Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Steam generator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Rigorous Kinetic Modeling and Optimization Study of a Modified Claus Unit for an Integrated Gasification Combined Cycle (IGCC) Power Plant with CO{sub 2} Capture

The modified Claus process is one of the most common technologies for sulfur recovery from acid gas streams. Important design criteria for the Claus unit, when part of an Integrated Gasification Combined Cycle (IGCC) power plant, are the ability to destroy ammonia completely and the ability to recover sulfur thoroughly from a relatively low purity acid gas stream without sacrificing flame stability. Because of these criteria, modifications to the conventional process are often required, resulting in a modified Claus process. For the studies discussed here, these modifications include the use of a 95% pure oxygen stream as the oxidant, a split flow configuration, and the preheating of the feeds with the intermediate pressure steam generated in the waste heat boiler (WHB). In the future, for IGCC plants with CO{sub 2} capture, the Claus unit must satisfy emission standards without sacrificing the plant efficiency in the face of typical disturbances of an IGCC plant, such as rapid change in the feed flow rates due to load-following and wide changes in the feed composition because of changes in the coal feed to the gasifier. The Claus unit should be adequately designed and efficiently operated to satisfy these objectives. Even though the Claus process has been commercialized for decades, most papers concerned with the modeling of the Claus process treat the key reactions as equilibrium reactions. Such models are validated by manipulating the temperature approach to equilibrium for a set of steady-state operating data, but they are of limited use for dynamic studies. One of the objectives of this study is to develop a model that can be used for dynamic studies. In a Claus process, especially in the furnace and the WHB, many reactions may take place. In this work, a set of linearly independent reactions has been identified, and kinetic models of the furnace flame and anoxic zones, WHB, and catalytic reactors have been developed. To facilitate the modeling of the Claus furnace, a four-stage method was devised so as to determine which set of linearly independent reactions would best describe the product distributions from available plant data. Various approaches are taken to derive the kinetic rate expressions, which are either missing in the open literature or found to be inconsistent. A set of plant data is used for optimal estimation of the kinetic parameters. The final model agrees well with the published plant data. Using the developed kinetics models of the Claus reaction furnace, WHB, and catalytic stages, two optimization studies are carried out. The first study shows that there exists an optimal steam pressure generated in the WHB that balances hydrogen yield, oxygen demand, and power generation. In the second study, it is shown that an optimal H{sub 2}S/SO{sub 2} ratio exists that balances single-pass conversion, hydrogen yield, oxygen demand, and power generation. In addition, an operability study has been carried out to examine the operating envelope in which both the H{sub 2}S/SO{sub 2} ratio and the adiabatic flame temperature can be controlled in the face of disturbances typical for the operation of an IGCC power plant with CO{sub 2} capture. Impact of CO{sub 2} capture on the Claus process has also been discussed.

20 FOSSIL-FUELED POWER PLANTS↗

System and method for production of ultra-pure hydrogen from biomass

The disclosure provides a system and method for synthesizing ultra-pure hydrogen from biomass waste. The present invention comprises a gasifier, an oils and tars filter, a steam generator, a water gas shift reactor ("WGS"), a heat-exchange two-phase water separator, a scrubber, a hydrogen separator, and fluid conduits in fluid communication with the various system components, which together convert hydrocarbon-based biomass, e.g., woodchips, into ultra-pure hydrogen gas. Fluid conduits connect the gasifier and the steam generator, separately, to the WGS, the WGS to the two-phase separator, the two-phase separator to the scrubber, and the scrubber to the hydrogen separator, which further comprises an outlet port through which hydrogen gas may flow free of carbon monoxide. The hydrogen may flow to a device that utilizes hydrogen to generate energy, such as a hydrogen fuel cell or to an internal combustion engine.

