A Statistical Project Control Tool for Engineering Managers

This slide presentation reviews the use of a Statistical Project Control Tool (SPCT) for managing engineering projects. A literature review pointed to a definition of project success, (i.e., A project is successful when the cost, schedule, technical performance, and quality satisfy the customer.) The literature review also pointed to project success factors, and traditional project control tools, and performance measures that are detailed in the report. The essential problem is that with resources becoming more limited, and an increasing number or projects, project failure is increasing, there is a limitation of existing methods and systematic methods are required. The objective of the work is to provide a new statistical project control tool for project managers. Graphs using the SPCT method plotting results of 3 successful projects and 3 failed projects are reviewed, with success and failure being defined by the owner.

Bauch, Garland T.↗

A Brief Description of My Projects

My internship was in the IDC which consist of a machine shop and an array of design space. During my tour I worked on a wide variety of projects some of which included design, research, machining and fabrication. I gained further knowledge on some machines that I have had prior experience on such as the lathe and Hurco CNC machines. The first thing we did was complete our checkout in the machine shop which went pretty well, since I was already familiar with most of the machines. I also did a couple of practice parts on some of the machines, I made a name block on the CNC machine and I also used the vertical milling machine to complete this project. One of the other projects that I did was machine a hammer with my initials with the use of the lathe and CNC machine, this project took much longer since I had to set up a cylindrical piece on the CNC machine. The first project that I began work on was the Systems Engineering & Management Advancement Program (SEPMAP) Hexacopter project and helped them to assemble and modify one of their particle capture doors on their boxes. After a while we ended up helping them make a hinge and holes to reduce the weight of their design. We helped the NASA Extreme Environment Mission Operations (NEEMO) team a bit with some of their name tags and assembly of some of their underwater parts. One of the more challenging projects was a rail that came in with a rather weirdly drawn part. The biggest project that I worked on was the solar array project. Which consisted of a variety of machining and 3D printing and it took me about 3 different times of re-designing to come up with a final prototype. Along with this project I also had to complete a project in which I had to modify a thermos. This was rather simple since I just had to draw up a part and print it out on the 3D printer. I also learned how to use Pro E/Creo parametric to design a square block and print it on the 3D Printer. All of these projects increased my experience on all of the machines and equipment that I used. I also got to tweak my design skills and better understand how to modify my designs and how to improve those specific designs.

Barnes, Tobin↗

W.A. Parish Post-Combustion CO 2 Capture and Sequestration Demonstration Project (Final Technical Report)

The Petra Nova Project (Project) is a commercial scale post-combustion carbon capture project developed by a joint venture between NRG Energy, Inc. (NRG) and JX Nippon Oil Exploration (EOR) Limited (JX). The Project is designed to separate and capture carbon dioxide (CO2) from an existing coal-fired unit’s flue gas slipstream at NRG’s W.A. Parish Electric Generating Station (WAP) located southwest of Houston, Texas. The captured CO2 is dried, compressed, and transported via an 81-mile pipeline to the West Ranch oilfield (West Ranch) in Jackson County, Texas, where it is injected to boost oil production. The Project, which is partially funded by a grant (Grant) from the United States (U.S.) Department of Energy (DOE) under the Clean Coal Power Initiative (CCPI) Round 3, uses the Kansai Mitsubishi Carbon Dioxide Recovery advanced amine-based CO 2 absorption technology (KM-CDR Process®), which was jointly developed by Mitsubishi Heavy Industries, Ltd. (MHI) and the Kansai Electric Power Co. Inc., to treat and capture at least ninety percent (90%) of the CO 2 from a 240-megawatt equivalent (MWe) flue gas slipstream off of Unit 8 at WAP. When operating at full capacity, the Project captures approximately 5,200 short tons of CO 2 per day, which would otherwise be emitted into the atmosphere, representing the largest commercial scale deployment of post-combustion CO2 capture technology at a coal power plant to date. Under the Grant, the Project was managed in 3 phases: (1) Phase 1: Project Definition / Front End Engineering Design (FEED) (2) Phase 2: Detailed Engineering, Procurement & Construction (3) Phase 3: Demonstration and Monitoring. On December 29, 2016, commercial operation of the Project was achieved, ending Phase 2 and starting Phase 3, a 3-year demonstration period running from January 1, 2017 through December 31, 2019. The key objectives of Phase 3 were to (a) demonstrate the specific advanced technologies constructed during Phase 2 and (b) monitor the injected CO 2 at West Ranch to demonstrate technologies and protocols for monitoring, verification, and accounting (MVA). As of the end of Phase 3, Petra Nova captured 3,904,978 short tons of CO 2 (3,542,537 metric tons) that was transported to West Ranch. To support the DOE obligation to monitor, verify, and account for the sequestered CO 2 at West Ranch, Petra Nova contracted with the Bureau of Economic Geology (in the Jackson School of Geosciences at The University of Texas at Austin) to (a) design a monitoring program, (b) draft an MVA Plan for DOE review and approval, and (c) working with Petra Nova and the operator of West Ranch to manage and report on the MVA activity. This report discussed the technical aspects of the project during each of the 3 phases of the project as identified above.

