Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Gasification of Coal and Biomass: The Route to Net-Negative-Carbon Power and Hydrogen

One promising process that is a candidate for meeting the goals of the US Department of Energy’s 21st Century Power Plant initiative is to gasify a mixture of coal and biomass to yield a syngas, which can have CO2 removed and then be used to produce hydrogen as well as an off-gas that can be used to flexibly produce power. This concept would overall be carbon net-negative and readily meet the 21st Century Power Plant initiative targets of smaller scale MW generation, high ramp rates and turndown, feedstock flexibility, and high efficiency—at a reasonable cost. Moreover, adding the large-scale production of “ultra-green” hydrogen yields a system tailored for the coming hydrogen economy, providing long-term energy storage and an attractive co-product for sale. The objective of the work being led by the Electric Power Research Institute, Inc. (EPRI), with support by Bechtel Corporation (Bechtel), Gas Technology Institute (GTI), Hamilton Mauer International, Inc. (HMI), Nebraska Public Power District (NPPD), NexantECA, Inc. (Nexant), and Wärtsilä, is to perform a front-end design and engineering (FEED) study on an oxygen-blown gasification system coupled with water-gas shift, pre-combustion CO2 capture, and pressure-swing adsorption working off a coal/biomass mix to yield high-purity hydrogen and a fuel off-gas that can generate power. Several designs are being considered that will be capable of producing 50 MW net from a flexible generator, over 8500 kg/hr of hydrogen, and net-negative CO2 emissions, at an efficiency of 50% net HHV. The plant would be hosted at an NPPD site, where opportunities for enhanced oil recovery and sequestration have been investigated and the need for low-carbon power and hydrogen is imminent. The principal biomass to be used is corn stover—prevalent in Nebraska where the plant will be located—mixed with Powder River Basin (PRB) coal, necessitating a gasifier that can use this feedstock and be flexible to allow other types. Waste plastics will also be reviewed for use. Two oxygen-blown gasifiers have been identified as candidates that have done testing with biomass including corn stover: the GTI gasifier—a high-pressure, fluidized-bed type—and HMI’s, a lower pressure moving-bed type. Both have relative advantages that were investigated in the Phase I design study, with a resultant down select of one system for which the FEED will be performed in Phase II. The technical tasks for the project are: • Design Development: Completion of design activities necessary to provide inputs for the FEED study. Multiple design cases will be assessed with the selection of the optimal one for the FEED. • Investment Case Preparation: Development of the draft investment case for the proposed process with business cases performed for the proposed host site and two other locations. • Host Site Selection: Evaluation of the two potential host sites within NPPD’s portfolio to select the preferred candidate based on technical, economic, and environmental considerations. • Environmental Information Volume (EIV) Development: Completion of the EIV for the host site. • FEED Study: Completion of a FEED study based on the design selected in Phase I. A Greenhouse Gas Life Cycle Analysis will also be performed for the process. • Update Investment Case: Finalization of the investment case based on findings from the FEED. The advantages of the proposed project are significant. Having an engaged U.S. power utility willing to provide a host site that will produce energy from coal plus a deep and experienced team is critical; the process meets all the goals of DOE’s 21st Century Power Plant initiative at an estimated total plant cost of ~$880M and a production cost of hydrogen of ~$2/kg-H2 while producing net-negative carbon power. If developed, this process has real commercial potential in the United States—supported by EPRI’s initial review of the considerable interest from selected U.S. utilities—and elsewhere around the globe. The process has fewer environmental hurdles compared to other concepts, lowering regulatory and protest risks—providing a pathway to preserving the viability of a critical indigenous energy source by transforming its use to match a changing world. This presentation outlines the motivation for the effort, summarizes project plans, work completed to date, results of the Phase I effort and, and detailed work scope for the remainder of the project in the Phase II FEED effort.

