Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TENNESSEE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Mercury Remediation in Oak Ridge, Tennessee; Successes and Remaining Challenges

Mercury remediation is a high priority for the US Department of Energy’s (DOE’s) Environmental Management program in Oak Ridge, Tennessee because of large historical losses of mercury to the environment, and the potential health risks to humans and wildlife primarily through fish consumption. Remedial solutions for mercury contaminated aquatic systems are limited – many aquatic systems have diffuse sources of mercury (Hg) and depending on the environmental conditions, these low concentrations of inorganic Hg can result in fish consumption advisories due to the production of the more toxic methylmercury (MeHg) and its bioaccumulation and biomagnification. From the 1980s to the present, long-term monitoring of mercury concentrations in water and fish downstream of DOE facilities in Oak Ridge have provided an opportunity to assess the performance and effectiveness of various remedial and abatement actions to address mercury. Early actions in the mid-1980s focused on pollution control that positively affected mercury discharges to one local stream, including consolidation and elimination of untreated discharges, sanitary sewer relining, the construction of a pollution control facility, and the replacement of a contaminated settling basin. The 1990s were an intensive period of facility remedial actions designed to improve stream water quality and reduce mercury discharges. Actions included dechlorinating cooling water discharges, an additional phase of storm sewer relining, the addition of flow from a nearby reservoir, the addition of two small-scale mercury treatment systems, the bypass of stream flow around the settling basin, and the removal of high mercury-contaminated floodplain soils. Because of these multiple remedial actions total mercury concentrations in receiving streams decreased significantly; however, mercury concentrations in fish did not respond commensurately and remain a challenge to the present day. Although the mercury remedial strategy in Oak Ridge will continue to focus in the near-term on upstream facility source reduction, recent research suggests that understanding mercury transport, methylation, and bioaccumulation processes in the downstream environment is essential to reducing mercury fish concentrations. Since 2014, mercury remediation research and technology development activities have been underway to develop potential remedial solutions for the downstream environment, including use of sorbents to control soil leaching and the potential use of chemical or biological manipulations. The Oak Ridge mercury remediation story is a valuable case study for flowing systems that can inform our national-level understanding of potential mercury cleanup actions and their likely environmental response.

Peterson, Mark J.↗

Mapping Lake Sturgeon ( Acipenser Fluvescens ) Spawning habitat in the Upper Tennessee River Using Side Scan Sonar

The Lake Sturgeon Acipenser fulvescens is a fish species that was once dispersed widely throughout the Mississippi River drainage but was largely extirpated from the southern portions of its range by overfishing and habitat degradation. There is an ongoing restoration effort to reestablish the Lake Sturgeon to rivers of the Southeastern United States. Reintroduced juvenile Lake Sturgeon now occupy several reservoirs along the Upper Tennessee River that are separated from each other by hydroelectric dams. To complete their life history, Lake Sturgeon will migrate upriver from reservoir habitats to more lotic habitats and spawn over coarse rocky substrate, even in the tailwaters of impassable dams. We mapped the substrate of four tailwaters that may be future Lake Sturgeon spawning locations using low-cost, consumer-grade side scan sonar and a GIS. We used video imagery collected from random locations within the mapped areas to validate our digitization of sonar imagery. We calculated the area of four substrate classes displayed in the maps to assess the suitability of each of the tailwaters for Lake Sturgeon spawning. The best spawning substrate (unembedded, coarse, rocky substrate 6 – 25 cm in diameter) comprised 17.0 – 30.5% of the total area mapped at each dam, while the least suitable substrate class (fine sediment <0.2 cm in diameter) comprised 6.2 – 30.7% of the mapped areas. Our results suggest any future spawning events by Lake Sturgeon below each of these dams are likely to encounter some suitable spawning substrate patches, while management opportunities exist to supplement other tailwater areas with suitable spawning substrate.

