At least 217 records · Page 12

Aerosol Measurement from Plasma Arc Torch Cuts on Various Metal for D and D Workers' Internal Dose Calculation - 20253

When dismantling a nuclear power plant, structures must be cut to reduce size. The cutting of radioactive material produces radioactive aerosols, which pose a health risk including radiation risk to site workers and the general public. However, due to a lack of research on the physical and chemical characteristics of aerosols produced in these processes, the calculation of internal dose in the event of an expected or unexpected accident is inaccurate. For the measurement of aerosols generated from cutting for internal dose calculations, we measured the number concentration distribution and nuclide distribution of aerosols from plasma arc cutting in a laboratory experimental setup, considering isokinetic sampling and automatic cutting. The results may suggest internal dose assessment without characteristics of radioactive aerosol has uncertainty and the possibility of being undervalued. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

3D Virtual Simulation for Radiation Safety and Hazards Identification Training

This presentation will be presented at CAES codebreaker session on May 4th. The slides include two projects that demonstrate how virtual training can benefit from visualization technology. One is a collaboration project between the Applied Visualization Laboratory and College of Eastern Idaho for radiation safety and survey training. The other one is Idaho National Laboratory's hazards identification online training that utilized LiDAR technology.

99 GENERAL AND MISCELLANEOUS↗

Materials for Shielding Astronauts from the Hazards of Space Radiations

One major obstacle to human space exploration is the possible limitations imposed by the adverse effects of long-term exposure to the space environment. Even before human spaceflight began, the potentially brief exposure of astronauts to the very intense random solar energetic particle (SEP) events was of great concern. A new challenge appears in deep space exploration from exposure to the low-intensity heavy-ion flux of the galactic cosmic rays (GCR) since the missions are of long duration and the accumulated exposures can be high. Because cancer induction rates increase behind low to rather large thickness of aluminum shielding according to available biological data on mammalian exposures to GCR like ions, the shield requirements for a Mars mission are prohibitively expensive in terms of mission launch costs. Preliminary studies indicate that materials with high hydrogen content and low atomic number constituents are most efficient in protecting the astronauts. This occurs for two reasons: the hydrogen is efficient in breaking up the heavy GCR ions into smaller less damaging fragments and the light constituents produce few secondary radiations (especially few biologically damaging neutrons). An overview of the materials related issues and their impact on human space exploration will be given.

Wilson, J. W.↗

Development of the Mobile Systems for Conditioning of Disused Sealed Radioactive Sources in Serbia - 20105

