Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SALT WASTE PROCESSING FACILITY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Optimization of salt-cake removal flowsheet at SRS through incorporation of testing and in-tank waste experience - 15263

Salt-cake removal at SRS may be performed for several reasons: to provide space for evaporator operation (i.e., to precipitate more salt in the drop tank), to provide feed for salt processing (i.e. immobilize the waste), or to remove the salt for tank closure. Many different salt dissolution techniques have been employed in the 40 years that SRS has been performing salt removal, from a basic 'Add, Sit, Remove' method (water is added on top of the salt-cake and time is allowed for diffusion), to performing interstitial liquid removal, or using mixing devices to promote contact with the liquid. Lessons learned from previous salt-cake removal campaigns, in addition to testing and modeling, have led to opportunities for improvements to the overall salt-cake removal process. This includes better understanding of salt properties and behavior during dissolution; the primary concerns for salt dissolution are the release of radiolytic hydrogen and criticality prevention (post-dissolution). Recent developments in salt dissolution include the reuse of dilute supernate and a semi-continuous dissolution (SCD) process, where low volume mixing eductors are used to deliver water near the surface of the salt-cake at the same rate as the salt solution is removed and transferred to a receipt tank. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RESULTS FOR THE FOURTH QUARTER TANK 50 WAC SLURRY SAMPLE: CHEMICAL AND RADIONUCLIDE CONTAMINANT RESULTS

The Saltstone Facility is designed and permitted to immobilize and dispose of low-level radioactive and hazardous liquid waste (salt solution) remaining from the processing of radioactive material at the Savannah River Site. Low-level waste (LLW) streams from the Effluent Treatment Project (ETP), H-Canyon, the DDA (Deliquification, Dissolution, and Adjustment) process, and the decontaminated salt solution product from the Actinide Removal Process/Modular Caustic Side Solvent Extraction (CSSX) Unit (ARP/MCU) process are stored in Tank 50 until the LLW can be transferred to the Saltstone Facility for treatment and disposal. The LLW must meet the specified waste acceptance criteria (WAC) before it is processed into saltstone. The specific chemical and radionuclide contaminants and their respective WAC limits are listed in the current Saltstone WAC. SRS Liquid Waste Operations (LWO) requested that Savannah River National Laboratory (SRNL) perform quarterly analysis on saltstone samples. The concentrations of chemical and radionuclide contaminants are measured to ensure the saltstone produced during each quarter is in compliance with the current WAC. This report documents the concentrations of chemical and radionuclide contaminants for the 2009 Fourth Quarter samples collected from Tank 50 on October 2, 2009 and discusses those results in further detail than the previously issued results report. This report details the chemical and radionuclide contaminant results for the characterization of the 2009 Fourth Quarter sampling of Tank 50 for the Saltstone Waste Acceptance Criteria (WAC). Information from this characterization will be used by Liquid Waste Operations (LWO) to support the transfer of low-level aqueous waste from Tank 50 to the Salt Feed Tank in the Saltstone Facility in Z-Area, where the waste will be immobilized. This information is also used to update the Tank 50 Waste Characterization System. The following conclusions are drawn from the analytical results provided in this report: (1) The concentrations of the reported chemical and radioactive contaminants were less than their respective WAC targets or limits unless noted in this section. (2) The reported detection limit for Isopar L is greater than the limit from Table 3 of the WAC. (3) The reported detection limits for {sup 59}Ni and {sup 94}Nb are above the requested limits from Reference 4. However, they are each below the limits established in Reference 3. (4) The reported detection limit for isopropanol is greater than the requested limit from Table 4 of the WAC. (5) The reported detection limits for {sup 247}Cm and {sup 249}Cf are above the requested limits from Reference 4. However, they are below the limits established in Reference 3. (6) Isopar L and Norpar 13 have limited solubility in aqueous solutions making it difficult to obtain consistent and reliable sub-samples. The values reported in this memo are the concentrations in the sub-sample as detected by the GC/MS; however, the results may not accurately represent the concentrations of the analytes in Tank 50.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tank Closure Cesium Removal Project CST Simulant Cesium Batch Contact Kinetics Test Results and Column Performance Predictions