13 HYDRO ENERGY↗

Tennessee's Clean Energy Jobs Potential Through 2030

According to the U.S. Census Bureau, Tennessee had 4,433,899 people in its working population (15 to 64 years of age) in 2019. The graphs below show solar photovoltaic (PV), land-based wind, battery energy storage (BES), and energy efficiency job estimates in 2020, 2025, and 2030. These job estimates do not represent net job creation. Rather, they represent the size of the workforce required to achieve projected national deployment levels of each technology for 2025 and 2030 if the state captures the same proportion of jobs in the sector as it did in 2020.

clean energy↗

Back from the Brink with Something for Everyone - The Final Executed Memorandum of Agreement for Interpretation of the East Tennessee Technology Park and the K-25 Building - 13370

When the Environmental Management (EM) Program at the Oak Ridge Office of the Department of Energy (DOE) began its major decontamination and decommissioning (D and D) program activities in the mid-1990's, it was understood that the work to demolish the gaseous diffusion process buildings at the K-25 Site, as it was then known, would be challenging. Nothing of that size and breadth had ever been done within the DOE complex and the job brought about a full menu of unique attributes: radiological contamination with enriched materials entrained in certain areas of the system, a facility that was never designed not to operate but had been shut down since 1964, and a loyal following of individuals and organizations who were committed to the physical preservation of at least some portion of the historic Manhattan Project property. DOE was able to solve and resolve the issues related to nuclear materials management, contamination control, and determining the best way to safely and efficiently deconstruct the massive building. However, for a variety of reasons, resolution of the historic preservation questions - what and how much to preserve, how to preserve it, where to preserve it, how to interpret it, how much to spend on preservation, and by and for whom preservation should occur - remained open to debate for over a decade. After a dozen years, countless meetings, phone calls, discussions and other exchanges, and four National Historic Preservation Act (NHPA) [1] Memoranda of Agreement (MOA), a final MOA [2] has been executed. The final executed MOA's measures are robust, creative, substantive, and will be effective. They include a multi-story replica of a portion of the K-25 Building, the dedication of the K-25 Building footprint for preservation purposes, an equipment building to house authentic Manhattan Project and Cold War equipment, a virtual museum, an on-site history center, a grant to preserve a historically-significant Manhattan Project-era hotel in Oak Ridge, and more. The MOA was designed to offer something for everyone. The MOA for the K- 25 Building and interpretation of the East Tennessee Technology Park (ETTP; formerly the K-25 Site) was executed by all of the signatory parties on August 7, 2012 - almost 67 years to-the-day after the 'product' of the K-25 process building became known to more than just a small group of scientists and engineers working on a secret project for the Army Corps of Engineers Manhattan District. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress and Future Plans for Mercury Remediation at the Y-12 National Security Complex, Oak Ridge, Tennessee - 13059

The U.S. Department of Energy (DOE), along with the Tennessee Department of Environment and Conservation (TDEC) and the U.S. Environmental Protection Agency (EPA), has identified mercury contamination at the Y-12 National Security Complex (Y-12) as the highest priority cleanup risk on the Oak Ridge Reservation (ORR). The historic loss of mercury to the environment dwarfs any other contaminant release on the ORR. Efforts over the last 20 years to reduce mercury levels leaving the site in the surface waters of Upper East Fork Poplar Creek (UEFPC) have not resulted in a corresponding decrease in mercury concentrations in fish. Further reductions in mercury surface water concentrations are needed. Recent stimulus funding through the American Recovery and Reinvestment Act of 2009 (ARRA) has supported several major efforts involving mercury cleanup at Y-12. Near-term implementation activities are being pursued with remaining funds and include design of a centrally located mercury treatment facility for waterborne mercury, treatability studies on mercury-contaminated soils, and free mercury removal from storm drains. Out-year source removal will entail demolition/disposal of several massive uranium processing facilities along with removal and disposal of underlying contaminated soil. As a National Priorities List (NPL) site, cleanup is implemented under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and directed by the Federal Facility Agreement (FFA) between DOE, EPA, and TDEC. The CERCLA process is followed to plan, reach approval, implement, and monitor the cleanup. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons-Learned from D and D Activities at the Five Gaseous Diffusion Buildings (K-25, K- 27, K-29, K-31 and K-33) East Tennessee Technology Park, Oak Ridge, TN - 13574