01 COAL, LIGNITE, AND PEAT↗

G3P3 Phase 3 Project Execution Plan. Issue 1

The National Solar Thermal Test Facility (NSTTF) at Sandia National Laboratories New Mexico (SNL/NM) developed this Project Execution Plan (PEP) to document its process for executing, monitoring, controlling and closing-out Phase 3 of the Gen 3 Particle Pilot Plant G3P3. This plan serves as a resource for stakeholders who wish to be knowledgeable of project objectives and how they will be accomplished. The plan is intended to be used by the development partners, principal investigator, and the federal project director. Project objectives are derived from the mission needs statement, and an integrated project team assists in development of the PEP. This plan is a living document and will be updated throughout the project to describe current and future processes and procedures. The scope of the PEP covers: Cost, schedule, and scope Project reporting Staffing plan Quality assurance plan Environment, safety, security, and health This document is a tailored approach for the Facilities Management and Operations Center (FMOC) to meet the project management principles of DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets , and DOE G 413.3-15, DOE Guide for Project Execution Plans. This document will elaborate on content as knowledge of the project is gained or refined.

14 SOLAR ENERGY↗

Integrated Mid-Continent Stacked Carbon Storage Hub Project Phase II (Final Summary Report)

The Phase II Integrated Midcontinent Stacked Carbon Storage Hub (IMSCS-HUB) is part of the Carbon Storage Assurance Facility Enterprise (CarbonSAFE) established by the United States Department of Energy (DOE) National Energy Technology Laboratory (NETL). CarbonSAFE is phased to support the development of commercial-scale (50 million metric tonnes [Mt] over a 30-year period) carbon capture, utilization, and storage (CCUS) in the United States. The IMSCS-HUB study area comprises carbon dioxide (CO 2 ) sources in Iowa, Kansas, and Nebraska (the source corridor), and CO 2 sinks in Kansas and Nebraska (the storage corridor), representing the first large-scale project for the Midcontinent region. The stacked storage corridor is characterized by alternating sequences of deep saline formations, oil-bearing reservoirs, shale, and evaporite units that are conducive to vertically stacked CO 2 injection for geologic storage and enhanced oil recovery (EOR). Three sites within the IMSCS-HUB stacked storage corridor were evaluated in Phase II for commercial CCUS feasibility: one in southwest-central Nebraska, Sleepy Hollow Field (SHF), a second in southwestern Nebraska near Madrid (Madrid), and a third in southwestern Kansas, the Patterson Site (composed of the Patterson, Heinitz, Hartland, and Oslo fields). In Phase II, the team assessed the feasibility of storage complexes at the potential storage sites in Nebraska and Kansas to support a commercial-scale storage hub that integrates proven CO 2 capture technology and transport from nearby ethanol sources. Building on lessons learned from the DOE-NETL Regional Carbon Sequestration Partnerships (RCSPs), the Project Team has identified a clear strategy to meet DOE’s 2025 objective of commercial carbon capture and storage (CCS) implementation by developing a CO 2 market and infrastructure that relies on multiple ethanol-based CO 2 sources in the short term and the incorporation of multiple coal-fired power plant CO 2 sources when commercial capture is economically viable. The team also leveraged the updated 45Q tax credit to develop capture and transport infrastructure. Commercial-scale CCUS is feasible at two candidate storage sites studied, the Madrid, Nebraska Site and the Patterson Site in Kearny County, Kansas. The Sleepy Hollow Field in Nebraska was found to be an attractive candidate for stacked storage with CO 2 -EOR (Battelle 2020e). Outreach efforts facilitated engagement from industry, government, and research sectors (Battelle and GPI, 2020) and an outreach plan for future phases of the project was developed to address issues that are of concern in the IMSCS-HUB project area (Battelle, 2020f). All components of a CCUS project were determined to be feasible in the IMSCS-HUB region and Risk Mitigation Plan was developed and includes strategies to mitigate risks associated with each project component (Battelle, 2020j). A roadmap was developed to obtain the required UIC permits for an integrated CCUS project (Battelle, 2020k). The regional storage resource characterization demonstrated significant opportunity for commercial-scale projects in the IMSCS-HUB storage corridor with 577.4 Mt of stacked CO 2 storage capacity and the potential to produce 181.9 MMbbls of oil via EOR across 17 individual storage areas (Battelle and ARI, 2020). The pipeline assessment study found viable pipeline routes that connected 45Q-eligible ethanol plants, coal fired power plants, and other sources in the IMSCS-HUB corridor. The comprehensive results of subsurface characterization, modeling efforts, outreach assessment, and regulatory analysis from were integrated to develop a Detailed Commercial Development Plan for the IMSCS-HUB (Battelle, 2020n). Commercialization efforts will involve obtaining Class VI UIC permits, establishing and finalizing the pipeline route, and evaluating capture projects at participating CO 2 sources. Phases I and II of the IMSCS-HUB CarbonSAFE provide a strong foundation for safely, efficiently, and cost-effectively characterizing and permitting commercial-scale project sites in the region. The plan for implementation of commercial-scale CCUS projects in the IMSCS-HUB is aligned with the objectives of CarbonSAFE Phase III: Site Characterization and CO 2 Capture Assessment.