To evaluate the cesium removal capabilities of the caustic-washed R9120-B version of crystalline silicotitanate (CST) ion exchange media from Savannah River Site (SRS) waste during Tank Closure Cesium Removal (TCCR) column processing, batch contact kinetics tests were performed at 23 °C in SRS Average simulant. Cesium loading kinetics data was also collected (in current and previous testing; King, et al., 2018a) using the same simulant for an older CST sample (IE- 911) which was caustic-washed by the vendor many years ago and was recently retrieved from drums stored at SRS. (Note that R9120-B and IE-911 are believed to be identical materials, after the R9120-B was caustic washed by SRNL, and differ only by particle size and manufacturing date, and thus can be considered different batches). Although cesium loading kinetics testing can be conducted more rigorously using dynamic column tests, the batch contact method requires less simulant and considerably less experimental effort. Average percent removal data for batch contact samples for the two CST batches are provided in Table ES-1. Faster cesium uptake was observed with IE-911, although the loading rates for the two media batches were similar. After 5.5 hours of CST contact, 81% cesium removal was observed with R9120-B versus 86% removal with IE-911. Although these differences are small, the trend is consistent across the timed results, with the larger bead material always loading slower. These seemingly small differences in percent removal are believed to have a large impact on the column performance. Cesium loading curves for the two CST batches are provided in Figure ES-1 below. Faster cesium loading with IE-911 CST is presumed to be associated with the smaller average particle diameter (408 μm mean volume diameter) versus R9120-B (572 μm diameter). Cesium loading kinetic data was needed to conduct column performance comparisons (i.e., model predictions) for the two CST batches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimization of Saltcake Removal Flowsheet at SRS through Incorporation of Testing and In-Tank Waste Experience

Saltcake removal at SRS may be performed for several reasons: to provide space for evaporator operation (i.e., to precipitate more salt in the drop tank), to provide feed for salt processing (i.e. immobilize the waste), or to remove the salt for tank closure. Many different salt dissolution techniques have been employed in the 40 years that SRS has been performing salt removal, from a basic “Add, Sit, Remove” method (water is added on top of the saltcake and time is allowed for diffusion), to performing interstitial liquid removal, or using mixing devices to promote contact with the liquid. Lessons learned from previous saltcake removal campaigns, in addition to testing and modeling, have led to opportunities for improvements to the overall saltcake removal process. This includes better understanding of salt properties and behavior during dissolution; the primary concerns for salt dissolution are the release of radiolytic hydrogen and criticality prevention (post-dissolution). Recent developments in salt dissolution include the reuse of dilute supernate and a semi-continuous dissolution (SCD) process, where low volume mixing eductors are used to deliver water near the surface of the saltcake at the same rate as the salt solution is removed and transferred to a receipt tank.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the Fourth Quarter Calendar Year 2015 Tank 50H Salt Solution Sample

In this memorandum, the chemical and radionuclide contaminant results from the Fourth Quarter Calendar Year 2015 (CY15) sample of Tank 50H salt solution are presented in tabulated form. The Fourth Quarter CY15 Tank 50H samples were obtained on October 29, 2015 and received at Savannah River National Laboratory (SRNL) on October 30, 2015. The information from this characterization will be used by Defense Waste Processing Facility (DWPF) & Saltstone Facility Engineering for the transfer of aqueous waste from Tank 50H to the Salt Feed Tank in the Saltstone Production Facility, where the waste will be treated and disposed of in the Saltstone Disposal Facility. This memorandum compares results, where applicable, to Saltstone Waste Acceptance Criteria (WAC) limits and targets. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals will be documented at a later time per the Task Technical and Quality Assurance Plan (TTQAP) for the Tank 50H saltstone task. The chemical and radionuclide contaminant results from the characterization of the Fourth Quarter Calendar Year 2015 (CY15) sampling of Tank 50H were requested by SRR personnel and details of the testing are presented in the SRNL Task Technical and Quality Assurance Plan.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DEMONSTRATION OF THE DWPF FLOWSHEET IN THE SRNL SHIELDED CELLS USING ARP PRODUCT SIMULANT AND SB4 TANK 40 SLUDGE SLURRY