The East Tennessee Technology Park (ETTP) is the site of five former gaseous diffusion plant (GDP) process buildings that were used to enrich uranium from 1945 to 1985. The process equipment in the original two buildings (K-25 and K-27) was used for the production of highly enriched uranium (HEU), while that in the three later buildings (K-29, K-31 and K-33) produced low enriched uranium (LEU). Equipment was contaminated primarily with uranium and to a lesser extent technetium (Tc). Decommissioning of the GDP process buildings has presented several unique challenges and produced many lessons-learned. Among these is the importance of good, up-front characterization in developing the best demolition approach. Also, chemical cleaning of process gas equipment and piping (PGE) prior to shutdown should be considered to minimize the amount of hold-up material that must be removed by demolition crews. Another lesson learned is to maintain shutdown buildings in a dry state to minimize structural degradation which can significantly complicate characterization, deactivation and demolition efforts. Perhaps the most important lesson learned is that decommissioning GDP process buildings is first and foremost a waste logistics challenge. Innovative solutions are required to effectively manage the sheer volume of waste generated from decontamination and demolition (D and D) of these enormous facilities. Finally, close coordination with Security is mandatory to effectively manage Special Nuclear Material (SNM) and classified equipment issues. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Mercury Issues and Complexities in Oak Ridge, Tennessee; Redefining the Conceptual Model - 12277

Releases of mercury from an industrial facility in Oak Ridge, Tennessee in the 1950's and early 1960's resulted in contamination of soil and groundwater within the facility, as well as downstream surface waters. Remediation efforts, which began in the 1980's, have decreased waterborne mercury concentrations near the facility, but elevated levels of mercury remain in the soil, sediment, water, and biota. Widespread distribution of mercury sources and complex mercury transport pathways are some of many challenges at the site. For effective environmental management and closure decision making relative to mercury contamination at the facilities, an up-to-date conceptual model of mercury source areas, processes, likely flow paths, and flux was deemed necessary. Recent facility and reconfiguration efforts, site characterizations, remedial actions, and research are facilitating the collection of new mercury data in Oak Ridge. To develop the current model, a multi-organizational team reviewed existing conceptual models from a variety of sources, consolidated historical data and source information, gathered input from local experts with extensive site knowledge, and used recently collected mercury data from a variety of sampling programs. The developed site conceptual model indicates that the nature and extent of mercury concentration and contaminant flux has significantly changed in the ten years since flux-based conceptual models were used for previous remedial action decisions. A new water treatment system has effectively reduced mercury inputs to the creek and is removing substantially greater quantities of mercury from groundwater than was expected. However, fish concentrations in downstream waters have not responded to decreased water concentrations in the stream. Flux from one large out-fall at the creek's headwaters appears to be a greater percentage of the overall flux leaving the site than previous years, albeit year to year variation in flux is large, and the many small sources of mercury identified in the model may also be important if the goal is to reach very low mercury levels in stream water and fish. The conceptual model is a key reference in helping to prioritize future remedial actions, defining future monitoring, conducting numerical modeling efforts, and evaluating research needs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Waste Factory at the East Tennessee Technology Park - 17424

To successfully support the U.S. DOE Oak Ridge Office of Environmental Management (OREM) in its cleanup at the East Tennessee Technology Park (ETTP), URS - CH2M Oak Ridge LLC (UCOR) recognized the need for the timely disposition of large amounts of waste. To achieve cleanup goals, UCOR implemented the 'Waste Factory' concept. The Waste Factory requires a centralized waste management program, waste management-deployed staff, and numerous outlets for the various waste streams that move the waste from generation to disposition in a timely, compliant manner. Because no waste can be double handled or stored, characterization has to be sound, the disposition path selected based on the characterization, packaging determined, the Waste Acceptance Criteria (WAC) evaluated for the selected repository, and the waste shipped immediately upon generation. Since inception of the UCOR contract, a total of 509,703.24 m{sup 3} (18 million ft{sup 3}) have been dispositioned, totaling more than 60,000 waste loads and 6.5 million safe kilometers (4 million safe miles) driven. The generated waste has been dispositioned onsite and offsite based on the waste characterization and the UCOR waste management hierarchy. Without the timely disposition of the large amounts of waste generated from a massive cleanup project like ETTP, the project could not have achieved the aggressive schedule and performance that has been accomplished to date. The Waste Factory concept can serve as a model for waste management operations across the DOE complex and in other industries where significant quantities of waste must be disposed of. Without the availability of secure, onsite disposal, UCOR would have been forced to send hundreds of millions of pounds of waste by truck to repositories around the country, increasing risks and costs and slowing the overall progress of cleanup. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Road to 2020: Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA): Cleanup of the East Tennessee Technology Park - 17425

