Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Second Target Station”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Development of an Exploration-Class Cascade Distillation Subsystem: Performance Testing of the Generation 1.0 Prototype

The ability to recover and purify water is crucial for realizing long-term human space missions. The National Aeronautics and Space Admininstration and Honeywell co-developed a five-stage vacuum rotary distillation water recovery system referred to as the Cascade Distillation Subsystem (CDS). Over the past three years, NASA's Advanced Exploration Systems (AES) Water Recovery Project (WRP) has been working toward the development of a flight-forward CDS design. In 2012 the original CDS prototype underwent a series of incremental upgrades and tests intened to both demonstrate the feasibility of a on-orbit demonstration of the system and to collect operational and performance data to be used to inform a second generation design. The latest testing of the CDS Generation 1.0 prototype was conducted May 29 through July 2, 2014. Initial system performance was benchmarked by processing deionized water and sodium chloride. Following, the system was challenged with analogue urine waste stream solutions stabilized with an Oxone-based and the two International Space Station baseline and alternative pretreatment solutions. During testing, the system processed more than 160 kilograms of wastewater with targeted water recoveries between 75 and 85% depending on the specific waste stream tested. For all wastewater streams, contaminant removals from wastewater feed to product water distillate, were estimated at greater than 99%. The average specific energy of the system was less than 120 Watt-hours/kilogram. The following paper provides detailed information and data on the performance of the CDS as challenged per the WRP test objectives.

Callahan, Michael R.↗

NIF-TAS Miniature Calibration Station

“On Aug. 8, 2021, an experiment at Lawrence Livermore National Laboratory’s (LLNL’s) National Ignition Facility (NIF) made a significant step toward ignition, achieving a yield of more than 1.3 megajoules (MJ). This advancement puts researchers at the threshold of fusion ignition, an important goal of the NIF, and opens access to a new experimental regime.” NIF experiments are conducted by symmetrically focusing 192 laser beams from NIF (three football fields in length) into the Target Chamber (10-meter diameter sphere) onto a target 2mm in size. The reaction produces a hot spot the diameter of a human hair, generating more than 10 quadrillion watts of fusion power for 100 trillionths of a second. These high pressures and temperatures created by the NIF have only been seen on the surface of the sun. To achieve fusion ignition, the target must be compressed to high pressures and temperatures, which requires symmetric compression. This symmetry requires precise alignment of the laser beams to the target. To achieve this precise symmetry a Target Alignment System (TAS) was developed to aid in aligning the beams to the target. The accomplishment on Aug 8 th could not have been accomplished without the TAS. TAS has proven to be a critical contributor to the success of NIF experiments. Each TAS is composed of several Charge Couple Device (CCD) sensors and various support electronics. Unfortunately, these CCDs are no longer available in industry as they have become outdated and obsolete. There is a limited amount of spare CCDs in the facility. As the NIF continues to increase its energy output of its fusion ignition shot experiments (heigh yield shots), more neutrons are being emitted from the Target Chamber. These neutrons are very damaging to the TAS electronics and its sensors, thus degrading and reducing its life expectancy dramatically. The increase of neutrons exceeds the damage threshold of the CCDs. This would increase the demand for more frequent TAS refurbishments and calibrations. The increase in resources to perform these refurbishments and calibrations would not be sustainable. In efforts to prolong the life of each TAS system it was determined that the TAS should be removed for every High Yield Shot and then reinstalled. The high precision fully calibrated TAS can easily be knocked out of alignment during these installs and reinstall exchanges and being transported in and out of the NIF. The Miniature Calibration Station System was developed to verify that the critical calibration parameters have been preserved during every TAS exchange. The Miniature Calibration Station System (Mini-Cal) would need to be a scaled down (in size and scope), portable version of the offline TAS calibration station to verify the critical TAS parameters are still within tolerances.

