Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Staging Building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

The SAGA Survey. II. Building a Statistical Sample of Satellite Systems around Milky Way–like Galaxies

In this work, we present the Stage II results from the ongoing Satellites Around Galactic Analogs (SAGA) Survey. Upon completion, the SAGA Survey will spectroscopically identify satellite galaxies brighter than M r,o = -12.3 around 100 Milky Way (MW) analogs at z ~ 0.01. In Stage II, we have more than quadrupled the sample size of Stage I, delivering results from 127 satellites around 36 MW analogs with an improved target selection strategy and deep photometric imaging catalogs from the Dark Energy Survey and the Legacy Surveys. We have obtained 25,372 galaxy redshifts, peaking around z = 0.2. These data significantly increase spectroscopic coverage for very low redshift objects in 17 < r o < 20.75 around SAGA hosts, creating a unique data set that places the Local Group in a wider context. The number of confirmed satellites per system ranges from zero to nine and correlates with host galaxy and brightest satellite luminosities. We find that the number and luminosities of MW satellites are consistent with being drawn from the same underlying distribution as SAGA systems. The majority of confirmed SAGA satellites are star-forming, and the quenched fraction increases as satellite stellar mass and projected radius from the host galaxy decrease. Overall, the satellite quenched fraction among SAGA systems is lower than that in the Local Group. We compare the luminosity functions and radial distributions of SAGA satellites with theoretical predictions based on cold dark matter simulations and an empirical galaxy–halo connection model and find that the results are broadly in agreement.

79 ASTRONOMY AND ASTROPHYSICS↗

Guidance Enhancements and Performance Assessments for the Mars Ascent Vehicle Spin-Stabilized Upper Stage Configuration

he objective of the Mars Sample Return (MSR) campaign is to return samples from the surface of Mars to Earth for research. As one element of the MSR campaign, the Mars Ascent Vehicle (MAV) is responsible for transporting the samples from the surface of Mars to a Low-Martian Orbit (LMO) for retrieval. Complete autonomy is required throughout ascent, and orbital insertion is constrained by tight dispersion boundaries. An unguided, spin-stabilized second stage for MAV has been selected over a guided upper-stage to drive mass savings and reduce overall MSR campaign mass risk, at the cost of reduced GNC capability. To address this design change, the MAV GNC team has derived a robust prediction algorithm, building on previous energy management schemes, that solves for a single inertial pointing direction solution for the spin-stabilized 2nd stage burn. Algorithm stability is explored that compared to previous versions of the algorithm. Also, a set of analytical partials was developed to study MAV’s dispersed orbital insertion performance with respect to MAV system uncertainties. These partials were verified through simulation analysis and prove useful for analytical insight into the dynamics of MAV during the 2nd stage maneuver.

Jason M Everett↗

Guidance Enhancements and Performance Assessments for the Mars Ascent Vehicle Spin-Stabilized Upper Stage Configuration

The objective of the Mars Sample Return (MSR) campaign is to return samples from the surface of Mars to Earth for research. As one element of the MSR campaign, the Mars Ascent Vehicle (MAV) is responsible for transporting the samples from the surface of Mars to a Low-Martian Orbit (LMO) for retrieval. Complete autonomy is required throughout ascent, and orbital insertion is constrained by tight dispersion boundaries. An unguided, spin-stabilized second stage for MAV has been selected over a guided upper-stage to drive mass savings and reduce overall MSR campaign mass risk, at the cost of reduced GNC capability. To address this design change, the MAV GNC team has derived a robust prediction algorithm, building on previous energy management schemes, that solves for a single inertial pointing direction solution for the spin-stabilized 2nd stage burn. Algorithm stability is explored that compared to previous versions of the algorithm. Also, a set of analytical partials was developed to study MAV’s dispersed orbital insertion performance with respect to MAV system uncertainties. These partials were verified through simulation analysis and prove useful for analytical insight into the dynamics of MAV during the 2nd stage maneuver.

