At least 217 records · Page 12

Optimization Efforts at DWPF to Ensure Waste Tank Closure by 2037 – 24404

At the Savannah River Site (SRS) in Aiken, South Carolina, the Defense Waste Processing Facility (DWPF) produces a glass-form product by processing high-level liquid waste (HLW) with borosilicate glass in a high-heated Melter, then putting the vitrified waste into stainless-steel canisters. Since 1996, DWPF has performed this vitrification process for the liquid waste mission at the SRS; the overall objective for this mission is to reduce the volume in the upstream waste tanks, so those tanks can be emptied and operationally closed. This mission seeks to eliminate the single biggest environmental risk in the state of South Carolina, which requires a robust processing strategy within the DWPF, along with optimal interface between the other facilities in the liquid waste organization (LWO). As of the end of July 2023, DWPF has safely remediated 63.7 MCi of HLW, and filled 4,319 canisters (We project that about 4,000 more canisters are needed to be filled to reach the closure goal.)

Armstead, III, Frank L.↗

Mark-18A Cold Runs

The Savannah River National Laboratory (SRNL) is tasked by the National Nuclear Security Administration (NNSA) to recover highly valued isotopes from irradiated Mark-18A (Mk-18A) targets. The Savannah River Site (SRS) has sixty-five Mk-18A targets available for the recovery of the high valued materials. The sixty-five Mk-18A targets are currently stored in the L-Area Basin and will be removed one at a time and individually transported to SRNL. Upon receipt at SRNL, the Mk-18A target material will be removed from the confinement, dissolved, chemically separated, and calcined to a stable oxide. The flowsheet is designed to recover the plutonium as well as the trivalent actinides. The remaining unrecovered material will be discarded to the high activity drain (HAD) system in SRNL. A specially designed cask was procured for transport of the targets from L-Area to SRNL. Once received at SRNL, the targets will be loaded into the back of Cell 7 and resized as they enter the cell. The resized targets (1/4 lengths) will then be processed one at a time through the following processes: caustic dissolution and filtration; acidic dissolution and filtration, Reillex anion exchange, diglycolamide (DGA) cation exchange; and DGA calcination. This processing will result in two product streams. The first is an aqueous plutonium solution which will be removed from the shielded cells and taken to a glovebox for further purification and conversion to an oxide. The second is a calcined oxide containing the Am and Cm as well as other lanthanide fission products which will be removed from the shielded cells using a bagless transfer system. Both materials will be packaged for shipment to Oak Ridge National Laboratory (ORNL). All equipment to carry out this process was designed, procured or fabricated, and installed in a mock-up facility (716-4A) at SRS to allow for simulation testing in a non-radioactive area. This equipment was then dismantled and transferred from 716-4A to 773-A and installed in the SRNL Shielded Cells. After installation in the shielded cells facility testing was performed using water followed by surrogates and cold chemicals. Issues were identified during these evaluations, including equipment issues as well as technical challenges. Many of the issues were rectified during performance of the cold runs, and the remaining have a resolution identified. Table ES-1 provides a summary of all issues identified during the cold run operations, as well as the status and identified resolutions to outstanding issues.

07 ISOTOPE AND RADIATION SOURCES↗

Bench-Scale Electrolytic Dissolution of Quarter-Scale FCA Cans

In 2016, the Savannah River National Laboratory (SRNL) led, in support of and under sponsorship of the Department of Energy’s National Nuclear Security Administration (DOE/NNSA) Office of Material Management and Minimization (M3), the removal and transfer of the plutonium based Fast Critical Assembly (FCA) fuel from the Japan Atomic Energy Agency (JAEA) Tokai facility to the Savannah River Site (SRS). The team also included JAEA, multiple organizations in Savannah River Nuclear Solutions (SRNS), International Nuclear Services, and many other entities. The FCA fuel removal project completion was a key deliverable for M3 to the 2016 Nuclear Security Summit and constituted the largest inventory of weapons-usable plutonium removed under the nonproliferation program. The FCA materials consist of thousands of stainless steel (SS) clad plates and hundreds of SS clad rods. The FCA fuel elements were packaged in a carrier can and stored at SRS pending disposition of the fuel. Following an assessment of candidate disposition options, SRNS identified electrolytic dissolution (ED) as the most promising disposition option for the FCA plates and their preferred option was endorsed by DOE. This option entails electrochemically dissolving the entire FCA carrier can with fuel elements and was based on bench-scale laboratory testing and historical work on processing SS-clad and zirconium-clad uranium-based fuel in the H-Canyon electrolytic dissolver (last operated in 1980). The FCA plate consists of a plutonium-aluminum metal alloy core hermitically sealed in SS cladding.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Automated Generation of Weather and Climate Analysis Products