42 ENGINEERING↗

Long Duration Exposure Facility

The Long Duration Exposure Facility (LDEF) materials were useful for testing technical concepts that needed to be validated for the Cosmic Dust Collector Facility (CDCF) - a large instrument that was under study for inclusion on the upcoming Space Station. As it turned out, CDCF, which was approved at one point as an external payload, was ultimately canceled due to the scaling back of the Space Station capabilities. However, the study of cosmic dust is still a field of great interest for NASA, being the crucial part of at least one experiment that is still being considered for a Discovery mission. The optimum analysis of hypervelocity impacts is thus a continuing NASA concern. Two experiments, AO187-1 and AO187-2 were explicitly designed to measure the flux and composition of dust particles impacting LDEF. The former consisted of flat targets of Au and Al while the second comprised a set of 237 "capture cells" using Ge target plates covered by thin (2.5 microns) metallized plastic foils. The spacecraft maintained a constant orientation with respect to its velocity vector thereby defining leading and trailing edges that faced respectively into and away from the direction of motion. Both AO187-1 and AO187-2 had detectors on both the leading and trailing edges of LDEF. It was expected that interplanetary dust particles would dominate impacts on the trailing edge while the leading edge would be exposed to both cosmic dust and particles of orbital manmade debris. In AO187-1, the compositions of the impactors was determined by SEM-EDS techniques; in AO187-2 a sensitive surface analysis technique - SIMS - was used to determine both elemental and (some) isotopic compositions. In the initial analysis of AO187-2, it was found that SIMS was more sensitive for the analysis of thin impact debris layers than SEM-EDS. The present grant was made to determine if SIMS analysis could also be applied to impacts recorded in the Au surfaces of AO187-1. Success would extend the analysis of AO187-1 and would also contribute important technical information for the design of future cosmic dust space missions. The results obtained with this grant are incorporated in the attached paper presented at the Third LDEF Symposium and are briefly summarized here. In addition, we comment on the potential implications of this work for future research.

Source record↗

Automated identification of local contamination in remote atmospheric composition time series

Abstract. Atmospheric observations in remote locations offer a possibility of exploring trace gas and particle concentrations in pristine environments. However, data from remote areas are often contaminated by pollution from local sources. Detecting this contamination is thus a central and frequently encountered issue. Consequently, many different methods exist today to identify local contamination in atmospheric composition measurement time series, but no single method has been widely accepted. In this study, we present a new method to identify primary pollution in remote atmospheric datasets, e.g., from ship campaigns or stations with a low background signal compared to the contaminated signal. The pollution detection algorithm (PDA) identifies and flags periods of polluted data in five steps. The first and most important step identifies polluted periods based on the derivative (time derivative) of a concentration over time. If this derivative exceeds a given threshold, data are flagged as polluted. Further pollution identification steps are a simple concentration threshold filter, a neighboring points filter (optional), a median, and a sparse data filter (optional). The PDA only relies on the target dataset itself and is independent of ancillary datasets such as meteorological variables. All parameters of each step are adjustable so that the PDA can be “tuned” to be more or less stringent (e.g., flag more or fewer data points as contaminated). The PDA was developed and tested with a particle number concentration dataset collected during the Multidisciplinary drifting Observatory for the Study of Arctic Climate (MOSAiC) expedition in the central Arctic. Using strict settings, we identified 62 % of the data as influenced by local contamination. Using a second independent particle number concentration dataset also collected during MOSAiC, we evaluated the performance of the PDA against the same dataset cleaned by visual inspection. The two methods agreed in 94 % of the cases. Additionally, the PDA was successfully applied to a trace gas dataset (CO2), also collected during MOSAiC, and to another particle number concentration dataset, collected at the high-altitude background station Jungfraujoch, Switzerland. Thus, the PDA proves to be a useful and flexible tool to identify periods affected by local contamination in atmospheric composition datasets without the need for ancillary measurements. It is best applied to data representing primary pollution. The user-friendly and open-access code enables reproducible application to a wide suite of different datasets. It is available at https://doi.org/10.5281/zenodo.5761101 (Beck et al., 2021).