GNC↗

Bantam: A Systematic Approach to Reusable Launch Vehicle Technology Development

The Bantam technology project is focused on providing a low cost launch capability for very small (100 kilogram) NASA and University science payloads. The cost goal has been set at one million dollars per launch. The Bantam project, however, represents much more than a small payload launch capability. Bantam represents a unique, systematic approach to reusable launch vehicle technology development. This technology maturation approach will enable future highly reusable launch concepts in any payload class. These launch vehicle concepts of the future could deliver payloads for hundreds of dollars per pound, enabling dramatic growth in civil and commercial space enterprise. The National Aeronautics and Space Administration (NASA) has demonstrated a better, faster, and cheaper approach to science discovery in recent years. This approach is exemplified by the successful Mars Exploration Program lead by the Jet Propulsion Laboratory (JPL) for the NASA Space Science Enterprise. The Bantam project represents an approach to space transportation technology maturation that is very similar to the Mars Exploration Program. The NASA Advanced Space Transportation Program (ASTP) and Future X Pathfinder Program will combine to systematically mature reusable space transportation technology from low technology readiness to system level flight demonstration. New reusable space transportation capability will be demonstrated at a small (Bantam) scale approximately every two years. Each flight demonstration will build on the knowledge derived from the previous flight tests. The Bantam scale flight demonstrations will begin with the flights of the X-34. The X-34 will demonstrate reusable launch vehicle technologies including; flight regimes up to Mach 8 and 250,000 feet, autonomous flight operations, all weather operations, twenty-five flights in one year with a surge capability of two flights in less than twenty-four hours and safe abort. The Bantam project will build on this initial capability to expand the capability of a reusable first stage, including ground launch, powered return to the launch site, and a fully reusable rocket propulsion system. A Bantam technology goal is to demonstrate twenty-five flights with no unplanned rocket engine maintenance and only minor planned maintenance or inspections. The design goal of the propulsion system is a mission life of one hundred.

Griner, Carolyn↗

Solid Rocket Booster (SRB) - Evolution and Lessons Learned During the Shuttle Program

The Solid Rocket Booster (SRB) element integrates all the subsystems needed for ascent flight, entry, and recovery of the combined Booster and Motor system. These include the structures, avionics, thrust vector control, pyrotechnic, range safety, deceleration, thermal protection, and retrieval systems. This represents the only human-rated, recoverable and refurbishable solid rocket ever developed and flown. Challenges included subsystem integration, thermal environments and severe loads (including water impact), sometimes resulting in hardware attrition. Several of the subsystems evolved during the program through design changes. These included the thermal protection system, range safety system, parachute/recovery system, and others. Obsolescence issues occasionally required component recertification. Because the system was recovered, the SRB was ideal for data and imagery acquisition, which proved essential for understanding loads and system response. The three main parachutes that lower the SRBs to the ocean are the largest parachutes ever designed, and the SRBs are the largest structures ever to be lowered by parachutes. SRB recovery from the ocean was a unique process and represented a significant operational challenge; requiring personnel, facilities, transportation, and ground support equipment. The SRB element achieved reliability via extensive system testing and checkout, redundancy management, and a thorough postflight assessment process. Assembly and integration of the booster subsystems was a unique process and acceptance testing of reused hardware components was required for each build. Extensive testing was done to assure hardware functionality at each level of stage integration. Because the booster element is recoverable, subsystems were available for inspection and testing postflight, unique to the Shuttle launch vehicle. Problems were noted and corrective actions were implemented as needed. The postflight assessment process was quite detailed and a significant portion of flight operations. The SRBs provided fully redundant critical systems including thrust vector control, mission critical pyrotechnics, avionics, and parachute recovery system. The design intent was to lift off with full redundancy. On occasion, the redundancy management scheme was needed during flight operations. This paper describes some of the design challenges, how the design evolved with time, and key areas where hardware reusability contributed to improved system level understanding.

