Providing Ancillary Services with Photovoltaic Generation in Multi- Timescale Grid Operation

With penetration levels of photovoltaic (PV) generation substantially increasing, electric power systems need more flexible resources that can provide ancillary services to mitigate the variability and uncertainty of the PV. On one hand, the increase in PV generation necessitates more flexible resources; on the other hand, because of its low operation cost, PV generation has been replacing conventional generation, which is currently the main flexible resource. Consequently, there is a trend to require renewable generation, including PV, to provide flexible ancillary services. This paper proposes a multi-timescale grid operation model considering the various control strategies of PV providing different ancillary services. Numerical case studies demonstrate that with PV providing both regulation reserve and primary frequency reserve, the system operating costs and PV curtailment will be reduced significantly. Results show that not only the system reliability can be improved but also PV profitability with PV providing more ancillary services.

41 EE - Solar Energy Technologies Office (EE-4S)↗

On the Use of Smart Meter Data to Estimate the Voltage Magnitude on the Primary Side of Distribution Service Transformers

This paper develops a novel method to estimate the voltage magnitude on the primary side of distribution service transformers. The proposed method relies exclusively on smart meters, and therefore it is fully data-driven. This is an important feature because electric utilities have detailed models of only the primary network - that is, the network between the distribution substation and the primary side of service transformers that are installed closer to end-customer sites. The network that connects the secondary side of service transformers to end-customer sites, referred to as the secondary network, is simply represented by a lumped load. For each secondary network, the proposed method uses data acquired from only 2 smart meters: the closest and the farthest-in the sense of electrical distance - from the service transformer. As a reference to this feature, the proposed method is named SM2Vp. To our knowledge, this is the first time a method is shown to provide actionable information for realtime operation and control of power distribution grids using only two smart meters per secondary network. This is important because utilities have experienced barriers in managing and using large data sets for real-time operation and control. SM2Vp is primarily intended to provide pseudo-measurements for distribution system state estimation, but it can also be used directly for voltage control schemes. The performance of SM2Vp is demonstrated by numerical simulations carried out on three secondary network synthetic models and by using field data provided by a utility partner serving customers in southwestern California. A maximum relative error of approximately 3.9% or less is observed for the primary voltage magnitude estimates in all numerical experiments.

distribution service transformer↗

Stackelberg Game Based on Supervised Charging Method and Pricing Strategy of Charging Service Providers

The charging of large-scale electric vehicles (EVs) brings about a large new load to the electricity network, while it is also a demand response resource. Smart charging equipment and patterns of charging service will be one of the research focuses at the next stage. Smart charging equipment schedules EV's charging on the basis of electricity price, and this method enables users to hold the right of controlling their own EV's charging procedure. Thus, there exists a Stackelberg game between charging service providers, who set the price, and independent EVs. The marginal charging price, which reflects properties of individual EV, and the pricing strategy of charging service providers can be derived through solving this game problem. A price based charging strategy is proposed, which is suitable for the dynamic electricity price mechanism because of its light communication burden. In a simulation of a charging service provider covering 200 smart devices, this real-time supervised charging strategy shows its advantages of curbing users' payment and guiding the charging load effectively.

33 ADVANCED PROPULSION SYSTEMS↗

Review of Standby and Ancillary Services in the Context of Behind-the-Meter Photovoltaics

The New Mexico Public Regulatory Commission (NMPRC) requested information on the following topics: Overview of ancillary and standby services. Examples of how ancillary and standby services are defined, used, and analyzed in other jurisdictions. Considerations regarding how ancillary and standby services may be economically valued. Background information on how ancillary and standby services differ from fixed costs to serve owners of behind-the-meter solar photovoltaic (BTM PV) systems.