Tawfik, Hazem↗

Overview of PGSFR Project

The long-term plan for advanced SFR development was authorized by Korean Atomic Energy Commission (KAEC) in 2008 and updated in 2011, which will be carried out toward the construction of a SFR prototype plant called PGSFR (Prototype Gen-IV Sodium-cooled Fast Reactor) by 2028. The primary purpose of PGSFR is to demonstrate the technology reducing radioactive waste of spent nuclear fuel from nuclear power plants (NPP) in Korea. There are 24 NPPs in operation nationwide covering 30% of domestic electricity demand. The spent nuclear fuel is currently stored in the on-site storage pool of NPPs. Then, it has become a critical issue to ensure technical options to handle spent nuclear fuel in the long term basis to secure the sustainable operation of NPPs. PGSFR is a pool type sodium-cooled fast reactor with the power of 150 MWe or 400 MWth. PGSFR uses metallic fuel to make use of inherent safety characteristics of metallic fuel. The spent nuclear fuel will be processed using pyro-process to produce U-TRU-Zr fuel for PGSFR. But the initial core shall be loaded by low enriched U-Zr fuels. PGSFR has two intermediate loops with two intermediate heat exchangers (IHX) for each loop to deliver the generated heat from the core to power conversion system. There a steam generators producing super-heated steam in each loop. There are four decay heat removal circuits; two passive and two active ones. The reactor building is built on a seismic isolation base mat which can significantly mitigate seismic vibration of major components in the reactor building. The reactor building has a containment structure to isolate the reactor building under specific accident conditions and also provide structural integrity at the time of aircraft impact accident. PGSFR project is the national development program of Korea to construct the first SFR in Korea by 2028. The primary goal of PGSFR is the demonstration of reduction of radioactive waste from spent nuclear fuel by incineration in PGSFR. SFRA will flexibly cope with the licensing environment to minimize the uncertainty in licensing and safety concerns. The successful construction of PGSFR will bring Korean nuclear industry a step closer to guarantee the sustainable operation of NPPs nationwide and finally most importantly will solve the spent nuclear fuel issue of Korea. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Economic solution for low carbon process heat: A horizontal, compact high temperature gas reactor

In 2018, nuclear energy generated 55% of United States’ and one third of the world’s carbon free electricity, making nuclear energy a key tool in efforts to mitigate climate change before 2050. However, the current nuclear technology, light water reactors (LWRs), is limited to 300°C, so it cannot be used to decarbonize industrial process heat which accounts for 12% of US greenhouse gas emissions. High temperature gas reactors (HTGRs) can meet the high temperature demand with carbon free nuclear heat. The estimated cost of HTGRs, such as the Next Generation Nuclear Plant (NGNP), are even higher than state-of-the-art LWRs. In this paper, we expanded our nuclear cost estimating tool to include HTGRs and find that the NGNP overnight capital costs were 32% higher than an advanced LWR per unit capacity. The higher cost will naturally result in larger risk to cost overrun as recently experienced by larger LWRs in western nations. With a design-to-build mindset to minimize cost and construction risk, we introduce the horizontal, compact HTGR (HC-HTGR). The reactor core and steam generator are mounted horizontally on rails and in-line with one another, decreasing the size of the reactor building relative to the power capacity four times when compared to traditional HTGRs. The HC-HTGR reduced overnight civil structure costs by 42%, indirect costs by 38%, and total capital costs by 20% from NGNP. We discussed the required engineering of new systems for the HC-HTGR including vessel supports, the reactor cavity cooling system, and steam generator design. Finally, we estimated the fuel and operations costs of the HC-HTGR, and a survey of low-carbon industrial process heat technology showed the HC-HTGR can deliver a highly competitive levelized cost of heat in the range of $6.13–12.48/GJ.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Assessment on Transport of Radioactive Species from Nuclear Facilities - 17079