54 ENVIRONMENTAL SCIENCES↗

International Space Station (ISS) External Television (TV) Camera Shutdown Investigation

In the early morning of January 15, 2006, the Stardust Sample Return Capsule (SRC) successfully delivered its precious cargo of cometary particles to the awaiting recovery team at the Utah Test and Training Range (UTTR). As the SRC entered at 12.8 km/s, the fastest manmade object to traverse the atmosphere, a team of researchers imaged the event aboard the NASA DC-8 airborne observatory. At SRC entry, the airplane was at an altitude of 11.9 km positioned within 6.4 km of the prescribed, preferred target view location. The incoming SRC was first acquired approximately 18 seconds (s) after atmospheric interface and tracked for approximately 60 s, an observation period that is roughly centered in time around predicted peak heating.

Kichak, Robert↗

Nozomi Cis-Lunar Phase Orbit Determination

Japan's Institute of Space and Astronautical Science (ISAS) launched Nozomi, its first mission to the planet Mars using the newly developed M-V launch vehicle on July 3, 1998. Scientific objectives of the mission are to study the structure and dynamics of the Martian upper atmosphere and its interaction with the solar wind. Nozomi is a cooperative mission between ISAS and the National Aeronautics and Space Administration (NASA). The NASA contribution includes navigation and tracking services provided by the Jet Propulsion Laboratory (JPL). The spacecraft also serves as an engineering demonstration of basic technology for planetary exploration. One of the new technologies was a unique trajectory, developed by ISAS, which used solar gravitational perturbations at the weak stability boundary as an aid to achieve an Earth-Mars transfer orbit. This trajectory saves approximately 120 m/s of Delta V compared to direct hyperbolic insertion and is considered an enabling technology for the mission. Nozomi was the first spacecraft to employ this trajectory and provided on-orbit validation of the technique. The trajectory was achieved by initially placing the spacecraft in a highly elliptical cis-lunar phasing orbit. Six maneuvers were performed during this period to correct injection errors and target an outbound lunar swingby in September 1998. The gravity assist from the lunar swingby raised apogee to the vicinity of the weak stability boundary. After three more targeting maneuvers, Nozomi performed an inbound lunar swingby followed immediately by a powered Earth swingby in late December 1998. A 420 m/s Trans Mars Insertion (TMI) burn at the final Earth periapsis was intended to place the spacecraft on a heliocentric trajectory leading to Mars orbit insertion in October 1999. Orbit determination for Nozomi is performed in parallel by both ISAS and the Multi-Mission Navigation (MMNAV) group at JPL. This was an advantage for the mission because each group would generate solutions based on data collected from their respective tracking networks. Spacecraft events, such as sequence uplinks and maneuvers, were generally scheduled during passes at the Usuda tracking station in Japan. As a result, maneuver design and reconstruction was derived from MMNAV solutions based on JPL tracking data obtained immediately prior to or following maneuvers. Data was also exchanged between ISAS and MMNAV so orbit determination could be performed on joint data sets in support of critical targeting late in the cis-lunar phase. In this paper, information regarding the MMNAV orbit determination effort for the first six months of the mission is presented. The spacecraft trajectory is characterized first, followed by a discussion of the orbit determination estimation procedure and models. Results from selected orbit solutions are presented and compared against reconstructed trajectories. One area of emphasis in this paper is orbit determination in the vicinity of the weak stability boundary. Precise navigation was necessary to target the second lunar swingby and the powered Earth swingby. Delivery accuracy of 150 m was required for these critical encounters, but a number of factors contributed to the general degradation of orbit determination accuracy. This included the fact that the spacecraft was at apogee, at a range of 1.7 million km and moving at less than I km/sec perpendicular to the line of sight. Nozomi was also close to zero degrees declination where there are known limitations on orbit determination performance. Finally, S-band tracking data was acquired through the Nozomi backup low gain antenna. This antenna is offset from the axis of this spin stabilized spacecraft and superimposed large signatures in the Doppler and range data. These difficulties were overcome by combining long data arcs, spanning several maneuvers, with a high fidelity solar pressure model. The model included a physically accurate representation of the spacecraft structure and a high time resolution orientation model. Observation modeling included the removal of the spin induced Doppler bias, spin signature and per pass correction of range calibration errors applied for data leading up to critical events. As a result, all orbit determination goals were met. A second area of emphasis in this paper is the JPL tracking and orbit determination effort in support of the TMI maneuver. TMI occurred out of contact with ground stations and the JPL Goldstone tracking complex had the first pass following the bum. As a result, MMNAV had the responsibility to make a rapid assessment of the maneuver performance. MMNAV made the determination that a 100 m/s under bum had occurred and promptly informed ISAS via voice lines. ISAS immediately began preparations for a correction maneuver (TMIc), which had to be performed during the next Usuda pass. The near real time assessment by MMNAV provided accurate antenna frequency and pointing updates for the spacecraft acquisition at Usuda and the close coordination between the two agencies enabled the design and successful execution of the TMc maneuver. Propellant consumption during the correction burn dictated that the mission be redesigned. ISAS developed a new plan which adds 3 full solar orbits, two Earth swingbys and one lunar swingby with arrival at Mars in January 2004. The final Mars orbit will still enable the mission to achieve all of its science objectives.