The radioactive startup of two new SRS processing facilities, the Actinide Removal Process (ARP) and the Modular Caustic-Side-Solvent-Extraction Unit (MCU) will add two new waste streams to the Defense Waste Processing Facility (DWPF). The ARP will remove actinides from the 5.6 M salt solution resulting in a sludge-like product that is roughly half monosodium titanate (MST) insoluble solids and half sludge insoluble solids. The ARP product will be added to the Sludge Receipt and Adjustment Tank (SRAT) at boiling and dewatered prior to pulling a SRAT receipt sample. The cesium rich MCU stream will be added to the SRAT at boiling after both formic and nitric acid have been added and the SRAT contents concentrated to the appropriate endpoint. A concern was raised by an external hydrogen review panel that the actinide loaded MST could act as a catalyst for hydrogen generation (Mar 15, 2007 report, Recommendation 9). Hydrogen generation, and it's potential to form a flammable mixture in the off-gas, under SRAT and Slurry Mix Evaporator (SME) processing conditions has been a concern since the discovery that noble metals catalyze the decomposition of formic acid. Radiolysis of water also generates hydrogen, but the radiolysis rate is orders of magnitude lower than the noble metal catalyzed generation. As a result of the concern raised by the external hydrogen review panel, hydrogen generation was a prime consideration in this experiment. Testing was designed to determine whether the presence of the irradiated ARP simulant containing MST caused uncontrolled or unexpected hydrogen production during experiments simulating the DWPF Chemical Process Cell (CPC) due to activation of titanium. A Shielded Cells experiment, SC-5, was completed using SB4 sludge from Tank 405 combined with an ARP product produced from simulants by SRNL researchers. The blend of sludge and MST was designed to be prototypic of planned DWPF SRAT and SME cycles. As glass quality was not an objective in this experiment, no vitrification of the SME product was completed. The results from this experiment were compared to the results from experiment SC-1, a similar experiment with SB4 sludge without added ARP product. This report documents: (1) The preparation and subsequent composition of the ARP product. (2) The preparation and subsequent compositional characterization of the SRAT Receipt sample. Additional details will be presented concerning the noble metal concentration of the ARP product and the SRAT receipt sample. Also, calculations related to the amount of formic and nitric acid added during SRAT processing will be presented as excess formic acid will lead to additional hydrogen generation. (3) Highlights from processing during the SRAT cycle and SME cycle (CPC processing). Hydrogen generation will be discussed since this was the prime objective for this experiment. (4) A comparison of CPC processing between SC-1 (without ARP simulant) and SC-5. This work was controlled by a Task Technical and Quality Assurance Plan (TTQAP)6, and analyses were guided by an Analytical Sample Support Matrix (ASSM)7. This Research and Development (R&D) was completed to support operation of DWPF.

08 HYDROGEN↗

RESULTS FOR THE SECOND QUARTER 2011 TANK 50 WAC SLURRY SAMPLE: CHEMICAL AND RADIONUCLIDE CONTAMINANT RESULTS

The Saltstone Facility is designed and permitted to immobilize and dispose of low-level radioactive and hazardous liquid waste (salt solution) remaining from the processing of radioactive material at the Savannah River Site. Low-level waste (LLW) streams from the Effluent Treatment Project (ETP), H-Canyon, the DDA (Deliquification, Dissolution, and Adjustment) process, and the decontaminated salt solution product from the Actinide Removal Process/Modular Caustic Side Solvent Extraction (CSSX) Unit (ARP/MCU) process are stored in Tank 50 until the LLW can be transferred to the Saltstone Facility for treatment and disposal. The LLW must meet the specified waste acceptance criteria (WAC) before it is processed into saltstone. The specific chemical and radionuclide contaminants and their respective WAC limits are listed in the current Saltstone WAC. Waste Solidification Engineering (WSE) requested that Savannah River National Laboratory (SRNL) perform quarterly analysis on saltstone samples. The concentrations of chemical and radionuclide contaminants are measured to ensure the saltstone produced during each quarter is in compliance with the current WAC. This report documents the concentrations of chemical and radionuclide contaminants for the 2011 Second Quarter samples collected from Tank 50 on April 4, 2011 and discusses those results in further detail than the previously issued results report. The following conclusions are drawn from the analytical results provided in this report: (1) The concentrations of the reported chemical and radioactive contaminants were less than their respective WAC targets or limits unless noted in this section. (2) The reported detection limit for {sup 59}Ni is above the requested limit from Reference 2 but below the established limit in Reference 3. (3) The reported detection limit for {sup 94}Nb is above the requested limit from Reference 2; however, it is below the established limits in Reference 3. (4) The reported concentration of {sup 242m}Am is above the target in Listed in Attachment 8.4 of the Saltstone WAC. (5) {sup 247}Cm and {sup 249}Cf are above the requested limits from Reference 2. However, they are below the limits established in Reference 3. (6) The reported detection limit for Norpar 13{sup 5} is greater than the limit from Table 4 and Attachment 8.2 of the WAC. (7) The reported detection limit for Isopar L is greater than the limit from Table 3 of the WAC. (8) Isopar L and Norpar 13 have limited solubility in aqueous solutions making it difficult to obtain consistent and reliable sub-samples. The values reported in this memo are the concentrations in the sub-sample as detected by the instrument; however, the results may not accurately represent the concentrations of the analytes in Tank 50.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Actinide Removal Process October 2014 Sample Analysis