20 FOSSIL-FUELED POWER PLANTS↗

Tracking the PACE of household energy usage: Energy usage impacts of projects financed through Property Assessed Clean Energy programs in California

This report examines the household-level energy impacts of residential property assessed clean energy (R-PACE) projects using normalized metered energy consumption methods. Our analysis covers projects that occurred through an R-PACE program between 2009 and 2017 and includes more than 25,000 electricity meters and 15,000 gas meters. We employ a comparison group, drawn from other R-PACE households with similar locational and usage characteristics whose projects were implemented at different times, to control for some non-project and non-weather factors that may impact energy use. We find that projects consisting of energy efficiency technologies save, on average, about 3% of household electricity usage and 3.5% of household gas usage. R-PACE financing, however, can be used to install central heating or air conditioning equipment for the first time. These projects would be expected to increase energy consumption. Since our data do not directly indicate which projects are new installations, we develop a simple algorithm for identifying them. Removing these inferred installation projects yields average savings of about 5% for electricity and 6% for gas for those households that remain in the sample. Given the mild California climate and the results of another study of similar California projects using similar methods, these results are in line with expectations. Solar PV projects yield large reductions in grid electricity use, averaging 69% of household consumption. We estimate that, collectively, all R-PACE projects installed in California through 2019 would generate annual reductions in grid-tied electricity consumption of 506 GWh (mostly due to solar PV) and gas consumption reductions of 2 million therms in a normal weather year. These impacts are equivalent to the electricity consumption of about 74,000 California households (including both efficiency and PV generation) and the gas consumption of about 4700 California households.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Data management for community research projects: A JGOFS case study

Since the mid 1980s, much of the marine science research effort in the United Kingdom has been focused into large scale collaborative projects involving public sector laboratories and university departments, termed Community Research Projects. Two of these, the Biogeochemical Ocean Flux Study (BOFS) and the North Sea Project incorporated large scale data collection to underpin multidisciplinary modeling efforts. The challenge of providing project data sets to support the science was met by a small team within the British Oceanographic Data Centre (BODC) operating as a topical data center. The role of the data center was to both work up the data from the ship's sensors and to combine these data with sample measurements into online databases. The working up of the data was achieved by a unique symbiosis between data center staff and project scientists. The project management, programming and data processing skills of the data center were combined with the oceanographic experience of the project communities to develop a system which has produced quality controlled, calibrated data sets from 49 research cruises in 3.5 years of operation. The data center resources required to achieve this were modest and far outweighed by the time liberated in the scientific community by the removal of the data processing burden. Two online project databases have been assembled containing a very high proportion of the data collected. As these are under the control of BODC their long term availability as part of the UK national data archive is assured. The success of the topical data center model for UK Community Research Project data management has been founded upon the strong working relationships forged between the data center and project scientists. These can only be established by frequent personal contact and hence the relatively small size of the UK has been a critical factor. However, projects covering a larger, even international scale could be successfully supported by a network of topical data centers managing online databases which are interconnected by object oriented distributed data management systems over wide area networks.