It is generally recognized that radioactive nuclides are most hazardous fission products that could be released in the event of reactor accidents. The reactor coolant system of a pressurized water reactor (PWR) nuclear plant exhibits radioactivity from various sources. These radiation sources consist of the fission products from fuel element and activated products from corrosion products. The complex infrastructure of the processes does not allow detailed measurement of activity until after the reactor is shutdown. All of the components that require dismantling will be radioactive which was caused by neutron activation during operation, contamination by corrosion products, contamination by damaged by fuel rods and leaks by equipment. Due mainly to the various operation modes and their aging, there are the increasing needs to carry out repair works that are not sufficiently provided for by the original design. Many difficulties are involved in these tasks, namely, high radiation doses, cramped areas, hard to reach components, coupled with stringent quality conditions. The need to simulate the behavior of corrosion products in a nuclear power plant environment has attracted many researchers' attention. It has performed the in-depth reviews of the various theories and physics associated with the corrosion products transportation, the laboratory loop testing, and the field measurements in operating plants. Before we start the decommissioning of nuclear power plants, workers, the public and the environment shall be properly protected from radiation hazards. For this purpose, a safety assessment should be carried out relating to the potential hazards that may occur during the decommissioning. The radiological hazards involved in the decommissioning activities also should be identified, and be taken into account in the safety assessment. The radiation conditions of the primary circuit are determined by the activity of corrosion and fission products that have accumulated on the internal surfaces of the components. Therefore the estimation of contamination on the components is very important and, may be the first step in the reactor operation and decommissioning of components. The predominant radionuclide in the PWR primary coolant is Co-60, although Co-58 contributes significantly to radioactivity level at the early stage of a reactor operation. Since Co-60 is produced from the in-core Co-58, which is the source of cobalt in a reactor coolant system, many researchers have investigated its transmutation in the core, its transport around the system, and its subsequent deposition on surfaces. The major parameter influencing the behavior of radioactivity, such as Co-60 in the coolant, is the corrosion product oxides. The objective of this work is to analyze the corrosion product activity transported in the primary circuit by using a multi-region model. This model, which is incorporated with the mass and activity transport between the dissolved corrosion products in the coolant and the surface, describes the specific activity of corrosion products in coolant and on the surfaces according to the operation modes as well as decommissioning stage. In order to evaluate the analysis of the corrosion products in an integral type reactor, a multi-region mass balance model is applied. The specific activities of the various species on the surface of core and steam generator throughout the effective full power hours, 15,000 hours, are simulated for the various modes of operations. As a result, the specific activities of corrosion products from the surface of primary circuit were shown as very low compared to those of other commercial nuclear power plants. In this simulated reactor, a significant reduction of specific activities from the activated corrosion products is obtained due to the introduction of titanium alloy to the steam generator tube and the avoidance of boric acid induced corrosion. From this result we conclude that we are able to predict the level of radioactive nuclides generated by corrosion products in a primary circuit according to the various modes of operations by using multi-region model. In this point of view it is concluded that this multi-region model can be used as an engineering tool for analysis of the corrosion products within the primary coolant for the nuclear power plants. It is also considered that it is possible to extend to a calculation tool for estimating the radiological hazards involved in the decommissioning activities in terms of safety assessment. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Cummins R-SOFC System Development

The overall purpose of this project was to reduce the Reversible-Solid Oxide Fuel Cell (R-SOFC) system cost by developing two technologies, an improved cell design and the incorporation of an ejector in the fuel recycle loop instead of a blower. A Simulink model of the baseline SOFC system was developed and calibrated with experimental test data. The R-SOFC system model was built by integrating GT Suite developed models of the steam generation components into the baseline Simulink SOFC system model. The ability to run the stack in SOEC operating mode was also added to the model. The system model was used to explore the ability of the R-SOFC system to meet operational constraints on Steam/Carbon ratio and H2 concentration on the fuel side electrode. A CFD ejector model was developed and used to explore a range of ejector design parameters, leading to the final ejector design that was prototyped for testing. A prototype steam ejector was first tested in a laboratory environment using room temperature air. The steam ejector was subsequently tested using the full hot recycle loop with all relevant heat exchangers and steam generation components. The test conditions utilized temperatures, pressures, and flow rates expected in an R-SOFC application. Throughout the experimental testing work, ejector performance test data was used to improve and then validate the CFD ejector model. A CFD cell model was developed and used to optimize thermal gradients, voltage, and cost of a new cell substrate design. A CFD comparison of co-flow and cross-flow cell designs informed the decision to use a co-flow design for the new cell substrate. Multiple rounds of CFD simulation were used to improve the cell design to minimize the variation in air and fuel distribution across cell channels and to minimize the variation in air and fuel distribution across different cells in the stack. A few prototypes of the new cell substrate design were produced and validated in a laboratory environment by thermally spraying and verifying that they met established manufacturing specifications. The cell manufacturing process was adjusted in order to bring these metrics within acceptable tolerances. Cummins’ internal calculations show that the new cell design reduces cost ~50% compared to the baseline cell, while the ejector + superheater/boiler concept reduces cost of the recycle loop by ~40%. The impact of these cost reductions on the cost of producing H2 will depend on the specific system where they are applied. Therefore, a Techno-Economic Analysis was completed using system cost as a variable, and showing how the NREL Current and Future system costs translate into H2 production cost.

