Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ScS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

210 records · Page 12

Comparison of Recent Solar Minima Using SABER Data and the Thermosphere Climate Index

The solar minimum at the end of Solar Cycle (SC) 23 was surprisingly long and deep, and it is predicted that the SC 24 minimum will be similar. We present results from analysis of the two most recent solar minima in terms of their duration in time and the degree of cooling that occurs, along with comparisons to the minima of five preceding solar cycles. Measurements of infrared emissions from NO and CO2 made by the Sounding of the Atmosphere Using Broadband Emission Radiometry (SABER) instrument on the NASA Thermosphere-Ionosphere-Mesosphere Energetics and Dynamics (TIMED) satellite for nearly 19 years allow us to see the effects of solar minima in the thermosphere. These data,and products derived from them, including the Thermosphere Climate Index (TCI), provide direct, quantitative information on the state of the upper atmosphere and enable comparisons of different SCs. The TCI extends the SABER record of nitric oxide infrared emission at 5.3 ìm using a linear multiple regression fit of solar and geomagnetic indices to the daily cooling power derived from SABER NO. Thus the TCI provides a 73-year measure of solar variability in Earth’s atmosphere and permits determination of the relative contribution of solar irradiance and geomagnetic processes at solar minimum and throughout the solar cycle. Results of these calculations will be presented to compare solar minima for the six solar cycles included in the TCI time series.

thermosphere↗

The Advanced Microwave Radiometer – Climate Quality (AMR-C) Instrument for Sentinel-6

The Advanced Microwave Radiometer – Climate Quality (AMR-C) is designed to measure the path delay due to atmospheric water vapor along Sentinel-6 altimeter path over one decade. The AMR-C receiver is based on heritage from previous AMR instruments with the addition of a THz-frequency radiometer, the High Resolution Microwave Radiometer (HRMR), for improved coastal zone accuracy and a Supplemental Calibration System (SCS) to meet level 3 requirements that the path delay error due to the altimeter-derived sea surface height be less at 0.8 cm and the path delay stability be maintained to 0.7 mm averaged over a 1-year time period.

Maiwald, Frank↗

Software System for the Mars 2020 Mission Sampling and Caching Testbeds

The development of the Sampling and Caching Subsystem (SCS) of the Mars 2020 Rover Mission is highly dependent on testing of prototype hardware and software operating in explicit conditions as part of integrated testbeds. To achieve relevant integration of hardware and software while maintaining rapid algorithm development capabilities and high testing throughput, the Controls and Autonomy for Sample Acquisition and Handling (CASAH) software system was developed. CASAH is an implementation of the Intelligent Robotics System Architecture (IRSA),which mimics JPL Flight Software (FSW) in that it is divided into hierarchical modules that run separate processes that communicate via message passing, each module is assigned an owner that is a single developer, and the operator initiates requests via a text-based interface that interprets sequences of commands.IRSA enables a modular breakdown of CASAH that follows that of 2020 Flight Software,so developers can take an algorithm from a module in CASAH and re-code it into the same module in FSW. As deployment of CASAH has grown to ten testbeds - each with different hardware and objectives - bottom-up design decisions have been intentionally made to keep the system lightweight and maintainable by a very small team. To date, CASAH has been used to run 1393 different tests. This work describes CASAH, the testbeds and functionality it supports, the tools used to manage the development and sharing of code, and the features of the software. Lessons learned over the past three years of development and deployment are provided.

Vieira, Peter↗

Thermal testing of a Mars 2020 enhanced engineering camera

The upcoming Mars 2020 rover mission is introducing a new generation of engineering cameras (ECAMs) called the enhanced engineering cameras (EECAMs), which have advanced imaging capability over the previous ECAMs used on the Spirit, Opportunity, and Curiosity rovers. The Mars 2020 rover will have nine EECAMs – six upgraded HazCams used for hazard avoidance, two upgraded NavCams used for navigation, and a single CacheCam used to take images of samples obtained by the rover’s Sampling and Caching Subsystem (SCS). The detailed EECAM design was completed in April 2017, and since then the EECAM Subsystem has been in the process of fabrication, integration, and testing. This paper describes two thermal tests that were done for thermal model correlation and validation of the EECAM thermal design during Mars surface operations.

Novak, Keith S.↗

Design and Development of a Robust Chuck Mechanism for the Mars2020 Coring Drill

The Sampling and Caching Subsystem (SCS) onboard the Mars2020 rover includes a coring drill that can perform coring, abrasion, and regolith collection operations. The coring drill requires a chuck mechanism to allow for the changing of the bits needed to perform sampling. The chuck mechanism must be capable of securely connecting a bit under drilling, rover slip, and pullout loads, but also readily release a bit after application of these loads. The Mars2020 chuck consists of a ball lock mechanism that allows for robust engagement and release of bit assemblies that is preloaded to ensure a secure, stiff connection between the bit assembly and the rest of the corer. To prevent jamming, the chuck incorporates rollers to preload the ball lock. The rollers are mounted onto a flexured cam that minimizes changes in internal mechanism loads that result from thermally induced dimensional changes, further mitigating the potential for jamming. The chuck mechanism is moved between engaged, disengaged, and loose chuck positions by rotating the cam with a gearmotor that incorporates a magnetic detent brake that prevents inadvertent mechanism motion under design loads. Ongoing testing is occurring on the qualification model in a dirty environment while coring and abrading rocks in a Mars representative environment.