14 SOLAR ENERGY↗

Scheduler Modeling of Distributed Energy Resources for Providing Ancillary Services

Distribution energy resources (DERs) have been integral components of modern power systems, and their capability to provide grid services has been widely studied. To promote the deployment of these resources in providing grid services in real-world utility operations, this paper proposes a day-ahead scheduler model for a distribution system connected DER plant. A certain amount of generation capacity of this DER plant is reserved for frequency services, and some ancillary services for the distribution system-including peak load reduction, voltage regulation, and power factor control-are integrated into the model. The model is tested on a real-world distribution system. From the simulation results, the energy and reserve schedule of the solar photovoltaic (PV) unit and battery energy storage system (BESS) can be determined, and voltage and power factor are well maintained. Additionally, in order to demonstrate the specific characteristics of the co-located and hybrid operation modes for the PV and BESS, these two modes are analyzed both theoretically and through real-time simulation. Simulation results show that most of PV's variability is transferred to the net power in the co-located mode, whereas it is transferred to the BESS in the hybrid mode. This proposed scheduler model and the comparison of co-located and hybrid modes can provide practical guidance for the applications of DER plant in the real-world utility.

14 SOLAR ENERGY↗

Data-Driven Linear Parameter-Varying Modeling and Control of Flexible Loads for Grid Services

Flexible loads have great potential to improve the electric grid's flexibility and stability. To effectively control large ensembles of heterogeneous loads, reliable models thereof are required. This paper presents a data-driven modeling and control approach to manage flexible loads for providing grid services. We leverage a linear parameter-varying autoregressive moving average (LPV-ARMA) model to describe the aggregate load response, where the parameters in the model are used to capture external environmental impacts (e.g., weather). A gain-scheduling feedback controller is then developed to adapt to environmental variations. This data-driven approach can be easily applied to different types of loads in various environmental conditions. In addition to the ensemble controller, distributed load controllers are designed to deliver grid services, while maintaining the quality of service of inherent load tasks. We demonstrate the work on the IEEE 37-node distribution system for real-time power regulation services through control of thermostatically controlled loads.

61 RADIATION PROTECTION AND DOSIMETRY↗

Providing Ancillary Services with Photovoltaic Generation in Multi-Timescale Grid Operation: Preprint

With photovoltaic (PV) generation substantially increases, electric power systems need more flexible resources that can provide ancillary services to mitigate the variability and uncertainty of the PV generation. On the one hand, the increase of PV generation necessitates the needs of more flexible resources. On the other hand, PV generation, because of its low operation cost, has been replacing the conventional generation in the system which is the main flexible resources in the current system. Consequently, there is a trend to require the renewable generation including PV to provide flexible ancillary services to further accommodate more PV integration. This paper proposes a multi-timescale grid operation model considering the various control strategies of PV providing different ancillary services. Numerical case studies demonstrate that with PV providing both regulation reserve and primary frequency reserve, the system operating costs and PV curtailment will be reduced significantly. It shows that not only the system reliability but also PV's profitability can be improved with PV providing more ancillary services.

41 EE - Solar Energy Technologies Office (EE-4S)↗

On the Use of Smart Meter Data to Estimate the Voltage Magnitude on the Primary Side of Distribution Service Transformers: Preprint

This paper develops a novel method to estimate the voltage magnitude on the primary side of distribution service transformers. The proposed method relies exclusively on smart meters, and therefore it is fully data-driven. This is an important feature because electric utilities have detailed models of only the primary network--that is, the network between the distribution substation and the primary side of service transformers that are installed closer to end-customer sites. The network that connects the secondary side of service transformers to end-customer sites, referred to as the secondary network, is simply represented by a lumped load. For each secondary network, the proposed method uses data acquired from only 2 smart meters: the closest and the farthest--in the sense of electrical distance--from the service transformer. As a reference to this feature, the proposed method is named SM2Vp. To our knowledge, this is the first time a method is shown to provide actionable information for real-time operation and control of power distribution grids using only two smart meters per secondary network. This is important because utilities have experienced barriers in managing and using large data sets for real-time operation and control. SM2Vp is primarily intended to provide pseudo-measurements for distribution system state estimation, but it can also be used directly for voltage control schemes. The performance of SM2Vp is demonstrated by numerical simulations carried out on three secondary network synthetic models and by using field data provided by a utility partner serving customers in southwestern California. A maximum relative error of approximately 3.9% or less is observed for the primary voltage magnitude estimates in all numerical experiments.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Utility Energy Service Contract Guide: A Resource for Contracting Officers Working on UESC Projects