Filtration within the Actinide Removal Process (ARP) currently limits the throughput in interim salt processing at the Savannah River Site. In this process, batches of salt solution with Monosodium Titanate (MST) sorbent are concentrated by crossflow filtration. The filtrate is subsequently processed to remove cesium in the Modular Caustic Side Solvent Extraction Unit (MCU) followed by disposal in saltstone grout. The concentrated MST slurry is washed and sent to the Defense Waste Processing Facility (DWPF) for vitrification. During past ARP processing, there has been a degradation of filter performance manifested as the inability to maintain high filtrate flux throughout a multi-batch cycles during Salt Batches 6, 5 and 4. The objectives of the current effort for Salt Batch 7 samples, which are similar to the most recent ARP sample analysis from 2013, were to characterize the feed streams, to determine if solids (in addition to MST) are precipitating and causing the degraded performance of the filters, and to assess the particle size and rheological data to address potential filtration impacts. The samples from the LWPT and LWHT were obtained from several stages of processing of Salt Batch 7B, Cycle 1, Batch 67.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Path to Nitrate Salt Disposition

The topic is presented in a series of slides arranged according to the following outline: LANL nitrate salt incident as thermal runaway (thermally sensitive surrogates, full-scale tests), temperature control for processing, treatment options and down selection, assessment of engineering options, anticipated control set for treatment, and summary of the overall steps for RNS.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SULFATE SOLUBILITY LIMIT VERIFICATION FOR DWPF SLUDGE BATCH 7A

