Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Risk Mitigation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Prototype HB650 Transportation Validation For The PIP-II Project

The PIP-II Project at Fermilab is centered around a superconducting 800 MeV proton linac to upgrade and modernize the Fermilab accelerator complex, allowing increased beam current to intensity frontier experiments such as LBNF-DUNE. PIP-II includes strong international collaborations, including the delivery of 12 cryomodules from European labs to FNAL (3 from STFC-UKRI in the UK and 9 from CEA in France). The transatlantic shipment of these completed modules is identifed as a serious risk for the project. To mitigate this risk, a rigorous and systematic process has been developed to design and validate a transport system, including specifcation, procedures, logistics, and realistic testing. This paper will detail the engineering process used to manage this effort across the collaboration and the results of the first major validation testing of the integrated shipping system prior to use with a cryomodule.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Securing The Future: 2026 Manufacturing & Critical Infrastructure Threat Landscape

This report outlines the current state of manufacturing weaknesses introduced by the complexities of modern environments, including cloud services and Internet of Things (IoT) devices, with particular attention paid to the unique vulnerabilities encountered by SMMs. It also highlights CyManII’s strategic initiatives and collaborative solutions to mitigate these risks and strengthen the cybersecurity posture of the manufacturing ecosystem. Utilizing data from 2025 to inform forward-looking mitigation strategies, this report provides manufacturers with a clear understanding of both current and emerging cybersecurity threats, as well as practical opportunities to strengthen their cyber ecosystems. The following sections detail key vulnerabilities and threat vectors, along with actionable mitigation strategies, many of which have been developed or piloted through CyManII-led efforts. A thorough understanding of these risks and mitigation strategies is essential for manufacturers seeking to strengthen the security and resilience of their manufacturing operations.

3D Printing↗

Threat Landscape for BESS and IBR

The cyber risk landscape for BESS and IBR can be broken up by threats, vulnerabilities, and consequences for these systems. This presentation walks through the cyber risk landscape for BESS through the lens of consequence-informed awareness and mitigation for each risk factor. Threats with varying capabilities have been demonstrated in real-world events. Though threat actors can rarely be directly influenced by organizations, exposure of systems to adversaries can be limited (a known issue with IBR systems) to reduce likelihood of adversaries accessing systems with disruptive consequences. Common trends in disclosed IBR vulnerabilities include weak password generation or managements for various devices or services and web portal vulnerabilities that provide unauthorized access to data or capabilities or elevated user privileges. Understanding these common vulnerabilities and considering the consequences if these types of vulnerabilities were to occur can help mitigate risk. Consequences range from loss-of-view events that have no reliability impact to asset damage or grid stability impacts. Five case studies are briefly shared to highlight trends in real-world events affecting IBR.

14 - SOLAR ENERGY↗

Decision Support Tool for Solar Energy Cybersecurity Policy and Regulation

The Decision Support Tool helps users address four discrete challenges: (1) complex requirements of relevant codes and standards, (2) technical complexity of solar assets, (3) undefined cyber risk severity, and (4) unclear roles and responsibilities. Content includes an analysis of cyber vulnerability risks, a decision support resource for policymakers to mitigate cyber risks to solar photovoltaic systems, and background resources for informing policy development. A key component of this tool is the Probable Risk Assessment (PRA), based on established, formal variables, models, and consequences, which helps users understand the determined risk and assigned ownership of the physical components. It helps states draw logical lines between vulnerabilities and mitigative solutions, of which some have been further detailed as Cybersecurity Advisory Team for State Solar (CATSS) tools.

14 SOLAR ENERGY↗

General Failure Modes and Effects Analysis for Accelerator and Detector Magnet Design at JLab

The aim of this article is to develop a risk management procedure, which could be applied to the magnet design process, for both superconducting and normal magnets at the Jefferson Laboratory (JLab). This procedure allowed us to identify the key risks at each of the critical phases of design and propose procedures, tests, and checks to mitigate each risk. In this article, we present a qualitative and quantitative risk management procedure commonly referred to a “failure modes and effects analysis.” As part of this procedure, we calculated a risk priority number (RPN) for each activity of the process, identified the most critical activities and proposed mitigation activities, which in turn resulted in a revised RPN. Additionally, another benefit of this procedure was the identification of appropriate “control and hold” points within the design process, which allowed one to review and approve a particular outcome before proceeding to the next sequential activity.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Multidimensional Modeling of Mixture Formation in a Hydrogen-Fueled Heavy-Duty Optical Engine With Direct Injection