Ryne, Mark↗

Engineering Design Study of Laser Power Beaming for Applications on the Moon

Using a laser to send power to a photovoltaic receiver has been proposed to transmit electrical power on the moon, particularly for applications such as powering a rover in near-polar permanent-ly-shadowed regions (PSR) where solar power is not available, however detailed engineering design studies of the spacecraft for such applications has not previously been undertaken. In this work, we did an engineering design study of two applications of laser power beaming for near-term lunar ap-plications. In the first application studied, an application was studied to provide power during the lunar night for a global network of small landers spread across the lunar surface, at latitudes ranging from equatorial to near polar landing sites. We analyze a proposal to power such small landers from orbit, using a laser to beam power from an orbital power station to photovoltaic arrays on the landers that are tuned to the laser wavelength. A commercially-available high-power 1.07-µ diode-pumped fiber laser was chosen as the source. To minimize beam spread of the a spot at the required distance, a 1.5 meter optical element was provided, using a design based on the Kepler telescope. To provide power to landers at any location, three orbital stations (“beamcraft) are required, each carrying a 3-kW laser. (If the surface science platforms requiring power are only in polar locations, or converse-ly, only in near equatorial locations, only one orbital platform is needed.) The approach is seen to be feasible, and a systems analysis was completed, the concept of operations for the system out-lined and a design for the beamcraft put together. The second design study looked at surface-to-surface power beaming using the VSAT as the la-ser platform, for an application to provide power to the interior of a permanently shadowed lunar crater from a surface platform. To maximize the distance of beaming, taking into account possible surface irregularities and the short distance to the horizon of the moon, it is desirable to emplace the laser at an elevation above the surface. The Vertical Solar Array Technology (VSAT) is a NASA program developing a solar array mounted vertically on a 10-m tall mast, designed for emplacement on a Commercial Lunar Payload Services (CLPS) lander to provide 10-kW (BOL) power near the south polar region of the moon, with a target readiness date of 2028. We used this design as the starting platform and the power source for a laser power beaming station. By mounting the laser beam director at the top of the solar array mast, a viewing distance to power receivers up to 10 km is possible. Requirements for the system were to be able to provide 300 W of continuous usable power to users including CLPS landers, VIPER class rovers, or the proposed Lunar Terrain Vehicle. The specified requirement was to be able to transmit power to a distance of up to 10 km, over a design lifetime of 5 years, and fitting within a total system landed mass under 625 kg. Again, a 1.07-µ fiber laser is mounted on the deck of the lander, with laser output sent to the laser beam director by a fiber-optic cable. A 7 square meter deployable radiator keeps the laser within operating temperature limits. The beam director is based on the design of a prototype unit developed by the University of California Santa Barbara. The system beams power for 57% of the time, with 44% of the time idle (accounting for the time when the VSAT array is itself in shadow). 1595 Watts of optical power are output in the beam. Accounting for receiver efficiency and beam losses, this results in an output onto the 1.5-meter receiving photovoltaic array of 542 watts. Of this, 300 watts is directly available to the user, while 242 watts is directed to the batteries for use while the beam is not available.