Lowry, Roy K.↗

Efferent projections of the ectostriatum in the pigeon (Columba livia)

The ectostriatum is a major visual component of the avian telencephalon. The core region of the ectostriatum (Ec) receives visual input from the optic tectum through thalamic nuclei. In the present study, the efferent projections of the ectostriatum were investigated by using the anterograde tracers Phaseolus vulgaris leucoagglutinin and biotinylated dextran amine. Projection patterns resulting from these tracers were confirmed by the retrograde tracer cholera toxin subunit B. When anterograde tracers were injected in Ec, primary projections were seen traveling dorsolaterally to the belt region of the ectostriatum (Ep) and the neostriatal area immediately surrounding Ep (Ep2). Neurons in Ep sent projections primarily to the overlying Ep2. The efferents of Ep2 traveled dorsolaterally to terminate in three telencephalic regions, from anterior to posterior: (1) neostriatum frontale, pars lateralis (NFL), (2) area temporo-parieto-occipitalis (TPO), and (3) neostriatum intermedium, pars lateralis (NIL). A part of the archistriatum intermedium and the lateral part of the neostriatum caudale also received somewhat minor projections. In addition, some neurons in Ec were also the source of direct, but minor, projections to the NFL, TPO, NIL, and archistriatum intermedium. The topographical relationship among the primary (Ec), secondary (Ep and Ep2), and tertiary (NFL, TPO, NIL) areas indicate that the neural populations for visual processing are organized along the rostral-caudal axis. Thus, the anterior Ec sent efferents to the anterior Ep, which in turn sent projections to anterior Ep2. Neurons in the anterior Ep2 sent projections to NFL and the anterior TPO. Similarly, the intermediate and posterior Ec sent projections to corresponding parts of Ep, whose efferents projected to intermediate and posterior Ep2, respectively. The intermediate Ep2 gave rise to major projections to TPO, whereas posterior Ep2 neurons sent efferents primarily to NIL. The organization of this neural circuit is compared with those of other sensory circuits in the avian telencephalon, as well as the laminar arrangement of the mammalian isocortex.

Non-NASA Center↗

Neurofilament protein is differentially distributed in subpopulations of corticocortical projection neurons in the macaque monkey visual pathways

Previous studies of the primate cerebral cortex have shown that neurofilament protein is present in pyramidal neuron subpopulations displaying specific regional and laminar distribution patterns. In order to characterize further the neurochemical phenotype of the neurons furnishing feedforward and feedback pathways in the visual cortex of the macaque monkey, we performed an analysis of the distribution of neurofilament protein in corticocortical projection neurons in areas V1, V2, V3, V3A, V4, and MT. Injections of the retrogradely transported dyes Fast Blue and Diamidino Yellow were placed within areas V4 and MT, or in areas V1 and V2, in 14 adult rhesus monkeys, and the brains of these animals were processed for immunohistochemistry with an antibody to nonphosphorylated epitopes of the medium and heavy molecular weight subunits of the neurofilament protein. Overall, there was a higher proportion of neurons projecting from areas V1, V2, V3, and V3A to area MT that were neurofilament protein-immunoreactive (57-100%), than to area V4 (25-36%). In contrast, feedback projections from areas MT, V4, and V3 exhibited a more consistent proportion of neurofilament protein-containing neurons (70-80%), regardless of their target areas (V1 or V2). In addition, the vast majority of feedback neurons projecting to areas V1 and V2 were located in layers V and VI in areas V4 and MT, while they were observed in both supragranular and infragranular layers in area V3. The laminar distribution of feedforward projecting neurons was heterogeneous. In area V1, Meynert and layer IVB cells were found to project to area MT, while neurons projecting to area V4 were particularly dense in layer III within the foveal representation. In area V2, almost all neurons projecting to areas MT or V4 were located in layer III, whereas they were found in both layers II-III and V-VI in areas V3 and V3A. These results suggest that neurofilament protein identifies particular subpopulations of corticocortically projecting neurons with distinct regional and laminar distribution in the monkey visual system. It is possible that the preferential distribution of neurofilament protein within feedforward connections to area MT and all feedback projections is related to other distinctive properties of these corticocortical projection neurons.

