Equipment Procurement and Final Design for the MARVEL High-Grade Heat Extraction System (HGHES)

This summer I worked on the design of a high-grade heat extraction system (HGHES) of the MARVEL Project. The MARVEL project at INL is a first-of-a-kind terrestrial microreactor to help provide a test platform to demonstrate the use of a microreactor to end customers and enable technology developers to test enabling microreactor technologies with a functional nuclear reactor. One of the project's main requirements is the reactors’ ability to deliver high-grade thermal power to end users, both for industrial and commercial use. The project required communication with multiple vendors for custom-made equipment, working with a high-temperature and high-pressure helium coolant system, and research of a Thermal Storage Unit (TSU).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SPC-70734 Rev 1 MARVEL Primary Coolant System (PCS) Fill and Eutectic NaK Procurement

This specification contains the requirements for the filling the Microreactor Applications Research Validation and Evaluation (MARVEL) reactor Primary Coolant System (PCS) with eutectic sodium-potassium (NaK). The subcontractor will design and fabricate a NaK filling system (referred to herein as the PCS Fill System), the requisite volume of high purity NaK, and perform filling operations in conjunction with the Contractor Operations. The MARVEL reactor system will be operated by the Contractor, and the PCS fill system will be operated by Subcontractor personnel.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Audit Report on "Work for Others Performed by the Department of Energy for the Department of Defense"

Pursuant to the Atomic Energy Act of 1954, as amended, and the Economy Act of 1932, the Department of Energy and its semi-autonomous National Nuclear Security Administration (NNSA) provide research and technical assistance to other Federal agencies on a reimbursable, full cost recovery basis through the Work for Others (WFO) program. For the vast majority of WFO technical projects, Department Federal officials furnish administrative project oversight while the actual detailed scientific or technical work is completed by the Department's 'management and operating' contractors. These contractors are awarded a special contract type specifically created under the Federal Acquisition Regulation to manage and operate Department sites and facilities, including sophisticated laboratories and technical centers, on a government-owned, contractor-operated basis. With annual expenditures exceeding $1 billion, the Department of Defense (DoD) is one of the Department's largest WFO customers. Work performed for DoD at the Department's national laboratories and other facilities includes highly technical research in areas such as nuclear weapons systems, counter-terrorism, and in-theater troop support. The National Defense Authorization Act for Fiscal Year (FY) 2009, required the Inspectors General of the DoD and the Department to review procurement methods to determine whether the Department complied with DoD procurement requirements and/or whether alternative procurement policies were in place. In response, we focused our review on projects performed by NNSA because it completes the vast majority (approximately $900 million in FY 2008) of the Department's work for DoD. As part of this effort, and, at the specific request of the DoD Office of Inspector General (DoD OIG), we identified the universe of WFO technical projects that received new funding in the fourth quarter of FY 2008 at NNSA sites. We independently reviewed a judgmental sample of 11 projects selected by the DoD OIG to meet the objectives of this audit. Our review revealed that NNSA managed DoD WFO technical projects in a manner consistent with requirements of the Atomic Energy Act of 1954, the Federal Acquisition Regulation, and the Department's implementing guidance, the Department of Energy Acquisition Regulation. Because of the very nature of the Department's management and operating contracting model, WFO projects may not be technically compliant with DoD procurement regulations in certain instances. We found that NNSA did not let new contracts or task orders for the DoD WFO technical projects we reviewed and instead managed them under its existing internal control process as part of its management and operating contract structure. In one instance, we noted that the Department had, at DoD's request, supplemented its control structure to incorporate specific DoD procurement requirements. Senior Department of Energy procurement officials acknowledged that neither the Department nor NNSA modified their existing prime contracts to incorporate specific defense procurement requirements because such modifications would be inappropriate, costly, and inefficient. In short, they informed us that the Department had developed and implemented a series of controls designed to monitor overall contractor performance, including WFO technical projects. Department and NNSA officials noted, however, that they were willing to incorporate DoD specific requirements into work orders should DoD request and fund such efforts. Additional details regarding management of WFO technical projects are discussed in the body of this report.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