01 COAL, LIGNITE, AND PEAT↗

EVALUATION OF A LOW FRICTION - HIGH EFFICIENCY ROLLER BEARING ENGINE

This Low Friction (High Efficiency Roller Bearing) Engine (LFE) report presents the work done by The Timken Company to conduct a technology demonstration of the benefits of replacing hydrodynamic bearings with roller bearings in the crankshaft and camshaft assemblies of an internal combustion engine for the purpose of collecting data sufficient to prove merit. The engines in the present study have been more extensively converted to roller bearings than any previous studies (40 needle roller bearings per engine) to gain understanding of the full potential of application of bearing technology. The project plan called for comparative testing of a production vehicle which was already respected for having demonstrated low engine friction levels with a rollerized version of that engine. Testing was to include industry standard tests for friction, emissions and fuel efficiency conducted on instrumented dynamometers. Additional tests for fuel efficiency, cold start resistance and other measures of performance were to be made in the actual vehicle. Comparative measurements of noise, vibration and harshness (NVH), were planned, although any work to mitigate the suspected higher NVH level in the rollerized engine was beyond the scope of this project. Timken selected the Toyota Avalon with a 3.5L V-6 engine as the test vehicle. In an attempt to minimize cost and fabrication time, a ‘made-from’ approach was proposed in which as many parts as possible would be used or modified from production parts to create the rollerized engine. Timken commissioned its test partner, FEV Engine Technology, to do a feasibility study in which they confirmed that using such an approach was possible to meet the required dimensional restrictions and tolerances. In designing the roller bearing systems for the crank and cam trains, Timken utilized as many production engine parts as possible. The crankshafts were produced from production line forgings, which use Timken steel, modified with special machining and heat treatment. Timken designed and manufactured all of the roller bearing related components such as the thrust bearing package. The production connecting rods and camshafts could not be used for the roller bearing engine, so new ones were produced according to the team’s designs using Timken steel. The remaining miscellaneous components were designed and procured by FEV. Timken prepared a display version of the crankshaft portion of the production engine without connecting rods which could be driven by a motor through a cogged-belt and electrically actuated clutch arrangement. A modified version was also made in which the engine was outfitted with roller bearings on the main bearing positions. Preliminary tests showed that the rollerized engine was running with 1/3 less friction than the standard display engine. Additional friction testing and noise characterization was cut short because of shipping damage to the rollerized engine display and because of other project priorities. The team did successfully demonstrate the ability to package roller bearings satisfactorily in numerous locations in a typical automotive engine. The scope of this project did not include durability demonstration and that subject would have to be addressed in any follow-on work. In the actual test phase, the rollerized engine did show significantly less friction in motored dynamometer tests compared to its production equivalent. The 5-10% improvement measured in this study was about half that seen in other studies. However, the fired test results did not show a reduction in friction which did not match prior experience or expectations. Subsequent teardown and inspection of the rollerized engine revealed potential sources of excessive friction in the experimental application. These features would be eliminated in a design not based on modification of production parts. The team is confident (based on experience) that friction reduction would be realized with proper modifications.

02 PETROLEUM↗

Assessment of Survey Results from Advanced Reactor Industry Domain Experts on Nonlinear Soil-Structure Interaction Analysis Software Verification and Validation