During processing at the Defense Waste Processing Facility (DWPF), high sulfate concentrations in the feed are a concern to DWPF as it can lead to the formation of a detrimental, sulfate-rich, molten salt phase on the surface of the glass melt pool. To avoid these issues, a sulfate concentration limit was implemented into the Product Composition Control System (PCCS). Related to SB7a frit development efforts, the Savannah River National Laboratory (SRNL) assessed the viability of using the current 0.6 wt % SO{sub 4}{sup 2-} limit set for SB6 (in glass) and the possibility of increasing the SO{sub 4}{sup 2-} solubility limit in PCCS to account for anticipated sulfur concentrations, targeted waste loadings, and inclusion of secondary streams (e.g., Actinide Removal Process (ARP)) with two recommended frits (Frit 418 and Frit 702) for SB7a processing. For a nominal SB7a blend with a 63 inch SB6 heel remaining in Tank 40 (projection SB7a-63), a 0.60 wt% SO{sub 4}{sup 2-} in glass limit was determined for waste loadings of 34 wt% up to 40 wt% with Frit 418 based on crucible melts with batched chemicals. SRNL also examined the inclusion of ARP for the same blending scenario (SB7a-63-ARP) with Frit 418 and at least a 0.6 wt% SO{sub 4}{sup 2-} level, and waste loadings of 34 wt% to 40 wt% were also acceptable. When a visible yellow and/or white sulfate salt layer was visible on the surface of any cooled glass, it was assumed to have surpassed the solubility limit of SO{sub 4}{sup 2-} for that particular composition. All of the glasses fabricated at these concentrations did not exhibit a sulfate rich salt layer on the surface of the glass melt and retained the majority of the batched SO{sub 4}{sup 2-}. At higher levels of SO{sub 4}{sup 2-} 'spiked' into the projected sludge compositions over the aforementioned interval of waste loadings, with Frit 418, low viscosity sulfur layers were observed on the surface of glass melts which confirm exceeding the solubility limit. The same sludge scenarios were also tested with Frit 702 and all glasses did not exhibit sulfur layers on the surfaces of the glass melts at spiking levels up to 0.80 wt% SO{sub 4}{sup 2-}. An ultimate SO{sub 4}{sup 2-} limit was not defined with Frit 702, but if projected SO{sub 4}{sup 2-} concentrations are expected to increase with the onset of SB7a processing, a higher limit is achievable with Frit 702 than is achievable with Frit 418. Given the anticipated concentration of SO{sub 4}{sup 2-} for SB7a, a SO{sub 4}{sup 2-} limit of 0.6 wt % SO{sub 4}{sup 2-} is recommended for processing using Frit 418. Once the confirmed SB7a composition is known and should a higher limit be needed, SRNL can re-evaluate the limit based on the actual composition and provide an updated recommendation. It has been observed that higher levels of SO{sub 4}{sup 2-} in glass can be retained with compositional changes to the frit, as was demonstrated by the glasses fabricated using Frit 702. SRNL also recommends the continuation of studies to define a more 'global' sulfate concentration limit to account for future sludge batch composition uncertainties.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Proposed guidance for preparing and reviewing a molten salt non-power production or utilization facility application

Development of non-power molten salt reactors (MSRs) are under consideration to further establish an MSR experience base, support the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.43(e), and provide any additional analyses needed for development of a full-scale MSR. Guidance provided in this report is based on MSRs operating with liquid fuel (i.e., fuel dissolved within a molten salt). These reactors, unless owned by the DOE or DOD, will require licensing by the US Nuclear Regulatory Commission (NRC) staff. Standard review plan (SRP) guidance for large light water reactors (LWRs) is available in NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants; Light Water Reactor (LWR) Edition. However, NRC staff observed that NUREG-0800 is very cumbersome to apply to non-power reactors “because of the great differences in complexity and hazards between non-power reactors and nuclear power plants.” Therefore, a program to develop performance-based guidance applicable to non-power reactors was initiated. In 1996, NUREG-1537, Parts 1 and 2, Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors, was published. Part 1, the format and content guide, suggests a uniform format for presenting information in non-power reactor applications that is acceptable to the NRC staff, but conformance with the format and content is not required. Part 2, the SRP, ensures the quality and uniformity of the staff review of an application. Unfortunately, the application guidelines and SRP do not provide adequate guidance for all advanced non-LWR technologies and applications. This discrepancy eventually led to the 2012 development of interim staff guidance (ISG) for NUREG-1537, which includes criteria for describing and reviewing aqueous homogeneous reactors (AHRs). Specifically, NUREG-1537 ISG, 2012 expanded the original document to address three areas: 1. updated criteria for heterogeneous non-power reactors, 2. criteria for licensing AHRs, and 3. criteria for licensing a Part 50-licensed isotope production facility. In 2015, the US Department of Energy (DOE) opted to build on the AHR NUREG-1537 ISG experience by performing a gap analysis of the guidance that would be used to license a non-power MSR. MSRs represent one of the advanced non-LWR technologies selected by DOE for development through a multiyear cost share award with Southern Company Services. Under this Advanced Reactor Concepts 2015 (DOE Advanced Reactor Concepts [ARC] 15) award program, the DOE tasked Oak Ridge National Laboratory (ORNL) to evaluate the guidance changes that the NRC may need to consider when licensing an MSR non-power reactor. ORNL staff, with support from Boston Government Services, LLC, focused on five system-related chapters in NUREG-1537 that were considered most relevant to inform the effort that would be required for a non-power MSR applicant. ORNL documented this review in a technical report, ORNL/TM-2018/834, Proposed Guidance for Preparing and Reviewing Molten Salt Non-Power Reactor License Applications (NUREG-1537). The report was subsequently shared with industry and the NRC. The 2018 review was limited in scope, focusing on key system chapters based on the expected significance of each chapter relative to expected differences in addressing advanced non-LWR technologies, specifically non-power MSRs, compared with heterogeneously fueled non-power reactors. In the ORNL report, proposed generic adaptations were suggested for the following NUREG-1537 chapters: Chapter 4, “Reactor Description”; Chapter 5, “Reactor Coolant Systems”; Chapter 6, “Engineered Safety Features”; Chapter 9, “Auxiliary Systems”; Chapter 11, “Radiation Protection Program and Waste Management” The inclusion of Chapter 11 in the previous review effort was intended to provide guidance for categorizing the waste-handling process for an MSR operating with homogenous fuel. The introductions from Parts 1 and 2 of the 2012 NUREG-1537 ISG provide guidance for the application and review of production facilities. After a period of operation, non-power MSRs with homogenous fuel will include gaseous and soluble fission products. The gaseous fission products will be collected and held for decay in an off-gas system. There might also be an initiative to polish or filter the soluble fission products in the fuel salt by some mechanical or chemical means. The treatment and handling of fission products in the non-power MSR fuel salt and the description of this process in the safety analysis report (SAR) must be very precise to avoid the waste treatment facility being construed as a co-located special nuclear material (SNM) fuel cycle facility (see Section 2.3 of this report). Subsequent to the release of ORNL/TM-2018/834, NRC staff expressed a desire to continue the regulatory gap analysis that was begun in that report. This would provide additional clarity and information addressed in certain sections of the original report, while also providing new guidance on certain topics not addressed in the original report. This revision would benefit the NRC staff reviewing applications involving non-power MSR designs and would help developers understand how the NRC staff might approach the review of such applications. The focus of this report is to provide infrastructure support to the NRC staff for the regulatory review of non-power MSRs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