Hydrogen (H 2 ), as a carbon-free fuel, is considered as one of the most promising solutions to reduce the carbon footprint of hard-to-decarbonize energy and transportation sectors. As such, hydrogen-fueled internal combustion engines (H 2 ICEs) have recently been receiving increasing attention, particularly in applications such as on-road/off-road heavy-duty transport and combined heat and power. The direct injection (DI) of gaseous hydrogen into the combustion chamber offers great potential for achieving high power density and high engine efficiency, while mitigating the risk of backfire and reducing pre-ignition. However, the numerical simulation of H 2 DI system remains a formidable challenge associated with the high computational cost of reproducing compressible supersonic flow and shocks in narrow injector passages and in near-nozzle regions. In general, there is a lack of well-established and validated practices for the modeling of high-pressure H 2 DI in large-bore engines. Here, to this end, this study focuses on computational fluid dynamics (CFD) modeling of the mixture formation process in a heavy-duty optical engine employing a medium-pressure H 2 DI system. Both large eddy simulations (LES) and Reynolds Averaged Navier–Stokes (RANS) simulations are performed and evaluated against optical data. Gaseous hydrogen is injected into the combustion chamber via a centrally located outward opening hollow-cone injector at a pressure of 40 bar. Simulations are carried out for two injection timings, namely, −120 and −60 °CA. The numerical predictions for H 2 distribution in different horizontal and vertical planes during the compression stroke are systematically compared against optical data obtained through planar laser-induced fluorescence (PLIF) measurements. Overall, the LES approach using the Dynamic Structure model is found to have good predictive capabilities for the early jet penetration in terms of length and shape, as well as the later H 2 distributions. However, the unsteady RANS approach with the renormalization group $k - ϵ$ model, which is widely used by industry to model heavy-duty ICEs, significantly underpredicts the H 2 mixing, even at similar mesh resolution to that used in LES. These results indicate that there is a need for the improvement of mixing submodels within the RANS approach when applied to H 2 DI simulations.

LES↗

Securing Digital Energy Infrastructure: Procurement, Contracting, and Supply Chain Risk Management Guidance

Recognizing the scale of this industry challenge, the United States (U.S.) Department of Energy (DOE) Grid Deployment Office (GDO) and Cybersecurity Energy Security & Emergency Response office have launched a multi-year BESS supply chain security initiative to identify consequence-driven approaches to addressing BESS supply chain security and provide resources to support prioritization of supply chain security efforts associated with the procurement of BESS equipment and services. This guide is one element of the supporting resources to be provided and sets forth a framework and guidance for procurement bidding, selection, risk analysis, and agreements stakeholders can implement to mitigate cybersecurity risks across the entirety of battery system component ecosystem, including the interconnected software and hardware required for control and monitoring BESSs.

25 ENERGY STORAGE↗

Combined Meteorological and Hydrologic Uncertainties Shape Projections of Future Soil Moisture in the Eastern United States

Physical hazards pose risks to many critical systems. Designing adaptive measures to mitigate these risks is challenging due to large uncertainties in modeling future hazards and the associated sectoral responses. Here, we help address this challenge in a hydrologic context by examining the combined role of meteorological forcing and hydrologic parameter uncertainties in shaping projections of future soil moisture. By encoding a simple conceptual water balance model in a differentiable programming framework, we facilitate fast runtimes and an efficient calibration, enabling an improved uncertainty analysis. We characterize uncertainty in model parameters by calibrating against different target data sets and by using several loss functions. We then convolve the resulting parameter ensemble with a set of Earth system model projections to produce a large ensemble (2,340 members) of daily soil moisture simulations. Focusing on the eastern United States, we find that most ensemble members project a drying of soils across the region, although some simulate wetter conditions throughout this century. Our ensemble shows an increase in the frequency and intensity of dry extremes while there is less agreement for wet extremes. We conduct sensitivity analyses on several soil moisture signatures to measure the relative influence of meteorological and hydrologic uncertainties across space and time. Both meteorological and hydrologic factors contribute consistently to uncertainty surrounding long-term trends, while changes to both wet and dry soil extremes are typically more sensitive to hydrologic parameter uncertainty. Our results underscore the need to account for varied sources of uncertainty when developing long-term hydrometeorological projections.

Lafferty, David C. [University of Illinois Urbana‐↗

Security Enhancement of Network Constraint Grid-Edge Energy Management System

Network constrained grid edge energy management system (EMS) provides economic solution for active and reactive power dispatch of distributed energy resources (DERs) at the grid edge level. Grid edge EMS ensures secure interconnection of a circuit segment to the distribution system by maintaining grid code requirements (e.g. IEEE 1547–2018). Grid edge EMS is dependent on communication to receive load measurement, which brings a risk of unobservable false data injection attacks (FDIAs). To mitigate the risk, this paper proposes a framework to enhance resilient operation of grid edge EMS by detecting the unobservable FDIAs on loads and replacing them with forecasted values. In this work, a two-step detection algorithm is proposed. In first step, conventional residual based algorithm is deployed. Autoencoder (AE) based data driven mechanism is included in second step to detect the presence of unobservable FDIAs. After ensuring the presence of FDIA, its specific location is detected by checking the maximum residue values till the predefined threshold value is reached. Detected false data injected loads are then replaced with forecasted load values following long-short term memory (LSTM) based forecast to ensure resilient performance of grid edge EMS in the presence of attacks. This proposed security enhancement framework for grid edge EMS is evaluated in IEEE 13 bus system with three integrated DERs. Numerical simulation shows the validation of the proposed framework by reducing voltage violation in real operation of grid edge EMS.