Henrichsen, Lars↗

Dynamic Approach to Dependency Analysis in Human Reliability Analysis: Application in a Stream Generator Tube Rupture Scenario

Dependency analysis in human reliability analysis (HRA) is a method of adjusting the failure probability of a given action by considering the impact of the action preceding it. It plays a role in reasonably accounting for human actions in the context of probabilistic safety assessments (PSAs), preventing PSA results from being estimated too optimistically based on the HRA results. Nevertheless, the existing dependency methods present a couple of challenges in that the quantification approaches rarely explain the adjustment of human error probabilities (HEPs). For this reason, the authors’ previous research has pointed out challenges of the existing dependency approaches and conceptually, theoretically proposed a performance shaping factor (PSF)-based dynamic dependency analysis method for HRA in order to complement the existing dependency methods. The current paper explores the latest version of the method and guidance for applying it to a steam generator tube rupture (SGTR) scenario.

99 GENERAL AND MISCELLANEOUS↗

Plant maintenance and plant life extension issue, 2009

The focus of the March-April issue is on plant maintenance and plant life extension. Major articles include the following: Application of modeling and simulation to nuclear power plants, by Berry Gibson, IBM, and Rolf Gibbels, Dassault Systems; Steam generators with tight manufacturing procedures, by Ei Kadokami, Mitsubishi Heavy Industries; SG design based on operational experience and R and D, by Jun Tang, Babcock and Wilcox Canada; Confident to deliver reliable performance, by Bruce Bevilacqua, Westinghouse Nuclear; An evolutionary plant design, by Martin Parece, AREVA NP, Inc.; and, Designed for optimum production, by Danny Roderick, GE Hitachi Nuclear Energy. Industry Innovation articles include: Controlling alloy 600 degradation, by John Wilson, Exelon Nuclear Corporation; Condensate polishing innovation, by Lewis Crone, Dominion Millstone Power Station; Reducing deposits in steam generators, by the Electric Power Research Institute; and, Minimizing Radiological effluent releases, by the Electric Power Research Institute. The plant profile article is titled 2008 - a year of 'firsts' for AmerenUE's Callaway plant, by Rick Eastman, AmerenUE.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Atomic Origins of Water-Vapour-Promoted Alloy Oxidation

The presence of water vapor, intentional or unavoidable, is crucial to many materials applications, such as steam generator, turbine engine, fuel cell, catalyst, and corrosion 1-6. Phenomenologically, water vapor has been noticed to accelerate oxidation of metals/alloys 7,8, however, the atomistic mechanisms remain elusive. Herein, through direct in situ atomic-scale transmission electron microscopy observation and density functional theory calculation, we reveal that water vapor enhanced oxidation of Ni-Cr alloy is associated with proton dissolution promoted vacancy formation, migration and clustering. Protons derived from water dissociation occupy interstitial position in the oxide lattice, which consequently leads to the lowering of both vacancy formation energy and the cation diffusion barrier. The atomic scale observations reveal a water vapor derived proton mediated oxide growth mechanism, which provides insights for reckoning many technological processes concerning materials in moist environment at elevated temperatures.

Luo, Langli (ORCID:000000026311051X)↗

Improving Unit Flexibility Utilizing Plasma Ignitors

Coal fired steam generation operators face increasing market challenges, including competition from low cost generation, renewables, and regulatory pressure. These market conditions are forcing utilities to operate their coal assets in a more flexible mode, including more frequent starts and stops, faster ramp rates, frequent cycling, and extended operation at the lowest possible loads. Without upgrades to firing and control systems, pressure parts, and auxiliary systems, CAPEX and OPEX costs will increase significantly. Typically, expensive support fuels (Oil or Gas) are required to maintain safe, stable coal ignition when operating below 25% to 35% MCR (Maximum Continuous Rating). The exact minimum load without support fuel differs depending upon unit design specifications and fuel being burned. Frequent starts also increase the use of support fuels. The firing and burner control systems must be designed to allow for proper operation over the unit’s load range, ensuring that all mechanical components operate properly, and proper control of air and fuel streams can be maintained. To address the need for frequent starts and the need for stable low load operation on coal fired steam generators, this paper discusses options available, including, Firing Systems upgrades, Digital solutions, and pressure part upgrades. Several case studies are included that highlight options available allowing units to stay in operation and reduce CAPEX and OPEX costs.