Sealed radioactive sources (SRS) are being used worldwide in the field of medicine, agriculture, industry and research. They can be found in mobile as well as stationary devices. SRS contains radioactive material that is (a) permanently sealed in a capsule or (b) closely bounded and in a solid form. The capsule or material of an SRS should be strong enough to maintain leak tightness under the conditions of use and purpose for which the source was designed, also in case of accidents. In this case only emitted radiation is utilized. Firstly, the hazard from external radiation has to be considered, but the possibility of contamination due to fracture of the capsule should not be disregarded. The radioactive sources are composed of the radiating isotope contained in the filling medium, the single or double isotope holder that partially or totally surrounds the filling medium, the outer cover that contains the parts mentioned above and the capsule closed airtightly by welding or using some other method. The capsule must be tested for leakage periodically. If the SRS is no longer needed (e.g. replaced by a different technique) or it becomes useless for the intended application (e.g. the activity becomes too weak, the equipment containing the source works poorly or becomes obsolete, the source is damaged or leaking) it is considered disused. Disused sealed radioactive sources (DSRS) are typically conditioned and disposed if a facility is available. If the disposal option is not available, conditioned DSRS should be stored under proper conditions. In some cases, the radionuclide(s) in DSRS can be recovered/recycled or the DSRS can be repurposed for other applications. Conditioning of DSRS ensures containment of the radioactive material, provides confinement for leaking sources, provides sufficient radiation shielding, reduces storage/disposal volume by allowing consolidation of multiple sources into a single storage/disposal container, facilitates transport operations and contributes to safety and security as well. Typically, conditioning technologies are deployed either as permanently installed stationary systems in centralized or mobile on-site waste processing facilities, or in a mobile configuration. Centralized stationary facilities provide a single processing location for multiple users that requires transport of the waste to the facility. On the other hand, mobile systems may be provided for the selection and application of the optimum technology for a specific waste stream (such as DSRS) by bringing the process to the point where the waste is generated. In addition, mobile systems could offer additional flexibility by sharing equipment among multiple waste generating sites for processing campaigns that vary in duration, from very short periods to several years. The term 'mobile processing system' refers to any radioactive waste processing system or component which is designed to be transportable and which is not considered permanently installed. Two mobile system for conditioning of disused sealed radioactive sources are developed in the Public Company Nuclear Facilities of Serbia. Development of these mobile systems was supported by SRB9005 national project via Technical Cooperation of the IAEA. The first mobile system, built inside the 20 feet ISO container, will be used for conditioning of DSRS category 3 to 5. The second mobile system, built inside the 7 m long vehicle (Iveco Daily Van), will be used for dismantling of ionizing smoke detectors mostly with Am-241 sources. Designs of the mobile systems were defined in cooperation with two companies from Belgium (Belgoprocess and Leniko) and a Croatian company Ekoteh as well as with the support of the IAEA experts. The generic safety assessment and operational procedures for the mobile systems are developed. Based on safety assessment the acceptance criteria and operational limits and conditions are established. Operational procedures include: (a) equipment and material requirements, (b) assembling procedure of the mobile unit, (c) procedure for acceptance of devices for dismantling and conditioning, (d) dismantling procedure for devices to recover the DSRS, (e) characterization of DSRS, (f) encapsulation procedure of DSRS, (g) disassembling procedure of the mobile unit, and (h) keeping records, identification and traceability. In addition, radiation safety, health safety, security and emergency preparedness plans are prepared. The generic safety assessment and operational procedures could be updated with site specific requirements, DSRS inventory, and different needs for future customers. Developed mobile systems could be used in all situations when it is feasible to perform conditioning of DSRS on the spot in the county and worldwide. Development of these mobile units was just the first step to create the Reference Center for Radioactive Waste Treatment and Disused Radioactive Sources Conditioning for Small Facilities which can become a regional training center in the future, and/or as a tool for comprehensive national search and secure programmes. In the next phases development of e-learning platforms and blended learning packages as well as application for the IAEA Qualified Technical Centre (QTC) for the management of DSRS is foreseen. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hazard calculations of diffuse reflected laser radiation for the SELENE program

The hazards from diffuse laser light reflections off water clouds, ice clouds, and fog and from possible specular reflections off ice clouds were assessed with the American National Standards (ANSI Z136.1-1986) for the free-electron-laser parameters under consideration for the Segmented Efficient Laser Emission for Non-Nuclear Electricity (SELENE) Program. Diffuse laser reflection hazards exist for water cloud surfaces less than 722 m in altitude and ice cloud surfaces less than 850 m in altitude. Specular reflections from ice crystals in cirrus clouds are not probable; however, any specular reflection is a hazard to ground observers. The hazard to the laser operators and any ground observers during heavy fog conditions is of such significant magnitude that the laser should not be operated in fog.

Miner, Gilda A.↗

Lessons Learned from Hanford's Purex Tunnel 2 Structural Stabilization Project - 20509