The seismic load case has a significant impact on the design and cost of nuclear power plants. Given the need to substantially reduce cost, advanced reactor designers are looking to leverage numerical tools that enable seismic analysis of an integrated vessel/support/structure/soil system. Modern nonlinear analysis tools provide a solution, capturing dynamic coupling between components (including soil-structure interaction (SSI)) concurrent with nonlinear behavior in one or more parts of the system. Although these methods have a rich history of technical development and implementation, software quality assurance (SQA) following nuclear industry standards remains a significant burden for those wishing to adopt such methods for advanced reactor design and licensing. To reduce the SQA burden, this project will develop the guidance for SQA verification and validation (V&V) of coupled nonlinear SSI analysis tools, to include a test matrix of software features and test problems to support commercial grade dedication (CGD). The guidance is intended to be technology-neutral: supporting designers of all advanced reactors. To maximize the value of the project to reactor designers, the project team performed focused surveys of and interviews with advanced reactor designers. Additionally, the project surveyed members of the broader industry involved in reactor design and licensing. The aggregated industry feedback consists of written survey responses, live polling responses, focused interviews, and informal feedback provided after outreach presentations, collectively referred to as “survey results”. Herein, the survey results are reported, reviewed, and assessed to inform follow-on project activities. The survey results confirmed the familiarity of the industry with the coupled nonlinear SSI analysis. They also affirm the project need based upon the expressed intent to (1) incorporate nonlinear features and (2) pursue the coupled nonlinear SSI analysis to reduce seismic demands and construction costs. All reactor designers indicated their intent to incorporate two or more nonlinear features, and all reactor designer respondents opined that the coupled nonlinear SSI analysis would allow for the optimization of the reactor design and construction. However, the programmatic challenges, whether real or perceived, present a significant barrier to reactor designers. The barrier most commonly identified by the reactor designer population was regulatory risk, with 70% citing this as a reason not to pursue the approach. The perceived regulatory risk identified by the reactor designers underscores the importance of regulator engagement and dialogue in this project. Additionally, half of the reactor designers identified cost and lack of guidance as a deterrent. The survey results also provide insights to tailor specific aspects of the guidance document and test matrix. The project plans to prepare both a formal referenceable guidance document and a collaborative, web-based test matrix and problem set. The project will focus on more complete test problem definitions for the prioritized nonlinear features over shallower problem descriptions for a larger set of features. The nonlinearities prioritized as high based upon survey feedback include fluid-structure interaction and seismic isolation and energy dissipation devices. The nonlinearities prioritized as intermediate include nonlinear geomaterials, nonlinear concrete, nonlinear steel, and interface/contact nonlinearity. Deep embedment and the associated nonlinear phenomena are assigned the lowest priority based upon survey feedback.

42 ENGINEERING↗

Accelerate Performance (Final Technical Report)

Encouraging commercial building owners to set measurable energy goals before design begins can drive design and contractor teams to develop innovative energy efficiency solutions within conventional building budgets. A federal building owner piloted this technique and created a large-scale zero-energy office building on a budget comparable to local market construction rates. The successes and lessons learned from this performance-based project formed the basis of Accelerate Performance, an expanded program using utilities as the primary outreach channel to replicate the approach. Four utilities partnered with Slipstream, a not-for-profit program implementer, to develop pilot incentive offerings to focus building owners on the whole building rather than on individual building components and systems. The original performance-based procurement process and its successful implementation in a federal building project informed all these efforts. The experiences and lessons learned in different new construction markets led to further process adaptations as well as the development of templates and tools to streamline outreach and technical support efforts. The approach can be adapted to utility new construction programs and is a powerful tool for engaging many building owners early in the project planning process as they make critical energy decisions that impact the performance of the building. The approach has led to real energy savings in building projects by encouraging cost-effective, low-risk, and creative design solutions. The performance-based approach was tested in a variety of applications including different building types and owner types, with many owners adopting performance-based procurement techniques, some with variations, but all maintaining the same core principles. Over the course of the project, nearly 100 building projects were impacted and additional projects will continue to be supported through ongoing program offerings with three leading utilities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Magnetic Fields on the National Ignition Facility (MagNIF)

A magnetized target capability on the National Ignition Facility (NIF) at Lawrence Livermore National Laboratory (LLNL) has been investigated. Stakeholders’ needs and project feasibility analysis were considered in order to down-select from a wide variety of different potential magnetic field magnitudes and volumes. From the large range of different target platforms, laser configurations, and diagnostics configurations of interest to the stakeholders, the gas-pipe platform has been selected for the first round of magnetized target experiments. Gas pipe targets are routinely shot on the NIF and provide unique value for external collaborators. High-level project goals have been established including an experimentally relevant 20Tesla magnetic field magnitude. The field will be achieved using pulsed power-driven coils. A system architecture has been proposed. The pulsed power drive system will be located in the NIF target bay. This decision provides improved maintainability and mitigates equipment safety risks associated with explosive failure of the drive capacitor. High-level and first-level subsystem requirements have been established. Requirements have been included for two distinct coil designs – full solenoid and quasi-Helmholtz. A Failure Modes and Effects Analysis (FMEA) has been performed and documented. Additional requirements have been derived from the mitigations included in the FMEA document. A project plan is proposed. The plan includes a first phase of electromagnetic simulations to assess whether the design will meet performance requirements, then a second phase of risk mitigation projects to address the areas of highest technical risk. The duration from project kickoff to the first magnetized target shot is approximately 29 months.