Non-NASA Center↗

Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project KDP-C Review

The topics discussed are the UAS-NAS project life-cycle and ARMD thrust flow down, as well as the UAS environments and how we operate in those environments. NASA's Armstrong Flight Research Center at Edwards, CA, is leading a project designed to help integrate unmanned air vehicles into the world around us. The Unmanned Aircraft Systems Integration in the National Airspace System project, or UAS in the NAS, will contribute capabilities designed to reduce technical barriers related to safety and operational challenges associated with enabling routine UAS access to the NAS. The project falls under the Integrated Systems Research Program office managed at NASA Headquarters by the agency's Aeronautics Research Mission Directorate. NASA's four aeronautics research centers - Armstrong, Ames Research Center, Langley Research Center, and Glenn Research Center - are part of the technology development project. With the use and diversity of unmanned aircraft growing rapidly, new uses for these vehicles are constantly being considered. Unmanned aircraft promise new ways of increasing efficiency, reducing costs, enhancing safety and saving lives 460265main_ED10-0132-16_full.jpg Unmanned aircraft systems such as NASA's Global Hawks (above) and Predator B named Ikhana (below), along with numerous other unmanned aircraft systems large and small, are the prime focus of the UAS in the NAS effort to integrate them into the national airspace. Credits: NASA Photos 710580main_ED07-0243-37_full.jpg The UAS in the NAS project envisions performance-based routine access to all segments of the national airspace for all unmanned aircraft system classes, once all safety-related and technical barriers are overcome. The project will provide critical data to such key stakeholders and customers as the Federal Aviation Administration and RTCA Special Committee 203 (formerly the Radio Technical Commission for Aeronautics) by conducting integrated, relevant system-level tests to adequately address safety and operational challenges of national airspace access by unmanned aircraft systems, or UAS. In the process, the project will work with other key stakeholders to define necessary deliverables and products to help enable such access. Within the project, NASA is focusing on five sub-projects. These five focus areas include assurance of safe separation of unmanned aircraft from manned aircraft when flying in the national airspace; safety-critical command and control systems and radio frequencies to enable safe operation of UAS; human factors issues for ground control stations; airworthiness certification standards for UAS avionics and integrated tests and evaluation designed to determine the viability of emerging UAS technology. Five Focus Areas of the UAS Integration in the NAS Project Separation Assurance Provide an assessment of how planned Next Generation Air Transportation System (NextGen) separation assurance systems, with different functional allocations, perform for UAS in mixed operations with manned aircraft Assess the applicability to UAS and the performance of NASA NextGen separation assurance systems in flight tests with realistic latencies and uncertain trajectories Assess functional allocations ranging from today's ground-based, controller-provided aircraft separation to fully autonomous airborne self-separation Communications Develop data and rationale to obtain appropriate frequency spectrum allocations to enable safe and efficient operation of UAS in the NAS Develop and validate candidate secure safety-critical command and control system/subsystem test equipment for UAS that complies with UAS international/national frequency regulations, standards and recommended practices and minimum operational and aviation system performance standards for UAS Perform analysis to support recommendations for integration of safety-critical command and control systems and air traffic control communications to ensure safe and efficient operation of UAS in the NAS Human Systems Integration Develop a research test bed and database to provide data and proof of concept for GCS - ground control station - operations in the NAS Coordinate with standards organizations to develop human-factors guidelines for GCS operation in the NAS Certification Define a UAS classification scheme and approach to determining Federal Aviation Regulation airworthiness requirements applicable to all UAS digital avionics Provide hazard and risk-related data to support development of type design criteria and best development practices Integrated Tests and Evaluation Integrate and test mature concepts from technical elements to demonstrate and test viability Evaluate the performance of technology development in a relevant environment (full-mission, human-in-the-loop simulations and flight tests)

outreach↗

A Review of Recent Updates of Sea-Level Projections at Global and Regional Scales