01 COAL, LIGNITE, AND PEAT↗

Economic viability of using thermal energy storage for flexible carbon capture on natural gas power plants

Fossil fuel-based power plants generate 80% of the electricity in the United States and provide a reliable generation source for both base and peak power demands. These plants are expected to adapt to changes in environmental policies that will require carbon management with carbon capture and storage (CCS) representing a possible solution. Current solvent-based CCS has a detrimental impact on a power plant's performance due to large heat loads required for carbon capture solvent regeneration. This parasitic load restricts the power plant's output and operation flexibility. Therefore, this study evaluates the feasibility of using thermal storage technologies for natural gas combined cycle (NGCC) power plants coupled with CCS to minimize the impact of solvent regeneration and enable the plant to operate at peak power output. Thermal storage can minimize the impact of CCS on the power plant by providing the heat load required for solvent regeneration during times of peak demand which will allow the plant to operate unrestricted and at full power. In total, fifteen unique thermal storage configurations were evaluated from three thermal storage categories: Brayton cycle heat pump, vapor compression heat pump, and heat recovery steam generator steam extraction for storage. The viability of these systems was determined by evaluating each configuration on thousands of real-world Locational Marginal Pricing (LMP) profiles from the New York Independent System Operator and California Independent System Operator electricity markets using a techno-economic analysis. Afterwards, results were compared to the performance of a base power plant (NGCC with CCS and no thermal storage) to determine the impact of thermal storage on power plant economics. Overall, six of the thermal storage configurations performed better than base CCS enabled power plant on between 11.5% and 38.7% of the LMP signals evaluated. The best performing configuration was a vapor compression heat pump that used flue gas as the working fluid and had both hot and cold thermal storage units. This configuration performed better than the base CCS power plant on 38.7% of the LMP profiles. The results of this study show thermal storage can mitigate the economic impact of carbon capture solvent regeneration on NGCC power plants. Discussion focuses on the impact of electricity pricing on the optimal thermal storage system, the advantages and disadvantages of the systems evaluated, and identifies limitations with the study.

25 ENERGY STORAGE↗

An Overview of the State-of-the-Art Reactor Consequence Uncertainty Assessment Accident Progression Insights

The U.S. Nuclear Regulatory Commission (NRC) with Sandia National Laboratories (Sandia) have completed three uncertainty analyses (UAs) as part of the State-of-the-Art Reactor Consequence Analyses (SOARCA) program. The SOARCA UAs included an integrated evaluation of uncertainty in accident progression, radiological release, and offsite health consequence projections. The UA for Peach Bottom, a boiling-water reactor (BWR) with a Mark I containment located in the State of Pennsylvania, analyzed the unmitigated long-term station blackout SOARCA scenario. The UA for Sequoyah, a 4-loop Westinghouse pressurized-water reactor (PWR) located in the State of Tennessee, analyzed the unmitigated short-term station blackout SOARCA scenario, with a focus on issues unique to the ice condenser containment and the potential for early containment failure due to hydrogen deflagration. The UA for Surry, a 3-loop Westinghouse PWR with a sub-atmospheric large dry containment located in the State of Virginia, analyzed the unmitigated short-term station blackout SOARCA scenario including the potential for thermally-induced steam-generator tube rupture. These three UAs are currently documented in three NUREG/CR reports. This report provides input to planned NRC documentation on the insights and findings from the SOARCA UA program. The purpose of the summary report is to provide a useful reference for regulatory applications that require the evaluation of offsite consequence risk from beyond design basis event severe accidents. This report focuses on the accident progression and source term insights developed from the MELCOR analyses. MELCOR is the NRC's best-estimate, severe accident computer code used in the SOARCA UAs. In anticipation of the SOARCA UA insights work, NRC and Sandia benchmarked the response of the Peach Bottom model to selected reference calculations from the Peach Bottom SOARCA UA. Peach Bottom was the first SOARCA UA performed and was completed in 2015 using the MELCOR 1.8.6 code. The PWR SOARCA UAs evolved the original methodology and utilized the updated MELCOR 2.2 computer code. The Peach Bottom model has been systematically updated for other NRC research efforts and has been updated to MELCOR 2.2. computer code. The findings from the new reference calculations using the updated model with the MELCOR 2.2 code are also integrated into the report. A second objective is an assessment of the applicability of the results to the other nuclear reactors in the U.S. As the key findings are reviewed, judgments are presented on the applicability of the results to other U.S. nuclear power plants. An important objective of the SOARCA program relied on high- fidelity plant-specific modeling. However, the nature of the insights and conclusions allowed judgements to be made on the applicability of the various insights to the same general classification of plant (i.e., BWR or PWR) or the entire fleet of plants. Finally, the results from the SOARCA UA accident progression calculations contain a wealth of information not previously documented in the NUREG/CRs. This report includes new but related information that can be used to benchmark past or support future regulatory decisions related to severe accidents. The new work includes a benchmark of the NUREG-1465 licensing source term definitions, the variability of key accident progression events and timing to radionuclide release, and an improved understanding of the timing and source terms from consequential steam generator tube ruptures. iii ACKNOWLEDGEMENTS The Sandia authors gratefully acknowledge the significant technical and programmatic contributions from the NRC SOARCA team which are reflected throughout the report. Dr. Tina Ghosh has been involved throughout the SOARCA UAs, providing the primary managerial and technical oversight. The long lists of NRC and Sandia contributors from the SOARCA UAs are cited in the three NUREG/CRs and are also gratefully acknowledged by the small team of authors compiling the results of their efforts. Significant technical contributions, advice, and reviews were provided by Dr. Hossein Esmaili, Dr. Alfred Hathaway, and Dr. Edward Fuller (retired) of the NRC. Dr. Randal Gauntt (retired), Mr. Patrick Mattie, Mr. Joseph Jones (retired), and Dr. Doug Osborn from Sandia are recognized as the SOARCA UA managers guiding the past efforts. There is a comparable list of project managers at the NRC including Ms. Patricia Santiago, Dr. Salman Haq, and Mr. Jon Barr. Sadly, we have lost Mr. Charlie Tinkler and Mr. Robert Prato, who were important contributors to the original SOARCA project. Finally, Mr. Kyle Ross and Mr. Mark Leonard have also retired but were significant technical contributors. Mr. Kyle Ross was the technical lead on all three SOARCA UAs and the original pressurized water reactor SOARCA study. Mr. Leonard was the technical lead on the original boiling water reactor SOARCA study and a key contributor to the first Peach Bottom SOARCA UA. iv