Kanner, Howard S.↗

Solid Rocket Booster (SRB) Flight System Integration at Its Best

The Solid Rocket Booster (SRB) element integrates all the subsystems needed for ascent flight, entry, and recovery of the combined Booster and Motor system. These include the structures, avionics, thrust vector control, pyrotechnic, range safety, deceleration, thermal protection, and retrieval systems. This represents the only human-rated, recoverable and refurbishable solid rocket ever developed and flown. Challenges included subsystem integration, thermal environments and severe loads (including water impact), sometimes resulting in hardware attrition. Several of the subsystems evolved during the program through design changes. These included the thermal protection system, range safety system, parachute/recovery system, and others. Because the system was recovered, the SRB was ideal for data and imagery acquisition, which proved essential for understanding loads, environments and system response. The three main parachutes that lower the SRBs to the ocean are the largest parachutes ever designed, and the SRBs are the largest structures ever to be lowered by parachutes. SRB recovery from the ocean was a unique process and represented a significant operational challenge; requiring personnel, facilities, transportation, and ground support equipment. The SRB element achieved reliability via extensive system testing and checkout, redundancy management, and a thorough postflight assessment process. However, the in-flight data and postflight assessment process revealed the hardware was affected much more strongly than originally anticipated. Assembly and integration of the booster subsystems required acceptance testing of reused hardware components for each build. Extensive testing was done to assure hardware functionality at each level of stage integration. Because the booster element is recoverable, subsystems were available for inspection and testing postflight, unique to the Shuttle launch vehicle. Problems were noted and corrective actions were implemented as needed. The postflight assessment process was quite detailed and a significant portion of flight operations. The SRBs provided fully redundant critical systems including thrust vector control, mission critical pyrotechnics, avionics, and parachute recovery system. The design intent was to lift off with full redundancy. On occasion, the redundancy management scheme was needed during flight operations. This paper describes some of the design challenges and technical issues, how the design evolved with time, and key areas where hardware reusability contributed to improved system level understanding.

Wood, T. David↗

System modeling for grid-interactive efficient building applications

Despite the abundance of research applications of system modeling in grid-interactive efficient buildings (GEBs), the transfer of those applications to real-world practices is still in its early stages. This is partially due to the lack of a summary on how system modeling should be established for a given application of GEBs. Here, we fill this gap by providing an extensive survey of the literature on system modeling for different GEBs that have been produced in the past decade. This survey involves over 300 relevant journal articles from the building community, the power system community, and the society of control. Specifically, we first identified key requirements of system modeling for GEBs based on various types of applications discussed in those publications. We then summarized the system modeling applications from those publications, in terms of their assumptions, modeling approach, and simulation. After that, we analyzed different assumptions made for various applications, the extent to which those modeling approaches satisfied the key requirements, and how those approaches can be scaled up for large-scale applications, which are quite common in GEBs. In addition, we gave insights on how to use system modeling for different applications in GEBs. At the end, we provided recommended directions for future studies to fully unleash the potentials of system modeling to support GEBs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Progress on Ares First Stage Propulsion

The mission of the National Aeronautics and Space Administration (NASA) is not simply to maintain its current position with the International Space Station and other space exploration endeavors, but to build a permanent outpost on the Moon and then travel on to explore ever more distant terrains. The Constellation Program will oversee the development of the crew capsule, launch vehicles, and other systems needed to achieve this mission. From this initiative will come two new launch vehicles: the Ares I and Ares V. The Ares I will be a human-rated vehicle, which will be used for crew transport; the Ares V, a cargo transport vehicle, will be the largest launch vehicle ever built. The Ares Projects team at Marshall Space Flight Center (MSFC) in Huntsville, Alabama is assigned with developing these two new vehicles. The Ares I vehicle will have an inline, two-stage rocket configuration. The first stage will provide the thrust or propulsion component for the Ares rocket systems through the first two minutes of the mission. The First Stage Team is tasked with developing the propulsion system necessary to liftoff from the Earth and loft the entire Ares vehicle stack toward low-Earth orbit. Building on the legacy of the Space Shuttle and other NASA space exploration initiatives, the propulsion for the Ares I First Stage will be a Shuttle-derived reusable solid rocket motor. Progress to date by the First Stage Team has been robust and on schedule. This paper provides an update on the design and development of the Ares First Stage Propulsion system. The presentation provides an overview of the information presented in the paper.

Priskos, Alex S.↗

Query Relaxation for LLM-Generated SPARQL Queries over Building Knowledge Graphs

When Knowledge Graph (KG) queries fail to match a pattern in a KG, they return no results. Identifying the statements causing these failures is tedious, especially for LLM-generated queries, which tend to be longer and more complex than queries written by hand. Query relaxation addresses this by systematically loosening query constraints until results are recovered. To evaluate the effectiveness of query relaxation against LLM generated queries, we propose a two-stage relaxation method combining triple deletion and path relaxation and test it against 1,823 failed queries for building KGs.