Barletta, Anthony↗

Percussion Mechanism for the Mars2020 Coring Drill

The Mars2020 rover includes a Sampling & Caching Subsystem (SCS) that is required to acquire core samples of hard rocks and to abrade rocky surfaces flat and smooth in order to facilitate surface science. Hard, high strength rocks exhibit brittle failure modes, and can be drilled and chiseled efficiently using percussive impacts. The coring drill percussion mechanism was designed to provide those impacts with variable output force and to be used with various drill bits. A unique hammering mechanism, using a base-driven hammer, powered by a conventional rotary actuator driving a Scotch yoke, was designed to robustly provide the required function in a Martian environment for a life exceeding 2 million impacts.

Chrystal, Kyle↗

Sealing Station Mechanisms for the Mars 2020 Rover Sample Caching Subsystem

The Sealing Station is composed of two mechanisms: the Gripper Mechanism, for orientation and support of the Sample Tube during the Hermetic Seal activation activity, as well as ejecting Sample Tubes out of the Rover, and the Ram Mechanism, which produces and applies a high force for seal activation. The Ram Mechanism is a compact high force linear actuator that uses a planetary roller screw (PRS) as the output linear stage, tapered roller bearings (TRB) to support the PRS at the high loads, a set of spur gears supported by cylinder roller bearings, and a brushless motor with a planetary gearhead and magnetic detent brake. This paper describes the role of these mechanisms in the Mars 2020 Rover mission as a part of the Sample Caching Subsystem (SCS) and Adaptive Caching Assembly (ACA) and their interactions with the Hermetic Seal and Sample Tube hardware. We report on development testing performed with the PRS that show it has capability of supporting cross-moment loads, something manufacturers of these components do not rate. Also discussed is the interaction of the passive holding torque from magnetic detent brakes and hardstop preload, setting of a very light preload in the TRB, and the complex linear dyno test equipment used, and how that testing could have been improved.

Grimes-York, Jesse↗

STIG: A Two-Speed Transmission Aboard the Mars2020 Coring Drill

The coring drill, part of the Sampling & Caching Subsystem (SCS) aboard the Mars2020 rover, demands a wide range of drill bit torque and speed capabilities during sample acquisition operations. The two driving operating points are high speed, low torque for rotary-percussive coring, as well as low speed, high torque for separating the rock core sample from its parent rock. The spindle twin-input transmission (STIG) allows these and other operating points to be reached with an actuator of substantially less peak power and maximum current draw than that of a single-speed actuator. Rather than containing gearing of its own, the transmission interfaces to an actuator with two outputs of different gear ratios, allowing the transmission to select one of the two of the outputs to be coupled to the drill bit. This paper describes the design, capabilities, and challenges associated with the transmission and the dual-output actuator.

Szwarc, Timothy↗

Effect of the Heliospheric State on CME Evolution

The culmination of solar cycle 24 by the end of 2019 has created the opportunity to compare the differing properties of coronal mass ejections (CMEs) between two whole solar cycles: solar cycle 23 (SC 23) and solar cycle 24 (SC 24). We report on the width evolution of limb CMEs in SCs 23 and 24 in order to test the suggestion by Gopalswamy et al. that CME flux ropes attain pressure balance at larger heliocentric distances in SC 24. We measure CME width as a function of heliocentric distance for a significantly large number of limb CMEs (∼1000) and determine the distances where the CMEs reach constant width in each cycle. We introduced a new parameter, the transition height (hc) of a CME, defined as the critical heliocentric distance beyond which the CME width stabilizes to a quasi-constant value. Cycle and phase-to-phase comparisons are based on this new parameter. We find that the average value of hc in SC 24 is 62% higher than that in SC 23. SC 24 CMEs attain their peak width at larger distances from the Sun than SC 23 CMEs do. The enhanced transition height in SC 24 is new observational ratification of the anomalous expansion. The anomalous expansion of SC 24 CMEs, which is caused by the weak state of the heliosphere, accounts for the larger heliocentric distance where the pressure balance between CME flux rope and the ambient medium is attained.