SMEX-Lite Modular Solar Array Architecture

For the most part, Goddard solar arrays have been custom designs that are unique to each mission. The solar panel design has been frozen prior to issuing an RFP for their procurement. There has typically been 6-9 months between RFP release and contract award, followed by an additional 24 months for performance of the contract. For Small Explorer (SMEX) missions, with three years between mission definition and launch, this has been a significant problem. The SMEX solar panels have been sufficiently small that the contract performance period has been reduced to 12-15 months. The bulk of this time is used up in the final design definition and fabrication of flight solar cell assemblies. Even so, it has been virtually impossible to have the spacecraft design at a level of maturity sufficient to freeze the solar panel geometry and release the RFP in time to avoid schedule problems with integrating the solar panels to the spacecraft. With that in mind, the SMEX-Lite project team developed a modular architecture for the assembly of solar arrays to greatly reduce the cost and schedule associated with the development of a mission- specific solar array. In the modular architecture, solar cells are fabricated onto small substrate panels. This modular panel (approximately 8.5" x 17" in this case) becomes the building block for constructing solar arrays for multiple missions with varying power requirements and geometrical arrangements. The mechanical framework that holds these modules together as a solar array is the only mission-unique design, changing in size and shape as required for each mission. There are several advantages to this approach. First, the typical solar array development cycle requires a mission unique design, procurement, and qualification including a custom qualification panel. With the modular architecture, a single qualification of the SMEX-Lite modules and the associated mechanical framework in a typical configuration provided a qualification by similarity to multiple missions. It then becomes possible to procure solar array modules in advance of mission definition and respond quickly and inexpensively to a selected mission's unique requirements. The solar array modular architecture allows the procurement of solar array modules before the array geometry has been frozen. This reduces the effect of procurement lead-time on the mission integration and test flow by as much as 50%. Second, by spreading the non-recurring costs over multiple missions, the cost per unit area is also reduced. In the case of the SMEX-Lite procurement, this reduction was by about one third of the cost per unit area compared to previous SMEX mission-unique procurements. Third, the modular architecture greatly facilitates the infusion of new solar cell technologies into flight programs as these technologies become available. New solar cell technologies need only be fabricated onto a standard-sized module to be incorporated into the next available mission. The modular solar array can be flown in a mixed configuration with some new and some standard cell technologies. Since each module has its own wiring terminals, the array can be arranged as desired electrically with little impact to cost and schedule. The solar array modular architecture does impose some additional constraints on systems and subsystem engineers. First, they must work with discrete solar array modules rather than size the array to fit exactly within an available envelope. The array area is constrained to an integer multiple of the module area. Second, the modular design is optimized for space radiation and thermal environments not greatly different from a typical SMEX LEO environment. For example, a mission with a highly elliptical orbit (e.g., Polar, SMEX/FAST) would require thicker coverglasses to protect the solar cells from the more intense radiation environment.

Lyons, John↗

Load Forecasting in Electric Utility Integrated Resource Planning

Integrated resource planning (IRP) is a process used by many vertically-integrated U.S. electric utilities to determine least-cost/risk supply and demand-side resources that meet government policy objectives and future obligations to customers and, in many cases, shareholders. Forecasts of energy and peak demand are a critical component of the IRP process. There have been few, if any, quantitative studies of IRP long-run (planning horizons of two decades) load forecast performance and its relationship to resource planning and actual procurement decisions. In this paper, we evaluate load forecasting methods, assumptions, and outcomes for 12 Western U.S. utilities by examining and comparing plans filed in the early 2000s against recent plans, up to year 2014. We find a convergence in the methods and data sources used. We also find that forecasts in more recent IRPs generally took account of new information, but that there continued to be a systematic over-estimation of load growth rates during the period studied. We compare planned and procured resource expansion against customer load and year-to-year load growth rates, but do not find a direct relationship. Load sensitivities performed in resource plans do not appear to be related to later procurement strategies even in the presence of large forecast errors. These findings suggest that resource procurement decisions may be driven by other factors than customer load growth. Our results have important implications for the integrated resource planning process, namely that load forecast accuracy may not be as important for resource procurement as is generally believed, that load forecast sensitivities could be used to improve the procurement process, and that management of load uncertainty should be prioritized over more complex forecasting techniques.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The use of wholesale market purchases by Western U.S. electric utilities

Load Serving Entities (LSEs) can procure electricity from their owned generation or purchase it on bilateral or centrally organized markets. Electric utility procurement decisions have important implications for resource adequacy, which is gaining attention especially in the Western U.S. However, there is little or no research on trends of utility procurement practices, and the role that wholesale market transactions can have for resource adequacy and other applications. This paper leverages information from the U.S. Department of Energy’s Energy Information Administration, Berkeley Lab’s Resource Planning Portal, and structured interviews with regulatory and utility staff. We find that use of market transactions to meet electric energy needs has been increasing across U.S. LSEs. The reasons for this trend include a general stagnation in building owned resources, a preference towards contracting renewable energy resources to meet RPS targets, and the lower relative cost of wholesale market electricity. Among market transactions across different time scales, short-term transactions were prevalent in Western U.S. LSEs until the 2008 recession, and thereafter declined to about a quarter of total purchases. In contrast, long-term market transactions have become more prevalent and resource planning reports project the share of these transactions in the procurement mix may continue to increase. Results suggest resource adequacy obligations may drive preferences for asset ownership more than a profit incentive. We also recommend improving the planning to procurement connection by reflecting in planning assumptions the operational constraints of market transactions. These results provide insights on key issues in electric utility procurement that could improve overall market efficiency, respond to rapidly changing industry conditions, and identify practices that LSEs and regulators should consider incorporating into their long-term transmission and capacity planning processes.

24 POWER TRANSMISSION AND DISTRIBUTION↗