Paul, Lazlo↗

Progress on Ares First Stage Propulsion

The mission of the National Aeronautics and Space Administration (NASA) is not simply to maintain its current position with the International Space Station and other space exploration endeavors, but to build a permanent outpost on the Moon and then travel on to explore ever more distant terrains. The Constellation Program will oversee the development of the crew capsule, launch vehicles, and other systems needed to achieve this mission. From this initiative will come two new launch vehicles: the Ares I and Ares V. The Ares I will be a human-rated vehicle, which will be used for crew transport; the Ares V, a cargo transport vehicle, will be the largest launch vehicle ever built. The Ares Projects team at Marshall Space Flight Center (MSFC) in Huntsville, Alabama is assigned with developing these two new vehicles. The Ares I vehicle will have an in-line, two-stage rocket configuration. The first stage will provide the thrust or propulsion component for the Ares rocket systems through the first two minutes of the mission. The First Stage Team is tasked with developing the propulsion system necessary to liftoff from the Earth and loft the entire Ares vehicle stack toward low-Earth orbit. Building on the legacy of the Space Shuttle and other NASA space exploration initiatives, the propulsion for the Ares I First Stage will be a Shuttle-derived reusable solid rocket motor. Progress to date by the First Stage Team has been robust and on schedule. This paper provides an update on the design and development of the Ares First Stage Propulsion system.

Priskos, Alex S.↗

Building Satellites is Easier

'Building Satellites' is a story about Jim Marsh's recovery from a severe head injury told by his wife Phyllis from the moment she learned of its happening, through the ups and downs of a lengthy rehabilitation, until his return to work and daily living. It continues on, however, and narrates his battle with the more insidious Grave's disease. Told in the first person, 'Building Satellites' vividly portrays Phyllis's thoughts and feelings throughout this experience with scrupulous honestly. This is a story worth reading for many reasons. First of all, Jim was an accomplished scientist, respected by his colleagues both in this country and abroad. Secondly, it narrates the many stages of his recovery from head injury with detailed readable accuracy; it informs us as well as inspires. Finally, 'Building Satellites" also tells us the story of Phyllis Marsh's remarkable creative response to this crisis. It narrates her personal experiences as she progresses through the strange and somewhat bizarre world of medicine and rehabilitation, guided by a few basic beliefs, which she learned as a child in Iowa, that provided her with the strength to endure. 'Building Satellites' seems to reaffirm our unconscious, but settled conviction, that when confornted overnight with adversity, we are somehow given the means for coping, supported by our basic beliefs, strengthened by family and friends, and eventually learning to accept any outcome.

Marsh, Phyllis Nimmo↗

Simulating Buildings While the Design is Still in the Architect's Imagination

Very early in the design process, prior to drawing a single line, architects get information from their client or prospective client trying to understand the nature and requirements of the building that needs to be designed. The design of the building is completely fluid, as the architect considers many options in their imagination. The overall massing of the building, the general shape and form, are being considered during this early step. Even for a simple box-shaped building, the aspect ratio between the east-west and the north-south dimensions of the building can greatly impact energy consumption due to daylighting availability. The prevailing winds and building orientation can impact natural ventilation. The locations of high and low population density spaces can also impact energy use. Deciding the floor area per office workstation or the size of the auditorium will impact energy use. Does making a building two stories instead of one reduce energy impacts by reducing roof area or does the additional volume for stairs and elevators result in more energy use. Since certain types of spaces require more windows for occupants than others, the locations of those spaces will determine how much glazing each building orientation has impacting daylighting as well as heating and cooling energy. The project was an attempted first step toward creating a system tailored toward architects for this very early stage in the design process to help them understand the energy impacts of design options. The approach was not to be based on drawing the building, and instead, the main inputs would have been the size of each type of space in the building. This report describes information gathered during the development that might be of use to others developing similar software as well as some of the software that was developed during the project. Phase II funding to continue this work was not pursued due to intellectual property issues discovered during the development of the commercialization plan.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Ares I First Stage: Powering Exploration