Wind roses are an important part to site operations as they depict the wind speed and direction percentage over a time period. In this project, I automated the production of wind roses for SRS meteorological towers. I developed a script to sequence through the dataset by period and create a wind rose for each of those period sets. Graphics were generated for every 4-hour period of the day, for each of the 4 heights of the instruments, for every half of each month. A 10-year climatological period consisted of wind speed and directions measurements at 15-minute intervals. We used the years 2014-2024 as the wind instruments on the tower were upgraded to sonic anemometers in early 2014. I then compared these wind roses to those from a previous study done in 2003 to analyze the differences and similarities in the wind patterns. The wind roses are also used to understand environmental transport conditions at SRS. When comparing the different heights of the anemometers to the 2003 report, there is a similarity in the fact that the direction is relatively the same across the levels, with the wind speeds increasing as you get higher in the air. When comparing the season of our graphs against the 2003 report, we noticed that the winter and summer months appear to have very similar wind directions. However, in the spring we noticed that there were more southerly winds compared to the 2003 report which had more westerly winds. Finally, in the fall months, we noticed that there was a higher percentage of northeasterly winds, while the 2003 report showed more southeasterly winds. We can use these summaries to estimate the directional dependence of dose that the surrounding areas receive throughout the year according to time of day.

47 OTHER INSTRUMENTATION↗

Validation of Weather Forecasting Products

Meteorological modeling plays a pivotal role in operational safety and emergency response at the Savannah River Site (SRS). This study focuses on verifying the Regional Atmospheric Modelling System (RAMS) Version 4.3 through Mean Bias Error (MBE) and Root Mean Square Error (RMSE) analyses of temperature, dew point, and wind speed over a decade. Using observed data from SRS, we assessed RAMS' accuracy, revealing seasonal biases and error trends. Results indicate RAMS' strengths in mild weather conditions but challenges during seasonal extremes and wind speed predictions due to measurement disparities. Future research aims to expand verification to other models and parameters, advocating for enhanced forecasting accuracy crucial for safeguarding personnel and community well-being.

42 ENGINEERING↗

Summary of Savannah River Site FY23 Salt Waste Qualification Data

The Savannah River National Laboratory (SRNL) analyzed samples from Savannah River Site (SRS) Waste Tanks 41H and 21H to support qualification of Salt Waste Processing Facility (SWPF) Waste Batches 8 and 9 for processing (the FY23 Salt Batch Qualification samples). These Tanks (i.e. 41H and 21H) are blend tanks for feed to SWPF. None of the samples displayed any unusual or unexpected characteristics such as large amounts of solids, floating solids, or unusual color. Characterization of these samples confirmed similar chemical composition and characteristics to previous salt waste batches. The results for Batches 8 and 9 were provided by SRNL to Savannah River Mission Completion (SRMC), the Liquid Waste Operations subcontractor at SRS, as External Sample Results (Laboratory Information Management System (LIMS)) Reports. Additionally, a separate technical memo was issued by SRNL to report re-test data for Batch 8 for Cs-137 for filtered samples only which were run at the request of SWPF. For Batch 9, a set of samples was also analyzed in parallel by the SWPF-Analytical Laboratory (SWPF-AL). The SWPF-AL data is included herein for comparison with the SRNL data where applicable. The analytical results (both rapid, typically 4 weeks, and long term, typically 8 weeks) for Batches 8 and 9 are now summarized and discussed in this technical report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Review of Tank 48H Treatment of Tetraphenylborate with Permanganate