laser power↗

Chance-Constrained Energy Management System for Power Grids With High Proliferation of Renewables and Electric Vehicles

This paper proposes a two-stage energy management system (EMS) for power grids with massive integration of electric vehicles (EVs) and renewable energy resources. The first stage economic dispatch determines the optimal operating points of charging stations and battery swapping stations (BSS) for EVs under plug-in and battery swapping modes, respectively. The proposed stochastic model predictive control (SMPC) problem in this stage is characterized through a chance-constrained optimization formulation that can effectively capture the system and the forecast uncertainties. A distributed algorithm, the alternating direction method of multipliers (ADMM), is applied to accelerate the optimization computation through parallel computing. The second stage is aimed in coordinating the EV charging mechanisms to continuously follow the first-stage solutions, i.e., the target operating points, and meeting the EV customers' charging demands captured via the Advanced Metering Infrastructure (AMI). In this work, the proposed solution offers a holistic control strategy for large-scale centralized power grids in which the aggregated individual parameters are predictable and the system dynamics do not vary sharply within a short time-interval.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Exploratory Exercise in Taguchi Analysis of Design Parameters: Application to a Shuttle-to-space Station Automated Approach Control System

The chief goals of the summer project have been twofold - first, for my host group and myself to learn as much of the working details of Taguchi analysis as possible in the time allotted, and, secondly, to apply the methodology to a design problem with the intention of establishing a preliminary set of near-optimal (in the sense of producing a desired response) design parameter values from among a large number of candidate factor combinations. The selected problem is concerned with determining design factor settings for an automated approach program which is to have the capability of guiding the Shuttle into the docking port of the Space Station under controlled conditions so as to meet and/or optimize certain target criteria. The candidate design parameters under study were glide path (i.e., approach) angle, path intercept and approach gains, and minimum impulse bit mode (a parameter which defines how Shuttle jets shall be fired). Several performance criteria were of concern: terminal relative velocity at the instant the two spacecraft are mated; docking offset; number of Shuttle jet firings in certain specified directions (of interest due to possible plume impingement on the Station's solar arrays), and total RCS (a measure of the energy expended in performing the approach/docking maneuver). In the material discussed here, we have focused on single performance criteria - total RCS. An analysis of the possibility of employing a multiobjective function composed of a weighted sum of the various individual criteria has been undertaken, but is, at this writing, incomplete. Results from the Taguchi statistical analysis indicate that only three of the original four posited factors are significant in affecting RCS response. A comparison of model simulation output (via Monte Carlo) with predictions based on estimated factor effects inferred through the Taguchi experiment array data suggested acceptable or close agreement between the two except at the predicted optimum point, where a difference outside a rule-of-thumb bound was observed. We have concluded that there is most likely an interaction effect not provided for in the original orthogonal array selected as the basis for our experimental design. However, we feel that the data indicates that this interaction is a mild one and that inclusion of its effect will not alter the location of the optimum.

Deal, Don E.↗

Optical Communication Transceiver For X2000; Second Delivery Program

Conceptual-design of a multi-functional optical instrument is underway for the X2000 - Second Delivery Program. The transceiver will perform both free-space optical- communication and science imaging by sharing a common 10-cm aperture telescope. A single focal-plane array (such as, APS-Active Pixel Sensor) in conjunction with a filter wheel will be used to perform the two functions. Targeted values for the transceiver's weight and power consumption are: 4 Kg, and 14 W. This transceiver would be capable of delivering greater than IO Kbps to a 3.5-m diameter receiving station from the range of 2 AU during day-time.

Hemmati, H.↗

Critical configurations of fundamental range networks.