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Performance tests of helium circulator under abnormal cooling conditions - 18523

Helium circulator is one of the key equipment of High-temperature Gas-cooled Reactor Pebble-bed Module (HTR-PM) and the unique rotating equipment of primary loop. It transports heat generated by fission reactions from reactor core to steam generator by forcing helium circulating in primary loop. As the study on the characteristics of helium circulator in HTGR was limited and the advanced designs integrated with many new technologies, a prototype of helium circulator was manufactured. It was supported by Active Magnetic Bearings (AMBs), and was assembled in a pressure vessel. The prototype was tested in Engineering Test Facility - Helium Circulator (ETF-HC), which is a full scale, rated flow rate and power, engineering test loop. Although performance tests under normal operation condition were successfully fulfilled, the complete features and performance still need further verification, especially for abnormal cooling conditions. Thus performance tests under abnormal cooling operation conditions were carried out. Tests such as temporary coolant loss of motor and AMBs cooler and abnormal high-temperature cooling water condition were fulfilled. All performance tests results showed that helium circulator met the entire requirement of HTR-PM plant under abnormal cooling conditions and validated its safety and reliability. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Modification of the ECAS reference steam power generating plant to comply with the EPA 1979 new source performance standards

Detailed capital cost estimates for the ECAS and modified reference plants in mid-1978 dollars for both 250 and 175 F (394 and 353 K) stack gas reheat temperatures based on the cost estimates developed for the ECAS study are presented. The scope of the work included technical assessment of sulfur dioxide scrubber system design, on site calcination versus purchased lime, reheat of stack gas, effect of sulfur dioxide scrubber on particulate emission, and control of nitrogen oxides.

Fogelson, S. A.↗

Development of a dynamic simulator for a natural gas combined cycle (NGCC) power plant with post-combustion carbon capture

The AVESTAR Center located at the U.S. Department of Energy’s National Energy Technology Laboratory and West Virginia University is a world-class research and training environment dedicated to using dynamic process simulation as a tool for advancing the safe, efficient and reliable operation of clean energy plants with CO{sub 2} capture. The AVESTAR Center was launched with a high-fidelity dynamic simulator for an Integrated Gasification Combined Cycle (IGCC) power plant with pre-combustion carbon capture. The IGCC dynamic simulator offers full-scope Operator Training Simulator (OTS) Human Machine Interface (HMI) graphics for realistic, real-time control room operation and is integrated with a 3D virtual Immersive Training Simulator (ITS), thus allowing joint control room and field operator training. The IGCC OTS/ITS solution combines a “gasification with CO{sub 2} capture” process simulator with a “combined cycle” power simulator into a single high-performance dynamic simulation framework. This presentation will describe progress on the development of a natural gas combined cycle (NGCC) dynamic simulator based on the syngas-fired combined cycle portion of AVESTAR’s IGCC dynamic simulator. The 574 MW gross NGCC power plant design consisting of two advanced F-class gas turbines, two heat recovery steam generators (HRSGs), and a steam turbine in a multi-shaft 2x2x1 configuration will be reviewed. Plans for integrating a post-combustion carbon capture system will also be discussed.