42 ENGINEERING↗

Southwestern Regional Partnership For Carbon Sequestration (Phase 2) Pump Canyon CO2- ECBM/Sequestration Demonstration, San Juan Basin, New Mexico

Within the Southwest Regional Partnership on Carbon Sequestration (SWP), three demonstrations of geologic CO{sub 2} sequestration are being performed -- one in an oilfield (the SACROC Unit in the Permian basin of west Texas), one in a deep, unmineable coalbed (the Pump Canyon site in the San Juan basin of northern New Mexico), and one in a deep, saline reservoir (underlying the Aneth oilfield in the Paradox basin of southeast Utah). The Pump Canyon CO{sub 2}-enhanced coalbed methane (CO{sub 2}/ECBM) sequestration demonstration project plans to demonstrate the effectiveness of CO{sub 2} sequestration in deep, unmineable coal seams via a small-scale geologic sequestration project. The site is located in San Juan County, northern New Mexico, just within the limits of the high-permeability fairway of prolific coalbed methane production. The study area for the SWP project consists of 31 coalbed methane production wells located in a nine section area. CO{sub 2} was injected continuously for a year and different monitoring, verification and accounting (MVA) techniques were implemented to track the CO{sub 2} movement inside and outside the reservoir. Some of the MVA methods include continuous measurement of injection volumes, pressures and temperatures within the injection well, coalbed methane production rates, pressures and gas compositions collected at the offset production wells, and tracers in the injected CO{sub 2}. In addition, time-lapse vertical seismic profiling (VSP), surface tiltmeter arrays, a series of shallow monitoring wells with a regular fluid sampling program, surface measurements of soil composition, CO{sub 2} fluxes, and tracers were used to help in tracking the injected CO{sub 2}. Finally, a detailed reservoir model was constructed to help reproduce and understand the behavior of the reservoir under production and injection operation. This report summarizes the different phases of the project, from permitting through site closure, and gives the results of the different MVA techniques.

01 COAL, LIGNITE, AND PEAT↗

The 11 T dipole for HL-LHC: Status and plan

The upgrade of the Large Hadron Collider (LHC) collimation system includes additional collimators in the LHC lattice. The longitudinal space for these collimators will be created by replacing some of the LHC main dipoles with shorter but stronger dipoles compatible with the LHC lattice and main systems. The project plan comprises the construction of two cryoassemblies containing each of the two 11-T dipoles of 5.5-m length for possible installation on either side of interaction point 2 of LHC in the years 2018-2019 for ion operation, and the installation of two cryoassemblies on either side of interaction point 7 of LHC in the years 2023-2024 for proton operation. The development program conducted in conjunction between the Fermilab and CERN magnet groups is progressing well. The development activities carried out on the side of Fermilab were concluded in the middle of 2015 with the fabrication and test of a 1-m-long two-in-one model and those on the CERN side are ramping up with the construction of 2-m-long models and the preparation of the tooling for the fabrication of the first full-length prototype. The engineering design of the cryomagnet is well advanced, including the definition of the various interfaces, e.g., with the collimator, powering, protection, and vacuum systems. Several practice coils of 5.5-m length have been already fabricated. This paper describes the overall progress of the project, the final design of the cryomagnet, and the performance of the most recent models. Furthermore, the overall plan toward the fabrication of the series magnets for the two phases of the upgrade of the LHC collimation system is also presented.

43 PARTICLE ACCELERATORS↗

TCCSP Task 6 Risk Assessment Report

For this Risk Assessment Plan, TCCSP has conducted a site-based risk assessment that quantifies the risk of CO 2 and/or brine leakage as a result of CO 2 injection at TCCSP. The risk assessment covers project planning, construction, injection, post-injection periods and closure of TCCSP. Key technical and non-technical Project risks are identified as part of the Risk Workshop and include a thorough evaluation of related scenarios. Mitigation strategies for the identified risk scenarios are defined to develop a scientifically sound, and community acceptable CO 2 storage Project.