A Utility Energy Service Contract (UESC) is a limited-source contract between a federal agency and serving utility for energy management services including energy and water efficiency improvements and demand-reduction services. In a UESC, the Contracting Officer (CO) will lead the acquisition effort, supported by technically knowledgeable staff working closely with the utility, to assess potential, investigate technical and economic feasibility, and ensure a fair and reasonable price for design and implementation of the project. The UESC Guide is a compilation of samples and templates developed as a resource to help COs implement Task Orders (TOs) for UESCs under existing U.S. General Services Administration (GSA) Areawide Contracts (AWC). All samples and templates provided in this guide were derived from actual UESC project contract documents and will be available for download on FEMP’s website at https://www.energy.gov/node/850656. Templates in Microsoft Word can be modified to address each agency’s unique acquisition process.

Federal Energy Management Program↗

Evolution of carbide precipitates in 2.25Cr-1Mo steel during long-term service in a power plant.

Carbide precipitation from the steel matrix during long-term high-temperature exposure can adversely affect the fracture toughness and high-temperature creep resistance of materials with implications on the performance of power plant components. In the present work, carbide evolution in 2.25Cr-1Mo steel after long-term aging during service was investigated. Boiler pipe samples of this steel were removed from a supercritical water-cooled coal-fired power plant after service times of 17 and 28 years and a mean operational temperature of 810 K (537C). The carbide precipitation and coarsening effects were studied using the carbon extraction replica technique followed by analysis using transmission electron microscopy and energy dispersive X-ray spectroscopy. The carbides extracted using an electrolytic technique were also analyzed using X-ray diffraction to evaluate phase transformations of the carbides during long-term service. Small ball punch and Vickers hardness were used to evaluate the changes in mechanical performance after long-term aging during service.

36 MATERIALS SCIENCE↗

FPGA-Accelerated Machine Learning Inference as a Service for Particle Physics Computing

Large-scale particle physics experiments face challenging demands for high-throughput computing resources both now and in the future. New heterogeneous computing paradigms on dedicated hardware with increased parallelization, such as Field Programmable Gate Arrays (FPGAs), offer exciting solutions with large potential gains. The growing applications of machine learning algorithms in particle physics for simulation, reconstruction, and analysis are naturally deployed on such platforms. We demonstrate that the acceleration of machine learning inference as a web service represents a heterogeneous computing solution for particle physics experiments that potentially requires minimal modification to the current computing model. As examples, we retrain the ResNet-50 convolutional neural network to demonstrate state-of-the-art performance for top quark jet tagging at the LHC and apply a ResNet-50 model with transfer learning for neutrino event classification. Using Project Brainwave by Microsoft to accelerate the ResNet-50 image classification model, we achieve average inference times of 60 (10) ms with our experimental physics software framework using Brainwave as a cloud (edge or on-premises) service, representing an improvement by a factor of approximately 30 (175) in model inference latency over traditional CPU inference in current experimental hardware. A single FPGA service accessed by many CPUs achieves a throughput of 600–700 inferences per second using an image batch of one, comparable to large batch-size GPU throughput and significantly better than small batch-size GPU throughput. Deployed as an edge or cloud service for the particle physics computing model, coprocessor accelerators can have a higher duty cycle and are potentially much more cost-effective.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The corrosion pattern of reinforcement and its influence on serviceability of reinforced concrete members in chloride environment