he mission of the National Aeronautics and Space Administration (NASA) is not simply to maintain its current position with the International Space Station and other space exploration endeavors, but to build a permanent outpost on the Moon and then travel on to explore ever more distant terrains. The Constellation Program will oversee the development of the crew capsule, launch vehicles, and other systems needed to achieve this mission. From this initiative will come two new launch vehicles: the Ares I and Ares V. The Ares I will be a human-rated vehicle, which will be used for crew transport; the Ares V, a cargo transport vehicle, will be the largest launch vehicle ever built. The Ares Projects team at Marshall Space Flight Center (MSFC) in Huntsville, Alabama is assigned with developing these two new vehicles. The Ares I vehicle will have an in-line, two-stage rocket configuration. The first stage will provide the thrust or propulsion component for the Ares rocket systems through the first two minutes of the mission. The First Stage Team is tasked with developing the propulsion system necessary to liftoff from the Earth and loft the entire Ares vehicle stack toward low-Earth orbit. Building on the legacy of the Space Shuttle and other NASA space exploration initiatives, the propulsion for the Ares I First Stage will be a Shuttle-derived reusable solid rocket motor. Progress to date by the First Stage Team has been robust and on schedule. This presentation provides an overview and update on the design and development of the Ares I First Stage Propulsion system.

Tiller, Bruce K.↗

Tight Fits for Americas Next Moon Rocket, Ares V

America has begun the development of a new heavy lift rocket which will enable humans to return to the moon and reach even farther destinations. Five decades ago, the National Aeronautics and Space Administration designed a system (called Saturn/Apollo) to carry men to the moon and back; the rocket which boosted them to the moon was the Saturn V. Saturn V was huge relative to contemporary rockets and is still the largest rocket ever launched. The new moon rocket is called Ares V. It will insert 40% more payload into low earth orbit than Saturn V; and after docking with the crew spacecraft, it will insert 50% more payload onto the translunar trajectory than Saturn V. The current design of Ares V calls for two liquid-fueled stages and 2 "strap-on" solid rockets. The solid rockets are extended-length versions of the solid rockets used on the Shuttle. The diameter of the liquid stages is at least as large as the first stage of the Saturn V; the height of the lower liquid stage (called the core stage) is longer than the external tank of the Shuttle. Huge rockets require huge infrastructure and, during the Saturn/Apollo era, America invested significantly in manufacturing, assembly and launch facilities which are still in use today. Since the Saturn/Apollo era, America has invested in additional infrastructure for the Shuttle program. Ares V must utilize this existing infrastructure, with reasonable modifications. Building a rocket with 50% more capability in the same buildings, testing it in the same test stands, shipping on the same canals under the same bridges, assembling it in the same building, rolling it to the pad on the same crawler, and launching it from the same launch pad is an engineering and logistics challenge which goes hand-in-hand with designing the structure, tanks, turbines, engines, software, etc. necessary to carry such a large payload to earth orbit and to the moon. This paper quantitatively discusses the significant "tight fits" that are constraining Ares V. The engineers designing and building the infrastructure for the Saturn/Apollo program usually added margins and growth capability; sometimes the size of existing facilities (such as the width of a draw bridge) was not a constraint. Ares V may utilize the "extra" space in the existing facilities and expand other tight fits. Some of the tight fits cannot be overcome without great expense; raising the roof on the Vertical Assembly Building for example. Other tight fits are easily overcome; the transporter at the manufacturing facility for the core stage can pass under low ceilings and later over a dike (without dragging the middle) by retracting or extending the struts which support the stage. Tight fits discussed in this paper include manufacturing (jigs, widths, heights, and local transportation), testing (test stand sizes and crane capability), transportation to the test stands and the launch site (barge, waterway, and rail), assembly (VAB internal dimensions and door size), roll-out limits, and launch pad size.