58 GEOSCIENCES↗

BUILDING 9201-5

Building 9201-5 (Alpha-5) functioned as a uranium enrichment facility during World War II and furthered the plant's mission of producing enriched uranium for the atomic bomb. As an Alpha processing facility associated with the Manhattan Project, Building 9201-5 aided in the development of wholly new technology and substantially advanced the field of nuclear science. In terms of facility planning, project engineers originally designed all Alpha and Beta buildings with "zero tolerance" for building movement or settling as the successful operation of the Y-12 Plant's calutrons depended on absolute structural stability. After World War II, the building was used in the plant’s COLEX process of the 1950s which separated the element Lithium-6 (Li-6). This was an important component in the manufacture of hydrogen bombs and the COLEX process is of notable significance in Cold War history. Building 9201-5 is eligible for inclusion in the National Register.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

The CHPRC Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.

300 FF-5 Operable Unit↗

Fuel Cell Powered Airport GSE (Ground Support Equipment) Deployment

The Fuel Cell Powered Airport GSE (Ground Support Equipment) Deployment Project was initiated in 2013 between Plug Power and U. S. Department of Energy Fuel Cell Technologies Office (DOE). The project plan included development and deployment of fifteen fuel cell powered units for two years at an airport to understand the feasibility and economic viability of hydrogen powered GSE. Project participants were the Department of Energy, Plug Power, and FedEx. The Memphis, TN airport is the hub of FedEx’s freight operation and was selected as the site for the demonstration portion of the project.

08 HYDROGEN↗

Microgrid Procurement Checklist Training: Part 1

Learn how to navigate the Microgrid Procurement Checklist, a key resource for federal agencies developing microgrid projects. This first session will provide a step-by-step walkthrough of the checklist, helping participants understand its structure, key tasks, and how to apply it in project planning.

25 ENERGY STORAGE↗

Sustainability on the urban scale: Proposal of a structure of indicators for the Spanish context

Some efforts to assess sustainability on the urban scale have been made and different tools for measuring the impact on and caused by cities have emerged. However, the sustainability concept varies from region to region, and indicators to measure it should be suitable for the context-specific conditions of the region under study. After doing a comprehensive review of the indicators included in 13 tools developed to assess urban sustainability of cities, this article proposes a new structure of indicators adapted to a Mediterranean city in Spain. The proposed structure is based on a two-level scheme that consists in 14 categories and 63 subcategories, which agglutinate urban sustainability indicators according to their purpose. This structure suggests a set of comprehensible qualitative and quantitative indicators that are easily applicable on neighbourhood or city scales. Given the similar features of Mediterranean countries in terms of environmental and socio-economic aspects, the proposed structure could be extrapolated to other countries with climatic and cultural similarities. Otherwise, the system is a useful tool in the decision-making process to help the different stakeholders involved in new urban developments and regeneration projects in existing neighbourhoods, such as developers, urban planners and public administrations. - Highlights: • Comprehensive review of 13 urban sustainability assessment tools • Proposal of a two-level structure to cluster urban sustainability indicators • Inclusion of sustainability criteria for urban planning projects and interventions.

54 ENVIRONMENTAL SCIENCES↗

Policy, Permit, Perform: Using City Benchmarking Data and Building Construction Permit History to Identify Energy Performance Improvements