This paper deals with two corroded reinforcement concrete beams, which have been stored under sustained load in a chloride environment for 14 and 23 years respectively. The evolution of corrosion pattern of reinforcement and its influence on serviceability are studied. In chloride-induced corrosion process, corrosion cracking affects significantly the corrosion pattern. During the corrosion cracking initiation period, only local pitting corrosion occurs. At early stage of cracking propagation, localized pitting corrosion is still predominant as cracks widths are very small and cracks are not interconnected, but a general corrosion slowly develops as the cracks widen. At late cracking stage, interconnected cracking with wide width develops along large parts of the beam leading to a general corrosion pattern. Macrocells and microcells concepts are used for the interpretation of the results. Mechanical experiments and corrosion simulation tests are performed to clarify the influence of this corrosion pattern evolution on the serviceability of the beams (deflection increase). Experimental results show that, when the corrosion is localized (early cracking stage), the steel-concrete bond loss is the main factor affecting the beams serviceability. The local cross-section loss resulting from pitting attack does not significantly influence the deflection of the beam. When corrosion is generalized (late cracking stage), as the steel-concrete bond is already lost, the generalized steel cross-section reduction becomes the main factor affecting the beams serviceability. But, at this stage, the deflection increase is slower due to the low general corrosion rate.

36 MATERIALS SCIENCE↗

Multi-actor involvement for integrating ecosystem services in strategic environmental assessment of spatial plans

Integrating an ecosystem services (ES) approach into Strategic Environmental Assessment (SEA) of spatial plans potentially enhances the consideration of the value of nature in decision making and policy processes. However, there is increasing concern about the institutional context and a lack of a common understanding of SEA and ecosystem services for adopting them as an integrated framework. This paper addresses this concern by analysing the current understanding and network relations in a multi-actor arrangement as a first step towards a successful integration of ES in SEA and spatial planning. Our analysis focuses on a case study in Chile, where we administered a questionnaire survey to some of the main actors involved in the spatial planning process. The questionnaire focused on issues such as network relations among actors and on conceptual understanding, perceptions and challenges for integrating ES in SEA and spatial planning, knowledge on methodological approaches, and the connections and gaps in the science-policy interface. Our findings suggest that a common understanding of SEA and especially of ES in a context of multiple actors is still at an initial stage in Chile. Additionally, the lack of institutional guidelines and methodological support is considered the main challenge for integration. We conclude that preconditions exist in Chile for integrating ES in SEA for spatial planning, but they strongly depend on appropriate governance schemes that promote a close science-policy interaction, as well as collaborative work and learning. - Highlights: • Linking ecosystem services in SEA is an effective framework for sustainability. • Multi-actor understanding and networks in ecosystem services and SEA were analyzed. • Understanding of SEA and especially of ES is still in an initial stage in Chile. • A lack of institutional guidelines is one of the key challenges for this link.

54 ENVIRONMENTAL SCIENCES↗

Commuter preferences for a first-mile/last-mile microtransit service in the United States

Transportation system models rely heavily upon value of time (VOT) estimates to predict customer behavior. Accurate VOT estimates are particularly vital for planning new services such as on-demand ride hailing or microtransit because customers’ sensitivity to wait time, walk time, and route detour time affects their likelihood of selecting these modes. If an incorrect VOT is assumed during service planning, then ridership will be depressed because of a mismatch between their preferences and how the system is designed. In this paper, we report on the measurement of VOT for microtransit, a shared first-mile/last-mile mobility service, obtained using stated preference microdata from four U.S. cities. Here, we found a median in-vehicle VOT for microtransit of $\$$18.63 (95% CI: $\$$13.39–$\$$24.46) and an access VOT of $\$$75.38 (95% CI: $\$$59.22–$\$$94.96). The former is practically equal to the VOT we found for respondents’ current modes ($\$$20.24, 95% CI: $\$$13.71–$\$$26.94). We also found that men, younger riders, the highly educated, and transit riders are more likely to be interested in microtransit. Since the disutility of time spent on microtransit is not higher than that of other modes, we believe this new service has the potential to attract riders, and particularly if the system is designed with low waiting and walking times.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