Jaap, John↗

Production of itaconic acid from alkali pretreated lignin by dynamic two stage bioconversion

Abstract Expanding the portfolio of products that can be made from lignin will be critical to enabling a viable bio-based economy. Here, we engineer Pseudomonas putida for high-yield production of the tricarboxylic acid cycle-derived building block chemical, itaconic acid, from model aromatic compounds and aromatics derived from lignin. We develop a nitrogen starvation-detecting biosensor for dynamic two-stage bioproduction in which itaconic acid is produced during a non-growth associated production phase. Through the use of two distinct itaconic acid production pathways, the tuning of TCA cycle gene expression, deletion of competing pathways, and dynamic regulation, we achieve an overall maximum yield of 56% (mol/mol) and titer of 1.3 g/L from p -coumarate, and 1.4 g/L titer from monomeric aromatic compounds produced from alkali-treated lignin. This work illustrates a proof-of-principle that using dynamic metabolic control to reroute carbon after it enters central metabolism enables production of valuable chemicals from lignin at high yields by relieving the burden of constitutively expressing toxic heterologous pathways.

59 BASIC BIOLOGICAL SCIENCES↗

Sensor Impact Evaluation and Verification Technical Advisory Group Meeting Minutes

This report provides the technical advisory group meeting minutes and summary of detailed discussions for future development of sensor impact evaluations and verifications. Methods for sensor configuration/deployment have critical impacts on energy-efficient building control and thermal comfort. However, traditional sensor techniques for building operation and fault detection and diagnostics (FDD) are not optimal in terms of energy efficiency and thermal comfort, and their global effects are not thoroughly investigated. In an effort to address and overcome this limitation, a 3 year project, Sensor Impact Evaluation and Verification, was proposed. The multi-laboratory team—the US Department of Energy’s Oak Ridge National Laboratory (ORNL), Pacific Northwest National Laboratory (PNNL), and the National Renewable Energy Laboratory (NREL)—is conducting early-stage R&D to provide technical supports and guidelines for sensor design in building/HVAC systems to optimize building energy use, FDD, thermal comfort, and grid efficiency. The overall goal of this project is to develop a framework that enables quantitative evaluation of the impact of sensors on building HVAC control, FDD, and consequently, building energy efficiency and thermal comfort.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Developing time-resolved x-ray diffraction diagnostics at the National Ignition Facility (invited)

As part of a program to measure phase transition timescales in materials under dynamic compression, we have designed new x-ray imaging diagnostics to record multiple x-ray diffraction measurements during a single laser-driven experiment. Our design places several ns-gated hybrid CMOS (hCMOS) sensors within a few cm of a laser-driven target. The sensors must be protected from an extremely harsh environment, including debris, electromagnetic pulses, and unconverted laser light. Another key challenge is reducing the x-ray background relative to the faint diffraction signal. Building on the success of our predecessor (Target Diffraction In Situ), we implemented a staged approach to platform development. First, we built a demonstration diagnostic (Gated Diffraction Development Diagnostic) with two hCMOS sensors to confirm we could adequately protect them from the harsh environment and also acquire acceptable diffraction data. This allowed the team to quickly assess the risks and address the most significant challenges. Here, we also collected scientifically useful data during development. Leveraging what we learned, we recently developed a much more ambitious instrument (Flexible Imaging Diffraction Diagnostic for Laser Experiments) that can field up to eight hCMOS sensors in a flexible geometry and participate in back-to-back shots at the National Ignition Facility (NIF). The design also allows for future iterations, such as faster hCMOS sensors and an embedded x-ray streak camera. The enhanced capabilities of the new instrument required a much more complex design, and the unexpected issues encountered on the first few shots at NIF remind us that complexity has consequences. Our progress in addressing these challenges is described herein, as is our current focus on improving data quality by reducing x-ray background and quantifying the uncertainties of our diffraction measurements.

36 MATERIALS SCIENCE↗

Scanning Terahertz Heterodyne Imaging Systems

Scanning terahertz heterodyne imaging systems are now at an early stage of development. In a basic scanning terahertz heterodyne imaging system, (see Figure 1) two far-infrared lasers generate beams denoted the local-oscillator (LO) and signal that differ in frequency by an amount, denoted the intermediate frequency (IF), chosen to suit the application. The LO beam is sent directly to a mixer as one of two inputs. The signal beam is focused to a spot on or in the specimen. After transmission through or reflection from the specimen, the beams are focused to a spot on a terahertz mixer, which extracts the IF outputs. The specimen is mounted on a translation stage, by means of which the focal spot is scanned across the specimen to build up an image.

Siegel, Peter↗