In 2019, U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC) completed structurally stabilizing the Plutonium Uranium Extraction Plant (Purex) waste storage Tunnel 2 with engineered grout. This action significantly reduced risk to Hanford workers, the surrounding community and environment by preventing future collapse of the tunnel and possible release of radioactive materials. Decades of plutonium production at the Purex facility required construction of two large underground tunnels for storage of highly contaminated plutonium processing equipment that had failed during the operation of Purex and other facilities across the Hanford Site. Following the partial collapse of Purex Tunnel 1 on May 9, 2017, DOE and CHPRC took immediate action to safely stabilize the collapsed section of the tunnel. The hole in the tunnel was filled the next day as a temporary stabilization measure, and no contamination was detected as a result of the partial collapse of the tunnel. Workers then stabilized Tunnel 1 in its entirety by filling with engineered grout, which also encapsulated the radioactive equipment and railcars within the tunnel. Grouting eliminated the risk of further collapse and stabilized the tunnel contents, all while not precluding future remedial actions or final closure decisions. While conducting an integrity analysis of Tunnel 1 by using construction drawings, photos and other historical documents, project teams also analyzed the much larger Purex Tunnel 2. The analysis found Tunnel 2 did not meet current codes for structural integrity, and it may not be able to bear the weight of the soil above the tunnel. Therefore, it was determined that Tunnel 2 was also at risk of collapse. DoE's independent panel of experts determined grouting to be the best choice for stabilizing Tunnel 2 because it provides the highest level of stability and protection, and does not preclude future remedial actions. DOE authorized CHPRC to commence work and the Purex Tunnel 2 Structural Stabilization Project was launched in December of 2017. The paper will discuss the process of recognizing the following critical aspects and risks associated with stabilizing Tunnel 2, and the actions taken by the project team to mitigate these risks, including: - Tunnel investigation and data collection to assist with future remediation; - On-site batching and mock-ups to provide the large quantity of grout required for stabilizing the tunnel; - Workforce involvement and innovative actions that mitigated the project's most significant potential hazards, including traffic control; - Project team high level of execution translated into successful project execution. Sharing lessons learned from this critical risk-reduction effort can enhance the safety and efficiency of other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Regulatory Strategy for Post Operational Clean Out Activities at Sellafield Limited Nuclear Licensed Site - 20273

The Thermal Oxide Reprocessing Plant (THORP) at the Sellafield nuclear licensed site carried out its final commercial shear of spent nuclear fuel in November 2018, since when the facility has undergone rundown prior to cessation of operations. The Magnox Reprocessing Facility (MRF) is also due to cease operating, around the end of 2020. Following the cessation of spent fuel reprocessing, the facilities and supporting infrastructure will transition into Post Operational Clean Out (POCO), which will become an increasingly significant portion of Sellafield Limited's (SL) activities. POCO is defined as the set of activities undertaken directly after a nuclear facility comes to the end of its operational life, in order to place the plant in a suitable state for the subsequent decommissioning steps. The decommissioning strategy at SL is for deferred dismantling of these facilities, which will be subject to a period of Surveillance and Maintenance (S and M) following completion of POCO. This paper outlines the development and implementation of a regulatory strategy for POCO activities at the Sellafield site by the Office for Nuclear Regulation (ONR), the independent nuclear safety, transport and security regulator in the United Kingdom. The paper also describes how this regulatory strategy is applied to nuclear installations undergoing transition into POCO and subsequent decommissioning. ONR works jointly with the Environment Agency, as the environmental regulators in England, to ensure that matters relevant to them have been duly considered. In developing a regulatory strategy, ONR has taken a site-wide approach, moving away from regulation on a facility-by-facility basis, to promote consistency, as well as maximising efficiency and effectiveness. The aim of this integrated approach was to prevent complications during future decommissioning and dismantling that have been experienced previously at similar facilities in France. The strategy recognised that once reprocessing operations are concluded, the hazard present will be reduced significantly, which provides the opportunity for ONR to consider how best to deliver a proportionate approach to regulatory interventions. Once POCO has been completed and the facility has transitioned into a period of S and M, the scale and frequency of ONR's interventions will reduce, commensurate with the safety case covering the remaining hazard and activities associated with maintaining the facility prior to final decommissioning. This approach allows ONR to consider risks holistically, considering the full life cycle of the facility and by taking due account of the interdependencies between facilities across the site. The strategy also aligns with existing regulation of high hazard and risk reduction activities, which remain ONR's top priority. As SL progresses with POCO activities in THORP and across the rest of the site, ONR will review its regulatory strategy to ensure that the intended safety benefits are realised. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from Demolition of Hanford's Plutonium Finishing Plant - 20507