A range network is defined to consist of ground stations and targets where only distances between the two sets of points are observed. Such a network is said to be fundamental when only those six constraints are used that are needed to define the coordinate system for an adjustment. When ground stations or targets have certain configurations, a unique adjustment in terms of coordinates may be impossible, even when the number of observations is sufficient and the coordinate system is uniquely defined. Such configurations, resulting in the singular solutions, are said to be critical. Attention is therefore focused on singular solutions rather than on numerical problems in some ill-conditioned systems of fundamental range networks. The critical configurations are presented in two separate groups. The first deals with ground stations lying all in a plane and the second deals with ground stations generally distributed. The two kinds of problems require different mathematical treatments and lead to quite different conclusions.

Blaha, G.↗

Simulation and Analysis of Opportunistic MSPA for Multiple Cubesat Deployments

We describe a software approach for simultaneous demodulation and decoding of multiple frequency- multiplexed spacecraft across multiple ground stations. The approach involves the use of a single ground antenna with wide enough aperture to receive multiple angularly adjacent spacecraft simultaneously. This technique uses a wide-band RF signal digitizer coupled with easily and cheaply duplicated software-receiver modules to independently process the frequency-channelized downlink signals from the spacecraft. This approach relaxes the need for realizable modems at each antenna, for example in the Deep-SpaceNetwork (DSN), and can also function as a delayed data retrieval method for cubesat missions with routine science data return. Thus, we hope that this solution can enable more efficient utilization of DSN assets. We concentrate on a simulation similar to the proposed Exploration Mission 1 (EM-1) mission from a geometric perspective. To that end, the simulated scenario involves ten secondary cubesats deployed and tracked for a span of four days (the modeled motion over the first four days of the mission does not include any Trajectory Correction Maneuvers (TCMs) that may be necessary as the cubesats approach the moon). Transmissions from the cubesats may be received through a combination of DSN ground sites based on visibility. The cubesats are assumed to utilize typical cubesat transmit powers and a waveform similar to that of the Iris radio. One cubesat is chosen as the “target” and is considered tracked by all ground-stations throughout the simulation (i.e., it is consistently at the center of the main lobe of each ground station antenna when the ground station is in view of the cubesat in terms of elevation angle). The simulation effort involves synthesizing a wideband signal that includes the ten cubesats across a large bandwidth due to each cubesat having its own center-frequency in X-band, near 8.4 GHz. Each signal is characterized by its own Doppler-frequency shift and free-space path-loss computed through the underlying geometry of the simulation as well as the cubesat transmit power. Finally, each cubesat signal experiences a unique antenna gain at each ground station due to the underlying antenna pattern and spacecraft-ground station geometry. We establish two interesting findings: First, the link-budget for the EM-1-like scenario is almost completely limited by the angle between the center of the antenna main beam and the cubesat, which means that the signal-to-noise ratio is wholly adequate for demodulation and decoding at the simulated bitrates unless the cubesat exits the main beam. Secondly, and fortunately due to the use of a software radio architecture, we show that it is possible to successfully receive signals from most cubesats for the entire 4-day simulation. Due to the signal-to-noise ratio being sufficient for demodulation even after the side-lobe’s 17dB reduction in SNR, the software radio can still demodulate such cubesats as long as the radio is capable of re-establishing carrier lock as the cubesats leave the main beam and enter the side-lobe. Considering that the target application utilizes offline processing, a loss of lock can be detected and lock can be re-established by iterating over the data. Extensive simulations demonstrate these results.

Abraham, Douglas S.↗

The Mars Reconnaissance Orbiter Mission Operations: Architecture and Approach

The Mars Reconnaissance Orbiter (MRO) was launched on August 12, 2005 by an Atlas V launch vehicle from Cape Canaveral Air Force Station. MRO will carry a rich set of science instruments to Mars and provide global, regional survey, and targeted observations. In addition, a set of engineering instruments providing optical navigation, Ka band telecommunication and UHF relay services to future Mars missions are part of the MRO payload. During the mission, the MRO operations teams are presented with two major challenges - unprecedented high data rate and data volumes, and complex science planning and resource sharing. MRO has the capability to communicate with earth at a maximum of six Megabits per second (> 50 times any previous Mars missions). With the current Deep Space Network (DSN) contact schedule of 19 eight-hour tracks per week, the baseline mission plan is for MRO to return 34 Terabits of raw science data during the two year primary science phase. Each of the science instruments has its unique requirements for global mapping, regional survey, and targeted observations. Some instruments prefer nadir-only observations, while others require off-nadir observations (especially for stereo viewing). The requirements from these Mars viewing instruments presented a significant challenge for the operations team to design the complex science planning and resource sharing/allocation process. This paper describes what MRO project is implementing to solve these challenges.