Tank 48H contains roughly 270,000 gallons of radioactive waste material. The waste stored in this tank was to be processed in multiple stages utilizing facilities at the Savannah River Site (SRS) almost 30 years ago. The In-Tank Precipitation Process (ITP) was initiated in Tank 48H, which precipitated highly radioactive cesium-137 using sodium tetraphenylborate (NaTPB). While the process succeeded in precipitating the Cs, Sr, and other actinides, it also generated an unexpectedly large amount of benzene. The evolved benzene created a safety concern and made the waste incompatible with further downstream processing. This halted the ITP, and a new method of treatment was required to continue processing the legacy waste contained in Tank 48H. A myriad of treatment options have been proposed with multiple teams of researchers assembled to work on this highly complex issue over the last few decades. This review investigated one potentially viable treatment option, in-tank oxidation with sodium permanganate. Permanganate has been well known in literature as a strong oxidizing agent for organic compounds, as well as being utilized at the Savannah River Site (SRS) in other processes. A small number of studies have been conducted utilizing waste simulants to evaluate the use of permanganate as an oxidant for tetraphenylborate (TPB). A search of the literature and data from these studies indicates that permanganate could be a viable treatment for destruction of TPB in Tank 48H. While the scoping studies had a small number of individual experiments and nonideal conditions, the permanganate decomposed up to 90% of the TPB. A free hydroxide concentration above 1.0 M is required for tank corrosion control. Simulant studies indicate no decrease in TPB decomposition by permanganate until pH 14. The simulant studies show an increase in TPB decomposition as the temperature of the solution is increased to 40 °C. The post-reaction analysis of previous simulant tests did not look at all of the organic degradation products. Investigations into what these organic products are and in what quantity will help guide determinations as to whether the downstream processing facilities are able to handle the material that will be generated. Study on the time frame for the reaction between permanganate and TPB should be investigated as the literature reports only extend out to two weeks reaction time. The permanganate treatment conditions indicate no corrosion control concerns and a longer timescale reaction may be needed for in-tank treatment. In addition, further study would be useful to identify a lower boundary condition for the ratio of TPB and oxidant. The simulant tests applied large excesses of permanganate, and this may be unnecessary. The size constraint of the tank means that there will be practical limitations on the amount of sodium permanganate that can be added to the tank. The amount of permanganate should be minimized as much as possible while still ensuring decomposition of the TPB to minimize the amount of manganese dioxide solids generated.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Automated Inspection of Criticality Control Overpacks for Surplus Plutonium Disposition: Qualification Update – 25313

In an effort to reduce the amount of nuclear waste in South Carolina, the Department of Energy (DOE) tasked the Savannah River Site (SRS) with diluting and disposing of the amount of plutonium in the state. This process involves the movement and shipment of over 100,000 criticality control overpacks (CCOs) throughout the project lifespan, lending itself to the use of automation to reduce worker radiation exposure and more efficiently utilize human capital. Due to the large scope, this overarching process was broken down into several different “automation projects” to be developed. The first opportunity pursued was the receipt and inspection of empty CCO drums coming into SRS, identified as Automation Project 1 (AP1), and is the focus of this paper. AP1 was developed to unpack incoming CCOs and inspect them for unwanted foreign objects and any damage to the drum or its contents. This process is accomplished by the combination of an automated guided vehicle (AGV) that delivers CCOs to a robotic arm which uses a suite of custom tools to disassemble a CCO, inspect the inside and outside of the CCO and its inner criticality control container (CCC), reassemble the CCC and CCO, and apply a tamper indicating device (TID) to the inspected drum. In past years, the robotic work cell had been developed in a small-scale testing facility for proof-of-concept. This year, major improvements were made to the robotic work cell to perform the process, including integration into the final facility where CCOs will be inspected. Other technical improvements include the implementation of sensor feedback and safety relays into the control system to allow the state of the work cell to be better tracked, and additional development of the TID application process to complete the robotic inspection. Further enhancements were made to the robotic vision processes and robot pathing, as well as development on a computer vision inspection process to detect inspection criteria anomalies in CCOs. In addition to developmental improvements, the work cell underwent a six-month testing period to ensure the project requirements were met. Results of this testing period demonstrate the work cell’s capability to meet project throughput goals at an acceptable level, successfully document the status of each CCO inspected, and reduce the toll on technical operations’ human power by two thirds. At the time of this paper, the work cell is capable of autonomously handling up to eight CCOs with an AGV, delivering CCOs to and from the robot work cell, and having a robotic arm perform a full receipt and inspection procedure on each CCO. Moving forward, repeatability will be improved so that these CCOs can be run back-to-back seamlessly, as well as improving the system to handle more significant edge cases and failure modes.