U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC), a Jacobs owned company, is making significant progress demolishing the Plutonium Finishing Plant (PFP), which has long been known as one of the most hazardous buildings in the DOE Environmental Management Complex (DOE Complex). The facility is located on the Hanford Site and produced plutonium metal during the Cold War. Production was stopped in 1989, the facility was formally shut down in 1996, and material processing was completed in 2004. After approximately 25 years of demolition preparations, open-air demolition of the main portions of the Hazard Category II nuclear facility began in November 2016. To prepare the PFP for demolition, CHPRC employees performed some of the most hazardous work across the DOE Complex. In addition to extensive demolition preparations, including a wide-reaching communication strategy across the Hanford Site, CHPRC implemented robust controls and monitoring during demolition, and when necessary, adjusted demolition practices and sequence to maintain employee safety and project efficiency. Demolition of the main PFP building began in November 2016. The technical complexity, high hazards and radiological concerns have all led to a difficult demolition environment. Following a spread of contamination at the project site beyond the radiological boundaries in December 2017, work was halted and a recovery plan was generated to allow the demolition work to continue. After the implementation of additional controls and concurrence from regulatory agencies and DOE, the demolition was ready to resume work and reinitiated in August 2018. There are a number of lessons learned from the demolition activities and recovery plan process. This paper allows CHPRC and DoE's Richland Operations Office (RL) to share lessons learned and progress to date with other challenging and hazardous projects across the DOE Complex. Understanding the risk acceptance level is critical to execution of any open-air demolition project and is unique to each facility. Four key lessons learned from this project include: 1) plan execution issues, 2) stakeholder communication issues, 3) watching for summit fever and 4) minimizing exposed contaminated surfaces during demolition. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Development of a Robotic Exoskeleton Device for use in Glove Boxes - 20374

Glovebox operators in nuclear facilities often operate under radioactive environment and typically perform monotonous, dull and repetitive work. This can result in muscle fatigue leading to increased levels of accidents. Current research work aims in assisting the glovebox operators by designing a novel upper limb exoskeleton device to reduce injuries and increase worker efficiency. Almost none of the commercially available hand and upper body exoskeletons are directly suitable for use in gloveboxes. This explains the novelty of the present work in developing a wearable powered robotic exoskeleton device. The device consists of electronics, motors and spring systems mounted on adjustable plates and is supported by a stationary frame behind the worker. The device is intended to be portable and adjustable according to the operator height. The elbow has a flexion movement assisted with motor control by way of a Bowden cable system. The system is floated on a spring and pulley combination that allows for extra safety and smoothness of operation. The end points are fixed near the pivot points to help minimize unwanted movement/torque. The extension movement of the upper and lower arm are assisted by gravity and a counter spring. The shoulder and upper arm movement are held in a neutral position with a spring system for counter balance allowing small movements within the glovebox. This initial concept considers only the vertical movement of the arm. The abduction and adduction movement will not be assisted or impeded by the over shoulder plate or at the forearm plate allowing for full range of motion. Several glovebox aspects such as the level of task assistance, ergonomic design, minimum hindrance in dexterity/operator movements and tear resistance for hazardous safety reasons will be considered in the design of the exoskeleton. Computer models will be simulated to test the load levels and stress conditions on the exoskeleton to enhance the designs. The exoskeleton focusses on major muscular involvement reduction through weight offset and active assistance with minimal parts and hence the device is derived with several joint links and contains both passive and active joints. The paper details the various stages in the design development and prototype testing of the exoskeleton device. Upon successful prototype device development, human testing will be conducted in a replica of the SRS-235F hot cell facility constructed at FIU-ARC. The final stage of the project will be potential testing/deployment of the exoskeleton device in one of the glovebox facilities in Savannah River Nuclear Waste site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