The City of Portland (City) and Multnomah County 2015 Climate Action Plan targets a 40 percent reduction in carbon emissions below 1990 levels by 2030. To reach this goal, the plan includes a key objective to reduce the total energy use of existing buildings by 25 percent. Buildings are responsible for one-half of carbon emissions in Portland, Oregon, U.S., and improving their performance is critical to achieving the City’s climate goals. As part of its climate action planning, the City passed an ordinance on April 22, 2015, requiring commercial buildings 20,000 ft2 and larger to benchmark and disclose annual energy performance metrics through ENERGY STAR® Portfolio Manager® (ESPM), including greenhouse gas emissions, building energy use intensity (EUI) and ENERGY STAR scores. Twenty-five cities in the U.S. have adopted similar policies requiring energy benchmarking. These policies are generating a treasure trove of data about the drivers of building performance, but practitioners are only beginning to link benchmarking data to other datasets to produce actionable insight into improving building performance. In 2016, the City received a financial assistance award from the U.S. Department of Energy (DOE) through the Cities Leading through Energy Analysis and Planning project (Award Number DE-0007737). Portland’s project evaluated the application of the DOE Building Energy Asset Score Tool and rating system developed by Pacific Northwest National Laboratory (PNNL) to commercial buildings that report to the City. The City used building construction permit history to develop Asset Scores for a set of office buildings that reported energy performance for 2015 – the first year the City mandated energy benchmarking and reporting for commercial buildings 50,000 ft2 and larger. The primary project objective was to link energy benchmarking data and commercial building permit data to analyze commercial buildings systems that present the best, specific opportunities to improve energy performance. Integrating these datasets from two City departments, the Bureau of Development Services and the Bureau of Planning and Sustainability, could expand Portland’s use of analytics to inform climate policy decisions and strategic targeting of financial incentives for building owners and managers who are best positioned to improve the performance of their buildings. The project began with the commercial benchmarking data received for 340 commercial buildings that submitted calendar year 2015 energy reports. The City retained Research Into Action and Energy 350 (RIA team) to evaluate this self-reported benchmarking data. Based on a survey of 53 building managers, the RIA team found that most respondents used the City’s compliance tools, including a How-to Guide and Help Desk, and found access to utility data to be straightforward. However, almost one-third of the respondents encountered challenges when estimating the gross floor area (GFA), and some experienced confusion regarding the input of property use types and details into ESPM. Based on the RIA team’s recommendations, the City refined its How-to Guide, created online answers to frequently asked questions, and hosted office hour sessions to help building managers accurately characterize their building’s physical characteristics and operations in ESPM. Concurrently with the RIA team’s evaluation, the City worked with PNNL to estimate DOE Asset Score Preview (Preview) scores for 181 of the 340 commercial buildings that submitted ESPM reports to the City. Asset Score Tool is a web-based tool developed by PNNL for DOE to evaluate and rate the as-built energy efficiency of a building. Asset Score Tool’s full analysis capability runs a detailed energy model based on building geometry, age, envelope, lighting and mechanical systems using standard operating assumptions to give the building a score, similar to a miles per gallon rating for a car. Preview, a simplified deployment of the full Asset Score Tool, provides a preliminary score range using only seven data points, six of which are readily available in the ESPM benchmarking data. Analysis of the combined Preview scores and the operational ESPM scores identified buildings with a high potential for energy improvements through either retro-commissioning and retuning of existing operations or capital investments into building systems. The City contracted Whole Building Solutions (WBS) to mine building permit history and develop full Asset Scores for a subset of 26 office buildings that were eligible for both ENERGY STAR scores and Asset Scores. WBS researched permits and building plans to identify mechanical, lighting and envelope systems and other building characteristics necessary to complete Asset Scores. This historical data was recorded using the web-based Asset Score Tool, which evaluates the as designed energy efficiency of existing buildings. Much of this City information was available online after 2010; however, WBS had to search through microfiche files and the City’s database to obtain permit and plan history prior to 2010. Although building geometry, mechanical system type and basic envelope information was consistently identifiable, WBS found permit data gaps that prevented complete and accurate Asset Scores for most of the office buildings. If the City decides to develop Asset Scores based on building permit information in the future, WBS recommended requiring lighting plans, control diagrams and as-built drawings that reflect how the buildings are actually constructed. In addition, WBS recommended uploading plans and permits from microfiche storage into a more comprehensive, searchable database consistent with the City’s current online permit information. To identify the actual lighting types, WBS and City staff conducted site visits of all 26 office buildings. As part of managing the flow of ESPM and Asset Score data for the project, Earth Advantage, a sub-recipient of the Cities-LEAP award, created a DOE Standard Energy Efficiency Data (SEED) (USDOE 2018) instance for the City and used Asset Score’s Application Programming Interface (API) (Asset Score 2018) capabilities to develop two new features in the SEED Platform™: (1) automated Asset Score Preview ranges calculated based on benchmarking data and the City’s estimate of number of building floors; and (2) storage of full Asset Score information. Leveraging the construction permit history and site visit information for the 26 office buildings, The Cadmus Group (Cadmus) analyzed benchmarking data and Asset Score information to identify opportunities and drivers to improve performance. Correlation and regression analysis of the combined dataset was completed to determine whether building operations or specific systems – mechanical, lighting or envelope – present the best opportunities to improve energy performance. The central outcome of this project was Cadmus’ detailed analysis of the richer dataset that was created by combining the City of Portland’s commercial building permit activity and building-specific energy performance information based on metrics from ESPM and Asset Score Tool. Some of their findings collaborate with well-known facts, such as buildings with less efficient lighting systems are good targets for efficiency improvements through lighting upgrades. This analysis also helped identify that individual heating, ventilation, and air conditioning (HVAC) equipment efficiency does not necessarily correlate with building performance. However, overall HVAC system performance, as measured with the Total System Performance Ratio (TSPR) metric, is a better indicator of building performance (Goel et al. 2014). As a metric, TSPR considers whole system performance that includes equipment efficiency and system controls, such as resets for static pressure and chilled water setpoints, which can be more effective and financially feasible options for improving building performance. Given the high cost associated with envelope retrofits, opportunities to upgrade envelope insulation are likely to be limited. However, buildings with single-pane and non-thermal break windows are good candidates for window replacements, such as upgrading to double-pane windows with thermal breaks. This research project determined that developing Asset Scores based on site visits is preferable to mining City building permit data. In addition, the use of benchmarking data to develop Asset Score Preview Scores is recommended as a first step in engaging building managers to develop full Asset Scores. Asset Score Tool outputs can help building managers quickly identify opportunities for improvement and then work with the utility incentive administrator and energy service providers to develop their retrofit plan. Where full Asset Scores are available, analysis using a quadrant matrix with ENERGY STAR scores is recommended to identify buildings that present the best opportunities for operational-behavioral improvements versus ones with opportunities for upgrades to physical building systems. This workflow and the tools will help cities, utility incentive administrators, building portfolio managers and energy service providers develop energy programs and strategies for screening and analysis of buildings with the greatest energy savings potential. This report describes the project approach and research results to inform future coordination of ESPM and Asset Score data, including the use of benchmarking data to generate Preview scores. Given better awareness of energy performance, building managers can make more informed decisions to reduce energy consumption and carbon emissions. With cities, states and jurisdictions adopting benchmarking and auditing ordinances, there are substantial amounts of data submitted to cities that could be used to inform investments in energy efficiency.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Strategic health assessment for large scale industry development activities: An introduction