CORE: A Global Aggregation Service for Open Access Papers

This paper introduces CORE, a widely used scholarly service, which provides access to the world’s largest collection of open access research publications, acquired from a global network of repositories and journals. CORE was created with the goal of enabling text and data mining of scientific literature and thus supporting scientific discovery, but it is now used in a wide range of use cases within higher education, industry, not-for-profit organisations, as well as by the general public. Through the provided services, CORE powers innovative use cases, such as plagiarism detection, in market-leading third-party organisations. CORE has played a pivotal role in the global move towards universal open access by making scientific knowledge more easily and freely discoverable. In this paper, we describe CORE’s continuously growing dataset and the motivation behind its creation, present the challenges associated with systematically gathering research papers from thousands of data providers worldwide at scale, and introduce the novel solutions that were developed to overcome these challenges. The paper then provides an in-depth discussion of the services and tools built on top of the aggregated data and finally examines several use cases that have leveraged the CORE dataset and services.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Prevalence of Self-Reported Voice Concerns and Associated Risk Markers in a Nonclinical Sample of Military Service Members

Introduction: Difficult communication environments are common in military settings, and effective voice use can be critical to mission success. This study aimed to estimate the prevalence of self-reported voice disorders among U.S. military service members and to identify factors that contribute to their voice concerns. Method: A nonclinical sample of 4,123 active-duty service members was recruited across Department of Defense hearing conservation clinics. During their required annual hearing evaluation, volunteers provided responses to voice-related questions including a slightly adapted version of the Voice Handicap Index-10 (VHI-10) as part of a larger survey about communication issues. Changepoint detection was applied to age and years of service to explore cohort effects in the reporting of voice concerns. Logistic regression analyses examined multiple available factors related to communication to identify factors associated with abnormal results on the VHI-10. Results: Among the respondents, 41% reported experiencing vocal hoarseness or fatigue at least several times per year, and 8.2% ( n = 336) scored above the recommended abnormal cut-point value of 11 on the VHI-10. Factors independently associated with the greatest risk for self-reported voice concerns were sex (female), cadmium exposure, vocal demands (the need for a strong, clear voice), and auditory health measures (frequency of experiencing temporary threshold shifts; self-reported hearing difficulties). Conclusions: Based on self-reported voice concerns and false negative rates reported in the literature, the prevalence of dysphonia in a large sample of active-duty service members is estimated to be 11.7%, which is higher than that in the general population. Certain predictors for voice concerns were expected based on previous literature, like female sex and voice use, but frequency of temporary threshold shifts and exposure to cadmium were surprising. The strong link between voice and auditory problems has particular implications regarding the need for effective communication in high-noise military and other occupational environments.

Audiology & Speech-Language Pathology↗

A two-stage service restoration method for electric power distribution systems

Improving the reliability of power distribution systems is critically important for both utilities and customers. This calls for an efficient service restoration module within a distribution management system to support the implementation of self-healing smart grid networks. Although the emerging smart grid technologies, including distributed generators (DGs) and remote-controlled switches, enhance the self-healing capability and allow faster recovery, they still pose additional complexity to the service restoration problem, especially under cold load pickup (CLPU) conditions. Herein, a novel two-stage restoration framework is proposed to generate a restoration solutions with a sequence of control actions. The first stage generates a restoration plan that supports both the traditional service restoration using feeder reconfiguration and the grid-forming DG-assisted intentional islanding methods. The second stage generates an optimal sequence of switching operations to bring the outaged system quickly to the final restored configuration. The problem is formulated as a mixed-integer linear program that incorporates system connectivity, operating constraints, and the CLPU models. It is demonstrated that on using a multi-feeder test case, the proposed framework is effective in utilizing all available resources to quickly restore the service and generate an optimal sequence of switching actions to be used by the operator to reach the desired optimal configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A new information architecture, website and services for the CMS experiment

The age and size of the CMS collaboration at the LHC means it now has many hundreds of inhomogeneous web sites and services, and hundreds of thousands of documents. We describe a major initiative to create a single coherent CMS internal and public web site. This uses the Drupal web Content Management System (now supported by CERN/IT) on top of a standard LAMP stack (Linux, Apache, MySQL, and php/perl). The new navigation, content and search services are coherently integrated with numerous existing CERN services (CDS, EDMS, Indico, phonebook, Twiki) as well as many CMS internal Web services. We describe the information architecture, the system design, implementation and monitoring, the document and content database, security aspects, and our deployment strategy, which ensured continual smooth operation of all systems at all times.

Taylor, Lucas↗