Spivey, Nicholas↗

Rescue of Unique Liquid IP-2 Portable Tanks at Savannah River Site

Introduction • Savanah River Site procured six large IP-2 portable tanks capable of transporting liquids in 2003 to support layup of F Canyon at SRS. • Tanks are being rescued and recertified to support eventual disposition of up to 171,000 L of contaminated solvent solutions from H Canyon at SRS and to potentially transport Depleted Uranium solutions to support the ABD Program.

Fee, Nathaniel C. [Savannah River Nuclear Solution↗

Summary of Savannah River Site FY24 Salt Waste Qualification Data

Savannah River Mission Completion (SRMC), the Liquid Waste Operations subcontractor at SRS, and Savannah River National Laboratory (SRNL) analyzed samples from Savannah River Site (SRS) Waste Tanks 21H, 41H, and 42H to support qualification of Salt Waste Processing Facility (SWPF) Waste Batches 10, 11, 12, and 13 for processing (the FY24 Salt Batch Qualification samples). These Tanks (i.e. 21H, 41H and 42H) are blend tanks for feed to SWPF. This report focuses on the characterization of the Salt Batch Qualification sub-samples (i.e., any adjustments after qualification or as a part of processing are documented elsewhere). None of the samples displayed any unusual or unexpected characteristics such as large amounts of solids, floating solids, or unusual color. Characterization of these samples confirmed similar chemical composition and characteristics to previous salt waste batches. The analytical results (both rapid, typically 4 weeks, and long-term, typically 8 weeks) for Salt Batches 10, 11, 12, and 13 are now summarized and discussed in this technical report. SRMC-Analytical Laboratory (SRMC-AL), for the first time, provided all the short-term analyses data used in the qualification evaluations of SWPF Salt Batches 10, 11, 12, and 13. These SRMC short-term results are presented along with the results for the long-term analyses provided by SRNL.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developing a Lightning All-Clear Signal for the Savannah River Site

Lightning safety is a major concern at the Savannah River Site (SRS). Notifications are provided when 3-strikes occur onsite within a 15-minute period. It is generally left up to individual contractors at SRS to determine when it is safe for workers to return to outside work, generally following a 3-hour period of no lightning, after the last lightning strike occurs. This work tries to improve safe return to work decisions by developing a reliable all-clear signal using an electric field mill. The best signal used thresholds from multiple electric field values to provide an average delay for return to work of 2 hours and 13 minutes. This average was heavily influenced by lingering storms in the area or missing data from power or network outages. One event out of 98 signaled the all-clear prior to another event occurring less than 60 minutes later. Regardless, 62% of the all clear signals had delay times less than the mean and 72% had delay times less than the current 3-hour delay after the last strike. This provides better worker safety for returning to work than 30 minutes after the last lightning strike (e.g. OSHA Lightning Safety) and improves the delay time from the current 3-hour delay.

Noble, Stephen [Savannah River National Laboratory↗

Frequency and Characteristics of Inland Advecting Sea Breezes in the Southeast United States

Sea breezes have been observed to move inland over 100 km. These airmasses can be markedly different from regional airmasses, creating a shallow layer with differences in humidity, wind, temperature and aerosol characteristics. To understand their influence on boundary layer and cloud development on subsequent days, we identify their frequency and characteristics. We visually identified sea breeze fronts on radar passing over the Savannah River Site (SRS) between March and October during 2015–2019. The SRS is ~150 km from the nearest coastal location; therefore, our detection suggests further inland penetration. We also identified periods when sea breeze fronts may have passed but were not visually observed on radar due to the shallow sea breeze airmass remaining below the radar beam elevation that ranges between approximately 1–8 km depending on the beam angle and radar source (Columbia, SC or Charleston, SC). Near-surface atmospheric measurements indicate that the dew point temperature increases, the air temperature decreases, the variation in wind direction decreases and the aerosol size increases after sea breeze frontal passage. A synoptic classification procedure also identified that inland moving sea breezes are more commonly observed when the synoptic conditions include weak to moderate offshore winds with an average of 35 inland sea breezes occurring each year, focused primarily in the months of April, May and June.