Sea-level change (SLC) is a much-studied topic in the area of climate research, integrating a range of climate science disciplines, and is expected to impact coastal communities around the world. As a result, this field is rapidly moving, and the knowledge and understanding of processes contributing to SLC is increasing. Here, we discuss noteworthy recent developments in the projection of SLC contributions and in the global mean and regional sea-level projections. For the Greenland Ice Sheet contribution to SLC, earlier estimates have been confirmed in recent research, but part of the source of this contribution has shifted from dynamics to surface melting. New insights into dynamic discharge processes and the onset of marine ice sheet instability increase the projected range for the Antarctic contribution by the end of the century. The contribution from both ice sheets is projected to increase further in the coming centuries to millennia. Recent updates of the global glacier outline database and new global glacier models have led to slightly lower projections for the glacier contribution to SLC (7-17 cm by 2100), but still project the glaciers to be an important contribution. For global mean sea-level projections, the focus has shifted to better estimating the uncertainty distributions of the projection time series, which may not necessarily follow a normal distribution. Instead, recent studies use skewed distributions with longer tails to higher uncertainties. Regional projections have been used to study regional uncertainty distributions, and regional projections are increasingly being applied to specific regions, countries, and coastal areas.

glaciers↗

Benchmarking Utility-Scale PV Operational Expenses and Project Lifetimes: Results from a Survey of U.S. Solar Industry Professionals

This paper draws on a survey of solar industry professionals and other sources to clarify trends in the expected useful life and operational expenditure (OpEx) of utility-scale photovoltaic (PV) plants in the United States. Solar project developers, sponsors, long-term owners, and consultants have increased project-life assumptions over time, from an average of ~21.5 years in 2007 to ~32.5 years in 2019. Current assumptions range from 25 years to more than 35 years depending on the organization; 17 out of 19 organizations surveyed or reviewed use 30 years or more. Levelized, lifetime OpEx estimates have declined from an average of ~$\$$35/kW DC -yr for projects built in 2007 to an average of ~$\$$17/kW DC -yr in 2019. Across 13 sources, the range in average lifetime OpEx for projects built in 2019 is broad, from $\$$13 to $\$$25/kW DC -yr. Operations and maintenance (O&M) costs—one component of OpEx—have declined precipitously in recent years, to $\$$5-8/kW DC -yr in many cases. Property taxes and land lease costs are highly variable across sites, but on average are—together—of similar magnitude. Other OpEx line items include security, insurance, and asset management. Given 2007-2009 values for not only project life and OpEx but also other drivers of the levelized cost of energy (LCOE, excluding the investment tax credit), the LCOE for utility-scale PV projects built from 2007 through 2009 averaged $\$$305 /MWh. Using 2019 values for all parameters yields an average LCOE of $\$$51 /MWh. The decline in LCOE from $\$$305 /MWh to $\$$51 /MWh was predominantly caused by reductions in up-front expenditures (and, to a much lesser extent, by changes in capacity factors, financing costs, and tax rates), but 9% ($\$$22 /MWh) of the overall decline is due to improvements in project life and OpEx. Project life extensions and OpEx reductions have had similarly sized impacts on LCOE over this period, at $\$$11 /MWh each. Had project life and OpEx not improved over the last decade, LCOE in 2019 would have instead been $\$$73 /MWh—43% higher. Given the limited quantity and comparability of previously available data on these cost drivers, the data and trends presented here may inform assumptions used by electric system planners, modelers, and analysts. The results may also provide useful benchmarks to the solar industry, helping developers and assets owners compare their expectations for project life and OpEx with those of their peers.