Attention to the determinants of health and health equity in impact assessment remains under-utilised at the project, Environmental Impact Assessment, level. Determinants focussed health impact assessment has developed at an upstream, policy level, but tends to assess draft proposals rather than form the basis of policies and plans. Project level health (risk) impact assessment tends to focus on a project by project basis, and generally eschews a broad model of health. One answer to this ‘health and impact assessment’ problem is to shift attention to the strategic level, in a similar manner to, and learning from, the development of Strategic Environmental Assessment and its theoretical and practical derivatives. In this article we explain the need for this shift both conceptually and practically by navigating the literature. Our analysis derives specifically from developing the Strategic Health Impact Assessment section of new international industry HIA guidance, coupled with work in and around health impact assessment and policy analysis for the past decade. We develop characteristics of conducting strategic health assessments for multiple industry development activities at the supra national, national or regional level. Our intended audience are public administrators, industry planners and financial sector investors. A particular focus is low and middle income countries, now seen by industry as emerging markets.

54 ENVIRONMENTAL SCIENCES↗

Systems engineering management plans.

The Systems Engineering Management Plan (SEMP) is a comprehensive and effective tool used to assist in the management of systems engineering efforts. It is intended to guide the work of all those involved in the project. The SEMP is comprised of three main sections: technical project planning and control, systems engineering process, and engineering specialty integration. The contents of each section must be tailored to the specific effort. A model outline and example SEMP are provided. The target audience is those who are familiar with the systems engineering approach and who have an interest in employing the SEMP as a tool for systems management. The goal of this document is to provide the reader with an appreciation for the use and importance of the SEMP, as well as provide a framework that can be used to create the management plan.