Uranium enrichment activities at the 890-ha (2,200-acre) East Tennessee Technology Park (ETTP), formerly the Oak Ridge Gaseous Diffusion Plant, date back to the World War II Manhattan Project. The site produced nuclear fuel for weapons and reactors for four decades. Because of these operations, ETTP has a legacy of radiologically and chemically contaminated buildings, soil, sediment, and groundwater that required remedial action to reduce the risk to human health and the environment. Since the early 1990's, the DOE Oak Ridge Office of Environmental Management (OREM) has directed the environmental cleanup of this contaminated site through the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA) process. Cleanup activities have included the demolition of contaminated facilities and structures, including five gaseous diffusion buildings; remediation of contaminated soils; disposal of associated waste; and treatment of contaminated groundwater. In August 2016, DOE realized its Vision 2016, demolition of all five gaseous diffusion buildings at ETTP. This milestone marked the first time that an entire uranium enrichment complex has been demolished. The landmark cleanup included deactivation and demolition of 418,064 m{sup 2} (4.5 million ft{sup 2}) of radiologically and chemically contaminated facilities, and disposal of more than 55,000 truckloads of debris. Fulfillment of Vision 2016 was a major step toward completing ETTP cleanup by 2020. To attain 2020 cleanup, DOE and its cleanup contractor, URS - CH2M Oak Ridge LLC (UCOR), must complete demolition of the following areas: - Poplar Creek Facilities; - K-731 Switch House; - Building K-1037; - Central Neutralization Facility; - K-1200 Complex; - Toxic Substances Control Act Incinerator facilities; - Balance of Site Facilities. In addition, DOE will complete all remedial actions in accordance with current Records of Decision (RODs); as well as cleanup activities involving surface water, sediment, and groundwater that will be addressed in a final site-wide ROD. All waste, including soils, debris, and rubble from demolition and remediation activities, will be dispositioned. Final cleanup of ETTP further advances DOE's goal for re-industrialization of the site as a private sector industrial park. With risks reduced, hazards removed, and the environment restored, DOE can transfer usable ETTP building and land assets to the community for redevelopment and reuse. A history center, equipment building, viewing tower, and wayside exhibits will tell the story of the site, honoring its contributions to the nation's defense and energy needs. Approximately 1,214 ha (3,000 acres) of adjoining lands, now the Black Oak Ridge Conservation Easement (BORCE), will be used for conservation and recreational purposes, including green-ways and trail systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mercury Remediation in Oak Ridge, Tennessee; Successes and Remaining Challenges - 19390