14 SOLAR ENERGY↗

The Ceres S'COOL Project: Two Years After First Launch

The idea for the Students' Cloud Observations OnLine (S'COOL) project as an outreach and education element of NASA's Clouds and the Earth's Radiant Energy System (CERES) research program was conceived in late 1996 during a conversation with a middle school science teacher. S'COOL was implemented in a series of increasingly developed test phases during 1997, as the launch of the first CERES instrument approached. Even before launch, the reception of the project in schools far exceeded expectations. After several delays the first instrument, on the Tropical Rainfall Measuring Mission (TRMM) spacecraft, was launched on Thanksgiving Day, 1997. Since the first launch, development and expansion of the project has continued with expectations for launch of Terra carrying two CERES instruments into a polar orbit in mid-1998. That launch is now expected in fall 1999, and will finally provide overflight of all participating schools. In two years, the project has grown from three initial test participants to over 300 schools now participating in 23 countries on five continents. Students from first grade through university level are involved (most participants are ages 10-15). S'COOL is also being used by a few education professors to teach about Internet use in the classroom. The project continues to grow through word of mouth, presentations at teacher workshops, and now increasingly through teachers who find it during web searches. Participants in the S'COOL project are part of the CERES validation team. They provide ground truth measurements at the time the CERES instrument flies over their location, to be compared with the retrieval of cloud properties by remote sensing from CERES. Quantities reported include cloud type, height, fraction and opacity; information on contrails; surface temperature, pressure and relative humidity; and ground cover (snow/ice, wet, dry; leaves on trees or not). in addition, a comment field on the report form serves as a catch-all for all kinds of interesting observations, including similes written by some classes to describe more exactly the clouds they see. Several not totally unexpected complications with the CERES instrument and processing software mean that the CERES team has not yet reached the point of computing the cloud properties, a high level product at the end of the processing stream. However, progress is being made and we anticipate that we will soon be populating the S'COOL database with a large number of satellite retrievals for comparison with the students' observations. Some satellite retrievals from the initial test phases are already available in the database, The CERES instruments are planned to operate at least through 2006, and the S'COOL Project is planned to continue at least that long, providing motivational learning to as many students as possible. This paper reports on the first several years of the S'CCOL project. It further reports on some of the noteworthy observations and comparisons made possible by this project. Schools are often located in interesting places, in terms of the clouds found there and the satellite's ability to observe these clouds. The paper also reports on the learning opportunities delivered by this project, and on new questions about the planet and its climate which arise in the students' minds as a result of their active participation.

Chambers, Lin H.↗

Guidelines for Project Management

Project management is an important part of the professional activities at Kennedy Space Center (KSC). Project management is the means by which many of the operations at KSC take shape. Moreover, projects at KSC are implemented in a variety of ways in different organizations. The official guidelines for project management are provided by NASA headquarters and are quite general. The project reported herein deals with developing practical and detailed project management guidelines in support of the project managers. This report summarizes the current project management effort in the Process Management Division and presents a new modeling approach of project management developed by the author. The report also presents the Project Management Guidelines developed during the summer.

Ben-Arieh, David↗

Afferent projections to the mammillary complex of the rat, with special reference to those from surrounding hypothalamic regions

To better understand the functional organization of the mammillary nuclei, we investigated the afferents to this nuclear complex in the rat with iontophoretically injected wheat germ agglutinin conjugated to horseradish peroxidase. Particular attention was paid to tracing local hypothalamic afferents to these nuclei. Injections into the medial mammillary nucleus (MMN) revealed strong projections from the subicular region, and weaker projections from the prefrontal cortex, medial septum, and the nucleus of the diagonal band of Broca. Other descending subcortical projections to the MMN arise from the anterior and the lateral hypothalamic area, the medial preoptic area, and the bed nucleus of the stria terminalis. Ascending afferents to the MMN were found to originate in the raphe and various tegmental nuclei. Following all injections into the MMN, labelled neurons were found in nuclei surrounding the mammillary body. The lateral and posterior subdivisions of the tuberomammillary nucleus projected mainly to the pars medianus and pars medialis of the MMN. The dorsal and ventral premammillary nuclei projected to the pars lateralis of the MMN. The supramammillary nucleus at rostral level had a small projection to the pars medialis and lateralis of the MMN. However, the most obvious projection from this nucleus was to the pars posterior of the MMN, chiefly from the lateral part of the caudal supramammillary nucleus. Injections into the lateral mammillary nucleus revealed inputs from the presubiculum, parasubiculum, septal region, dorsal tegmental nucleus, dorsal raphe nucleus, and periaqueductal gray. In addition, the lateral mammillary nucleus was found to receive a moderate projection from the medial part of the supramammillary nucleus and stronger projections from the lateral part of the caudal supramammillary nucleus. A very light projection was also seen from the lateral and posterior subdivisions of the tuberomammillary nucleus. These findings add to our knowledge of the extensive and complex connectivity of the mammillary nuclei. In particular, the local connections we have demonstrated with the supramammillary and tuberomammillary nuclei indicate the existence of significant local circuits as well as circuits involving more distant brain regions such as the septal nuclei, subiculum, prefrontal cortex, and brain stem tegmentum.

