to safely land at a designated runway. The first free flight of the Orbiter occurred on August 12, 1977. Attention is also given to the results obtained in free-flight two, three, four, and five. Free-flight five was specifically planned to demonstrate a runway landing.

Brice, T. R.↗