I-NERI Annual Technical Progress Report 2007-004-K Development and Characterization of New High-Level Waste Forms for Achieving Waste Minimization from Pyroprocessing

The current method for the immobilization of fission products that accumulate in electrorefiner salt during the electrochemical processing of used metallic nuclear fuel is to encapsulate the electrorefiner salt in a glass-bonded sodalite ceramic waste form. This process was developed by Argonne National Laboratory in the USA and is currently performed at the Idaho National Laboratory for the treatment of Experimental Breeder Reactor-II (EBR-II) used fuel. This process utilizes a “once-through” option for the disposal of spent electrorefiner salt; where, after the treatment of the EBR-II fuel, the electrorefiner salt containing the active fission products will be disposed of in the ceramic waste form (CWF). The CWF produced will have low fission product loading of approximately 2 to 5 weight percent due to the limited fuel inventory currently being processed. However; the design and implementation of advanced electrochemical processing facilities to treat used fuel would process much greater quantities fuel. With an advanced processing facility, it would be necessary to selectively remove fission products from the electrorefiner salt for salt recycle and to concentrate the fission products to reduce the volume of high-level waste from the treatment facility. The Korean Atomic Energy Research Institute and the Idaho National Laboratory have been collaborating on I-NERI research projects for a number of years to investigate both aspects of selective fission product separation from electrorefiner salt, and to develop advanced waste forms for the immobilization of the collected fission products. The first joint KAERI/INL I-NERI project titled: 2006-002-K, Separation of Fission Products from Molten LiCl-KCl Salt Used for Electrorefining of Metal Fuels, was successfully completed in 2009 by concentrating and isolating fission products from actual electrorefiner salt used for the treated used EBR-II fuel. Two separation methods were tested and from these tests were produced concentrated salt products that acted as the feed material for development of advanced waste forms investigated in this proposal. Accomplishments from the first year activities associated with this I-NERI project included the down selection of candidate waste forms to immobilize fission products separated from electrorefiner salt, and the design of equipment to fabricate actual waste forms in the Hot Fuels Examination Facility (HFEF) at the INL. Reported in this document are accomplishments from the second year (FY10) work performed at the INL, and includes the testing of waste form fabrication equipment, repeating the fission product precipitation experiment, and initial waste form fabrication efforts.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Daher-TLI UCSC Wash Process - Lessons Learned from Handling a Legacy Cylinder - 16506