54 ENVIRONMENTAL SCIENCES↗

Incorporation of aerosol into the COSPv2 satellite lidar simulator for climate model evaluation

Abstract. Atmospheric aerosol has substantial impacts on climate, air quality and biogeochemical cycles, and its concentrations are highly variable in space and time. A key variability to evaluate within models that simulate aerosol is the vertical distribution, which influences atmospheric heating profiles and aerosol–cloud interactions, to help constrain aerosol residence time and to better represent the magnitude of simulated impacts. To ensure a consistent comparison between modeled and observed vertical distribution of aerosol, we implemented an aerosol lidar simulator within the Cloud Feedback Model Intercomparison Project (CFMIP) Observation Simulator Package version 2 (COSPv2). We assessed the attenuated total backscattered (ATB) signal and the backscatter ratios (SRs) at 532 nm in the U.S. Department of Energy's Energy Exascale Earth System Model version 1 (E3SMv1). The simulator performs the computations at the same vertical resolution as the Cloud-Aerosol Lidar with Orthogonal Polarization (CALIOP), making use of aerosol optics from the E3SMv1 model as inputs and assuming that aerosol is uniformly distributed horizontally within each model grid box. The simulator applies a cloud masking and an aerosol detection threshold to obtain the ATB and SR profiles that would be observed above clouds by CALIOP with its aerosol detection capability. Our analysis shows that the aerosol distribution simulated at a seasonal timescale is generally in good agreement with observations. Over the Southern Ocean, however, the model does not produce the SR maximum as observed in the real world. Comparison between clear-sky and all-sky SRs shows little differences, indicating that the cloud screening by potentially incorrect model clouds does not affect the mean aerosol signal averaged over a season. This indicates that the differences between observed and simulated SR values are due not to sampling errors, but to deficiencies in the representation of aerosol in models. Finally, we highlight the need for future applications of lidar observations at multiple wavelengths to provide insights into aerosol properties and distribution and their representation in Earth system models.

54 ENVIRONMENTAL SCIENCES↗

Panel Session 45: Savannah River National Laboratory Advancing the EM Mission Through Technology

This panel focused on Savannah River National Laboratory (SRNL) activities and addressed: 1) Initial development work that SRNL performed to develop the technologies and processes, as well as design the equipment for the DOE EM HLW tank waste treatment and soil and groundwater mission, 2) Implemented technology and process improvements to the EM systems, and 3) Current technologies being evaluated for future implementation to improve throughput and reduce cost/schedule. Panelists with presentations: Advancing the EM Mission: SRNL Technology Approach (Connie Herman); Nuclear Materials Management (William Bates); Adjust, Adapt, Attest, and Adjudicate (Bruce Wiersma); SRNL Research and Development for Technological Advancements in the Liquid Waste Mission at SRS (Frank Pennebaker); EM TD Applies Solutions at SRS (Andrew Fellinger); Remediation of Complex Groundwater Plumes: Three Decades of Cleanup Success (Carol Eddy-Dilek)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cesium Removal and Hydraulic Performance Comparisons of CST Ion Exchange Media Batches in Support of the Tank Closure Cesium Removal Project - 20522

Three batches of Crystalline Silicotitanate (CST) ion exchange media have been evaluated for cesium removal efficiency from a Savannah River Site (SRS) High Level Waste (HLW) supernate simulant in support of the Tank Closure Cesium Removal (TCCR) Project, which involves at-tank column waste treatment. Results will be utilized to select the CST media batch to be added to the next TCCR unit columns. Two of the CST media samples were recent production batches and the third was an archived batch studied extensively at SRS nearly two decades ago. The archived CST batch had a significantly smaller average particle diameter than more recent batches. Small-scale (∼23 mL), side-by-side column tests were conducted at 35 deg. C with each of the CST batches using the same simulant at flow rates near 1.2 mL/min (3.0-3.4 CST bed volumes/hr). The cesium ion exchange column performance results were lower than expected for all three CST batches, but the data indicated that 30% more simulant volume and 40% more equivalent CST bed volumes of solution can be processed with the older CST batch prior to reaching the 50% cesium breakthrough point than can be processed with the newer CST batches. Hydraulic evaluations of the CST columns were also conducted in simulant at 24 deg. C to determine the impact of the different particle size distributions and associated bed porosities on frictional pressure drop under dynamic flow conditions. Higher differential pressure drops were observed with the archived CST batch relative to recent production batches, due to the smaller particle size distribution and the packing characteristics of the archived batch. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sulfonamide and Sulfonamido-phenol Ligands for Extraction of f-Elements from Alkaline High-Level Waste

