STRUCTURAL DESIGN AND PERMITTING FOR SOLAR ROOFTOP INSTALLATIONS.
Abstract Not Provided
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract Not Provided
Abstract Not Provided
This fact sheet discusses the causes and consequences of incorrect RTU sizing (with respect to cooling tonnage and supply fan horsepower) and points to resources that can help ensure accurate sizing calculations.
Emerging Technologies Project for the 2013 Building Technologies Office's Program Peer Review
Building Technologies Office's commercial building integration project 2013
Emerging Technologies Project for the 2013 Building Technologies Office's Program Peer Review
Building Technologies Office's commercial building integration project 2013
Explore the source record for details and available documents.
Abstract not provided.
The software was developed to realize the precise control of the in-plane rotation and fixed-tilt motions, to drive the lens arrays accurately following the sun for the CPV module prototype.
Abstract not provided.
Learn about the NREL-developed software Preconfiguring & Controlling Inverter Set-Points (PRECISE), which helps utilities identify optimal inverter modes and settings for distributed PV. PRECISE is a standalone system that allows utility engineers to seamlessly interconnect PV generation, significantly cutting the wait time and costs for customers.
In 2014, the Mickey Leland Federal Building in Houston, Texas installed a 192 kW PV system on top of its parking structure. To monitor and optimize its performance, the General Services Administration, which manages the site, responded to the Federal Energy Management Program’s request for federal agency participation in the Federal Energy Management Program Solar PV Performance Initiative.
Fact sheet describes evaluating and optimizing a PV system on the Mickey Leland Federal Building.
Abstract not provided.
Explore the source record for details and available documents.
A roof top cooling unit has an evaporative cooling section that includes at least one evaporative module that pre-cools ventilation air and water; a condenser; a water reservoir and pump that captures and re-circulates water within the evaporative modules; a fan that exhausts air from the building and the evaporative modules and systems that refill and drain the water reservoir. The cooling unit also has a refrigerant section that includes a compressor, an expansion device, evaporator and condenser heat exchangers, and connecting refrigerant piping. Supply air components include a blower, an air filter, a cooling and/or heating coil to condition air for supply to the building, and optional dampers that, in designs that supply less than 100% outdoor air to the building, control the mixture of return and ventilation air.
No abstract prepared.