Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Management of Risks Associated with Application of Novel Materials in Novel Operating Environments in Novel Reactor Designs

There is currently no widely agreed, detailed general method for licensing a novel plant incorporating novel materials (or materials being deployed in novel environments); in many such situations, there are no directly applicable engineering code cases for decision-makers (including regulators) to rely on. This paper discusses a framework for solving this problem that is based on the Reliability and Integrity Management (RIM) approach delineated in ASME BPVC Section XI Division 2. NRC Regulatory Guide 1.246, Rev. 0, endorses, with conditions, the subject portion of the ASME Code. The proposed framework is meant to support development of a licensing case by addressing certain technical challenges. The framework discussed here is compatible with the Licensing Modernization Project, but applying it in a specific case will call for advances in the state of practice, if not the state of the art. The RIM approach calls for applicants to (a) allocate reliability targets to plant structures, systems, and components (SSCs), (b) show that they are able to relate the currently observed physical condition of each SSC in the program to its failure probability well enough to determine whether the target reliability allocations are being satisfied, allowing for uncertainty related to the novelty of the materials/designs/operating environments, and (c) be able to demonstrate that the proposed program of surveillances will reliably detect unacceptable degradation of an SSC before SSC failure occurs. These challenges are discussed in the paper, and a potentially applicable modeling approach based on cumulative damage rather than failure rates is briefly illustrated.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Risk Reduction of CO 2 Storage with Stochastic Simulations

The purpose of this project was to create an efficient and flexible tool based on principal component analysis (PCA) for a generation of differentiable realizations of porosity and permeability fields. Of particular interest were data which had significant connectivity between patches of the same rock type, which is called “binary”. The efficiency requirement needed a so called kernel PCA, and the binary images were found with the method called optimization based PCA (OPCA) for which interpretation is provided. The ability to honor given data at particular locations is also incorporated. The tool worked very well and efficiently for two dimensional (2-D) simulations. Furthermore, the tool was applied to a three-dimensional (3-D) dataset and determined that conditioning can be used to maintain the connectivity between vertical layers.

47 OTHER INSTRUMENTATION↗

Risk Control Through the Use of Procedures - A Method for Evaluating the Change in Risk

Organizations use procedures to influence or control the behavior of their workers, but often have no basis for determining whether an additional rule, or procedural control will be beneficial. This paper outlines a proposed method for determining if the addition or removal of procedural controls will impact the occurrences of critical consequences. The proposed method focuses on two aspects: how valuable the procedural control is, based on the inevitability of the consequence and the opportunity to intervene; and how likely the control is to fail, based on five procedural design elements that address how well the rule or control has been Defined, Assigned, Trained, Organized and Monitored-referred to as the DATOM elements

Praino, Gregory↗