cyber attack detection↗

Organizational Conflicts of Interest Disclosure Update Statement (FY2019)

The National Technology & Engineering Solutions of Sandia, LLC (NTESS) Prime Contract department manages an organizational conflicts of interest (OCI) program that is designed to provide NTESS employees an accessible means to assist in identifying potential OCI risk and providing development support services to avoid, neutralize, or mitigate the risk. The OCI program is responsible for maintaining a regulatory infrastructure, such as corporate OCI policy and training content, to comply with NTESS's obligations set forth in prime contract clauses H-4: ORGANIZATIONAL CONFLICT OF INTEREST (OCI) — SPECIAL PROVISION and Section I Department of Energy Acquisition Regulation 952.209-72, Organizational Conflicts of Interest, Alternate I, paragraph (c)(1), Disclosure After Award. Risk identification is a key OCI program priority. Providing employees with a straight-forward, accessible and navigable mechanism to identify potential OCI risk will assist the OCI program in meeting this priority.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

ORNL Peer Review Summary and Recommendations for: Advanced Reactor Designs Security Analysis, Risk, and Recommendations: Risks, Consequences, and Possible Design Mitigation Approaches Associated with Select Advanced Reactors Study

The purpose of this document is to provide a summary of the peer review conducted for the "Advanced Reactor Designs Security Analysis, Risk, and Recommendations: Risks, Consequences, and Possible Design Mitigation Approaches Associated with Select Advanced Reactors" study prepared by researchers at Idaho National Laboratory (INL), Argonne National Laboratory (ANL), and Oak Ridge National Laboratory (ORNL). The National Nuclear Security Administration (NNSA) International Nuclear Security (INS) program team requested that ORNL perform a peer review of the study report prior to publication as a final peer check before distributing the report to a broader audience.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Managing Insurance Cost and Business Risk

This fact sheet explores the role insurance and re-insurance industries play in mitigating resilience risk and offers best practices for building owners to work effectively with insurers. It also reviews the types of insurance coverages relevant to resilience as well as efforts by the insurance industry to respond to increased risk.

Commercial, Resilience, Resiliency, Financing, Ins↗

Cyber100 Compass [SWR 23-64]

Cyber100 Compass ("Compass") is a unique risk assessment framework that will enable grid system planners to understand and mitigate cybersecurity risk for grids transitioning to high levels of renewable generation, including 100%. The idea for Compass was developed by NREL based on past work on high-renewable grids and a series of discussions with DOE. Compass is part of Cyber100, a portfolio of proposed research activities that would greatly expand understanding of cybersecurity for high-renewable grids. Compass is a desktop application designed with a user-friendly interface. The tool gathers information from users, conducts probabilistic backend calculations, and outputs a series of visualizations to help users understand and analyze their cybersecurity risks based on the unique features of their future grid. Compass will take as inputs the values for different conditions and produce a risk score of the resulting grid. By trying different configurations, system planners can compare the resultant risks against their own risk tolerance and decide which system-of-system controls to implement as they transition toward a 100% renewable grid.

Martin, Maurice↗

ML Clustering to Identify Natural Gas Pipeline Infrastructure Vulnerabilities

The network of more than 2.5 million miles of natural gas pipelines the U.S. are exposed to a range of vulnerabilities, ranging from extreme weather, to human behavior, and increasingly, to cyber threats. Advanced, data-driven analytics, including the use of machine learning and artificial intelligence, afford an opportunity to identify potential vulnerabilities, better understand risks, and help mitigate vulnerabilities in the network. At NETL, machine learning is being used to explore pipeline vulnerabilities and identify significant clusters of failure events, including failures due to weather, human behavior, and materials. These findings are being used to support the development of new technologies, including sensors, but can also be used to evaluate and inform mitigation strategies to reduce risks and vulnerabilities throughout the network.