Mercury remediation is a high priority for the US Department of Energy's (DoE's) Environmental Management program in Oak Ridge, Tennessee because of large historical losses of mercury to the environment, and the potential health risks to humans and wildlife primarily through fish consumption. Remedial solutions for mercury contaminated aquatic systems are limited - many aquatic systems have diffuse sources of mercury (Hg) and depending on the environmental conditions, these low concentrations of inorganic Hg can result in fish consumption advisories due to the production of the more toxic methylmercury (MeHg) and its bioaccumulation and biomagnification. From the 1980's to the present, long-term monitoring of mercury concentrations in water and fish downstream of DOE facilities in Oak Ridge have provided an opportunity to assess the performance and effectiveness of various remedial and abatement actions to address mercury. Early actions in the mid-1980's focused on pollution control that positively affected mercury discharges to one local stream, including consolidation and elimination of untreated discharges, sanitary sewer relining, the construction of a pollution control facility, and the replacement of a contaminated settling basin. The 1990's were an intensive period of facility remedial actions designed to improve stream water quality and reduce mercury discharges. Actions included dechlorinating cooling water discharges, an additional phase of storm sewer relining, the addition of flow from a nearby reservoir, the addition of two small-scale mercury treatment systems, the bypass of stream flow around the settling basin, and the removal of high mercury-contaminated floodplain soils. Because of these multiple remedial actions total mercury concentrations in receiving streams decreased significantly; however, mercury concentrations in fish did not respond commensurately and remain a challenge to the present day. Although the mercury remedial strategy in Oak Ridge will continue to focus in the near-term on upstream facility source reduction, recent research suggests that understanding mercury transport, methylation, and bioaccumulation processes in the downstream environment is essential to reducing mercury fish concentrations. Since 2014, mercury remediation research and technology development activities have been underway to develop potential remedial solutions for the downstream environment, including use of sorbents to control soil leaching and the potential use of chemical or biological manipulations. The Oak Ridge mercury remediation story is a valuable case study for flowing systems that can inform our national-level understanding of potential mercury cleanup actions and their likely environmental response. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Session 097B - Panel: Pathway to End State at the East Tennessee Technology Park in Oak Ridge, TN (2/4) (R1.16b)

This panel was to focus on the 'Pathway to End State at the East Tennessee Technology Park (ETTP)'. It was to discuss the DoE's long-term vision for the ETTP site and the process for converting the site into a multi-use industrial park, historic preservation and national park, and conservation area. The Panelists were to discuss the challenges in executing a cleanup project of this magnitude, the waste management, and the monitoring efforts that supported the achievement of the Oak Ridge Office of Environmental Management (OREM) Vision 2020. This session integrated with panel sessions 97A, 97C, and 97D. Panelists with presentations: Beginning with the End in Mind (Kevin Ironside); Project Execution (Daniel Macias); Waste Management (John Wrapp); Environmental Remediation (Samantha Pack); Waste Management (Josh Pemberton); DOE's Long-Range Vision (Laura Wilkerson)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mineralogical characterization of saprolite at the FRC background site in Oak Ridge, Tennessee

The Field Research Center (FRC) including five contaminated sites and a clean background area was established in Oak Ridge, Tennessee, as a part of the U.S. Department of Energy's Natural and Accelerated Bioremediation Research (NABIR) program. This study investigates the mineralogy and mineralogical pathways of saprolite at the FRC background site to provide a fundamental basis for the remediation strategy for contaminated sites. The background site is underlain interbedded shales, siltstones, and limestones with nearly identical characteristics to the contaminated sites. Bulk samples of saprolite were collected by hand picking approximately at 1 m depth (C horizon) from the soil surface. The soil pH of 4.3 and cation exchange capacity (CEC) of 10.5 cmol/kg measured are in the range of the typical shallow depth saprolite layer in this area. Total Fe by citrate-bicarbonate-dithionate (CBD) and ammonium oxalate extractable (amorphous) were 17.6 and 0.61 g/kg, respectively. Total Mn extracted by NH{sub 2}OH{center_dot}HCl was 0.17 g/kg. X-ray diffraction (XRD) and scanning electron microscopy (SEM) analyses indicate that quartz, illite, and microcline (K-feldspar) are the dominant minerals, occupying 95% of mineral composition. The saprolite samples analyzed have shown characteristics of oxic conditions overall, and the degrees of weathering for three sampling locations were various, most for S1 and least for S3, likely influenced either by the flow channels developed through saprolite or by seasonal fluctuation of the groundwater table. The source of the manganese oxide that observed from the site is likely to be Mn-rich muscovite in the shale or Mn-rich biotite in the blackish band in the limestone. The results such as abundant Mn and Fe contents identified encouraging prospects for conducting remediation projects in FRC sites.