Solar coronal mass ejections↗

Future Lunar Geophysical Mission Opportunities Including the Lunar Geophysical Network and CLPS

In the next few years, several opportunities are underway to take new geophysical observations of the Moon including geodetic and seismic. NASA’s novel Commercial Lunar Payload Services (CLPS) program seeks to acquire delivery services from 14 US companies. Nine funded task orders have been selected with payloads from multiple disciplines. Here we review the upcoming geophysical CLPS payloads and their measurement objectives then we provide a review of the Lunar Geophysical Network mission in development for New Frontiers 5. The Lunar Geophysical Network (LGN) mission is proposed to land on the Moon in the early 2030’s and deploy packages at four locations to enable continuous geophysical measurements for a minimum of 6 and a goal of 10 years. Returning to the lunar surface with a long-lived geophysical network is a key next step to advance lunar and planetary science. LGN will greatly expand our primarily Apollo-based knowledge of the deep lunar interior by identifying and characterizing mantle melt layers, as well as core size and state. To meet the mission objectives, the instrument suite provides complementary seismic, geodetic, heat flow, and electromagnetic (EM) observations. We discuss the network landing site requirements and provide example sites that meet these requirements. Landing sites include the P-5 region within the Procellarum KREEP Terrane (PKT; (lat:15˚; lon:-35˚), Schickard basin (lat:-44.3˚; lon:-55.1˚), Crisium basin (lat:18.5˚; lon:61.8˚), and the farside Korolev basin (lat:-2.4˚; lon:-159.3˚) (Figure 1). Network optimization considers the best locations to observe seismic core phases, e.g., ScS and PKP. Ray path density and proximity to young fault scarps are also analyzed to provide increased opportunities for seismic observations. Geodetic constraints from laser ranging require the LGN to have at least three nearside stations at maximum limb distances. Heat flow and EM measurements should be obtained away from terrane boundaries and from magnetic anomalies at locations representative of global trends. In our recent paper, an in-depth case study is provided for Mare Crisium. We also discuss the consequences for scientific return of less-than-optimal locations or number of stations.

Moons↗

Future Lunar Geophysical Mission Opportunities Including the Lunar Geophysical Network, Artemis and CLPS

In the next few years, several opportunities are underway to take new geophysical observations of the Moon including geodetic and seismic. NASA’s novel Commercial Lunar Payload Services (CLPS) program seeks to acquire delivery services from 14 US companies. Nine funded task orders have been selected with payloads from multiple disciplines. Here we review the upcoming geophysical CLPS payloads and their measurement objectives then we provide a review of the Lunar Geophysical Network mission in development for New Frontiers 5. The Lunar Geophysical Network (LGN) mission is proposed to land on the Moon in the early 2030’s and deploy packages at four locations to enable continuous geophysical measurements for a minimum of 6 and a goal of 10 years. Returning to the lunar surface with a long-lived geophysical network is a key next step to advance lunar and planetary science. LGN will greatly expand our primarily Apollo-based knowledge of the deep lunar interior by identifying and characterizing mantle melt layers, as well as core size and state. To meet the mission objectives, the instrument suite provides complementary seismic, geodetic, heat flow, and electromagnetic (EM) observations. We discuss the network landing site requirements and provide example sites that meet these requirements. Landing sites include the P-5 region within the Procellarum KREEP Terrane (PKT; (lat:15˚; lon:-35˚), Schickard basin (lat:-44.3˚; lon:-55.1˚), Crisium basin (lat:18.5˚; lon:61.8˚), and the farside Korolev basin (lat:-2.4˚; lon:-159.3˚) (Figure 1). Network optimization considers the best locations to observe seismic core phases, e.g., ScS and PKP. Ray path density and proximity to young fault scarps are also analyzed to provide increased opportunities for seismic observations. Geodetic constraints from laser ranging require the LGN to have at least three nearside stations at maximum limb distances. Heat flow and EM measurements should be obtained away from terrane boundaries and from magnetic anomalies at locations representative of global trends. In our recent paper, an in-depth case study is provided for Mare Crisium. We also discuss the consequences for scientific return of less-than-optimal locations or number of stations.

Moons↗

Testing Mars 2020 Flight Software and Hardware in the Surface System Development Environment

The Mars 2020 (M2020) Perseverance Rover is NASA's most advanced planetary rover mission to date. It includes a novel Sample Caching Subsystem (SCS) which will collect rock cores for possible future return to Earth, as well as an improved mobility system with enhanced autonomous navigation which will enable it to traverse faster and farther than prior rovers. The development of both systems required extensive flight software and flight hardware testing. To support this testing, we developed the Surface System Development Environment (SSDEV) and used it for a wide variety of testing. SSDEV is a bundled subset of M2020 Flight Software which runs on commercially available Linux computers and can be combined with multiple backend options for simulation and hardware control. The SSDEV architecture enabled our teams to perform much more testing of flight software and flight hardware than would have otherwise been possible. As a secondary benefit, the SSDEV-based test campaigns also helped our teams enter the operations phase of the mission with greater readiness of operations products and tools. In this paper, we summarize the motivation for SSDEV, provide an overview of the SSDEV architecture, list several examples of how SSDEV was used, and summarize lessons learned. SSDEV is not a substitute for integrated testing with flight-like avionics, but it enabled substantially more testing than would have otherwise been possible and also provided some unique benefits. We recommend architectures like SSDEV to future projects that need to perform extensive hardware and software testing using a limited set of flight-like avionics.

Wai, Dennis↗