99 GENERAL AND MISCELLANEOUS↗

OES-IA Annex IV: Environmental Effects of Marine and Hydrokinetic Devices - Report from the Experts’ Workshop September 27th – 28th 2010 Clontarf Castle, Dublin Ireland

An experts' workshop was convened in Dublin Ireland September 27th – 28th 2010 in support of IEA Ocean Energy Systems Implementing Agreement Annex IV. PNNL was responsible for organizing the content of the workshop, overseeing the contractors (Irish Marine Institute) hosting the event, presenting material on Annex IV and materials applicable to the workshop intent. PNNL is also overseeing a contractor (Wave Energy Center/University of Plymouth – WEC/UP) in the collection and analysis of the Annex IV data. Fifty-eight experts from 8 countries attended the workshop by invitation, spending two days discussing the needs of Annex IV. Presentations by DOE (background on Annex IV), PNNL (process for developing Annex IV; presentation of the draft database for PNNL project, plans for incorporating Annex IV data), WEC/UP on the environmental effect matrix, and four MHK developers (two from the UK, one from Ireland and one from Sweden; each discussing their own projects and lessons learned for measuring and mitigating environmental effects, as well as interactions with consenting [permitting] processes) helped provide background. The workshop participants worked part of the time in the large group and most of the time in four smaller breakout groups. Participants engaged in the process and provided a wealth of examples of MHK environmental work, particularly in the European nations. They provided practical and actionable advice on the following: • Developing the Annex IV database, with specific uses and audiences • Strong consensus that we should collect detailed metadata on available data sets, rather than attempting to draw in copious datasets. The participants felt there would then be an opportunity to then ask for specific set of data as needed, with specific uses and ownership of the data specified. This is particularly important as many data collected, particularly in Europe but also in Canada, are proprietary; developers were not comfortable with the idea of handing over all their environmental effects data, but all said they would entertain the request if they specifics were clear. • The recommendation was to collect metadata via an online interactive form, taking no more than one hour to complete. • Although the idea of cases representing the “best practices” was recognized as useful, the participants pointed out that there are currently so few MHK projects in the water, that any and all projects were appropriate to highlight as “cases”. There was also discomfort at the implication that “best practices” implied “lesser practices”; this being unhelpful to a new and emerging industry. • Workshop participants were asked if they were willing to continue to engage in the Annex IV process; all expressed willingness. The workshop was successful in adequately addressing its objectives and through participation and interaction in the breakout sessions around the various topics. As a result of the workshop, many delegates are now better informed and have a greater understanding of the potential environmental effects of MHK devices on the marine environment. There is now a greater sense of understanding of the issues involved and consensus by those regulators, developers and scientists who attended the workshop. A strong network has also been built over the two days between European and US/Canadian technical experts in wave and tidal energy.

54 ENVIRONMENTAL SCIENCES↗

Bishop Paiute's Residential Solar Program Phase III

The project consisted of the design, installation, inspection, interconnection and monitoring of 40 grid-tied solar electric systems, totaling up to 108 kW rated capacity, on qualified existing low-income single-family homes located within the Bishop Paiute Reservation. The systems are to provide at least 30-75% savings in displaced electricity totaling 175,000 kWh/year. After the DOE grant contract was signed, the Tribal Employment Rights Ordinance (TERO) board voted to reduce the tribal tax to work on the reservation for these low-income projects from 4% to 1%. This generous reduction was applied back into the community solar project and two additional tribal homes were added for a new total of 40 grid-tied solar electric systems, totaling up to 113 kW rated capacity (two more than originally planned) projects. Additionally, each homeowner was educated on energy efficiency and how solar works and saves them money. The estimated 75% savings on monthly electric bills brings financial relief to tribal homeowners and makes a significant difference on the reservation; giving low-income families money to spend on other essential items, while reducing their carbon footprint in this remote tribal reservation. The GRID IE program and this tribal project had a training component for tribal members to get free hands-on job training on 8 of the 40 homes. Those tribal members that came out to train with GRID IE could then be eligible for the “train to hire” portion of the program, on the remaining 32 homes. Overall, the triple impact of the Bishop Paiute Tribe Residential Solar Program Phase III—affordable energy for low-income families, on-site clean energy production, and hands-on solar installation jobs for local workers—these all help build the Tribe’s energy, economic, environmental goals and offers local self-sufficiency while supporting energy independence to the neediest on the Reservation.

14 SOLAR ENERGY↗