Mars Reconnaissance Orbiter (MRO)↗

Recovery Act: Training Program Development for Commercial Building Equipment Technicians (Final Scientific/Technical Report)

The overall goal of this project has been to develop curricula, certification requirements, and accreditation standards for training on energy efficient practices and technologies for commercial building technicians. These training products will advance industry expertise towards net-zero energy commercial building goals and will result in a substantial reduction in energy use. The ultimate objective is to develop a workforce that can bring existing commercial buildings up to their energy performance potential and ensure that new commercial buildings do not fall below their expected optimal level of performance. Commercial building equipment technicians participating in this training program will learn how to best operate commercial buildings to ensure they reach their expected energy performance level. The training is a combination of classroom, online and on-site lessons. The Texas Engineering Extension Service (TEEX) developed curricula using subject matter and adult learning experts to ensure the training meets certification requirements and accreditation standards for training these technicians. The training targets a specific climate zone to meets the needs, specialized expertise, and perspectives of the commercial building equipment technicians in that zone. The combination of efficient operations and advanced design will improve the internal built environment of a commercial building by increasing comfort and safety, while reducing energy use and environmental impact. Properly trained technicians will ensure equipment operates at design specifications. A second impact is a more highly trained workforce that is better equipped to obtain employment. Organizations that contributed to the development of the training program include TEEX and the Texas Engineering Experiment Station (TEES) (both members of The Texas A&M University System). TEES is also a member of the Building Commissioning Association. This report includes a description of the project accomplishments, including the course development phases, tasks associated with each phase, and detailed list of the course materials developed. A summary of each year's activities is also included.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A planetary ultra hypervelocity impact mechanics and shock wave science facility

Using the concept of intercepting orbits from a pair of Space Station serviced free flyers, a class of impact and shock wave experiments pertinent to planetary science can be performed. One proposed free flying vehicle is an impactor dispensor, and the second is the impact laboratory. How collision is achieved by utilizing essentially twice orbital velocity is demonstrated. The impactor dispensor contains a series of small flyer plates or other projectiles which are launched into the trajectory of the impactor laboratory at appropriate positions. The impactor laboratory is a large impact tank similar to those in terrestrial gun laboratories, except that it contains a supply of targets and instrumentation such as high speed cameras, flash X-ray apparatus and digital recorders. Shock and isentropic pressures of up to 20 Mbar are achievable with such a system which provides 15 km/sec impact velocities for precisely oriented projectiles.

Ahrens, T. J.↗

A planetary ultra hypervelocity impact mechanics and shock wave science facility

Using the concept of intercepting orbits from a pair of Space Station serviced free flyers, a class of impact and shock wave experiments pertinent to planetary science can be performed. One proposed free flying vehicle is an impactor dispensor, and the second is the impact laboratory. How collision is achieved by utilizing essentially twice orbital velocity is demonstrated. The impactor dispensor contains a series of small flyer plates or other projectiles which are launched into the trajectory of the impactor laboratory at appropriate positions. The impactor laboratory is a large impact tank similar to those in terrestrial gun laboratories, except that it contains a supply of targets and instrumentation such as high speed cameras, flash X-ray apparatus, and digital recorders. Shock and isentropic pressures of up to 20 Mbar are achievable with such a system which provides 15 km/sec impact velocities for precisely oriented projectiles.