03 NATURAL GAS↗

System for the highly autonomous operation of a modular liquid-metal reactor with steam cycle

The invention relates to a nuclear plant in which the power of a nuclear reactor is controlled via demand of a connected electric grid. A naturally circulating nuclear reactor coolant loop is linked to a water/steam loop by means of a steam generator. The water/steam loop consists of an electric power generating unit and a water recirculating and steam control system. The generator is coupled to an external power grid. As power requirements of the grid change, a controller linked to the generator and a three way valve divides steam flow between the expansion turbine and a feedwater heater to boost or retard the power output. Altering the steam flow changes the pressure and temperature in the water/steam system and thus the coolant flow rate. The change in coolant flow allows the reactor core to regulate its reactivity to reach a state of equilibrium to the demand for electric power.

Vilim, Richard B.↗

The Cires facility in Morvilliers: from a VLL waste disposal facility to the development of industrial activities - 15252

The disposal facility of CIRES for very low level wastes was designed to provide safe and cost effective services to waste generators, in particular for decommissioning works. The facility could significantly increase waste annual deliveries to meet waste generators' needs and accommodate large disused components as PWR steam generators after decontamination. However an anticipated saturation of its capacity is foreseen as needs for disposal has doubled since its start-up. The geometry of the cells was optimized and the technical capacity of the repository is presently by 40% above its licensed capacity. Saturation has been delayed; however a new facility will be necessary by 2030 and other waste management options are to be considered as recycling of metallic wastes or crushed concrete rubble. CIRES facility also became Andra's industrial platform for the management of institutional wastes. A grouping and a storage facility have been built and a new processing facility should start up in 2016. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hydrogen Storage for Load-Following and Clean Power: Duct-firing of Hydrogen to Improve the Capacity Factor of NGCC Plants (Final Report, Phase II Pre-Front End Engineering Design Study)

GTI Energy (GTI) and team members Southern Company Services (SCS), Pacific Gas & Electric (PG&E) and the Electric Power Research Institute (EPRI) performed a Phase II Pre-Feed Study under contract DE-FE0032008 for Hydrogen Storage for Load-Following and Clean Power. The configuration of the proposed system consists of subsystems for on-site H 2 production, on-site H 2 storage (up to 54 MWth in commercial vessels) and H 2 combustion in a duct burner in a Heat Recovery Steam Generator (HRSG) integrated with an existing fossil asset. Here, the firing rate of the duct burner is varied to let the plant respond to fluctuations of electrical load and H 2 production is relatively constant by storing H 2 . The proposed system is an improvement over alternate low carbon dispatchable power options. Technoeconomic analyses show H 2 produced with GTI’s patented Compact Hydrogen Generator (CHG) with inherent carbon capture will be lower cost (Levelized Cost of Hydrogen, LCOH) relative to hydrogen produced with a Steam Methane Reformer (SMR) with an amine system for carbon capture. This lower cost hydrogen enables our integrated system to deliver electricity (Levelized Cost of Electricity, LCOE) at 17.4% lower cost relative to a SMR sourced H 2 -fired HRSG (with an amine system for carbon capture) – Steam Turbine Generator (STG). Our analysis using EPRI’s US REGEN macroeconomic model shows our system will have significant demand in the power market and therefore require significant capacity expansion (CHG plants built to deliver hydrogen) to deliver low cost, low carbon power. In Phase II, our Team has completed a detailed system definition including the development of process models, definition of battery limits, Process Flow Diagrams (PFDs), Piping and Instrumentation Drawings (P&IDs), and a plant layout. A preliminary design for the key components of the CHG was developed including component lists & specifications. An evaluation of environmental and permitting considerations was completed and included the development of an Environmental Information Volume (EIV). The duct burners, which are flexible and can burn hydrogen and/or natural gas, were defined and initial CFD analyses were completed.

03 NATURAL GAS↗