The Daher-TLI UF{sub 6} Cylinder Service Center (UCSC) began operation in 2013 and functions as a dedicated wash, re-certification, storage and disposal facility for 122 cm uranium hexafluoride (UF{sub 6}) cylinders. The primary purpose of the facility is to provide cylinder cleaning and re--certification services to the UF{sub 6} industry for cylinders that previously contained natural or depleted UF6. The facility also has the ability to recover most of the uranium in the form of uranyl peroxide (UO{sub 4}) or triuranium octoxide (U{sub 3}O{sub 8}). Small residues of UF{sub 6} (commonly referred to as a heel) from natural cylinders are removed and treated in a patented three-step purification process that recovers U{sub 3}O{sub 8} that meets the ASTM specification. The wastewater ordinarily contains a mixture of sodium salts (77% sodium sulfate, 23% sodium nitrate) along with minute traces of uranium (1 - 2 mg/L) and fluoride (10 - 20 mg/L). Over a period of 6 months, lab analyses were performed on the filtrate from a legacy cylinder in an attempt to separate uranium and fluoride from this stream. These pilot results established near quantitative recovery of uranium (< 1 mg/L) and near complete separation of fluorides (5 - 15 mg/L). This paper follows the efforts of the Daher-TLI UCSC to process the abnormal heeled UF{sub 6} cylinder. This paper also documents the lessons learned from this experience and how those lessons were used to improve the UCSC wash process. These modifications served to recover 99.87% of the input uranium as UO{sub 4} while simultaneously creating a waste stream with only trace amounts of impurities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Waste Glasses: Beautiful Simplicity of Complex Systems

The behavior of glasses with a large number of components, such as waste glasses, is not more complex than the behavior of simple glasses. On the contrary, the presence of many components restricts the composition region of these glasses in a way that allows approximating composition-property relationships by linear functions. This has far-reaching practical consequences for formulating nuclear waste glasses. On the other hand, processing high-level and low-activity waste glasses presents various problems, such as crystallization, foaming, and salt segre-gation in the melter. The need to decrease the settling of solids in the melter to an acceptable level and to maximize the rate of melting presents major challenges to processing technology. However, the most important property of the glass product is its chemical durability, a somewhat vague concept in lieu of the assessment of the glass resistance to aqueous attack while the radioactivity decays over tens of thousands of years.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Qualification of Processing Batches for Tank Closure Cesium Removal Through In-Tank Batch Contact Testing - 20470

The Tank Closure Cesium Removal (TCCR) process at the Savannah River Site (SRS) is currently processing waste from Tank 10H, generating decontaminated salt solution that is sent to Tank 11H. Transfers out of Tank 11H are then disposed of on site as a grout wasteform in the SRS Saltstone Processing Facility. This is a full-scale demonstration of the use of Crystalline Silicotitanate (CST) for the decontamination of aqueous nuclear waste supernate. CST primarily removes cesium from the high sodium alkaline feed, but also adsorbs strontium, actinides, and some other trace metals. The TCCR unit is an at-tank set of four ion exchange columns, with two typically being operated in series during waste processing. Tank 10H is serving a dual function as both the salt dissolution tank as well as the feed tank for the TCCR system. Prior to operation of TCCR, Tank 10H must undergo dissolution campaigns, dissolving the salt cake to form an aqueous salt solution (supernate). After each dissolution campaign, the supernate created must be qualified prior to processing through the TCCR system. Qualification includes detailed characterization of the supernate as well as in-tank batch contact tests to determine the equilibrium loading of Cs-137 on the CST ion exchange media (IONSIV{sup TM} R9120-Ba). In support of the in-tank batch contact testing, Savannah River National Laboratory (SRNL) developed a CST sample holder, also referred to as a 'tea-bag', to hold a measured amount (∼0.1 grams) of pretreated CST between stainless steel screens. The tea-bag fits within a standard stainless steel sample vial that has been modified to allow the flow of supernate to the CST. This sample holder is then immersed in the waste tank allowing free contact between the CST beads and the surrounding liquid, at an effectively infinite liquid-to-solid phase ratio. A pair of tea-bags are deployed in the tank for a period of 10 days for each batch, after which the CST is recovered, digested, and analyzed to determine the loading of cesium isotopes on the CST. This result then supports the TCCR column thermal loading limits for processing as part of the TCCR safety basis. This paper will discuss the design and testing of the CST sample holder, as well as results from the first few batches of waste qualified and subsequently processed through the TCCR system. In addition, results from analyses of Tank 11H samples, showing decontamination of the product will be included. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RESULTS FOR THE THIRD QUARTER 2011 TANK 50 WAC SLURRY SAMPLE: CHEMICAL AND RADIONUCLIDE CONTAMINANT RESULTS