54 ENVIRONMENTAL SCIENCES↗

Copula-Based Flood Frequency Analysis at Ungauged Basin Confluences: Nashville, Tennessee

Many cities are located at or near the confluence of streams where availability of water resources may be enhanced to sustain user needs while also posing an increased flooding risk from multiple tributaries. An accurate flood frequency estimator that models the joint flood potential at a basin confluence is needed. Given that long-term flow observations are often unavailable, estimating flood frequency at ungaged basin confluences proves challenging. Through the use of copulas, this case study demonstrates how an improved flood frequency analysis can be performed for stream confluences at Nashville, TN. The approach involves four major steps including initial data quality control, fitting of marginal distributions of tributary peak flows, construction of a suitable dependence structure, and identification of flood frequency at the confluence point based on synthesized peak flows. This case study may help researchers and practitioners develop a better understanding of joint flood frequency with consideration of upstream dam regulation among several contributing watersheds.

54 ENVIRONMENTAL SCIENCES↗

Knoxville, Tennessee: Solar in Action (Brochure)

This brochure provides an overview of the challenges and successes of Knoxville, TN, a 2008 Solar America City awardee, on the path toward becoming a solar-powered community. Accomplishments, case studies, key lessons learned, and local resource information are given.

14 SOLAR ENERGY↗

Digital Image Correlation of Concrete Slab at University of Tennessee, Knoxville

Assessment and management of aging concrete structures in nuclear power plants require a more systematic approach than simple reliance on existing code margins of safety. Some degradation mechanisms of concrete manifest themselves via swelling or by other shape deformation of the concrete. Specifically, degradation of concrete structure damaged by ASR is viewed as one of the dominant factors impacting the structural integrity of aging nuclear power plants. Structural health monitoring of concrete structures aims to understand the current health condition of a structure based on heterogeneous measurements to produce high-confidence actionable information regarding structural integrity that supports operational and maintenance decisions. Number of nondestructive examination techniques (i.e., thermography, digital image correlation, mechanical deformation measurements, nonlinear impact resonance (DIC) acoustic spectroscopy, and vibro-acoustic modulation) is used to detect the damage caused by ASR. DIC techniques have been increasing in popularity, especially in micro- and nano-scale mechanical testing applications due to its relative ease of implementation and use. Advances in computer technology and digital cameras help this method moving forward. To ensure the best outcome of the DIC system, important factors in the experiment are identified. They include standoff distance, speckle size, speckle pattern, and durable paint. These optimal experimental options are selected basing on a thorough investigation. The resulting DIC deformation map indicates that this technique can be used to generate data related to degradation assessment of concrete structure damaged by the impact of ASR.

36 MATERIALS SCIENCE↗

Verification of the Accountability Method as a Means to Classify Radioactive Wastes Processed Using THOR Fluidized Bed Steam Reforming at the Studsvik Processing Facility in Erwin, Tennessee, USA - 13087

Studsviks' Processing Facility Erwin (SPFE) has been treating Low-Level Radioactive Waste using its patented THOR process for over 13 years. Studsvik has been mixing and processing wastes of the same waste classification but different chemical and isotopic characteristics for the full extent of this period as a general matter of operations. Studsvik utilizes the accountability method to track the movement of radionuclides from acceptance of waste, through processing, and finally in the classification of waste for disposal. Recently the NRC has proposed to revise the 1995 Branch Technical Position on Concentration Averaging and Encapsulation (1995 BTP on CA) with additional clarification (draft BTP on CA). The draft BTP on CA has paved the way for large scale blending of higher activity and lower activity waste to produce a single waste for the purpose of classification. With the onset of blending in the waste treatment industry, there is concern from the public and state regulators as to the robustness of the accountability method and the ability of processors to prevent the inclusion of hot spots in waste. To address these concerns and verify the accountability method as applied by the SPFE, as well as the SPFE's ability to control waste package classification, testing of actual waste packages was performed. Testing consisted of a comprehensive dose rate survey of a container of processed waste. Separately, the waste package was modeled chemically and radiologically. Comparing the observed and theoretical data demonstrated that actual dose rates were lower than, but consistent with, modeled dose rates. Moreover, the distribution of radioactivity confirms that the SPFE can produce a radiologically homogeneous waste form. The results of the study demonstrate: 1) the accountability method as applied by the SPFE is valid and produces expected results; 2) the SPFE can produce a radiologically homogeneous waste; and 3) the SPFE can effectively control the waste package classification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