Non-NASA Center↗

The Habitat Demonstration Unit Project Overview

This paper will describe an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) Project. The HDU project is a "technology-pull" project that integrates technologies and innovations from numerous NASA centers. This project will be used to investigate and validate surface architectures, operations concepts, and requirements definition of various habitation concepts. The first habitation configuration this project will build and test is the Pressurized Excursion Module (PEM). This habitat configuration - the PEM - is based on the Constellation Architecture Scenario 12.1 concept of a vertically oriented habitat module. The HDU project will be tested as part of the 2010 Desert Research and Technologies Simulations (D-RATS) test objectives. The purpose of this project is to develop, integrate, test, and evaluate a habitat configuration in the context of the mission architectures and surface operation concepts. A multi-center approach will be leveraged to build, integrate, and test the PEM through a shared collaborative effort of multiple NASA centers. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Lunar Surface Systems Project Office (LSSPO) to test surface elements in a surface analog environment. The 2010 analog field test will include two Lunar Electric Rovers (LER) and the PEM among other surface demonstration elements. This paper will describe the overall objectives, its various habitat configurations, strategic plan, and technology integration as it pertains to the 2010 and 2011 field analog tests. To accomplish the development of the PEM from conception in June 2009 to rollout for operations in July 2010, the HDU project team is using a set of design standards to define the interfaces between the various systems of PEM and to the payloads, such as the Geology Lab, that those systems will support. Scheduled activities such as early fit-checks and the utilization of a habitat avionics test bed prior to equipment installation into PEM are planned to facilitate the integration process.

Kennedy, Kriss J.↗

Project Interface Requirements Process Including Shuttle Lessons Learned

Most failures occur at interfaces between organizations and hardware. Processing interface requirements at the start of a project life cycle will reduce the likelihood of costly interface changes/failures later. This can be done by adding Interface Control Documents (ICDs) to the Project top level drawing tree, providing technical direction to the Projects for interface requirements, and by funding the interface requirements function directly from the Project Manager's office. The interface requirements function within the Project Systems Engineering and Integration (SE&I) Office would work in-line with the project element design engineers early in the life cycle to enhance communications and negotiate technical issues between the elements. This function would work as the technical arm of the Project Manager to help ensure that the Project cost, schedule, and risk objectives can be met during the Life Cycle. Some ICD Lessons Learned during the Space Shuttle Program (SSP) Life Cycle will include the use of hardware interface photos in the ICD, progressive life cycle design certification by analysis, test, & operations experience, assigning interface design engineers to Element Interface (EI) and Project technical panels, and linking interface design drawings with project build drawings

Bauch, Garland T.↗

Project M: Scale Model of Lunar Landing Site of Apollo 17

The basis of the project was creating a scale model representation of the Apollo 17 lunar landing site. Vital components included surface slope characteristics, crater sizes and locations, prominent rocks, and lighting conditions. The model was made for Project M support when evaluating approach and terminal descent as well as when planning surface operations with respect to the terrain. The project had five main mi lestones during the length of the project. The first was examining the best method to use to re-create the Apollo 17 landing site and then reviewing research fmdings with Dr. Tim Crain and EO staff which occurred on June 25, 2010 at a meeting. The second step was formulating a construction plan, budget, and schedule and then presenting the plan for authority to proceed which occurred on July 6,2010. The third part was building a prototype to test materials and building processes which were completed by July 13, 2010. Next was assembling the landing site model and presenting a mid-term construction status report on July 29, 2010. The fifth and final milestone was demonstrating the model and presenting an exit pitch which happened on August 4, 2010. The project was very technical: it needed a lot of research about moon topography, lighting conditions and angles of the sun on the moon, Apollo 17, and Autonomous Landing and Hazard Avoidance Technology (ALHAT), before starting the actual building process. This required using Spreadsheets, searching internet sources and conducting personal meetings with project representatives. This information assisted the interns in deciding the scale of the model with respect to cracks, craters and rocks and their relative sizes as the objects mentioned could interfere with any of the Lunar Landers: Apollo, Project M and future Landers. The project concluded with the completion of a three dimensional scale model of the Apollo 17 Lunar landing site. This model assists Project M members because they can now visualize approach phase, terminal descent phase, and surface phase operations on the physical model. The project had an additional requirement that was also satisfied: the granite table the model was placed on must be returnable to its original condition if needed in the future.

O'Brien, Hollie↗