Ahrens, Thomas J.↗

Results of prototype software development for automation of shuttle proximity operations

The effort involves demonstration of expert system technology application to Shuttle rendezvous operations in a high-fidelity, real-time simulation environment. The JSC Systems Engineering Simulator (SES) served as the test bed for the demonstration. Rendezvous applications were focused on crew procedures and monitoring of sensor health and trajectory status. Proximity operations applications were focused on monitoring, crew advisory, and control of the approach trajectory. Guidance, Navigation, and Control areas of emphasis included the approach, transition and stationkeeping guidance, and laser docking sensor navigation. Operator interface displays for monitor and control functions were developed. A rule-based expert system was developed to manage the relative navigation system/sensors for nominal operations and simple failure contingencies. Testing resulted in the following findings; (1) the developed guidance is applicable for operations with LVLH stabilized targets; (2) closing rates less than 0.05 feet per second are difficult to maintain due to the Shuttle translational/rotational cross-coupling; (3) automated operations result in reduced propellant consumption and plume impingement effects on the target as compared to manual operations; and (4) braking gates are beneficial for trajectory management. A versatile guidance design was demonstrated. An accurate proximity operations sensor/navigation system to provide relative attitude information within 30 feet is required and redesign of the existing Shuttle digital autopilot should be considered to reduce the cross-coupling effects. This activity has demonstrated the feasibility of automated Shuttle proximity operations with the Space Station Freedom. Indications are that berthing operations as well as docking can be supported.

Hiers, Hal↗

Orbit Determination Support for the Microwave Anisotropy Probe (MAP)

The Microwave Anisotropy Probe (MAP) is a Medium Class Explorers (MIDEX) mission produced in partnership between Goddard Space Flight Center (GSFC) and Princeton University. The main science objective of the MAP mission is to produce an accurate full-sky map of the cosmic microwave background temperature fluctuations anisotropy. MAP was launched from the Cape Canaveral Air Force Station Complex 17 aboard a Delta II 7425-10 expendable launch vehicle at exactly 19:46:46.183 UTC on June 30, 2001. The spacecraft received a nominal direct insertion by the Delta into a 185 km circular orbit. MAP was then maneuvered into a sequence of phasing loops designed to set up a lunar swingby (gravity-assisted acceleration) of the spacecraft onto a transfer trajectory to a Lissajous orbit about the Earth-Sun L2 point. The mission duration is approximately 27 months with 3 to 4 months of transfer time to the final mission orbit about L2. The MAP transfer orbit consisted of 3.5 phasing loops: the first loop has a 7-day period, the second and third loops have a 9-day period, and the last half loop has a 4-day period as illustrated in Figure 1, which also indicates the placement of maneuvers. A Pfinal correction maneuver was performed 18 hours after the last perigee to more closely achieve the targeted lissajous orbit. The lunar encounter or swingby took place approximately 30 days after launch. After the lunar encounter, the spacecraft will cruise for approximately 120 days before it arrives at L2. A Mid-Course Correction (MCC) maneuver was executed seven days after the swingby to further refine the trajectory. Once the MAP satellite is injected into the L2 Lissajous orbit, it will perform occasional stationkeeping maneuvers to maintain the Lissajous orbit for a minimum of two years (and a goal of four years). Because of its complex orbital characteristics, the mission provided a unique challenge to orbit determination (OD) support in many orbital regimes. Extensive trajectory error covariance analysis was performed to predict ephemeris accuracy for the OD process using a Bayesian least-squares technique. The orbit determination error analysis is essential for maneuver planning and maneuver recovery study. Several tracking scenarios were investigated for each phase of the mission. This paper provides a summary of the premission trajectory covariance error analysis, as well as actual real-time OD results. The use and impact of the various tracking stations, systems, and measurements will be discussed. Details of the operational OD support and the inferred OD accuracy will be presented, and the results will be compared to the premission covariance analysis, In addition, there will be a discussion of the challenges presented to OD support including delta-Vs at apogee as well as perigee, and effects due to spacecraft attitude mode, in light of their implications to the OD accuracy and covariance analysis.

Truong, Son H.↗