Bauer, Jennifer↗

Lessons Learned from Hanford's Purex Tunnel 2 Structural Stabilization Project - 20509

In 2019, U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC) completed structurally stabilizing the Plutonium Uranium Extraction Plant (Purex) waste storage Tunnel 2 with engineered grout. This action significantly reduced risk to Hanford workers, the surrounding community and environment by preventing future collapse of the tunnel and possible release of radioactive materials. Decades of plutonium production at the Purex facility required construction of two large underground tunnels for storage of highly contaminated plutonium processing equipment that had failed during the operation of Purex and other facilities across the Hanford Site. Following the partial collapse of Purex Tunnel 1 on May 9, 2017, DOE and CHPRC took immediate action to safely stabilize the collapsed section of the tunnel. The hole in the tunnel was filled the next day as a temporary stabilization measure, and no contamination was detected as a result of the partial collapse of the tunnel. Workers then stabilized Tunnel 1 in its entirety by filling with engineered grout, which also encapsulated the radioactive equipment and railcars within the tunnel. Grouting eliminated the risk of further collapse and stabilized the tunnel contents, all while not precluding future remedial actions or final closure decisions. While conducting an integrity analysis of Tunnel 1 by using construction drawings, photos and other historical documents, project teams also analyzed the much larger Purex Tunnel 2. The analysis found Tunnel 2 did not meet current codes for structural integrity, and it may not be able to bear the weight of the soil above the tunnel. Therefore, it was determined that Tunnel 2 was also at risk of collapse. DoE's independent panel of experts determined grouting to be the best choice for stabilizing Tunnel 2 because it provides the highest level of stability and protection, and does not preclude future remedial actions. DOE authorized CHPRC to commence work and the Purex Tunnel 2 Structural Stabilization Project was launched in December of 2017. The paper will discuss the process of recognizing the following critical aspects and risks associated with stabilizing Tunnel 2, and the actions taken by the project team to mitigate these risks, including: - Tunnel investigation and data collection to assist with future remediation; - On-site batching and mock-ups to provide the large quantity of grout required for stabilizing the tunnel; - Workforce involvement and innovative actions that mitigated the project's most significant potential hazards, including traffic control; - Project team high level of execution translated into successful project execution. Sharing lessons learned from this critical risk-reduction effort can enhance the safety and efficiency of other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Laboratory and Field Arrays: Debris Modeling, Detection,& Mitigation (Task 1)

The statement of project objectives for this task was: develop tools, methods and models to assess, and mitigate the risk of damage to MHK infrastructure from woody debris. Develop the capability to detect woody debris using sonar and/or physical methods for purposes of characterizing debris statistics in river (at UAF’s Tanana River Test Site) and near-shore wave (at Yakutat, AK) environments and to activate debris mitigation measures. Develop debris impact risk maps and tables using statistics on debris size, geometry, type, prevalence, mobility and location. Improve and apply the COUPi discrete element method (DEM) to develop models of debris movement and impact on MHK infrastructure to evaluate risk of damage, and interference, to operations from debris. The proposed final deliverable for the task was a set of tools or techniques for providing estimates of the probability of debris impact, and resulting impact forces, on MHK infrastructure as a function of debris size, type, wave regime, and current velocity. Such estimates are required to assess damage risks to operational MHK infrastructure.

13 HYDRO ENERGY↗

Long-Term Impacts of Constrained Transmission Deployment on the Cost-Reliability Tradeoff

Traditional Resource Adequacy (RA) frameworks in the U.S. undervalue the contributions of inter-regional transmission to resource adequacy during stress periods, focusing on the availability of nameplate capacity instead. However, availability of nameplate capacity does not always translate into electricity delivery, especially during tail events. Moreover, the rapid deployment of energy-limited resources and increasing electricity demand challenge existing resource adequacy frameworks and couple regional electricity demand and availability of supply via transmission. We propose a two-stage framework that goes beyond the existing capacity-centered approaches to reveal the RA contributions of transmission. In the first stage we introduce a multi-objective optimization framework to quantify the merits of transmission expansion via Pareto Frontiers under alternative futures of no transmission investment, primary energy resources availability and demand growth. The second stage focuses on tail events and leverages the results of the first stage to characterize the risk profile of regional consumers across the U.S. under the alternative energy futures. We find that no new transmission can lead to a more expensive and less reliable national grid across scenarios, however, the impact on regional RA can vary. The probabilistic analysis reveals that transmission investments can alleviate the tail risk of consumers, however, the availability of fuel resources does not always alleviate regional tail risks. Our findings inform policymakers and utilities on the prioritization of transmission investments to mitigate the risk of widespread outages, also for tail events, and ensure reliable and affordable electricity delivery to all.

24 POWER TRANSMISSION AND DISTRIBUTION↗

1.3.3.402 - Cybersecurity Value-at-Risk Framework

The Cybersecurity Value-at-Risk Framework tool will guide users through an assessment and detailed analysis of a hydropower plant's operations. The tool will then provide results and data to inform effective cybersecurity investment decision-making and planning. The results will help managers understand the risk probability of cyberattacks on their facilities and how best to use resources to mitigate those risks.

cybersecurity↗