Alkaline High Level Waste (HLW) has been accumulated at Hanford and Savannah River Sites as a result of reprocessing for nuclear weapons production during the cold war. A large volume (∼100 MGal) has been accumulated in carbon steel tanks at Savannah River (SRS) and Hanford. The tank waste contains three separate phases generated when NaOH was added to previously acidic Purex raffinates: 1-2 Supernatant liquid, salt-cake, and sludge. The sludge consists mainly of insoluble hydroxides of transition metals while the supernate and salt-cake contain caustic-soluble materials, including salts of highly radioactive fission products Cs(I) and Sr(II). Current treatment of alkaline HLW in SRS includes: i) The Actinide Removal Process (ARP), which is based on sorption of {sup 90}Sr and Actinides (An) on monosodium titanate (MST), also known as 'alpha-strike' process, followed by ii) Caustic Side Solvent Extraction (CSSX),4 which is used for the extraction of {sup 137}Cs by modified calixarenes in a hydrocarbon diluent. Residual actinides in some tanks are removed after CSSX by an additional ARP process commonly referred to as 'alpha-finishing'. Despite the success of ARP for Sr and An removal, as it is a sorption process, it represents the kinetic bottleneck of integrated salt waste processing. Hence potential introduction of additional organic ligands for actinide extraction (in a modified CSSX process) could simplify the overall integrated process, making it more efficient and economical, with less titanate needed and shorter sorption time, as some of the actinide component would be removed during CSSX. In this study tri-sulfonamide and o-sulfonamido-phenol (mono-sulfonamide) ligands have been studied as extractants for Sm(III), which is being used as an Am(III) surrogate. Our prior studies in the group using a tri-sulfonamide (iPr-tsa-B) showed favorable extraction for Sm(III) nitrate salts from alkaline solutions. Mono-sulfonamides possess similar orientation of binding sites to pyrocatechols, which have been found to be good ligands for Am(III) binding and extraction from alkaline media. Tri-sulfonamide of the type iPr-tsa-B6 (1 mM in CH{sub 2}Cl{sub 2} solution) was studied for Ln{sup 3+} extraction using Sm(NO{sub 3}){sub 3}.6H{sub 2}0 (10 and 25 μM) in alkaline solution of NaOH (0.05, 0.1, 0.2, 0.3 mM) / 0.1 M NaNO{sub 3}. Stripping of the organic phase was done using 0.1 M HNO{sub 3} and quantification of Sm{sup 3+} was done using ICP-OES at 359.3 nm. The need to improve stability of the complex led to synthesis of compounds with N-donor site closer to the central benzene ring to facilitate cation-π interactions. Synthesis of tri-sulfonamide type A: a) Chloromethyl methyl ether, SnCl{sub 4}, CH{sub 2}Cl{sub 2}, 0 deg. C, N{sub 2}, 4 h, 57%; b) NaN{sub 3}, reflux in H{sub 2}O/acetone for 22 h, 80%; c) PPh{sub 3}, THF/H{sub 2}O, 22 h, 79%; d) p-toluene sulfonyl chloride, Et{sub 3}N, 1,2-DCE, 22 h. Extraction: Sm(NO{sub 3}){sub 3}.6H{sub 2}O (2 mM) in 5 ml of aqueous NaOH (pH 10.5 - 14) + 6 ml of CH{sub 2}Cl{sub 2} solution of msa (20 mole equiv.) were rotated on a wheel (60 rpm; 20 h). Stripping: 5 ml of 0.1 M HNO{sub 3} + CH{sub 2}Cl{sub 2} solution of msa (after extraction, centrifugation and filtration) was rotated on the wheel (60 rpm; 20 h). Sm{sup 3+} was quantified using UV-Visible spectrophotometry.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Large Volume Airborne Contamination Monitoring To Support Nuclear Processes' Deactivation and Decommissioning

