DOE OSTI2020
The Phase 1 Final Technical Report describes the results of the work completed during the “Advanced Modular Sub-Atmospheric Hybrid Heat Engine” project. A key part of the Phase 1 work was the completion of a thermodynamic cycle analysis for the MHHE at the selected module size. The hybrid heat engine has been developed as a modular unit (sized in the range of 500kW – 60MW) that can be used with modular coal or biomass gasifiers, with distributed power generation systems, with large power plants comprised of multiple generating units, and with natural gas compression stations. The MHHE will provide cleaner, more efficient, and lower cost generation with better load following capabilities than existing competing technologies with a singular generating source such as solar farm, gas turbine, or combustion engine. The drivers of the MHHE technology are: benefits of modular power generation (reduced equipment cost, construction cost and implementation time, connection ready on delivery, flexible scalability, serviceability), fuel flexibility, lowest cost power generation and reduced emissions.A logical progression of work and a clear path forward toward meeting the FOA goals and objectives have been established. Namely, a preliminary market analysis and primary fuel identification was completed first and then the modularity of the system was defined. The benefits of the proposed hybrid and modular heat engine were described when applied to modular coal gasifiers, distributed power generators, and larger power plants. Based on the market analysis, modularity, and chosen primary fuel, a conceptual design and layout of the hybrid heat engine was developed, analyzed, and characterized. The technology gaps already identified have been reviewed and expanded upon, and a test plan to address these gaps through bench scale testing in Phase 2 has been developed. Cost estimate methodology and considerations in support of a potential Phase 2 project have been described.