The Saltstone Facility is designed and permitted to immobilize and dispose of low-level radioactive and hazardous liquid waste (salt solution) remaining from the processing of radioactive material at the Savannah River Site. Low-level waste (LLW) streams from the Effluent Treatment Project (ETP), H-Canyon, and the decontaminated salt solution product from the Actinide Removal Process/Modular Caustic Side Solvent Extraction (CSSX) Unit (ARP/MCU) process are stored in Tank 50 until the LLW can be transferred to the Saltstone Facility for treatment and disposal. The LLW must meet the specified waste acceptance criteria (WAC) before it is processed into saltstone. The specific chemical and radionuclide contaminants and their respective WAC limits are in the current Saltstone WAC. Waste Solidification Engineering (WSE) requested that Savannah River National Laboratory (SRNL) perform quarterly analysis on saltstone samples. The concentrations of chemical and radionuclide contaminants are measured to ensure the saltstone produced during each quarter is in compliance with the current WAC. This report documents the concentrations of chemical and radionuclide contaminants for the 2011 Third Quarter samples collected from Tank 50 on July 7, 2011 and discusses those results in further detail than the previously issued results report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the Fourth Quarter 2011 Tank 50 WAC Slurry Sample: Chemical and Radionuclide Contaminant Results

The Saltstone Facility is designed and permitted to immobilize and dispose of low-level radioactive and hazardous liquid waste (salt solution) remaining from the processing of radioactive material at the Savannah River Site. Low-level waste (LLW) streams from the Effluent Treatment Project (ETP), H-Canyon, and the decontaminated salt solution product from the Actinide Removal Process/Modular Caustic Side Solvent Extraction (CSSX) Unit (ARP/MCU) process are stored in Tank 50 until the LLW can be transferred to the Saltstone Facility for treatment and disposal. The LLW must meet the specified waste acceptance criteria (WAC) before it is processed into saltstone. The specific chemical and radionuclide contaminants and their respective WAC limits are in the current Saltstone WAC. Waste Solidification Engineering (WSE) requested that Savannah River National Laboratory (SRNL) perform quarterly analysis on saltstone samples. The concentrations of chemical and radionuclide contaminants are measured to ensure the saltstone produced during each quarter is in compliance with the current WAC. This report documents the concentrations of chemical and radionuclide contaminants for the 2011 Fourth Quarter samples collected from Tank 50 on October 12, 2011 and discusses those results in further detail than the previously issued results report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SALTSTONE PROCESSING FACILITY TRANSFER SAMPLE

On May 19, 2010, the Saltstone Production Facility inadvertently transferred 1800 gallons of untreated waste from the salt feed tank to Vault 4. During shut down, approximately 70 gallons of the material was left in the Saltstone hopper. A sample of the slurry in the hopper was sent to Savannah River National Laboratory (SRNL) to analyze the density, pH and the eight Resource Conservation and Recovery Act (RCRA) metals. The sample was hazardous for chromium, mercury and pH. The sample received from the Saltstone hopper was analyzed visually while obtaining sample aliquots and while the sample was allowed to settle. It was observed that the sample contains solids that settle in approximately 20 minutes (Figure 3-1). There is a floating layer on top of the supernate during settling and disperses when the sample is agitated (Figure 3-2). The untreated waste inadvertently transferred from the SFT to Vault 4 was toxic for chromium and mercury. In addition, the pH of the sample is at the regulatory limit. Visually inspecting the sample indicates solids present in the sample.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