Current D and D operations at Hanford have demonstrated a flaw in the current state of the art capability of defining airborne contamination boundaries - Airborne particulate emissions of Pu-239 from CM2H operations on the Hanford Pu Finishing Plant were detected well beyond areas controlled for airborne Pu, putting numerous workers at risk for radiological assimilations - Current air samplers and CAM systems were surveying insufficient volumes of air to accurately predict where respiratory protection was required - Hanford is located in a high radon environment, making air monitoring for alpha emitting actinides challenging in high alpha radon induced backgrounds. - Inexpensive HEPA based home and industrial air purifiers filter significantly higher volumes of air than commercially available continuous-air monitoring (CAM) systems. - Inexpensive models capable of filtered air volumes exceeding 1000 times that of a CAM. - Detector system can be built to detect x-rays generated from actinide decay. - Branching ratios of x-rays are 4 orders of magnitude more intense from Plutonium decay than its gamma emissions. - Detector system can be a low resolution systems, as x-ray region of interest is not terribly congested. - Detection systems evaluated will be designed based on slabs of NaI or pixelated NaI or CsI panels. - Simple graphical user interface software will be developed to operate the detection system. - Concept is to deploy some of these air-purifying systems in nonradiological areas around SRNL to confirm radon can be rejected with confidence. - Generate some filters contaminated with plutonium via electroplated Pu or lab generated simulated particles. - then deploy units in known airborne radiological environments to establish systems ability to accurately measure actinide based hot particles Lab analyses will follow up the system analyses to ensure hot particles were correctly identified. Analysis by Scintillation: - Application of scintillation media to the surface of the filters is being explored. - Evaluating slabs of ZnS(Ag), application of powdered ZnS(Cu) and spray on Perkin Elmer Enhance. - Scintillation events would then be digitized with a digital camera and quantified. - Comparing against sensitivity of a PMT or SiPD readout. - Currently evaluating a Thorlabs 8 Megapixel Monochrome Scientific CCD Camera, hermetically sealed cooled package with a wide angle lens. - Wide angle lens allows complete view of HEPA filter from 7 inches away. - Images taken of glow in the dark paint, as well as plutonium-induced fluorescence. - Plutonium was flamed mounted on a 1 inch diameter stainless steel planchet, covered with a layer of mylar and a section of scintillating ZnS obtained from Eljon. - Currently working on reducing signal-to-noise levels to boost sensitivity. - Dark box to hold contaminated or electroplated source covered filters under fabrication. Analysis by x-ray Spectroscopy: - Branching ratios for x-ray emissions from Plutonium isotopes are orders of magnitude more intense than gamma-ray emissions. - The nuclear databases are incomplete on the branching ratios of some of the isotopes. - Evaluating some custom built SrI2 x-ray spectrometers vs a conventional windowed NaI detector. - SrI2 detectors are carbon-composite-windowed 51 mm x 51 mm. - MCNP calculations to establish self absorbance of filter media on 17 keV x-ray. Radon Rejection: - Activated charcoal pre-filter acts as a Radon trap. - Adding a time lapse feature to camera to aid in radon rejection. SRS Plutonium Fuel Form D and D Operations: Currently deploying air sampler to D and D operation of Pu-238 facility at SRS to generate some field samples to analyze.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Look At Dissolved Organic Carbon In Streams and Its Effect On DGT Hg Collection

Savannah River Site (SRS) and Oak Ridge National Laboratory (ORNL) were both major material production sites for the U.S.'s nuclear program during the 20. century. Both sites discharged mercury (Hg) to streams. Oak Ridge streams have accumulated significant levels of Hg from early 'historical' discharges. Diffusive Gradient in Thin Films (DGT) samplers may be a labor and material saving method to monitor the Hg contamination of streams at both sites. Humic and Fulvic acids are released during the degradation of plant and animal residue. They are part of the Dissolved Organic Matter that colors the black water streams of the southern U.S.. Humic acid and Fulvic acids have a tendency to sequester heavy metals, like Hg, and may interfere with the reactions needed to draw the Hg through the thin films of the DGT samplers. Project Objective: Use a UV-Vis spectrophotometer to estimate the levels of Dissolved Organic Carbon (DOC) in the streams selected to test the effect of DOC on DGT samplers. Conclusion: UV-Vis is a convenient way to estimate the amount of DOC in streams and may be used to provide more context in DGT Hg sampling. efforts. Future Work: Analyze data from SRS and ORNL DGT samples; Compare the results of the DGT samplers with more traditional speciating methods from ORNL; Use a TOC Spectrophotometer to gain a more accurate picture of stream DOC.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